View the file

Other files

File Type Posted
Am4.pdf PDF
CAD FilesAm3.zip ZIP file
Am2.pdf PDF
CAD Files.zip ZIP file
Am01.pdf PDF
Appendix_P.pdf PDF
APPENDIX_C_thru_K.pdf PDF
APPENDIX_N.pdf PDF
APPENDIX_Q.pdf PDF
APPENDIX_M.pdf PDF
Appendix_R.pdf PDF
APPENDIX_L.pdf PDF
W912PL-10-R-0011_Spec.pdf PDF
APPENDIX_O.pdf PDF
Appendix_A.pdf PDF
APPENDIX_B.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0003 Jan 7, 2010

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017

W912PL-10-R-0011

Dec 21, 2009

FY10 144 PN Dormitory at Davis-Monthan AFB, Arizona

AMENDMENT 0003 to Solicitation No. W912PL-10-R-0011 Is issued to Add and replace the following:

1. Section 110 and 120 have been replaced in its Entirety

2. Missing CADD files are attached w912pl-10-R-

W912PL-10-R-0011

SECTION 00110

SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1.0. SUBMISSION REQUIREMENTS AND INSTRUCTIONS 2

1.1. GENERAL SUBMISSION REQUIREMENTS 2

1.2. GENERAL INSTRUCTIONS: 2

1.3. WHERE TO SUBMIT: 2

1.4. SUBMISSION DEADLINE: 2

1.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME ) 3

1.8. PROPOSAL COVER SHEET: 6

AMD 0003, SECTION 110 1

SECTION 00110

SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1.0. SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1.1. GENERAL SUBMISSION REQUIREMENTS

1.1.1. In order to effectively and equitably evaluate all offers, the Contracting Officer must receive information sufficiently detailed information that clearly responds to the technical evaluation factors in Section 00120.

1.1.2. Each Offeror must submit a Price Proposal, Volume I, and a Technical Proposal Volume II as separate distinct volumes. The Price Proposal, and Technical Proposal, must be received by the closing date and time set for receipt of proposals.

1.1.3. All information intended by the Offeror to be evaluated must be submitted as part of the Technical Proposal. No proposed price information should be included in the response to the technical evaluation factors.

1.2. GENERAL INSTRUCTIONS:

1.2.1. All written portions: Use only 8 ½ by 11 inch paper, unless another size is specifically authorized elsewhere in this section for a particular submission. Do not use 11” x 14” or 11” x 17” size sheets (e.g., fold-outs) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print.

1.2.2. All drawing sheets: 22” x 34” (1/2 size 11”x17”), 24" x 36" or 30" x 42" format. Full or half-size sets are acceptable, but must include a minimum of one (1) full-size set; half-size sets must be readable.

1.2.3. Three-ring binders are preferred. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages.

1.2.4. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offeror—Competitive Acquisition”, paragraph (3), “Restriction on disclosure and use of data”.

1.2.5. Offerors must provide one (1) CD Rom disk of all the following Design Technical Criteria (AutoCAD 2000 & MS WORD 2000) and Offerors Performance Capability with technical proposal.

Offerors will not be required to submit electronic copies of catalog cuts.

1.3. WHERE TO SUBMIT:

1.3.1. Offeror(s) shall submit their proposal packages to the Los Angeles District Corps of Engineers (COE) as directed by the RFP letter and in accordance with Section 00100.

1.4. SUBMISSION DEADLINE:

1.4.1. Offers shall be received by the Los Angeles District COE no later than the time and date specified as directed by the RFP letter and in accordance with Section 00100.

AMD 0003, SECTION 110 2

1.5. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME I):

* 1.5.1. Number of Sets of the Price Proposal: Submit One (1) original only

1.5.2. Format and Contents of the Price Proposal/List of Tabs: The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart.

TAB CONTENTS OF THE PRICE PROPOSAL (VOLUME I)

TAB #1 RFP Acknowledgement form

Proposal Cover Sheet

TAB #2

The Completed Pricing Schedule with the Offeror’s proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for the Base Bid and Option Items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., extended prices). Do not round off to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.

