About this file

Amendment 2 - Proposal due date extended. Changes to multiple sections appendices and drawings.

View the file

Other files

File Type Posted
Am3_W912PL-14-R-0002.pdf PDF
J Alenel.pdf PDF
J A_HID.pdf PDF
Site_Visit_sign_in_sheet.pdf PDF
Am1_W912PL-14-R-0002.pdf PDF
LOGIC.pdf PDF
DISTECH.pdf PDF
SIMPLEX.pdf PDF
MONACO.pdf PDF
W912PL-14-R-0002_Appendix_H_part2.zip ZIP file
W912PL-14-R-0002_Vol_3_Appdx_N_thru_BB.pdf PDF
W912PL-14-R-0002_Vol_2_Appdx_G_thru_M.pdf PDF
W912PL-14-R-0002_Vol_1_Spec_Appdx_A_thru_F.pdf PDF
W912PL-14-R-0002_Appendix_H_part1.zip ZIP file
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 3

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

0002 Jan 10, 2014

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICIATION NO.

W912PL-14-R-0002

9B. DATED (SEE ITEM 11)

Nov 22, 2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY14 F-35 Squadron Operations Facility and - Aircraft Maintenance Unit (AMU)3, Luke Air Force Base, AZ.

1. This is Amendment No. 0002 to Solicitation No. W912PL-14-R-0002; 22 November 2013. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged. General Wage Decision Numbers have been updated on 1/3/2014 and incorporated in this Amendment:

AZ140032 (Building) and AZ140008 (Highway)

Proposal due date has been extended to 22 January 2014 by 2:00pst. Please replace SF-1442 Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

Amendment No. 0002

2. SOLICITATION, OFFER, AND AWARD, Standard Form 1442:

Block 11: Change “The Contractor shall begin performance within 10 calendar days and complete within 540 calendar days after receiving notice to proceed.” to “The Contractor shall begin performance within 10 calendar days and complete within 600 calendar days after receiving notice to proceed.”

Block 13A: Change the date for Receipt of Proposal from “15Jan14” to “22Jan14”.

Time remains unchanged.

3. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue.

All portions of the revised (or new) pages shall apply whether or not changes have been indicated.

Delete Insert

Table of Contents, Pages i to iv Table of Contents, Pages i to iv Volumes 1, 2, and 3 Volumes 1, 2, and 3 00010, Entire Section 00010, Entire Section 00800, Entire Section 00800, Entire Section 01 02 00, Entire Section 01 10 10, Entire Section 01 10 10, Entire Section 01 10 12, Entire Section 01 10 12, Entire Section

4. Appendices: The following appendices have been revised.

APPENDICES DESCRIPTION

Appendix S Revised “Exterior” room data sheet to remove payphone, charging station requirement.

Revised “Exterior” room data sheet to remove backflow preventer and exterior fire department connection. Revised to indicate New Fire Main to connect to suction side of fire pump.

Revised “Mechanical” room data sheet, Fire Protection section to indicate connection of underground to fire pump and backflow preventer installed on discharge side of pump.

Revised “Elevator” room data sheet to remove “Pull Stations” from the Fire Protection section.

Appendix T Revised required EAc1 points to 5 (20% energy cost savings).

Appendix X Revised Wall finish of Room 116

Appendix AA Clarified Room Names

5. DRAWING CHANGES: The following drawings shall be revised as stated below.

Bidders are requested to change their drawings for bidding purposes. Successful bidder drawings will be issued to the successful bidder.

CADD LATEST

DWG. NO. DATE DRAWING TITLE DESCRIPTION

A103 10/01/14 EXTERIOR BUILDING ELEVATIONS Changed board-formed concrete at stairwells to CMU

A104 10/01/14 EXTERIOR BUILDING ELEVATIONS Changed board-formed to CMU

A105 10/01/14 ROOM FINISH SCHEDULE Changed board-formed concrete at stairwells to CMU. Added typical

CMU pattern and rendering for stairwell walls.

