Amendment 3 - specification section changes including Bid Schedule Special Clauses and 5 technical sections.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0003 Aug 2, 2013
USACE, Los Angeles District Contracting Division, West Region branch 915 Wilshire Bl,14th Floor P.O. Box 532711 Los Angeles, CA 90053-2325
W912PL-13-B-0004
Jul 14, 2013
Lower Santa Ana River Channel reach 9 - Phase 3, (Gypsum Canyon Road to Coal Canyon Road), Orange County, California
Section 01 10 01 paragraph 1.3.1 - Contractor's License was deleted.
See SF-30 Continuation sheet for other changes to the plans & specifications.
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004 Gypsum Canyon Road to Coal Canyon Road Orange County, CA
SF-30 Continuation – page 2 Amendment 3
SF 30 Continuation – Amendment 3
Specification:
Replace the following sections:
Table of Contents 00010 Bid Schedule 00800 Special Clauses
01 10 01 GENERAL REQUIREMENTS
01 22 00 MEASUREMENT AND PAYMENT
01 57 20 ENVIRONMENTAL PROTECTION
31 23 16 EXCAVATION
32 21 00 INSTRUMENTATION
Plans:
Replace the following Drawings:
Sheet Drawing Name
G02 INDEX TO CONTRACT DRAWINGS & ABBREVIATIONS
G10 DIVISION OF WORK BETWEEN SARI CONTRACTOR
AND SAR PHASE 3 CONTRACTOR (OPTION ITEM) (1)
C01 PLAN AND PROFILE (1)
C02 PLAN AND PROFILE (2)
C03 OUTLET STRUCTURE FOR EX. 18” CMP (STA.1372+20+/-)
C04 OUTLET STRUCTURE FOR EX. 60” RCP (STA.1375+26.5+/-)
C05 OUTLET STRUCTURE FOR EX. 60” RCP (STA.1380+04+/-)
C06 CROSS SECTIONS (1)
C07 CROSS SECTIONS (2)
C08 CROSS SECTIONS (3)
C09 TYPICAL SECTIONS AND DETAILS
C22 SOUND WALL DETAILS
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
TOC - 1
Amendment 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONTRACT CONDITIONS
SF-1442 SOLICITATION, OFFER AND AWARD
00010 BID SCHEDULE Am1 Am3 00100 INSTRUCTIONS TO BIDDERS Am2
00600 REPRESENTATIONS AND CERTIFICATIONS
00700 CONTRACT CLAUSES Am2 00800 SPECIAL CLAUSES Am2 Am3 00850 WAGE RATES Am1
DIVISION 01 – GENERAL REQUIREMENTS
01 10 01 GENERAL REQUIREMENTS Am1 Am3 01 22 00 MEASUREMENT AND PAYMENT Am1 Am3
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00a SUBMITTAL REGISTER
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 CONTRACTOR QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 57 20 ENVIRONMENTAL PROTECTION Am3
01 57 23.00 10 STORM WATER POLLUTION PREVENTION MEASURES
01 57 30 DIVERSION AND CONTROL OF WATER
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 – CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 37 28 SOIL CEMENT
DIVISION 05 - METALS
05 50 13 METALWORK FABRICATION
DIVISION 31 - EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING Am1
31 23 13 FILLS AND SUBGRADE PREPARATION
31 23 16 EXCAVATION Am3
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 17 24.00 10 PAVEMENT MARKINGS
32 21 00 INSTRUMENTATION Am3
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
TOC - 2
Amendment 1
32 92 19 HYDROSEEDING Am1
32 93 00 EXTERIOR PLANTING (SANTA ANA RIVER)
DIVISION 33 – UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
33 31 19 STONE PROTECTION
APPENDIX Am1
Geotechnical Appendix of Design Documentation Report, Lower Santa Ana River Channel Reach 9 – Phase 3, Orange County, California, dated November 23, 2011 (revised August 28, 2012).