TAB #3 A Bid Guarantee (e.g., Standard Form 24, “Bid Bond”)

TAB #4 Representations & Certifications *

1.6. CONTENT FOR THE TECHNICAL PROPOSAL (VOLUME II):

1.6.1. TAB 1 – CONSTRUCTION EXPERIENCE ON SIMILAR PROJECTS (VOLUME II):

Must be submitted in accordance with Section 00120

1.6.2. TAB 2 – PAST PERFORMANCE ON RECENT, RELEVANT PROJECTS (VOLUME II):

Required submittal data for Factor 2, Past Performance on Recent, Relevant Projects

1.6.2.1. This information will be evaluated as part of this competitive negotiation procurement process. Offeror(s) shall submit the following as part of their offers.

Project Examples (Past Performance). Submit information on recent contracts relevant in demonstrating your capability to perform the proposed effort, in accordance with the following instructions:

a. Identify all contracts, including Federal, State, local government and private/commercial for efforts similar to the Government requirement in scope, size and complexity which are either currently ongoing or which were completed within the past five years.

Past performance data must also be provided for all projects submitted to demonstrate experience, even if the referenced project was not completed within the past five years. Past performance on State, local, and private/ commercial contracts will be evaluated equally with past performance on Federal contracts. Offeror(s) are encouraged to provide information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this solicitation. Important Note: See paragraph e. below regarding required consent for release of subcontractor past performance information.

b. For each project, submit the information in the formats provided at the end of * this Section:

1. Please provide past performance reference check and cover letter to previous clients. Formats for past performance reference check and cover letter have been provided at the end of this Section titled: Past Performance Reference Check and Sample Cover Letter. Please have clients return the forms directly to the Contracting Division at:

Department of the Army U.S. Army Engineer District, Los Angeles Contracting Division (Attn: Ms. Sandra Oquita)

AMD 0003, SECTION 110 3

915 Wilshire Blvd., Suite 1040

Los Angeles, CA 90017.

FAX Number 213-452-4184 or 4187.

Sandra.Oquita@usace.army.mil

2. Furnish a performance assessment report for each referenced contract as an attachment to the past performance information submitted for each referenced project. If an official written performance evaluation/assessment was not received, so indicate. A performance questionnaire must be sent to the reference if a written performance evaluation/rating is not included in the proposal as an attachment to the performance assessment report. The Offeror(s) is also encouraged to submit any letters of appreciation or similar correspondence that the Contractor received from the Owner/Customer at the time of contract performance/completion. However, the Offeror(s) is neither required nor requested to have the Owner/Customer write such a letter for the purpose of this solicitation. These attachments will not count against the page limitation. Formats for the performance assessment report has been provided at the end of this Section titled: Format For Offeror(s) Submission of Recent/Relevant Project Information.

c. Offeror(s) are encouraged to provide information on problems encountered on the identified contracts and corrective actions taken.

d. “Confidential” projects cannot be submitted unless all of the information required for evaluation purposes as specified herein can nonetheless be provided to the Government as part of the Offeror(s) technical proposal. Offeror(s) that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offeror(s)—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

e. Release of Subcontractor Past Performance Information. Past performance information pertaining to a proposed subcontractor cannot be disclosed to the Offeror(s) by the Government without the proposed subcontractor’s consent. Therefore, if subcontractor past performance information is being utilized by the Offeror(s), the Offeror(s) must also submit as part of its technical proposal the subcontractor’s consent to release of its past performance information by the Government to the Offeror(s). If there is a problem with the proposed subcontractor’s past performance, the prospective prime contractor can be notified, but no details can be discussed without the proposed subcontractor’s permission.

AMD 0003, SECTION 110 4

1.6.3 TAB 3 – MANAGEMENT PLAN (VOLUME II)

Must be submitted in accordance with Section 00120. Required submittal data for Factor 3, use EXPERIENCE AND QUALIFICATIONS – CONSTRUCTION KEY PERSONNEL (Resume) at the end of this section.