A106 10/01/14 ROOM FINISH SCHEDULE Changed board-formed to CMU

A107 10/01/14 MATERIALS LEGEND Changed board-formed to CMU

////////LAST ITEM////////

F-35 Squadron Operations Facility and AMU 3 W912PL-14-R-0002 Luke Air Force Base, AZ i Amendment 1

TABLE OF CONTENTS

VOLUME 1

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

SF 1442 Solicitation, Offer and Award Am2

00010 PRICING SCHEDULE Am2

00100 INSTRUCTIONS TO BIDDERS Am1

00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS Am1

00120 PROPOSAL EVALUATION AND CONTRACT AWARD Am1

00600 REPRESENTATIONS & CERTIFICATIONS

00700 CONTRACT CLAUSES

00800 SPECIAL CONTRACT REQUIREMENTS Am2

00850a WAGE RATES – Building Am2 00850b WAGE RATES – Highway Am2

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 02 00 SOLE SOURCE JUSTIFICATION Am2

01 04 00 MECHANICAL ROOM LAYOUT AND COORDINATION

01 08 00 PERMITS

01 10 10 DESIGN REQUIREMENTS Am2

01 10 12 DESIGN AFTER AWARD Am2

01 20 00 INTERFACE WITH OTHER WORK

01 31 00 PROJECT MEETINGS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 LEED™ DOCUMENTATION

01 34 10 COLOR/FINISH SAMPLE BOARDS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 38 00 CONSTRUCTION PHOTOGRAPHS

F-35 Squadron Operations Facility and AMU 3 W912PL-14-R-0002 ii Amendment 1

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

VOLUME 1 (Cont’d)

01 43 00 AIRFIELD SAFETY (SPECIAL CONDIDERATIONS)

01 45 01 QUALITY CONTROL

01 45 02 QUALITY CONTROL SYSTEM (QCS)

01 51 00 UTILITIES

01 53 00 TEMPORARY FENCING

01 54 00 SECURITY

01 57 00 TRAFFIC CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 58 00 PROJECT IDENTIFICATION

01 58 50 STAGING AREAS

01 59 00 OFFICE FACILITY

01 62 35 RECYCLED / RECOVERED MATERIALS

01 72 80 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 82 00 FUNDAMENTAL COMMISSIONING REQUIREMENTS

01 82 01 ENHANCED COMMISSIONING REQUIREMENTS (BID OPTION)

APPENDIX A LUKE ARCHITECTURAL COMPATIBILITY GUIDE

APPENDIX B SELECTED CHAPTERS FROM THE SOUTHWESTERN DIVISION

ARCHITECTURAL AND ENGINEERING INSTRUCTIONS MANUAL

(AEIM):

CHAPTER II CIVIL

CHAPTER III ARCHITECTURAL

CHAPTER IV STRUCTURAL

CHAPTER V MECHANICAL

CHAPTER VI ELECTRICAL

CHAPTER VIII DRAWINGS

CHAPTER XII ENVIRONMENTAL

APPENDIX C SPECIFICATION GUIDANCE

F-35 Squadron Operations Facility and AMU 3 W912PL-14-R-0002 iii Amendment 1

VOLUME 1 (Cont’d)

APPENDIX D ATTACHMENT F, BUILDING INFORMATION MODELING (BIM)

REQUIREMENTS

APPENDIX E DESIGN ANALYSIS GUIDANCE

APPENDIX F STORMWATER PERMITTING GUIDANCE & LUKE BMPS

VOLUME 2

APPENDIX G ENVIRONMENTAL DATA

APPENDIX H GIS DATA & TOPOGRAPHIC SURVEY (electronic only)

