About this file

Abstract of Bids

View the file

Other files

File Type Posted
Am5.pdf PDF
Plans_Am5.zip ZIP file
Am4.pdf PDF
Am3.pdf PDF
AM03Plans.zip ZIP file
Am2.pdf PDF
Am01.pdf PDF
W912PL10B0002_Plan1.zip ZIP file
W912PL10B0002_spec.pdf PDF
W912PL10B0002_Plan4.zip ZIP file
W912PL10B0002_Plan3.zip ZIP file
W912PL10B0002_Plan2.zip ZIP file
W912PL10B0002_Plan5.zip ZIP file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers GOVERNMENT ESTIMATE P.O. Box 532711 Los Angeles, CA 90053-2325

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $256,584.00 $256,584.00 0002 Mobilization and Demobilization 1 LS $1,154,627.00 $1,154,627.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $641,459.00 $641,459.00 0004 Removal, Disposal and Installation of Levee 1 LS $44,902.00 $44,902.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $12.83 $115,470.00 0006 Excavation, Levee Toe 338,000 CY $3.21 $1,084,980.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $38.49 $6,004,440.00 0008 Miscellaneous Fill 265,000 CY $1.28 $339,200.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.57 $282,700.00 0010 18'' Riprap Toedown Protection 295 CY $109.00 $32,155.00 0011 Grout Protection 10 CY $257.00 $2,570.00 0012 Removal of the Existing ABC, Levee Road 1 LS $64,146.00 $64,146.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $51.00 $158,100.00 0014 Survey Marker Installation 1 LS $6,415.00 $6,415.00 0015 RCB and RCP Culverts 1 LS $218,096.00 $218,096.00 0016 As-Built Drawings 1 LS $12,829.00 $12,829.00 0017 Mobilization and Demobilization 1 LS $128,292.00 $128,292.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,194.00 $3,865,828.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $513.00 $45,144.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $19,244.00 $19,244.00 0021 Installation of New 4'' ABC, Levee Road 340 CY $77.00 $26,180.00

Total Estimated Amount (Items 0001-0021) $14,503,361.00

Wood Bros Inc PO Box 216: 14147 18th Ave Lemoore, CA 93245

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $179,600.00 $179,600.00 0002 Mobilization and Demobilization 1 LS $1,170,015.00 $1,170,015.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $55,660.00 $55,660.00 0004 Removal, Disposal and Installation of Levee 1 LS $11,220.00 $11,220.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $3.96 $35,640.00 0006 Excavation, Levee Toe 338,000 CY $1.55 $523,900.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $25.70 $4,009,200.00 0008 Miscellaneous Fill 265,000 CY $0.29 $76,850.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $0.29 $31,900.00 0010 18'' Riprap Toedown Protection 295 CY $14.00 $4,130.00 0011 Grout Protection 10 CY $447.50 $4,475.00 0012 Removal of the Existing ABC, Levee Road 1 LS $12,600.00 $12,600.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $29.17 $90,427.00 0014 Survey Marker Installation 1 LS $4,335.00 $4,335.00 0015 RCB and RCP Culverts 1 LS $122,315.00 $122,315.00 0016 As-Built Drawings 1 LS $42,240.00 $42,240.00 0017 Mobilization and Demobilization 1 LS $110,000.00 $110,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,908.00 $5,123,896.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,430.00 $125,840.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $2,100.00 $2,100.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $31.60 $10,744.00

$11,747,087.00

West-Tech Contracting, Inc.

568 North Tulip St.

Escondido, CA 92025

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $33,474.53 $33,474.53 0002 Mobilization and Demobilization 1 LS $515,918.71 $515,918.71 0003 Foundation Preparation, Soil Cement Levee 1 LS $89,491.34 $89,491.34 0004 Removal, Disposal and Installation of Levee 1 LS $7,072.05 $7,072.05