1.6.4. TAB 4 –TECHNICAL APPROACH (VOLUME II)

Must be submitted in accordance with Section 00120. Based on your understanding of the Design requirements in Section 01010, describe in narrative form the technical approach you will take to address the unique challenges, opportunities and constraints inherent to this project.

1.6.5. TAB 5 –SCHEDULE (VOLUME II)

Must be submitted in accordance with Section 00120. By narrative, address how you maintain, update and use your schedule. State in the narrative the total number of calendar days you have shown in your proposed schedule for project execution and acknowledge that this duration will become contractually binding should you receive the award. In graphic format, submit a proposed schedule in calendar days for the design and construction of this project. The proposed schedule may be of any size but should be folded and inserted within Tab 5 of the binder.

1.6.6. DRAWINGS –

Must be submitted in accordance with Section 00120 and are included in the requirements under Factor 4, Technical Approach. All drawings shall be either full size (22" x 34") or half size (11" x 17") as described in Section 01012.

1.7. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME II):

1.7.1. Number of Sets of the Technical Proposal: Submit the original and 3 additional sets of the written Technical Proposal, with each set separately packaged. In addition, submit one complete copy of the technical proposal on Compact Disk (CD) using a searchable “.pdf” file format.

1.7.1.1. Format and Contents of the Technical Proposal/List of Tabs: The original and all copies of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the following chart. The main tabs directly correlate to the evaluation factors identified in Section 00120. The Maximum number of pages for the Technical Proposal is seventy-five (75) pages.

1.7.1.2. Detailed Submission Requirements for the Technical Proposal: Offeror(s) must submit detailed responses to the evaluation factors under each of the following volumes and tabs:

VOLUME TAB CONTENTS OF THE TECHNICAL PROPOSAL

VOLUME II

TAB #1

CONSTRUCTION EXPERIENCE ON SIMILAR CONTRACTS

(Factor 1 in Section 120)

VOLUME II

TAB #2

PAST PERFORMANCE ON RECENT, RELEVANT PROJECTS

(Factor 2 in Section 120)

VOLUME II

TAB #3 MANAGEMENT PLAN (Factor 5 in Section 120)

VOLUME II TAB #4 TECHNICAL APPROACH (Factor 3 in Section 120)

VOLUME II

TAB #5 PROPOSED SCHEDULE (Factor 6 in Section 120)

AMD 0003, SECTION 110 5

AMD 0003, SECTION 110 6

DRAWINGS

DESIGN APPROACH & AESTHETICS

CIVIL SITE PLAN, OVERALL FLOOR PLAN, FLOOR PLAN OF

DORMITORY MODULE, AND EXTERIOR ELEVATIONS

(Factor 4 in Section 120)

Instructions regarding responses to the evaluation factors are detailed in Section 00120, entitled, “Proposed Evaluation and Contract Award”

1.8. PROPOSAL COVER SHEET:

1.8.1. Format for the Proposal Cover Sheet: The proposal cover sheet is required by FAR 52.215-1(c)(i)-(v). This provision, titled “Instructions to Offerors—Competitive Acquisition,” has been provided in full text in Section 00100.

The format is as follows:

PROPOSAL COVER SHEET

1. Solicitation Number:

2. The name, address, and telephone and facsimile numbers of the Offeror and electronic address (if available):

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

SUMMARY OF PROPOSAL SUBMISSION REQUIREMENTS

SUBMITTAL CONTENTS NUMBER REQUIRED

VOLUME 1

PROPOSAL/

PRO-FORMA

REQUIREMENTS

--PROPOSAL COVER SHEET

--RFP ACKNOWELDGEMENT FORM AND

AMENDMENTS

--PRICING SCHEDULE

--OFFER GUARANTEE (“BID BOND”)