APPENDIX I GEOPHYSICAL INFORMATION

APPENDIX J GEOTECHNICAL INFORMATION

APPENDIX K STRUCTURAL DRAFTING STANDARDS

APPENDIX L FIRE FLOW TEST RESULTS

APPENDIX M UTILITY COST INFORMATION

VOLUME 3

APPENDIX N LUKE AFB EMCS DOCUMENT

APPENDIX O LUKE COMMUNICATIONS 400’ GUIDELINES

APPENDIX P LUKE AFB COMMUNICATIONS DESIGN STANDARDS

APPENDIX Q CONCEPTUAL AESTHETIC CONSIDERATIONS

APPENDIX R CONCEPTUAL PROJECT DRAWINGS

APPENDIX S ROOM CRITERIA DATA SHEETS Am2

APPENDIX T LEED PROJECT CREDIT GUIDANCE Am2

APPENDIX U LEED OWNER’S PROJECT REQUIREMENTS

APPENDIX V ROOM SUMMARY MATRIX

APPENDIX W FURNITURE, FIXTURES AND EQUIPMENT (BID OPTION)

APPENDIX X ROOM FINISHES Am2

F-35 Squadron Operations Facility and AMU 3 W912PL-14-R-0002 iv Amendment 1

APPENDIX Y REFERENCED DIGITAL SID

VOLUME 3 (Cont’d)

APPENDIX Z FACILITY 925 EQUIPMENT SALVAGE LIST

APPENDIX AA AUDIO VISUAL SYSTEMS Am2

APPENDIX BB BLDG 927 ASBESTOS & LEAD REPORTS (BID OPTION)

-- End of Project Table of Contents --

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION CALL

A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

Amendment 0002

W912PL-14-R-0002

X

22 Nov 2013 1 OF 2

W912PL

U. S. Army Corps of Engineers Los Angeles District CESPL-CT-E, East Region Branch P. O. Box 532711 Los Angeles, CA 90053-2325

SEE BLOCK 7

Ms Sandra Oquita (213) 452-3249

FY14 F-35 Squadron Operations Facility and - Aircraft Maintenance Unit (AMU)3,Luke Air Force Base, AZ. Work will consist of Construction of a 3,963 SM (42,462 SF) combined Squad Ops and AMU work will include a sprinkler-equipped facility containing a steel-framed structure, concrete slab and foundation system, masonry block exterior walls, and standing seam metal roof. The facility will include both classified and unclassified areas in the Squadron Operations area and an Aircraft Maintenance Unit area. Work will include demolition of older existing buildings in the way of construction to provide a clear site for this MILCON project. The Operations portion of the facility contains the space for flight planning, secure air crew briefing and debriefing areas, and training and administration of the squadron. Space must be provided for the storage, care and issue of flight crew life support system equipment and personal space is required for changing into and out of flight clothing. Flightline maintenance portion will provide adequate area for maintenance, a tool crib with mezzanine, equipment issue area classified vault storage area, equipment and administrative spaces required to support the aircraft and the mission of the particular squadron.

THIS PROJECT IS A UNRESTRICTED PROCUREMENT WITH HUBZONE PRICE EVALUATION PREFERENCE.

THE ESTIMATED COST RANGE OF THIS PROCUREMENT IS BETWEEN 10-25 MILLION

10 *See 00800

X X See Section 00800 x 10

Sec 00110 2:00 p.m

January 22, 2014

X

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and

(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

Amendment 0002

DUNS NO.: TAX ID NO.:

CAGE CODE NO.:

( ) - ; FAX ( ) -

SEE PRICING SCHEDULE, SECTION 00010

00010-1 of 7

Section 00010

PRICING SCHEDULE

THE CONTRACTOR SHALL COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN

540600 CALENDAR DAYS AFTER THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED.

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC.

NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND

CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

“NO FAST TRACKING ALLOWED”

Item Unit No. Description Quantity Unit Price Amount

0001 FY14 F-35 Squadron Operations /

Aircraft Maintenance Unit 3 to 5' Outside the Building, Complete

1 L.S. **** $

0002 Site Work and Utilities Outside the 5' Building Line, Complete

0003 LEED Silver Certification Including Fundamental Commissioning, Complete

TOTAL AMOUNT BASE ITEMS NO.’S. 0001 THRU 0003: $

0004 OPTIONAL ITEM 1. Demolition of

Building 927, Complete

0005 OPTIONAL ITEM 2. South Parking Lot Area, Complete

0006 OPTIONAL ITEM 3. Furniture, Fixtures and Equipment (FF&E)Audio-Visual Equipment, 1 L.S. **** $600,000

00010-2 of 7

SECTION 00010 – PRICING SCHEDULE (Cont’d)