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $2.83 $25,470.00 0006 Excavation, Levee Toe 338,000 CY $2.04 $689,520.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $30.38 $4,739,280.00 0008 Miscellaneous Fill 265,000 CY $1.49 $394,850.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.24 $246,400.00 0010 18'' Riprap Toedown Protection 295 CY $26.48 $7,811.60 0011 Grout Protection 10 CY $125.00 $1,250.00 0012 Removal of the Existing ABC, Levee Road 1 LS $33,106.35 $33,106.35 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $39.89 $123,659.00 0014 Survey Marker Installation 1 LS $2,511.63 $2,511.63 0015 RCB and RCP Culverts 1 LS $66,686.14 $66,686.14 0016 As-Built Drawings 1 LS $1,500.00 $1,500.00 0017 Mobilization and Demobilization 1 LS $70,000.00 $70,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,700.00 $4,757,400.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,700.00 $149,600.00

0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,497.40 $3,497.40 0021 Installation of New 4'' ABC, Levee Road 340 CY $39.89 $13,562.60

$11,972,061.35

Cushman Contracting Corporation P.O. Box 147 Goleta, CA

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $850,680.00 $850,680.00 0002 Mobilization and Demobilization 1 LS $507,450.00 $507,450.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $408,800.00 $408,800.00 0004 Removal, Disposal and Installation of Levee 1 LS $11,400.00 $11,400.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $6.30 $56,700.00 0006 Excavation, Levee Toe 338,000 CY $2.35 $794,300.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $28.70 $4,477,200.00 0008 Miscellaneous Fill 265,000 CY $0.25 $66,250.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.35 $258,500.00 0010 18'' Riprap Toedown Protection 295 CY $55.00 $16,225.00 0011 Grout Protection 10 CY $350.00 $3,500.00 0012 Removal of the Existing ABC, Levee Road 1 LS $15,000.00 $15,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $60.00 $186,000.00 0014 Survey Marker Installation 1 LS $3,500.00 $3,500.00 0015 RCB and RCP Culverts 1 LS $105,000.00 $105,000.00 0016 As-Built Drawings 1 LS $26,520.00 $26,520.00 0017 Mobilization and Demobilization 1 LS $599,000.00 $599,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,115.00 $3,726,630.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,090.00 $95,920.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $10,000.00 $10,000.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $60.00 $20,400.00

$12,238,975.00

Legacy Construction & Development Inc.

340 Falcon Ridge Parkway #700 Mesquite, NV 89027

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $205,000.00 $205,000.00 0002 Mobilization and Demobilization 1 LS $820,000.00 $820,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $350,000.00 $350,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $41,000.00 $41,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $5.00 $45,000.00 0006 Excavation, Levee Toe 338,000 CY $2.80 $946,400.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $29.50 $4,602,000.00 0008 Miscellaneous Fill 265,000 CY $0.70 $185,500.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.10 $121,000.00 0010 18'' Riprap Toedown Protection 295 CY $50.00 $14,750.00 0011 Grout Protection 10 CY $350.00 $3,500.00 0012 Removal of the Existing ABC, Levee Road 1 LS $31,000.00 $31,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $44.00 $136,400.00 0014 Survey Marker Installation 1 LS $4,000.00 $4,000.00 0015 RCB and RCP Culverts 1 LS $48,000.00 $48,000.00 0016 As-Built Drawings 1 LS $12,000.00 $12,000.00 0017 Mobilization and Demobilization 1 LS $220,500.00 $220,500.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,560.00 $4,510,720.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,425.00 $125,400.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,500.00 $3,500.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $44.00 $14,960.00

$12,440,630.00

Alpine Diversified Inc.

PO Box 51: 770 E. Bush St.

Lemoore, CA 93245

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $47,250.00 $47,250.00 0002 Mobilization and Demobilization 1 LS $1,440,696.00 $1,440,696.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $57,200.00 $57,200.00 0004 Removal, Disposal and Installation of Levee 1 LS $11,250.00 $11,250.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $4.10 $36,900.00 0006 Excavation, Levee Toe 338,000 CY $1.60 $540,800.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $27.25 $4,251,000.00 0008 Miscellaneous Fill 265,000 CY $0.45 $119,250.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.60 $176,000.00 0010 18'' Riprap Toedown Protection 295 CY $15.40 $4,543.00 0011 Grout Protection 10 CY $455.00 $4,550.00 0012 Removal of the Existing ABC, Levee Road 1 LS $13,305.00 $13,305.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $30.15 $93,465.00 0014 Survey Marker Installation 1 LS $5,226.00 $5,226.00 0015 RCB and RCP Culverts 1 LS $122,530.00 $122,530.00 0016 As-Built Drawings 1 LS $44,375.00 $44,375.00 0017 Mobilization and Demobilization 1 LS $115,000.00 $115,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,180.00 $5,603,160.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,870.00 $164,560.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $2,250.00 $2,250.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $32.05 $10,897.00

$12,864,207.00

SEMA Construction, Inc.