--REPRESENTATIONS & CERTIFICATIONS

1 ORIGINAL ONLY

VOLUME II

CONSTRUCTION

EXPERIENCE ON

SIMILAR

CONTRACTS

PROJECTS OF SIMILAR TYPES, SCOPES

AND COMPLEXITY

-RECENT RELEVANT TEAMING

EXPERIENCES

-CONSTRUCTION KEY PERSONNEL

RESUMES

ORIGINAL + 3 SETS

VOLUME II PAST

PERFORMANCE ON

RECENT RELEVANT

CONTRACTS

-PAST PERFORMANCE REFERENCE

CHECK

-RELEVANT PROJECT SUMMARY

-RECENT RELEVANT PROJECT

INFORMATION

ORIGINAL + 3 SETS

VOLUME II

MANAGEMENT

PLAN

- PROJECT MANAGEMENT PLAN

- CONSTRUCTION KEY PERSONNEL’S

RESUME

- ORGANIZATIONAL CHART

ORIGINAL + 3 SETS

VOLUME II

TECHNICAL

APPROACH

- NARRATIVES

ORIGINAL + 3 SETS

VOLUME II

PROPOSAL

SCHEDULE

-PROJECT SCHEDULE NARRATIVE

-PROPOSED SCHEDULE

ORIGINAL + 3 SETS

DRAWINGS

-CIVIL SITE PLAN,

-OVERALL FLOOR PLAN,

-FLOOR PLAN OF DORMITORY MODULE

-EXTERIOR ELEVATIONS

ORIGINAL + 3 SETS

AMD 0003, SECTION 110 7

SAMPLE COVER LETTER

Date

SUBJECT: Past Performance Reference Check

Name and Address of Reference

Ladies and Gentlemen:

The U.S. Army Corps of Engineers, Los Angeles District, is conducting a review of our past performance history as part of an upcoming source selection acquisition.

Please complete the attached questionnaire to aid the Government in its evaluation of our past performance and FAX it directly to the Corps of Engineers, ATTN: Sandra Oquita at (213) 452- 4184. If you prefer, you may provide the requested information by email to sandra.oquita@usace.army.mil *

* The Government is requesting receipt of this information by 2:00 p.m. on 15 January 2010.

You are advised that it is Government policy that the identity of sources providing past performance information will not be released outside the Government.

We appreciate your efforts to help the Government fairly evaluate our record of past performance. Should you have any questions related to this matter, please contact Ms. Oquita at telephone (213) 452-3249.

Sincerely, Contractor Attachment

AMD 0003, SECTION 110 8

PAST PERFORMANCE REFERENCE CHECK

1. Name of contractor whose performance is being evaluated:

2. Project/Contract: _________________________________ ____________________

3. Name of person completing this form: ____________________________________

4. Company/Organization of person completing this form: _______________________

5. Date form was completed: _____________________________________________

6. Ratings:

a. Quality of Service:

EXCELLENT

VERY GOOD

GOOD

SATISFACTORY

MARGINAL

UNSAT

Comments:

b. Timeliness:

EXCELLENT

VERY GOOD

GOOD

SATISFACTORY

c. Business Relationships:

GOOD

SATISFACTORY

AMD 0003, SECTION 110 9

d. Overall Assessment:

GOOD

SATISFACTORY

Would you use this company again for similar work?

_____YES _____NO

NOTE: In addition to assigning adjectival ratings, comments may be written in the adjacent blank spaces.

AMD 0003, SECTION 110 10

Format For Offeror’s Submission of Recent/Relevant Project Information (To be completed by Offeror)

2. Contract Number: Task Order (TO) Number if Applicable:

3. Solicitation Type: Negotiated Sealed Bid

1. Contractor (Firm being evaluated): Name: Address:

4. Contract/TO Type: Fixed-Price Cost Reimbursement Hybrid (explain)____________

6. Contract/TO Dollar Value:

Routine Difficult 5. Complexity of Work 1 2 3 4 5

7. Contract/TO Status: Active Complete Completion Date (w/ extensions):

8. Description, location & relevancy of work:

9. Problems encountered and how resolved:

10. Name, Address, Telephone Number and E-mail of the Procuring Contracting Officer and/or the Contracting Officer’s Representative (COR) (and other references, e.g., Administrative Contracting Officer, if applicable):

11. Check one of the following blocks:

A written performance evaluation was received for this project and is attached.

A written performance evaluation was not received for this project.