Item Unit No. Description Quantity Unit Price Amount

0007 OPTIONAL ITEM 4. Enhanced

Commissioning, Complete (See Note 24)

1 L.S.

0008 OPTIONAL ITEM 5. Additional 70kw Photovoltaic Array, TOTAL AMOUNT OPTIONAL ITEMS NO.’S. 0004 THRU 0008: $

TOTAL AMOUNT BASE ITEMS AND OPTIONAL ITEMS: $

OFFEROR NOTES

PLEASE NOTE: "The Offeror shall acknowledge that it understands the contract requirements for sustainable construction and that the final project will achieve a minimum LEED Silver certification rating prior to project closeout.

If the offeror proposes a higher LEED rating than silver, the proposal shall describe whether or not it involves additional costs and clearly indicate if such costs would detract from other factors herein, such as functionality, quality of materials, systems, and site work, etc."

In accordance with the National Defense Appropriations Act of 2012 Section 2830, the Government will not compensate the contractor for any expense expended with the express intent to obtain LEED certification above the Silver level. It is recognized that competitive best value proposal details and requirements cited elsewhere in this document and supporting documents may provide for features which allow for a certification higher than Silver to be obtained. Whether to achieve a future marketing advantage or for other purposes, a contractor may obtain LEED Gold or Platinum certification provided that achieving such certification imposes no additional cost on the Government. The Government’s evaluation of contractor proposals will not consider any offeror’s statement of intent to achieve or otherwise provide a certification higher than Silver.

00010-3 of 7

OFFEROR NOTES (Cont’d)

1. EVALUATION: The Government intends to issue a contract resulting from the Request for Proposal (RFP) to the responsible Offeror whose proposal represents the Best Value to the Government by using the Trade-Off procedure as described in Sections 00110 and 00120.

2. Award of all Base Bid and Options Items will be made to one offeror.

Prices must be submitted on all individual items of the Price Schedule.

Offeror must propose on all items. Failure to do so may cause the proposal to be determined Not Acceptable.

3. Performance Period: The Offeror shall complete and propose on all Base

Bid and Options items in the Price Schedule to correspond with the completion time in calendar days after receipt of Notice To Proceed (NTP) as specified in Section 00800, Special Contract Requirements, Clause 52.211-10, Commencement, Prosecution and Completion of Work.

4. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offered amount.

5. If a modification to a price is submitted which provides for a lump sum adjustment to the total amount, the application of the lump sum adjustment to each item in the Price Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Price Schedule.

6. The Offeror shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Price Schedule. The Government will review the submitted Price Schedule for any unbalancing of the items. Any submitted Price Schedule determined to be unbalanced may cause the bidder to be ineligible for contract award.

7. The Lump Sum (L.S.) line items are not “estimated quantity” line items and therefore are not subject to the Variation in Quantity contract clause.

8. For the purpose of initial evaluation of offers, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the offeror:

a. Obviously misplaced decimal points will be corrected;

b. In case of discrepancy between the unit price and the extended price, the unit price will govern;

c. Apparent errors in extensions of unit prices will be corrected;

d. Apparent errors in addition of lump sum and extended prices will be corrected.

00010-4 of 7

9. The Contract Clause 52.232-27, "Prompt Payment for Construction Contracts" requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.

10. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment.

The Contractors attention is directed to Contract Clause No. 52.232-33 "Mandatory Information for Electronic Funds Transfer" located in Section 00800.

11. PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of

Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442 Back, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 20th day of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre-Construction Conference.

12. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, Contracting Division within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.

13. Amounts and prices shall be indicated in either words or figures, NOT BOTH.

14. Offeror is cautioned to check Price Schedule carefully prior to submission. If the Price Schedule contains unit prices, they should be round off to the second decimal point only NOT EXTENDED FURTHER.

15. The Offeror shall furnish all design and engineering effort, plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.