6 Orchard, Ste. 150 Lake Forest, CA 92630

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $20,000.00 $20,000.00 0002 Mobilization and Demobilization 1 LS $1,000,000.00 $1,000,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $200,000.00 $200,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $30,000.00 $30,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $10.00 $90,000.00 0006 Excavation, Levee Toe 338,000 CY $2.70 $912,600.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $32.00 $4,992,000.00 0008 Miscellaneous Fill 265,000 CY $1.00 $265,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.00 $220,000.00 0010 18'' Riprap Toedown Protection 295 CY $25.00 $7,375.00 0011 Grout Protection 10 CY $300.00 $3,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $20,000.00 $20,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $50.00 $155,000.00 0014 Survey Marker Installation 1 LS $2,500.00 $2,500.00 0015 RCB and RCP Culverts 1 LS $170,000.00 $170,000.00 0016 As-Built Drawings 1 LS $2,500.00 $2,500.00 0017 Mobilization and Demobilization 1 LS $250,000.00 $250,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,500.00 $4,405,000.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,850.00 $162,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,000.00 $3,000.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $50.00 $17,000.00

$12,927,775.00

MJ Avila Company, Inc.

7258 W. Rialto Ave Fresno, CA 93723

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $320,358.06 $320,358.06 0002 Mobilization and Demobilization 1 LS $758,670.13 $758,670.13 0003 Foundation Preparation, Soil Cement Levee 1 LS $160,144.88 $160,144.88 0004 Removal, Disposal and Installation of Levee 1 LS $27,890.69 $27,890.69

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $10.68 $96,120.00 0006 Excavation, Levee Toe 338,000 CY $1.87 $632,060.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $32.04 $4,998,240.00 0008 Miscellaneous Fill 265,000 CY $0.91 $241,150.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.20 $352,000.00 0010 18'' Riprap Toedown Protection 295 CY $75.44 $22,254.80 0011 Grout Protection 10 CY $491.35 $4,913.50 0012 Removal of the Existing ABC, Levee Road 1 LS $62,862.06 $62,862.06 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $41.76 $129,456.00 0014 Survey Marker Installation 1 LS $2,967.09 $2,967.09 0015 RCB and RCP Culverts 1 LS $103,239.90 $103,239.90 0016 As-Built Drawings 1 LS $32,624.96 $32,624.96 0017 Mobilization and Demobilization 1 LS $118,510.44 $118,510.44 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,990.01 $5,268,397.62 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,591.11 $140,017.68 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $9,165.95 $9,165.95

0021 Installation of New 4'' ABC, Levee Road 340 CY $55.31 $18,805.40

$13,499,849.16

Earth Construction & Mining 11542 Knott St., #10 Garden Grove, CA 92841

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $295,000.00 $295,000.00 0002 Mobilization and Demobilization 1 LS $985,500.00 $985,500.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $275,000.00 $275,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $42,500.00 $42,500.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $16.50 $148,500.00 0006 Excavation, Levee Toe 338,000 CY $1.80 $608,400.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $32.20 $5,023,200.00 0008 Miscellaneous Fill 265,000 CY $1.00 $265,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.60 $286,000.00 0010 18'' Riprap Toedown Protection 295 CY $45.00 $13,275.00 0011 Grout Protection 10 CY $380.00 $3,800.00 0012 Removal of the Existing ABC, Levee Road 1 LS $12,500.00 $12,500.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $46.00 $142,600.00 0014 Survey Marker Installation 1 LS $2,400.00 $2,400.00 0015 RCB and RCP Culverts 1 LS $95,000.00 $95,000.00 0016 As-Built Drawings 1 LS $9,000.00 $9,000.00 0017 Mobilization and Demobilization 1 LS $275,000.00 $275,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,800.00 $4,933,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,850.00 $162,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $12,500.00 $12,500.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $46.00 $15,640.00

$13,607,215.00

Rodney Williams Construction 107 North H St.

