Amendment 2 - changes to Section 00100 and Appdx H

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Design-Build Communications Network Control Center Nellis Air Force Base, Clark County, Nevada

1. Revised Pages: 00100-4, MPR6 LEED Exemption Forms (to be added at end of Appendix H)

LOS ANGELES DISTRICT , COECESPL-CT-EAST REGION

BRANCH P.O. BOX 532711LOS ANGELES, CALIFORNIA

90053-2325

LOS ANGELES DISTRICT , COECESPL-CT-EAST REGION

BRANCH P.O. BOX 532711LOS ANGELES, CALIFORNIA

90053-2325

N/A

W912PL-12-R-0001

N/A

1 1

NOV 29, 2011

11/17/2011

N/A

W912PL-12-R-0001

SECTION 00100 - 4 Amendment No. 0002

Contractor employees scheduled to access the Homeland Security determined National Infrastructures, i.e., Powerhouses, Switchyards, Locks/Dams or other restricted/sensitive areas are required to submit a State Bureau of Investigation Criminal Records (History In accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers' contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services.) The contractor shall submit to the Division/District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).

Classified contracts require the issuance of a DD Form 254 (Department of Defense Contract Security Classification Specification).

52.0000-4023 SAFETY REQUIREMENTS

The bidder's attention is directed to the latest version of U.S Army Corps of Engineers Safety and Health Manual, EM 385-1-1, which will be strictly enforced. This publication may be obtained online and is available for download at: http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx .

Hard Copies are available from the Associated General Contractors of America, (Item #3607). The U.S. Government Printing Office is sold out of its inventory of the manual. Any other Safety and Occupational specific questions can be addressed to the US Army Engineer District, Los Angeles, ATTN: Safety Office, P.O. Box 53211, Los Angeles CA 90053-2325

PREAWARD SURVEY

52.209-4501 CONTRACTOR RESPONSIBILITY, PRE-AWARD SURVEY

In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, a statement regarding previous experience in performing comparable work, information related to their business organization, financial resources, and/or plant to be used in performing the work is required. After the bid opening, the Government will request this information and set a due date for its submission.

INSTRUCTIONS FOR PREAWARD SURV

INSTRUCTIONS FOR PREPARING PRE-AWARD SURVEY

In accordance with Section FAR PART 9, Determination of responsibility of the offeor by the Contracting Officer, pleas provide the following information in order to perform a pre-award survey on your firm:

1. List of projects completed for the past three years, including dollar value of each correct.

2. List of projects in progress, percentage of work completed, including dollar value of each contract.

3. The name and qualifications of the employee designated to act as the Project Superintendent/Manager for this contract.

4. Copy of latest financial statement.

USGBC – MINIMUM PROGRAM REQUIREMENTS – EXEMPTION FORMS, MPR 6 1

MPR 6 EXEMPTION FORMS

Effective July 25, 2011, the U.S. Green Building Council has granted to the U.S. Department of Defense a blanket exemption from Minimum Program Requirement (MPR) 6 (Must Commit to Sharing Whole-Building Energy and Water Usage Data) for projects registered under LEED 2009. This exemption is retro-active for projects certified under LEED 2009 prior to July 25, 2011. The exemption relieves any project owned by the DOD from the expectation that they provide energy and water data post-certification, and alleviates related concerns about national security. However, USGBC will accept such data from any project that wishes to provide it.

The LEED 2009 Minimum Program Requirements define the minimum characteristics that a project must possess in order to be eligible for certification under LEED 2009. These requirements serve three goals: to give clear guidance to customers, to protect the integrity of the LEED program, and to reduce challenges that occur during the LEED certification process.

MPR 6 is essential to ongoing development of the LEED program, as it allows USGBC to evaluate the impact and efficacy of rating system requirements and of each rating system as a whole.

EXEMPTION PROCESS

1. Department of Defense distributes Exemption Forms to project managers Alternative: Project Administrators request the Exemption Forms from GBCI

2. Project Administrator completes the Exemption Forms and a DOD employee signs them

3. Project Information (PI) Form 3 (Occupant and Usage Data) in LEED Online, Additional

Details: Project Administrator checks the box titled “Special Circumstances preclude compliance with the submittal requirements outlined in this form.”

4. The Project Administrator uses the text box to acknowledge that the project will take advantage of the DOD exemption from the requirements of MPR 6

5. The Project Administrator uploads the completed Exemption Forms as supporting documentation.

Please use one of the following standard formats for Project Owner Organization (below):

Air Force Air National Guard Army Army National Guard Marine Corps

National Geospatial-Intelligence Agency Navy Washington Headquarters Service Department of Defense – Other

USGBC – MINIMUM PROGRAM REQUIREMENTS – EXEMPTION FORMS, MPR 6 2

Please provide the following information:

Project ID: ____________________________________________________________________

Project Name: _________________________________________________________________

Current Project Owner (insert Project Owner Organization during design and construction):

Intended Project Owner [insert Project Owner Organization during occupancy]:

Signatory should be a DOD employee. Examples:

Air Force Federal government employee of the Design/Construction Agent Army USACE Project Manager Navy or Marine Corps NAVFAC Design Manager

SIGNATORY

Signed, Name: ________________________

Title: ________________________

Organization: ________________________

Date: ________________________

PROJECT ADMINSTRATOR

Signed, Name: ________________________

Title: ________________________

Organization: ________________________

Date: ________________________

SF 30
00100-4
MPR6 LEED Exemption Forms (to be added at end of Appendix H)