16. The successful offeror grants the options listed in the Price Schedule to the Government and agrees that the options may be exercised any time up to 120 calendar days after NOTICE to PROCEED. No additional time for contract completion will be allowed when an option item is exercised.

The given contract completion time was formulated to include time necessary to perform all option work. The time stated for completion shall include final clean-up of the premises. Refer to Section 00800, Contract Clause No. FAR 52.211-10, “Commencement, Prosecution and Completion of Work.”

17. EVALUATION OF OPTIONS: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Please see FAR Clause 52.217-5, Entitled, “Evaluation of Options (Jul 1990), Section 00800.

00010-5 of 7

18. The process permits trade-off between price and technical (non-cost) factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative assessment in proposals against all source selection criteria in the solicitation

19. Contractor is required to fill in CAGE CODE and DUNS NUMBER (Reference

Section 00700, entitled System Acquisition Management (SAM) in Block No 15 on Standard Form 1442, Name and Address Block (Cage Code under Cage and DUNS No. under Duns respectively).

20. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.0

21. CONTRACTOR PERFORMANCE EVALUATIONS. In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $650,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.

22. PLEASE NOTE: PROSPECTIVE OFFERORS SHOULD SUBMIT CONTRACTING AND

TECHNICAL INQUIRIES AND QUESTIONS RELATING TO PROPOSAL PROCEDURES ARE TO

BE SUBMITTED VIA BIDDER INQUIRY IN PROJNET AT WWW.PROJNET.ORG.PROJNET

REFER TO SECTION 00100, CLAUSE NO. 52.0000-4010, ENTITLED, “INQUIRIES”.

23. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

http://www.cpars.navy.mil/ http://www.projnet.org.projnet/

00010-6 of 7

24. These additional commissioning requirements are in addition to

Fundamental Commissioning requirements and include the following:

1) Review contractor submittals applicable to systems being commissioned for compliance with the Owners Project Requirements and Basis of Design.

This review shall be concurrent with Government or A-E reviews and submitted to the design team and the Owner.

2) Develop a Systems Manual that provides future operating staff information to understand and optimally operate the commissioned systems.

3) Verify that the requirements for training operating personnel and building occupants are completed.

4) Review building operation within 10 months after substantial completion with O&M staff and occupants. Include a plan for resolution of outstanding Commissioning related issues.

25. PLEASE NOTE: ALL PROSPECTIVE OFFERORS MUST BE REGISTERED IN ORCA

https://orca.bpn.gov AND SAM www.sam.gov https://orca.bpn.gov/

00010-7 of 7

CERTIFICATE OF OFFEROR’S PRINCIPAL

(1) IF THE OFFEROR IS PARTNERSHIP OR JOINT VENTURE, LIST FULL NAME OF ALL

PARTNERS/ JOINT VENTURERS (Add addendum as necessary):

(Company Name) (Signature) (Title)

(2) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE

COMPLETED:

CERTIFICATION AS TO CORPORATE PRINCIPAL

I, ______________________________, certify that I am the Secretary of the corporation named as principal in the within SF 1442; that ________________________________, who signed the SF 1442 at Block 20B on behalf of the principal, was the _________________________________of the corporation; that I know the individual’s signature and that his/her signature is genuine; and that said Offer was duly signed, sealed and attested for on behalf of said corporation by authority of its governing body.

CORPORATE PRINCIPAL

CORPORATE SEAL

SECRETARY

(3) IF THE OFFEROR IS A LIMITED LIABILITY COMPANY/PARTNERSHIP, LIST FULL NAME OF

ALL MANAGERS BELOW (Add addendum as necessary). SIGNATURES BY ALL MANAGERS HERE

SIGNIFY THAT THAT THE INDIVIDUAL WHO SIGNED THE OFFER IN BLOCK 20B OF THE

SF 1442 HAS THE AUTHORITY TO BIND THE LIMITED LIABILITY COMPANY/PARTNERSHIP.