A performance questionnaire has been sent to the reference(s) listed in Block 10, with a letter requesting that the completed questionnaire be returned directly to the Corps of Engineers by the closing date for this solicitation.

AMD 0003, SECTION 110 11

AMD 0003, SECTION 110 12

EXPERIENCE AND QUALIFICATIONS – CONSTRUCTION KEY PERSONNEL

(Resume)

1. Name and job title: (If this job title differs from the one used in the solicitation to designate key personnel but the individual will be performing essentially the same functions, provide a cross-reference to the job title used in the solicitation.)

2. Total cumulative number of years individual has worked in the above position:

3. Individual’s current status: (Current employee of the Offeror, prospective employee of the

Offeror, key subcontractor employee, prospective employee of a key subcontractor, etc...)

4. Name and address of individual’s current employer: (If other than the Offeror)

5. Individual’s projected availability to work on the prospective contract: (Estimated percentage of his or her time this person will be working on the prospective contract.)

6. Individual’s proposed role/assignment on this project: (Briefly describe the authorities, duties, and responsibilities this individual will have on the prospective contract.)

7. Individual’s relevant education: (Degree(s)/Year/Specialization):

8. Individual’s active registration: (If applicable)

State________ Year ______ Discipline _______________

9. Relevant Specialized Training: (If applicable)

10. Individual’s specific qualifications and experience relevant to this project:

(Provide specific details, not general statements. Explain their relevance. Provide any other information pertaining to the qualifications of this person for this project not specifically addressed above that directly relates to this evaluation subfactor (for example, prior design-build experience). A complete list of the individual’s prior experience is neither required nor desired.

Tailor the information provided to this acquisition.)

NOTE: If the proposed person is not currently employed by either the Offeror or a proposed key subcontractor, provide a letter of commitment from the person stating his or her intent to work on this project if the Offeror is awarded the contract. The attachment is not included in the page limitation.

-END OF SECTION-

SECTION 00120

PROPOSAL EVALUATION AND CONTRACT AWARD

I. ELIGIBILITY FOR CONTRACT AWARD………………………………………………………..1

II. SOURCE SELECTION USING THE TRADE-OFF PROCESS………………………………….1

III. RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION

FACTORS…………………………………………………………………………………………………1

IV. LIST OF THE TECHNICAL EVALUATION FACTORS………………………………………1

V. TECHNICAL EVALUATION FACTORS AND EVALUATION CRITERIA…………………..3

VI. EVALUATION OF THE PRICE PROPOSAL……………………………………………………7

VII. INTENT TO AWARD WITHOUT DISCUSSIONS………………………………………………7

AMD 0003, SECTION 120 1

SECTION 00120

PROPOSAL EVALUATION AND CONTRACT AWARD

I. ELIGIBILITY FOR CONTRACT AWARD

In accordance with the Federal Acquisition Regulations (FAR), no contract will be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

II. SOURCE SELECTION USING THE TRADE-OFF PROCESS

The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15. This process permits tradeoffs between price and technical merit/quality and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative assessment of proposals against all source selection criteria in the solicitation.

All non-cost (i.e., technical) evaluation factors, when combined, are approximately equal to price. The Government is concerned with striking the most advantageous balance between Technical merit (quality) and cost to the Government (the price). The degree of importance of price could become greater depending upon the equality of the proposals for the non-price technical evaluation factors. Where competing technical proposals are determined to be substantially equal, price could become the controlling factor.

III. LIST OF THE TECHNICAL EVALUATION FACTORS

The Technical Proposal will be evaluated based on the following technical evaluation factors

FACTOR 1, CONSTRUCTION EXPERIENCE ON SIMILAR CONTRACTS

FACTOR 2, PAST PERFORMANCE ON RECENT, RELEVANT CONTRACTS

FACTOR 3, MANAGEMENT PLAN

FACTOR 4, TECHNICAL APPROACH

FACTOR 5, PROPOSED SCHEDULE

IV. THE RELATIVE WEIGHTS OF THE TECHNICAL EVALUATION FACTORS. The non-price evaluation factors are listed in descending order of importance.