-- End of Project Table of Contents –
Lower Santa Ana River Channel, Reach 9 - Phase 3
Orange County, CA
W912PL-13-B-0004
00010 - 1 Amendment 3
CERTIFICATE OF CORPORATE PRINCIPAL
1) IF THE OFFEROR IS A JOINT VENTURE, COMPLETE THE FOLLOWING:
(Company Name) (Signature) (Title)
2) IF THE OFFEROR IS PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS:
3) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE COMPLETED:
CERTIFICATION AS TO CORPORATE PRINCIPAL
I, , certify that I am the Secretary of the corporation named as principal in the within contract; that , who signed the said contract on behalf of the principal, was the of the corporation; that I know his signature and that his signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
CORPORATE PRINCIPAL
CORPORATE SEAL
SECRETARY
Orange County, CA
00010 - 2 Amendment 3
PRICE SCHEDULE
Estimated
Item Description Quantity Unit Price Amount
BASE BID
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB LS __________
0002 DIVERSION OF WATER 1 JOB LS __________
0003 CONTROL OF WATER 1 JOB LS __________
0004 EROSION CONTROL 1 JOB LS __________
0005 TRAFFIC CONTROL 1 JOB LS __________
0006 CLEARING 26.2 AC _______ __________
0007 GRUBBING 2.5 AC _______ __________
0008 EXCAVATION 40,550 CY _______ __________
0009 BACKFILL - EXISTING SOIL
CEMENT EMBANKMENT 14,400 CY _______ __________
0010 BACKFILL - ON SITE 22,300 CY _______ __________
0011 BACKFILL - BORROW SITE 16,350 CY _______ __________
0012 SOIL CEMENT 17,250 CY _______ __________
0013 OUTLET STRUCTURE - 18" RCP 1 EA _______ __________
0014 OUTLET STRUCTURE - 60" RCP 2 EA _______ __________
0015 VEHICLE GATE 1 EA _______ __________
0016 AS-BUILT DRAWINGS 1 JOB LS __________
0017 HYDROSEEDING AND EXTERIOR
PLANTS- RIPARIAN AREA 8 AC _______ __________
0018 TEMPORARY IRRIGATION SYSTEM -
RIPARIAN AREA 8 AC _______ __________
0019 LANDSCAPE MAINTENANCE -
RIPARIAN AREA 8 AC _______ __________
0020 GUARD CABLE FENCE 1,460 LF _______ __________
0021 INCLINOMETERS 1 JOB LS __________
0022 CALTRANS POST-CONSTRUCTION
DEFLECTION STUDY 1 JOB LS $ 12,000.00
Orange County, CA
00010 - 3 Amendment 3
0023 SOUND WALL 5,470 LF _______ __________
TOTAL ESTIMATED BASE $__________________
OPTION ITEMS
0024 CALTRANS PRE-CONSTRUCTION
DEFLECTION STUDY (OPTION) 1 JOB LS $12,000.00
0025 REMOVE TEMPORARY BIKE PATH (OPTION) 7,350 LF _______ __________
0026 PERMANENT BIKE PATH (OPTION) 6,665 LF _______ __________
0027 HYDROSEEDING AND EXTERIOR
PLANTS - UPLAND AREA (OPTION) 9 AC _______ __________
0028 TEMPORARY IRRIGATION SYSTEM -
UPLAND AREA (OPTION) 9 AC _______ __________
0029 LANDSCAPE MAINTENANCE -
UPLAND AREA (OPTION) 9 AC _______ __________
0030 DECOMPOSED GRANITE (OPTION) 5,810 SY _______ __________
0031 COAL CANYON ON/OFF RAMPS
RESURFACING (OPTION) 1,600 LF _______ __________
0032 DIVERSION STRUCTURE 1B (OPTION) 1 JOB LS __________
TOTAL ESTIMATED OPTION ITEMS $____________________
TOTAL ESTIMATED, BASE PLUS OPTION ITEMS $____________________
Abbreviations:
AC = Acre CY = Cubic Yard EA = Each LF = Linear Foot LS = Lump Sum SY = Square Yard TON = 2000 pounds
Orange County, CA
00010 - 4 Amendment 3
BIDDERS NOTES
1. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
2. If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated amount, the application of the lump sum adjustment to each unit price in the Price Schedule must be stated.
If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Price Schedule.
3. Prices must be submitted on all individual items of the Price Schedule, otherwise the bid will be considered non-responsive and will be rejected.
4. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between the unit price and the extended price, the unit price will govern;
c. Apparent errors in extensions of unit prices will be corrected;
d. Apparent errors in addition of lump sum and extended prices will be corrected.
5. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on the basis of unit prices the totals arrived at by the resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
6. The lump sum “LS” line items in the Price Schedule are not “Estimated Quantity” line items and are not subject to the “Variation in Estimated Quantity” contract clause.
7. The Contract Clause 52.232-27, “Prompt Payment for Construction Contracts” requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.