(Officer’s Name) (Signature) (Title)

(Officer’s Name) (Signature) (Title)

(Officer’s Name) (Signature) (Title)

00800-1 of 11

Section 00800 - Special Contract Requirements

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

52.211-13 TIME EXTENSIONS (SEP 2000)

252.227-7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)

252.227-7023 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT. (MAR 1979) 2

252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)

252.236-7005 AIRFIELD SAFETY PRECAUTIONS. (DEC 1991)

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

ER 415-1-15 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89)

PARTNERING

ACCURALS

52.236-5000 DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE (AUG 1997)

52.236-5001 PERSONNNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS (MAY 2006)

52.236-5002 GOVERNMENT-FURNISHED SPECIFICATIONS, DRAWINGS, SURVEYS, AND SPECIFICATIONS

IN THE REQUEST FOR PROPOSAL (JUL 2002)

52.236-5003 GOVERNMENT-FURNISHED SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2003)

52.236-5004 RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN (MAY 2002)

52.236-5005. WARRANTY OF DESIGN (MAY 2002)

52.236-5006 DEVIATING FROM THE ACCEPTED DESIGN (JUN 2002)

52.236-5007 CONTRACTOR’S ROLE DURING DESIGN PROCESS (JUN 1998)

52.236-5008 VALUE ENGINEERING AFTER AWARD (JUN 1999)

52.236-5010 GOVERNMENT RE-USE OF DESIGN (MAY 2006)

SEQUENCE OF DESIGN-CONSTRUCTION (AUG 1997)

RECOMMENDED INSURANCE COVERAGE

DESIGN CONFERENCES

00800-2 of 11

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work (including all awarded options) ready for use not later than 540 600 calendar days after receipt of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,129.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.211-13 TIME EXTENSIONS (SEP 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

252.227-7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)

The Government shall have unlimited rights, in all drawings, designs, specifications, notes and other works developed in the performance of this contract, including the right to use same on any other Government design or construction without additional compensation to the Contractor. The Contractor hereby grants to the Government a paid-up license throughout the world to all such works to which he may assert or establish any claim under design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish the original or copies of all such works on the request of the Contracting Officer.

252.227-7023 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT. (MAR

1979)

All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was

00800-3 of 11 prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish all retained works on the request of the Contracting Officer. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all works beyond such period.

252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)

(a) The Contractor shall furnish a price breakdown, itemized as required and within the time specified by the Contracting Officer, with any proposal for a contract modification.

(b) The price breakdown --

(1) Must include sufficient detail to permit an analysis of profit, and of all costs for --

(i) Material;

(ii) Labor;

(iii) Equipment;

(iv) Subcontracts; and

(v) Overhead; and

(2) Must cover all work involved in the modification, whether the work was deleted, added, or changed.

(c) The Contractor shall provide similar price breakdowns to support any amounts claimed for subcontracts.

(d) The Contractor's proposal shall include a justification for any time extension proposed.

252.236-7005 AIRFIELD SAFETY PRECAUTIONS. (DEC 1991)

(a) Definitions. As used in this clause --

(1) "Landing areas means" --

(i) The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 2,000 feet (1,000 feet on each side of the runway centerline);

(ii) The "clear zone" beyond the ends of each runway, i.e., the extension of the primary surface for a distance of 1,000 feet beyond each end of each runway;

(iii) All taxiways, plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway, e.g., a 75-foot-wide taxiway would have a combined width of taxiway and lateral clearance zones of 425 feet); and

(iv) All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.

00800-4 of 11

(2) "Safety precaution" areas means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance, or the transitional surface.

(i) "The approach-departure clearance surface" is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended.

(A) The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway. It continues upward at a slope of 50:1 (1 foot vertically for each 50 feet horizontally) to an elevation of 500 feet above the established airfield elevation. At that point the plane becomes horizontal, continuing at that same uniform elevation to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there.

(B) The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone. It then flares uniformly, reaching the maximum width of 16,000 feet at the end.

(ii) The "approach-departure clearance zone" is the ground area under the approach-departure clearance surface.

(iii) The "transitional surface" is a sideways extension of all primary surfaces, clear zones, and approach-departure clearance surfaces along inclined planes.