The following factor is the most important and when combined with Factor 2 is worth significantly more than the combined weight of remaining factors.

Factor 1 Construction Experience on Similar Contracts

The following factor (Factor 2) is approximately equal in importance to Factor 1.

Factor 2 Past Performances on Recent Relevant Contracts

The following factor (Factor 3) is slightly less important than the previous factors (Factors 1 and 2).

AMD 0003, SECTION 120 2

Factor 3 Management Plan

The following factor (Factor 4) is approximately equal in importance to the previous factor (Factor 3).

Factor 4 Technical Approach

The following factor (Factor 5) is less important than the previous factors .

Factor 5. Proposed Schedule

V. TECHNICAL EVALUATION FACTORS AND EVALUATION CRITERIA

The weighting of the evaluation factors takes into consideration not only how important that particular factor is to the overall project, but also the latitude for the Offeror to provide features that would be more advantageous to the Government. An evaluation of technical quality/technical merit is inherent in these criteria. Proposals, which exceed the minimum criteria or include desirable betterments will therefore be rated higher than proposals which only meet the minimum criteria in accordance with the value of these features to the Government.

Risk to the Government will be evaluated. The offerer shall identify what is considered to be betterments as outlined in Section 00800 “Proposed Betterments” for Factor 3 & 4. Proposal risk is an assessment of the weaknesses and risks associated with the Offerors proposed approach derived from the technical evaluation. Performance risk is an assessment of the Offeror’s demonstrated performance on recent, relevant contracts relative to the past performance factor.

FACTOR 1: CONSTRUCTION EXPERIENCE ON SIMILAR CONTRACTS

EXPERIENCE – The Government will evaluate the extent of an offeror’s experience and proposed team’s experience (key subcontractors) on projects of similar type, scope, and complexity as compared to the work that is required under this RFP. Recent, relevant, and teaming experiences are advantageous for evaluation purposes. Similarly, previous design-build experience, both individually and as a team, is advantageous. Information submitted on projects currently under construction will only be evaluated if the work is completed to an extent, from which experience can be creditable, i.e., at least 70% complete. Projects older than five years will carry little weight for evaluation purposes.

FACTOR 2: PAST PERFORMANCE ON RECENT, RELEVANT PROJECTS

This area considers the Offeror's capabilities and past performance for successful completion of recent, relevant construction projects.

(1) The government will evaluate past performance information to assess the risks associated with each Offerors likelihood of success in performing the requirements stated in the RFP based on that Offerors demonstrated performance on recent, relevant contracts within the past five years. The government will focus on information that demonstrates quality of performance relative to the size and complexity of the procurement under consideration.

(2) The evaluation may take into consideration the Offerors record of conformance to contract specifications and standards of good workmanship; the Offerors safety performance, the Offerors adherence to contract cost, the Offerors adherence to contract schedule, including the administrative aspects of performance; the Offerors history of reasonable and cooperative behavior, commitment to customer satisfaction, and timely award and management of subcontracts; and for federal contracts, the Offerors history of compliance with the requirements of FAR 52.219-8, Utilization of Small Business Concerns, and for large businesses only, the Offerors history of compliance with the requirements of FAR 52.219-9, AMD 0003, SECTION 120 3

“Small Business Subcontracting Plan”.

(3) The evaluation may take into account the number and severity of problems, the demonstrated effectiveness of corrective actions taken, and the overall work record.

(4) The performance record of proposed major subcontractors and proposed key personnel might also be considered. The result will be a performance risk rating based on the identified strengths and weaknesses in each Offerors record of past performance.

(5) In conducting the performance risk assessment, the government may use data provided by the Offeror and data obtained from other sources, including automated databases. The “References’ Past Performance/Quality Questionnaire” (Past Performance Reference Check in Section 00110) is one of the means that may be used by the government to collect past performance information. The Government may contact references other than those identified by the Offeror. The Government may also take into consideration the Offerors performance of contracts with the Agency.