8. Procuring Contracting Officer. The Contracting Officer who signs this contract will be the Pocuring Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, contracting within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.
9. Amounts and prices shall be indicated in either words or figures, NOT BOTH.
10. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The Contractors attention is directed to Contract Clause NO. 52.232-33 “Payment by Electronic Funds Transfer-Central Contractor Registration” and Contract Clause No. 52.232-34, “Payment by Electronic Funds Transfer-Other Than Central Contractor Registration” located in Section 00700.Mandatory Information for Electronic Funds Transfer” located in Section 00700.
11. The bidder shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Price Schedule.
The Government will review all submitted Price Schedules for any unbalancing of the items. Any submitted Price Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for contract award.
Orange County, CA
00010 - 5 Amendment 3
12. The bidder shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.
13. Some quantities are ESTIMATED, the bidders prices MUST BE FIRM.
14. Bidder is cautioned to check his Price Schedule carefully prior to submission.
15. Please Note: All inquiries must be submitted in accordance with the instructions found in the solicitation, Section 00100, paragraph titled, “Inquiries.” The Bidder Inquiry System will be unavailable for new inquiries five business days prior to submission of bids, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
16. The Government contemplates award on one contract to the responsive, responsible bidder who submits the low bid for the total of all the items in the Price Schedule.
17. The Geotechnical Appendix of Design Documentation Report for the Lower Santa Ana River Channel Reach 9 – Phase 3, Orange County, California, revised August 28, 2012, is posted on the project’s bid package website (FedBizOps). This Geotechnical Report is made available for information purposes. All bidders are responsible for downloading the report, for their use, prior to bid opening. All bidders are notified that the Geotechnical Study Report is provided for information purposes only. Any discrepancies found between the geotechnical Study Report and the specification, the specifications will govern.
This page was intentionally left blank for duplex printing.
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-1 Amendment 3
SECTION 00800 SPECIAL CLAUSES
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
52.211-11 EXERCISE OF OPTION ITEMS
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2011)
52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
MAR 1995)--EFARS
52.236-4 PHYSICAL DATA (APR 1984)
52.236-16 QUANTITY SURVEYS (APR 1984)
52.0236-4201 CONTRACTOR PERFORMANCE EVALUATIONS
52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991)
SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF ENGINEERS' UNCLASSIFIED CONTRACTS
CONTRACT ADMINISTRATION DATA
ACCRUALS:
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-2 Amendment 3
52.211-10 COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work, including options, ready for use not later than 450 calendar days after the Contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-11 EXERCISE OF OPTION ITEMS
The Government may exercise any or all Option Items in the Contract Schedule in accordance with the calendar days from Notice to Proceed (NTP), as shown below. The Project Option Items are listed below according to their assigned CLIN. Each Option Item, if exercised, will be exercised within the number of calendar days indicated from the issuance of the NTP. Option Items may be exercised individually or exercised concurrently, as shown below. The Government is under no obligation to exercise any of the Option Items.
CLIN
NO.
Option Item Description Number of Days to Exercise Option Items (counted in calendar days from issuance of NTP)
Option Items Exercised Concurrently
0024 Caltrans Pre- Construction Deflection Study
120 -
0025 Remove Temporary Bike Path
350 0025, 0026
0026 Permanent Bike Path 350 0025, 0026 0027 Hydroseeding and
Exterior – Upland Area 350 0027, 0028, 0029, 0030
0028 Temporary Irrigation System – Upland Area
350 0027, 0028, 0029, 0030
0029 Landscape Maintenance
– Upland Area
350 0027, 0028, 0029, 0030
0030 Decomposed Granite 350 0027, 0028, 0029, 0030 0031 Coal Canyon On/Off
Ramps Resurfacing 420 -
0032 Diversion Structure 1B Up to completion of the soil cement revetment (CLIN 0012)
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-3 Amendment 3
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP
2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $ 3,061 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN
2011)
(a) It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns.
(b) The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance. The Contractor further agrees to cooperate in any studies or surveys as may be conducted by the United States Small Business Administration or the awarding agency of the United States as may be necessary to determine the extent of the Contractor's compliance with this clause.
(c) Definitions. As used in this contract--
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-4 Amendment 3
HUBZone small business concern means a small business concern that appears on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration.
Service-disabled veteran-owned small business concern--
(1) Means a small business concern--
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
Small business concern means a small business as defined pursuant to Section 3 of the Small Business Act and relevant regulations promulgated pursuant thereto.