(A) The inclined plane in each case begins at the edge of the surface.

(B) The slope of the incline plane is 7:1 (1 foot vertically for each 7 feet horizontally). It continues to the point of intersection with the --

(1) Inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation); or

(2) Outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.

(iv) The "transitional zone" is the ground area under the transitional surface. (It adjoins the primary surface, clear zone, and approach-departure clearance zone.)

(b) General. (1) The Contractor shall comply with the requirements of this clause while --

(i) Operating all ground equipment (mobile or stationary);

(ii) Placing all materials; and

(iii) Performing all work, upon and around all airfields.

(2) The requirements of this clause are in addition to any other safety requirements of this contract.

(c) The Contractor shall -

(1) Report to the Contracting Officer before initiating any work;

(2) Notify the Contracting Officer of proposed changes to locations and operations;

(3) Not permit either its equipment or personnel to use any runway for purposes other than aircraft operation without permission of the Contracting Officer, unless the runway is -

(i) Closed by order of the Contracting Officer; and

00800-5 of 11

(ii) Marked as provided in paragraph (d)(2) of this clause;

(4) Keep all paved surfaces, such as runways, taxiways, and hardstands, clean at all times and, specifically, free from small stones which might damage aircraft propellers or jet aircraft;

(5) Operate mobile equipment according to the safety provisions of this clause, while actually performing work on the airfield. At all other times, the Contractor shall remove all mobile equipment to locations -

(i) Approved by the Contracting Officer;

(ii) At a distance of at least 750 feet from the runway centerline, plus any additional distance; and

(iii) Necessary to ensure compliance with the other provisions of this clause; and

(6) Not open a trench unless material is on hand and ready for placing in the trench. As soon as practicable after material has been placed and work approved, the Contractor shall backfill and compact trenches as required by the contract. Meanwhile, all hazardous conditions shall be marked and lighted in accordance with the other provisions of this clause.

(d) Landing areas. The Contractor shall -

(1) Place nothing upon the landing areas without the authorization of the Contracting Officer;

(2) Outline those landing areas hazardous to aircraft, using (unless otherwise authorized by the Contracting Officer) red flags by day, and electric, battery-operated low-intensity red flasher lights by night;

(3) Obtain, at an airfield where flying is controlled, additional permission from the control tower operator every time before entering any landing area, unless the landing area is marked as hazardous in accordance with paragraph (d)(2) of this clause;

(4) Identify all vehicles it operates in landing areas by means of a flag on a staff attached to, and flying above, the vehicle. The flag shall be three feet square, and consist of a checkered pattern of international orange and white squares of 1 foot on each side (except that the flag may vary up to ten percent from each of these dimensions);

(5) Mark all other equipment and materials in the landing areas, using the same marking devices as in paragraph (d)(2) of this clause; and

(6) Perform work so as to leave that portion of the landing area which is available to aircraft free from hazards, holes, piles of material, and projecting shoulders that might damage an airplane tire.

(e) Safety precaution areas. The Contractor shall -

(1) Place nothing upon the safety precaution areas without authorization of the Contracting Officer;

(2) Mark all equipment and materials in safety precaution areas, using (unless otherwise authorized by the Contracting Officer) red flags by day, and electric, battery-operated, low-intensity red flasher lights by night; and

(3) Provide all objects placed in safety precaution areas with a red light or red lantern at night, if the objects project above the approach-departure clearance surface or above the transitional surface.

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --

00800-6 of 11

(1) Furnishing all plant, labor, equipment, appliances, and materials; and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.

ER 415-1-15 TIME EXTENSION FOR

ER 415-1-15 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89)

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Default: Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

5 3 2 1 1 0 2 2 1 1 2 3

Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work.

Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled "Default (Fixed Price Construction)".