Lompoc, CA 93436

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $658,000.00 $658,000.00 0002 Mobilization and Demobilization 1 LS $1,273,445.00 $1,273,445.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $649,255.00 $649,255.00 0004 Removal, Disposal and Installation of Levee 1 LS $32,715.00 $32,715.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $7.94 $71,460.00 0006 Excavation, Levee Toe 338,000 CY $2.82 $953,160.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $29.50 $4,602,000.00 0008 Miscellaneous Fill 265,000 CY $0.25 $66,250.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.50 $165,000.00 0010 18'' Riprap Toedown Protection 295 CY $49.60 $14,632.00 0011 Grout Protection 10 CY $895.00 $8,950.00 0012 Removal of the Existing ABC, Levee Road 1 LS $56,265.00 $56,265.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $29.90 $92,690.00 0014 Survey Marker Installation 1 LS $1,820.00 $1,820.00 0015 RCB and RCP Culverts 1 LS $159,835.00 $159,835.00 0016 As-Built Drawings 1 LS $3,250.00 $3,250.00 0017 Mobilization and Demobilization 1 LS $118,235.00 $118,235.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,590.50 $4,564,461.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,315.00 $115,720.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $12,155.00 $12,155.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $29.90 $10,166.00

$13,629,464.00

C.A. Rasmussen, Inc.

28548 Livingston Ave.

Valencia, CA 91355

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $6,900.00 $6,900.00 0002 Mobilization and Demobilization 1 LS $250,000.00 $250,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $22,000.00 $22,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $33,000.00 $33,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $12.00 $108,000.00 0006 Excavation, Levee Toe 338,000 CY $2.10 $709,800.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $37.00 $5,772,000.00 0008 Miscellaneous Fill 265,000 CY $0.91 $241,150.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.20 $242,000.00 0010 18'' Riprap Toedown Protection 295 CY $140.00 $41,300.00 0011 Grout Protection 10 CY $300.00 $3,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $25,000.00 $25,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $105.00 $325,500.00 0014 Survey Marker Installation 1 LS $3,100.00 $3,100.00 0015 RCB and RCP Culverts 1 LS $175,000.00 $175,000.00 0016 As-Built Drawings 1 LS $1,500.00 $1,500.00 0017 Mobilization and Demobilization 1 LS $30,000.00 $30,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,300.00 $5,814,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $2,100.00 $184,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $5,700.00 $5,700.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $105.00 $35,700.00

$14,030,050.00

Altfillisch Contractors, Inc. DBA ACI 13300 Citrus Street Corona, CA 92880

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $415,000.00 $415,000.00 0002 Mobilization and Demobilization 1 LS $800,000.00 $800,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $422,000.00 $422,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $14,000.00 $14,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $3.59 $32,310.00 0006 Excavation, Levee Toe 338,000 CY $2.67 $902,460.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $35.44 $5,528,640.00 0008 Miscellaneous Fill 265,000 CY $0.40 $106,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $4.31 $474,100.00 0010 18'' Riprap Toedown Protection 295 CY $268.00 $79,060.00 0011 Grout Protection 10 CY $217.00 $2,170.00 0012 Removal of the Existing ABC, Levee Road 1 LS $8,400.00 $8,400.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $50.00 $155,000.00 0014 Survey Marker Installation 1 LS $5,000.00 $5,000.00 0015 RCB and RCP Culverts 1 LS $189,000.00 $189,000.00 0016 As-Built Drawings 1 LS $7,800.00 $7,800.00 0017 Mobilization and Demobilization 1 LS $110,000.00 $110,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,950.00 $5,197,900.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,850.00 $162,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,250.00 $3,250.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $50.00 $17,000.00

$14,631,890.00

Yerba Buena Engineering & Construction, Inc.

1340 Egbert Ave.

San Francisco, CA 94124

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $20,000.00 $20,000.00 0002 Mobilization and Demobilization 1 LS $1,275,000.00 $1,275,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $330,000.00 $330,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $20,000.00 $20,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $6.00 $54,000.00 0006 Excavation, Levee Toe 338,000 CY $4.00 $1,352,000.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $38.00 $5,928,000.00 0008 Miscellaneous Fill 265,000 CY $1.00 $265,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.00 $110,000.00 0010 18'' Riprap Toedown Protection 295 CY $40.00 $11,800.00 0011 Grout Protection 10 CY $300.00 $3,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $15,000.00 $15,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $40.00 $124,000.00 0014 Survey Marker Installation 1 LS $5,000.00 $5,000.00 0015 RCB and RCP Culverts 1 LS $200,000.00 $200,000.00 0016 As-Built Drawings 1 LS $1,000.00 $1,000.00 0017 Mobilization and Demobilization 1 LS $100,000.00 $100,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,750.00 $4,845,500.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,300.00 $114,400.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,000.00 $3,000.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $40.00 $13,600.00

$14,790,300.00

Ace Engineering, Inc.