(6) While the Government may elect to consider data obtained from other sources, the burden of providing thorough and complete factual information pertaining to recent and relevant contracts from which the Government can ascertain past performance information rests with the Offeror. Inaccurate or incomplete data from the Offeror may result in a less than satisfactory past performance/risk-assessment rating.

(7) Past performance information collected by the Government may be used for both the responsibility determination for this procurement and in conjunction with the technical evaluation.

(8) In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror will not be evaluated favorably or unfavorably on past performance. However, the Government is not precluded from making award to a higher-priced Offeror with a favorable past performance record over a lower-priced Offeror with a “neutral” past performance rating.

(9) Generally, the Offerors record of past performance on contracts, which are not considered by the Government to be both recent and relevant, will not be evaluated. However, the Offerors record of past performance on such contracts may be utilized by the Government when appropriate (e.g., in lieu of giving the Offeror a neutral rating, if the Offeror is not a new business entity and nonetheless has not provided information to the Government pertaining to its recent, relevant contracts). However, since the past performance information may not be recent or for similar types of projects, the Offeror may receive a higher, less favorable risk assessment rating for such projects.

FACTOR 3: MANAGEMENT PLAN

The Government will evaluate the experience and qualifications of the key personnel proposed for the project. Personnel will be evaluated on their overall professional experience and on specific experience on projects of similar type, scope, and complexity to the work required under this RFP.

The Government will evaluate the management structure from design-start to construction-complete, showing organizational charts, level of personnel authority of the individuals involved specifically with this project; and the involvement of the construction team, including major subcontractors, during design and the design team’s involvement during construction.

The Government will evaluate the proposed Project Manager, Construction Site Superintendent, Safety Manager, and Quality Control (QC) individual(s)’ respective qualifications, responsibilities, AMD 0003, SECTION 120 4 and authority levels.

FACTOR 4: TECHNICAL APPROACH

The Government will evaluate the Offeror’s understanding of the unique requirements of the facility as portrayed in your discussion of design and construction intent for this project.

Requirements to be evaluated include, but are not limited to the following:

CIVIL/SITE DESIGN AND NARRATIVE. Evaluations will consider the demonstrated understanding of requirements for the site circulation, layout and utilities for the elements of the project. The narrative shall also include discussions on sequencing of work, economy of grading, security requirements and site amenities. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards, and the Air Force Enlisted Dormitory Design Guide requirements.

ARCHITECTURAL AND INTERIOR DESIGN AND NARRATIVES. Evaluations will consider the understanding of adjacency and space allocation requirements for the development of the floor plan(s), and appearance of the exterior facades. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements. Also considered advantageous will be the, Life Safety provisions, circulation, location on the site, size of building (Insure that facility does not exceed scope), support spaces, vehicular and pedestrian access. Other considerations include that the plan to provide a complex that is representative of an inviting community and effectively utilizes horizontal and vertical space, natural light and outdoor amenities.

STRUCTURAL NARRATIVE. Evaluations will consider the understanding of requirements for the structural systems of the facility. The narrative shall include discussions on system benefits, economy, and safety and security requirements. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements.

MECHANICAL NARRATIVE. Evaluations will consider the understanding of requirements for the mechanical systems for the facility. The narrative shall also include discussions on redundancies, sound attenuation, security requirements and interface with the existing chiller plant. The mechanical narrative must address any considerations for fire protection and plumbing. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements.

ELECTRICAL NARRATIVE. Evaluations will consider the understanding of requirements for electrical, lighting and communications systems for each room type within the facility and including primary site amenities. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements.

LANDSCAPING PLAN AND STREETSCAPE. Evaluations will consider the location and appropriateness of the plantings proposed, exterior elevation features and relationship with the facilities from the adjacent major streets or pedestrian walkways. Landscaping of common area is desired, and water conservation is important to Davis-Monthan Air Force Base. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements.

AMD 0003, SECTION 120 5

OPERABILITY AND MAINTAINABILITY. Evaluations will consider finishes, systems and other factors addressing reduced operations cost, and maintainability of the facility. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements.