(End of Clause)

PARTNERING

LEVEL A PARTNERING: To most effectively accomplish this contract, the GOVERNMENT requires the formation of a cohesive partnership with the CONTRACTOR and its subcontractors. Key Government personnel, including the Using Agency who will occupy the facility, Base Civil Engineering, AFCEE and US Army Corps of Engineers shall be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management, must participate. The partnership will draw on the strength of each organization in an effort to achieve a quality project done right the first time, within budget, on schedule, and without any safety mishaps. The initial session shall be one-day minimum and the follow-on sessions, held at a minimum of once every three months or as agreed to by the partners, shall be a

00800-7 of 11 half-day minimum. The initial partnering session may be held away from the project site at a location acceptable to the CONTRACTOR and to the GOVERNMENT; the follow-on sessions can be held at locations agreed to by the partners. The Contractor shall provide all costs associated with the partnering effort including facilitator, meeting room, materials and other incidental items. Before the partnering session, the Contractor shall coordinate with the facilitator to ensure that all required items (audio-visual equipment, two easels, flipchart paper, colored markers, note pads, pens/pencils, colored flash cards, etc.)

are readily available at the partnering session. The CONTRACTOR shall copy all necessary documents for distribution to all attendees. The facilitator must be acceptable to both the CONTRACTOR and the GOVERNMENT. The participants shall bear their own costs for meals, lodging and transportation associated with partnering.

ACCURALS

ACCRUALS: In accordance with USACE Engineer Financial Regulation (ER) 37-1-30 and other applicable Federal and DOD financial accounting standards, the contractor is required to assist government personnel with providing reasonably accurate accrual estimates. The accrual is from the thru date of the period of performance (Eng Form 93, block 9) to the end for the month of the value of goods and/or services rendered/expected to be rendered to the Government pursuant to this contract. This is for each calendar month during which goods and services are delivered. Standard forms with instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before six (6) business days prior to each calendar month-end

THE NEXT PAGES CONTAIN THE SEPCIAL CONTRACT REQIREMENTS CLAUSES APPLICABLE TO FIXED

PRICE DESIGN-BUILD CONSTRUCTION CONTRACTS/TASK ORDERS.

52.236-5000 DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE (AUG 1997)

(a) The contract includes the standard contract clauses and schedules current at the time of contract award. It entails (1) the solicitation in its entirety, including all drawings, cuts, and illustrations, and any amendments, and

(2) the successful offeror’s accepted proposal. The contract constitutes and defines the entire agreement between the Contractor and the Government. No documentation shall be omitted which in any way bears upon the terms of that agreement.

(b) In the event of conflict or inconsistency between any of the provisions of this contract, precedence shall be given in the following order:

(1) Betterments: Any portions of the accepted proposal which both conform to and exceed the provisions of the solicitation.

(2) The provisions of the solicitation. (See also FAR 52.236-21, Specifications and Drawings for Construction)

(3) All other provisions of the accepted proposal.

(4) Any design products including, but not limited to, plans, specifications, engineering studies and analyses, shop drawings, equipment installation drawings, etc. These are "deliverables" under the contract and are not part of the contract itself. Design products must conform with all provisions of the contract, in the order of precedence herein.

00800-8 of 11

52.236-5001 PERSONNNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS

(MAY 2006)

In connection with this contract, any in-house personnel, subcontractors, and outside associates or consultants will be limited to individuals or firms that were specifically identified in the Contractor's accepted proposal. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.

(End of clause)

52.236-5002 GOVERNMENT-FURNISHED SPECIFICATIONS, DRAWINGS, SURVEYS, AND

SPECIFICATIONS IN THE REQUEST FOR PROPOSAL (JUL 2002)

This is to clarify DFARS 252.236-7001, Contract Drawings and Specifications, refers to any Government-furnished design or design criteria included in the Request for Proposal (RFP).

(End of Clause)

52.236-5003 GOVERNMENT-FURNISHED SPECIFICATIONS AND DRAWINGS FOR

CONSTRUCTION (JUL 2003)

This is to clarify FAR 52.236-21, Specifications and Drawings for Construction, refers to any specifications and drawings furnished in the Request for Proposal (RFP). The term "specifications" refers to the design criteria or scope of work, in addition to any attached specifications.

(End of clause)

52.236-5004 RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN (MAY 2002)