Small disadvantaged business concern means a small business concern that represents, as part of its offer that--
(1)(i) It has received certification as a small disadvantaged business concern consistent with 13 CFR part 124, subpart B;
(ii) No material change in disadvantaged ownership and control has occurred since its certification;
(iii) Where the concern is owned by one or more individuals, the net worth of each individual upon whom the certification is based does not exceed $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(iv) It is identified, on the date of its representation, as a certified small disadvantaged business in the CCR Dynamic Small Business Search database maintained by the Small Business Administration, or
(2) It represents in writing that it qualifies as a small disadvantaged business (SDB) for any Federal subcontracting program, and believes in good faith that it is owned and controlled by one or more socially and economically disadvantaged individuals and meets the SDB eligibility criteria of 13 CFR 124.1002.
Veteran-owned small business concern means a small business concern--
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
Women-owned small business concern means a small business concern--
(1) That is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and
(2) Whose management and daily business operations are controlled by one or more women.
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-5 Amendment 3
(d)(1) Contractors acting in good faith may rely on written representations by their subcontractors regarding their status as a small business concern, a veteran-owned small business concern, a service-disabled veteran-owned small business concern, a small disadvantaged business concern, or a women-owned small business concern.
(2) The Contractor shall confirm that a subcontractor representing itself as a HUBZone small business concern is certified by SBA as a HUBZone small business concern by accessing the Central Contractor Registration (CCR) database or by contacting the SBA. Options for contacting the SBA include--
(i) HUBZone small business database search application Web page at http://dsbs.sba.gov/dsbs/search/dsp_searchhubzone.cfm; or http://www.sba.gov/hubzone;
(ii) In writing to the Director/HUB, U.S. Small Business Administration, 409 3rd Street, SW., Washington DC 20416; or
(iii) The SBA HUBZone Help Desk at hubzone@sba.gov.
52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING
EXPENSE SCHEDULE
MAR 1995)--EFARS
(a) This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region ____. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-6 Amendment 3
52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by survey.
(b) Weather conditions. The Contractor shall satisfy himself as to the hazards likely to arise from weather conditions.
(c) Transportation facilities. The Contractor shall make his own investigation of the conditions of existing public and private roads and clearances, restrictions, bridge load limits and other limitations affecting transportation and ingress and egress at the job site. The unavailability of transportation facilities or limitation thereof shall not become a basis for claims against the Government for extensions of time or for delays in completion of the work.
(d) N/A
52.236-16 QUANTITY SURVEYS (APR 1984)
(a) Quantity surveys shall be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.
(b) The Government shall conduct the original and final surveys and make the computations based on them. The Contractor shall conduct the surveys for any periods for which progress payments are requested and shall make the computations based on these surveys. All surveys conducted by the Contractor shall be conducted under the direction of a representative of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance.
(c) Promptly upon completing a survey, the Contractor shall furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who shall use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of all such material furnished to the Contracting Officer.
52.0236-4201 CONTRACTOR PERFORMANCE EVALUATIONS
In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-7 Amendment 3
$100,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.
52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS
Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(b) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(c) If equipment costs have been allocated to a contract using predetermined rates , those charges will be adjusted to actual costs.
(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
(4) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of FAR 31.205-11).
(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
(End of Clause)
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS
(AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--http://www.cpars.navy.mil/
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-8 Amendment 3
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File No. Drawing No.
Index to Contract Drawings 239 / 3202 G02
252.236-7004 PAYMENT FOR MOBILIZATION AND
DEMOBILIZATION (DEC 1991)
(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.
(1) 65 percent of the lump sum price upon completion of the contractor's mobilization at the work site.
(2) The remaining 35 percent upon completion of demobilization.
(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in paragraphs (a) (1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.
(1) Failure to justify such price to the satisfaction of the Contracting Officer will result in payment, as determined by the Contracting Officer, of --
(i) Actual mobilization costs at completion of mobilization;
(ii) Actual demobilization costs at completion of demobilization; and
(iii) The remainder of this item in the final payment under this contract.
(2) The Contracting Officer's determination of the actual costs in paragraph (b)(1) of this clause is not subject to appeal.