1880 Wright Ave.

La Verne, CA 91750

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $54,297.00 $54,297.00 0002 Mobilization and Demobilization 1 LS $212,972.00 $212,972.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $269,479.00 $269,479.00 0004 Removal, Disposal and Installation of Levee 1 LS $50,728.00 $50,728.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $9.71 $87,390.00 0006 Excavation, Levee Toe 338,000 CY $2.51 $848,380.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $46.99 $7,330,440.00 0008 Miscellaneous Fill 265,000 CY $0.41 $108,650.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.27 $359,700.00 0010 18'' Riprap Toedown Protection 295 CY $129.00 $38,055.00 0011 Grout Protection 10 CY $238.00 $2,380.00 0012 Removal of the Existing ABC, Levee Road 1 LS $73,715.00 $73,715.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $49.29 $152,799.00 0014 Survey Marker Installation 1 LS $15,033.00 $15,033.00 0015 RCB and RCP Culverts 1 LS $81,274.00 $81,274.00 0016 As-Built Drawings 1 LS $15,033.00 $15,033.00 0017 Mobilization and Demobilization 1 LS $244,260.00 $244,260.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,776.00 $4,891,312.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $478.00 $42,064.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $24,067.00 $24,067.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $53.00 $18,020.00

$14,920,048.00

USS Cal Builders, Inc.

8051 Main Street Stanton, CA 90680

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $275,000.00 $275,000.00 0002 Mobilization and Demobilization 1 LS $440,000.00 $440,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $660,000.00 $660,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $50,000.00 $50,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $6.60 $59,400.00 0006 Excavation, Levee Toe 338,000 CY $1.98 $669,240.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $35.20 $5,491,200.00 0008 Miscellaneous Fill 265,000 CY $1.38 $364,375.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.20 $242,000.00 0010 18'' Riprap Toedown Protection 295 CY $77.00 $22,715.00 0011 Grout Protection 10 CY $550.00 $5,500.00 0012 Removal of the Existing ABC, Levee Road 1 LS $24,200.00 $24,200.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $33.00 $102,300.00 0014 Survey Marker Installation 1 LS $165,000.00 $165,000.00 0015 RCB and RCP Culverts 1 LS $220,000.00 $220,000.00 0016 As-Built Drawings 1 LS $44,000.00 $44,000.00 0017 Mobilization and Demobilization 1 LS $165,000.00 $165,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,300.00 $5,814,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,760.00 $154,880.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $5,500.00 $5,500.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $33.00 $11,220.00

$14,986,130.00

Specialty Construction, Inc.

645 Clarion Ct.

San Luis Obispo, CA 93401

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $15,000.00 $15,000.00 0002 Mobilization and Demobilization 1 LS $1,038,200.00 $1,038,200.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $95,250.00 $95,250.00 0004 Removal, Disposal and Installation of Levee 1 LS $19,650.00 $19,650.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $12.35 $111,150.00 0006 Excavation, Levee Toe 338,000 CY $2.15 $726,700.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $42.50 $6,630,000.00 0008 Miscellaneous Fill 265,000 CY $1.50 $397,500.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.70 $407,000.00 0010 18'' Riprap Toedown Protection 295 CY $30.00 $8,850.00 0011 Grout Protection 10 CY $923.00 $9,230.00 0012 Removal of the Existing ABC, Levee Road 1 LS $25,900.00 $25,900.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $26.00 $80,600.00 0014 Survey Marker Installation 1 LS $1,500.00 $1,500.00 0015 RCB and RCP Culverts 1 LS $88,200.00 $88,200.00 0016 As-Built Drawings 1 LS $26,500.00 $26,500.00 0017 Mobilization and Demobilization 1 LS $107,520.00 $107,520.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,909.00 $5,125,658.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,400.00 $123,200.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $8,600.00 $8,600.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $106.00 $36,040.00

$15,082,248.00

Proven Management, Inc.