ENERGY CONSERVATION. Evaluations will consider energy and water conservation features integrated into the site and building construction, including renewable energy systems. The narrative should address how the design will incorporate energy and water saving devices and systems into the building envelope, electrical and mechanical systems within the facility, and any renewable energy systems proposed. The Government will consider it advantageous that the proposal complies with the Davis-Monthan Air Force Base Design Compatibility Standards requirements and the Air Force Enlisted Dormitory Design Guide requirements.

LEED CERTIFIABILITY. Evaluations will consider the incorporation of LEED elements into the design and construction of the project. The narrative should address the incorporation of LEED elements into the design and construction, and how that will ultimately lead to a LEED certifiable project. The narrative should also address the LEED certified personnel that will be a part of the design and construction teams.

DRAWING; CIVIL SITE PLAN: At appropriate scale, provide a civil engineering overall layout of the project site, showing all elements required, including, but not limited to, dormitory layout, common areas, recreation areas, streets, adjoining buildings, parking, sidewalks, storm water management, utilities and landscaping (if not shown on separate sheet).

DRAWING; FLOOR PLAN DORMITORY MODULE: At appropriate scale, provide dimensioned single line floor plan of the dormitory module. Identify all spaces, fixed equipment, door swings, and window openings. Provide module overall and room square foot calculations.

DRAWING; OVERALL FLOOR PLAN: At appropriate scale, provide dimensioned single line floor plan of the dormitory footprint incorporating the dormitory module. Identify all living and support spaces, fixed equipment, door swings, and window openings and circulation. Provide overall building square foot calculations.

DRAWING; EXTERIOR ELEVATIONS: At appropriate scale, show a minimum of two elevations of the new facility, and indicate all proposed building materials and finishes, fenestration, building height and roof slopes.

SPECIFICATIONS: Offeror(s) are not required to submit specifications. Sample specifications may be provided within the narrative to define proposed quality levels

FACTOR 5: PROPOSED SCHEDULE

The Government will evaluate the proposed schedule to determine if the Offeror’s plan assures completion within the specified time stated in Section 00800 or a lessor time proposed by the Offeror. The schedule will be evaluated to determine whether it is, complete, reasonable, realistic, and achievable. A schedule proposing less time than required in Section 00800 will be considered advantageous.

This schedule shall clearly show how it compares to the number of calendar days and the sequence of construction as stated in Section 00800 of the RFP. The schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Give special attention to the following tasks:

(a) Show the design phase, including events associated with coordinating the

AMD 0003, SECTION 120 6

AMD 0003, SECTION 120 7

design submittals and Government review.

(b) Show the construction phase for each major feature of construction. The schedule shall indicate the Offeror’s understanding of the relationship between design after award and building construction.

(c) Include long lead material submittals and government review.

(d) Show proposed completion date of the project and the total proposed project duration in calendar days.

VI. EVALUATION OF THE PRICE PROPOSAL

Price or cost to the Government will be evaluated and considered in the trade-off process but will not be scored or combined with other aspects of the evaluation. The proposed price will be analyzed for reasonableness. It may also be analyzed to determine whether it is realistic for the work to be performed; reflects a clear understanding of the requirements; and is consistent with the Offerors Technical Proposal. All offers with separately priced line items or sub line items will be analyzed for unbalanced pricing.

VII. INTENT TO AWARD WITHOUT DISCUSSIONS

The Government intends to evaluate proposals and award a contract without discussions, but reserves the right to conduct discussions and receive revised proposals if later determined to be in the best interest of the Government.

VIII. PROPOSAL SUBMITTAL:

The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being downgraded and/or being found deficient if inadequate detail is provided. Material omission(s) may cause the technical proposal to be rejected as unacceptable. The technical proposals will be reviewed for compliance with the technical specifications and applicable building codes and regulations. Non-compliance with the technical specifications and/or applicable building codes and/or regulations will be considered a deficiency. Proposals which are generic, vague, or lacking in detail, may be downgraded.

-END OF SECTION-

amd 3 section 110.pdf
PROPOSAL COVER SHEET
SUMMARY OF PROPOSAL SUBMISSION REQUIREMENTS