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-9 Amendment 3
SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF
ENGINEERS' UNCLASSIFIED CONTRACTS
A. AUTOMATED INFORMATION SYSTEM (AIS) EFFORT
All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The contractor shall have each applicable employee complete a SF-85P and submit to the Los Angeles District, ATTN: CESPL-P.O Box 532711, Los Angeles, California 90053 Security Officer within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS. Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Los Angeles District Security Officer. For those contractors that do not have a CAGE Code or Facility Security Clearance, the Los Angeles District Security Office will process the investigation in coordination with the Contractor and contract employees.
B. NATIONAL INFRASTRUCTURES EFFORTS
Contractor employees scheduled to access the Homeland Security determined National Infrastructures, i.e., Powerhouses, Switchyards, Locks/Dams or other restricted/sensitive areas are required to submit a State Bureau of Investigation Criminal Records (History) Check from the state where the work will be performed to the Contracting Officer no later than ten (10) working days after contract award. In addition to providing the individual Criminal Records (History) Check, contractor employees scheduled to have access to the National Infrastructures for six (6) months or longer required a favorable Public Trust Background Investigation (SF-85P), which includes fingerprints (FD-258). Contractor employees may have the finger print card (FD-258) completed by local law enforcement anyone qualified in the Los Angeles District Field Offices, or by making an appointment with the District Security Officer, Capt Reginald Seabrook, Telephone No.213-452-3969.
The contractor shall have each applicable employee provide the completed SF-85P and FD-258 to the Los Angeles Security Office as soon as possible after contract award, but definitely prior to the employee being permitted access to the work area.
C. FOREIGN NATIONALS
Contractor employees scheduled to access the Homeland Security determined National Infrastructures, i.e., Powerhouses, Switchyards, Locks/Dams or other restricted/sensitive areas are required to submit a State Bureau of Investigation Criminal Records (History In accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers' contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE:
exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services.) The contractor shall submit to the Division/District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).
Lower Santa Ana River Channel Reach 9 – Phase 3 W912PL-13-B-0004
00800-10 Amendment 3
Classified contracts require the issuance of a DD Form 254 (Department of Defense Contract Security Classification Specification).
CONTRACT ADMINISTRATION DATA
The Contract Administration Office for this contract subsequent to award is:
Department of the Army Los Angeles District, Corps of Engineers P.O. Box 532711 Los Angeles, California 90053-2325
ATTN: Julie Ayala
Telephone No: 213-452-3241
Payment will be made by:
USACE Finance Center
ATTN: CEFC-AO-P
5270 Integrity Drive Millington, TN 38054-5005
Submit Invoices to:
USACE-Los Angeles District Santa Ana Dams Resident Office
2493 Pomona-Rincon Rd Corona, CA 92880 Attn: Michael Siu
ACCRUALS:
In accordance with USACE Engineer Financial Regulation (ER) 37-1-30, and other applicable Federal and DOD financial accounting standards, the Contractor is required to assist government personnel with providing reasonably accurate accrual estimates. The accrual is from the thru date of the period of performance (Eng Form 93, block 9) to the end for the month of the value of goods and/or services rendered/expected to be rendered to the Government pursuant to this contract. This is for each calendar month during which goods and services are delivered. Standard forms with instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before six (6) business days prior to each calendar month-end. Please contact Mr. Richard Wagner 213-452-3307 or email at Richard.S.Wagner@usace.army.mil for further information.
End of Section
Lower Santa Ana River Channel, Reach 9 - Phase 3 W912PL-13-B-0004 (Gypsum Canyon Road to Coal Canyon Road), Orange County, CA
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 01
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 APPLICABLE PUBLICATIONS
1.2 SUBMITTALS
1.3 GENERAL REQUIREMENTS
1.3.1 Documents to be Provided by the Government
1.3.1.1 Design Geotechnical Report
1.3.1.2 Santa Ana River Interceptor Construction Schedule
1.3.1.3 Existing As-Built Plans
1.3.2 Site Plan
1.3.3 Location of Contractor's Field Offices
1.3.4 Identification of Employees
1.3.5 Employee Parking
1.4 TEMPORARY CONSTRUCTION FACILITIES
1.5 CONSTRUCTION SIGNS AND BULLETIN BOARDS
1.5.1 General
1.5.2 Construction Signs
1.5.3 Bulletin Board
1.5.4 Project and Safety Signs
1.5.5 Painting
1.6 CONTRACTOR'S OFFICES
1.6.1 Administrative Field Offices
1.6.2 Storage Area
1.6.3 Appearance of Trailers
1.6.4 Maintenance of Storage Area
1.6.5 Security Provisions
1.7 MAINTENANCE AND DISPOSAL OF PROJECT FACILITIES
1.7.1 General
1.7.1.1 Flood Facilities
1.7.1.1.1 Weed Abatement
1.7.1.1.2 Debris Removal
1.7.1.2 Aesthetic Features
1.7.2 Temporary Staging or Stockpile Areas
1.7.3 Required Insurance
1.7.3.1 Term
1.7.3.2 Clauses
1.7.3.3 Liability Insurance
1.7.3.4 Worker's Compensation
1.8 AVAILABILITY AND USE OF UTILITY SERVICES
1.8.1 Payment for Utility Services
1.8.2 Meters and Temporary Connections
1.8.3 Sanitation
1.8.4 Telephone
1.9 PROTECTION AND MAINTENANCE OF TRAFFIC
1.9.1 Haul Roads
1.9.2 Traffic Warning Devices
1.9.3 Maintenance of Traffic
1.9.4 Protection of Traffic
SECTION 01 10 01 Page 1 Amendment 3
1.9.5 Dust Control
1.9.6 Fire Protection
1.9.7 Barricades
1.10 PLANT COMMUNICATION
1.11 TEMPORARY PROJECT SAFETY FENCING
1.12 SCRAP MATERIAL
1.13 SALVAGE MATERIALS
1.14 ARCHAEOLOGICAL FINDINGS DURING CONSTRUCTION
1.15 PROTECTION OF EXISTING WORK
1.16 POINT OF CONTACT
1.16.1 The following is a list of points of contact:
1.17 PUBLIC UTILITIES, NOTICES, AND RESTRICTIONS
1.17.1 General
1.17.2 Cooperation and Coordination with Others
1.17.3 Relocation or Removal
1.17.4 Utilities Not Shown
1.17.5 Notices
1.17.5.1 Utilities To be Relocated or Protected
1.17.5.2 Permanent Utility Relocations by Others
1.17.5.3 Existing Bench Marks and R/W Markers
1.17.5.4 Spill Reporting
1.17.6 Restrictions
1.17.6.1 Representatives of Other Agencies
1.17.6.2 Vehicle and Construction Equipment
1.17.6.3 Contractor's Work Area
1.17.6.4 Working Hours
1.17.6.5 Disposal Locations for Excess Excavated Material
1.17.6.6 Water Spreading Operations
1.17.6.7 Drainage and Erosion Control
1.17.6.8 Water Course
1.17.6.9 Environmental Restrictions
1.17.6.10 Progress Payments
1.17.6.10.1 Partial Pay Estimate
1.17.6.10.2 Forecasting of Future Progress Payments
1.17.6.11 Roads/ Bike Paths
1.18 PUBLIC SAFETY
1.19 OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
1.19.1 Accident Reporting
1.20 WATER CONTAMINATION
1.21 PERMITS
1.21.1 General
1.21.1.1 Public Property Permit
1.21.1.2 NPDES Permit
1.21.1.3 Dewatering Permit
1.21.1.4 SCAQMD PERMITS
1.21.1.5 Air Quality Permit
1.21.1.6 CalTrans Encroachment Permit
1.22 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.23 LAYOUT OF WORK
1.24 SUPERVISION BY THE CONTRACTOR
1.25 INTERRUPTION OF EXISTING UTILITIES SERVICES
1.26 UTILITY OUTAGES
1.27 DAILY CLEANUP
1.28 POST-CONSTRUCTION CLEANUP AND OBLITERATION
1.29 RESTORATION OF STORAGE AREA
1.30 SANTA ANA RIVER INTERCEPTOR (SARI) LINE
1.31 RESTORATION OF BIKE PATH TRAIL AND PRIVATE ROADWAY
1.32 Existing Soil Cement Bank Protection
1.33 Caltrans Deflection Study
SECTION 01 10 01 Page 2 Amendment 3
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 10 01 Page 3 Amendment 3
SECTION 01 10 01
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CDT)
Caltrans (June 1, 2001) Flexible Pavement Rehabilitation Manual
CAMUTCD (January 2012) California Manual on Uniform Traffic Control Devices
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Change 1-2010; Change 3-2010;
Errata 1-2010) Safety and Health Requirements Manual
EP 310-1-6a (2006) Sign Standards Manual, VOL 1
U.S. DEPARTMENT OF TRANSPORTATION
MUTCD (MAY 2012) Manual on Uniform Traffic Control Devices
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OSHA Occupational Safety and Health Act for Construction (CFR 29, Part 1926)
1.2 SUBMITTALS
SD-01 Preconstruction Submittals
Site Plan; G Required Insurance; G Traffic Control Plan; G Water Contamination Containment Plan
SD-05 Design Data
Caltrans Deflection Study; G
1.3 GENERAL REQUIREMENTS
A copy of the contract documents shall be kept in an easily accessible
SECTION 01 10 01 Page 4 Amendment 3 location on the site at all times during construction.
1.3.1 Documents to be Provided by the Government
The following documents are provided by the Government. These documents are to be used as references for information only and may be downloaded from the same website as the bid package.
1.3.1.1 Design Geotechnical Report
Geotechnical report for the project titled "Geotechnical Appendix of Design Documentation Report Lower Santa Ana River Channel Reach 9 - Phase 3, Orange County, California", dated August 28, 2012, prepared by Leighton Consulting, Inc., to be used as reference.
Boring logs are presented in the contract drawings for informational purpose. The complete geotechnical report is available on the USACE's website
1.3.1.2 Santa Ana River Interceptor Construction Schedule
The Santa Ana River Interceptor (SARI) project schedule to be provided and used as reference and used to coordinate construction activities.
1.3.1.3 Existing As-Built Plans
Existing storm drains As-Built plans that join the outlet structures are to be provided and used as reference.
1.3.2 Site Plan
a. The Contractor shall prepare a site plan indicating the proposed location and dimensions of any area to be fenced and used by the Contractor, the number of trailers to be used, avenues of ingress/egress to the fenced area and details of the fence installation. Any areas which may have to be graveled to prevent the tracking of mud shall also be identified. The Contractor shall also indicate if the use of a supplemental or other staging area is desired.
The staging areas identified in the drawings are in the floodplain. The Contractor shall be responsible for protecting any structure and equipment in the staging area from possible flood flows.
b. If unanticipated conditions are encountered during the course of construction, the contractor shall immediately bring the condition to the attention of the USACE.
1.3.3 Location of Contractor's Field Offices
The Contracting Officer shall approve location of the Contractor's Field Offices. The Contractor's field office shall be located so that people visiting, such as salespersons or personnel seeking employment, will not have to enter the work area to get to the office. The Contractor's office is required to have an address located within five (5) miles of the project site where Contractor is able to sign for and accept deliveries.
1.3.4 Identification of Employees
The Contractor shall be responsible for furnishing to each employee, and for requiring each employee engaged on the work to display, identification
SECTION 01 10 01 Page 5 Amendment 3 as approved and directed by the Contracting Officer. Prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employee. When required, the Contractor shall obtain and provide fingerprints of persons employed on the project. Contractor and subcontractor personnel shall wear identifying markings on hard hats clearly identifying the company for whom the employee works.
1.3.5 Employee Parking
Contractor employees shall park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site.
1.4 TEMPORARY CONSTRUCTION FACILITIES
The Contractor shall construct and/or erect the following temporary project facilities:
a. Construction Signs. The signs shall be erected as soon as possible and within 15 days after the notice to proceed.
(1) Five-Project Signs at locations designated by the Contracting Officer.
(2) Warning Signs facing approaching traffic on all permanent public road and temporary construction access/haul roads crossing under overhead power transmission lines and at the bases of the Southern California Edison towers.
(3) Six hard hat signs at locations directed by the Contracting Officer.
(4) Traffic control regulatory and warning signs at locations as directed along the construction traffic routes.
b. Bulletin Board at the Contractor's office.
c. Contractor's Offices
d. Sanitary Facilities.
1.5 CONSTRUCTION SIGNS AND BULLETIN BOARDS
1.5.1 General
The Contractor shall construct and erect a project sign and hard hat sign and a bulletin board at respective locations designated by the Contracting Officer. The signs shall conform to the requirements of the EP 310-1-6a, attached at the end of this section. Signs and bulletin boards shall be erected as soon as possible and within 15 days after receipt of the Notice to Proceed under this contract.
1.5.2 Construction Signs
a. The following signs shall be erected:
1. Project Sign at location designated by the Contracting Officer.
SECTION 01 10 01 Page 6 Amendment 3
2. Warning Signs facing approaching traffic on all haul roads crossing under overhead power transmission lines.
3. Two (2)hard hat signs at locations directed.
4. Four (4) beach…