712 Sansome Street San Francisco, CA 94111

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $50,000.00 $50,000.00 0002 Mobilization and Demobilization 1 LS $200,000.00 $200,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $100,000.00 $100,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $25,000.00 $25,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $15.00 $135,000.00 0006 Excavation, Levee Toe 338,000 CY $3.00 $1,014,000.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $39.00 $6,084,000.00 0008 Miscellaneous Fill 265,000 CY $3.00 $795,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.00 $110,000.00 0010 18'' Riprap Toedown Protection 295 CY $75.00 $22,125.00 0011 Grout Protection 10 CY $500.00 $5,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $50,000.00 $50,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $50.00 $155,000.00 0014 Survey Marker Installation 1 LS $10,000.00 $10,000.00 0015 RCB and RCP Culverts 1 LS $50,000.00 $50,000.00 0016 As-Built Drawings 1 LS $20,000.00 $20,000.00 0017 Mobilization and Demobilization 1 LS $255,000.00 $255,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,300.00 $5,814,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,600.00 $140,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $100,000.00 $100,000.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $100.00 $34,000.00

$15,169,525.00

Ceres Environmental Services 3825 85th Ave N.

Brooklyn Park, MN 55443

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $82,314.24 $82,314.24 0002 Mobilization and Demobilization 1 LS $1,283,002.13 $1,283,002.13 0003 Foundation Preparation, Soil Cement Levee 1 LS $547,256.54 $547,256.54 0004 Removal, Disposal and Installation of Levee 1 LS $37,394.14 $37,394.14

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $8.04 $72,360.00 0006 Excavation, Levee Toe 338,000 CY $1.61 $544,180.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $33.12 $5,166,720.00 0008 Miscellaneous Fill 265,000 CY $1.32 $349,800.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.87 $425,700.00 0010 18'' Riprap Toedown Protection 295 CY $116.62 $34,402.90 0011 Grout Protection 10 CY $510.31 $5,103.10 0012 Removal of the Existing ABC, Levee Road 1 LS $34,311.96 $34,311.96 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $39.21 $121,551.00 0014 Survey Marker Installation 1 LS $9,137.29 $9,137.29 0015 RCB and RCP Culverts 1 LS $63,019.91 $63,019.91 0016 As-Built Drawings 1 LS $10,850.54 $10,850.54 0017 Mobilization and Demobilization 1 LS $688,441.51 $688,441.51 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,168.39 $5,582,703.18 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,996.78 $175,716.64 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $4,189.56 $4,189.56

0021 Installation of New 4'' ABC, Levee Road 340 CY $39.79 $13,528.60

$15,251,683.24

Morgen & Oswood Construction Co., Inc.

1321 8th Ave N. Ste 204 Great Falls, MT 59403

1.1 Bid Items

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 Diversion and Control of Water 1 LS $55,000.00 $55,000.00 0002 Mobilization and Demobilization 1 LS $950,000.00 $950,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $55,000.00 $55,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $65,000.00 $65,000.00

Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $8.60 $77,400.00 0006 Excavation, Levee Toe 338,000 CY $2.70 $912,600.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $33.75 $5,265,000.00 0008 Miscellaneous Fill 265,000 CY $0.28 $74,200.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.45 $159,500.00 0010 18'' Riprap Toedown Protection 295 CY $21.50 $6,342.50 0011 Grout Protection 10 CY $375.00 $3,750.00 0012 Removal of the Existing ABC, Levee Road 1 LS $8,000.00 $8,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $48.00 $148,800.00 0014 Survey Marker Installation 1 LS $3,000.00 $3,000.00 0015 RCB and RCP Culverts 1 LS $210,000.00 $210,000.00 0016 As-Built Drawings 1 LS $11,000.00 $11,000.00 0017 Mobilization and Demobilization 1 LS $1,500,000.00 $1,500,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,310.00 $5,832,220.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,400.00 $123,200.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $2,000.00 $2,000.00

0021 Installation of New 4'' ABC, Levee Road 340 CY $55.00 $18,700.00

$15,480,712.50

Bidders Total Estimated Amount Wood Bros Inc $11,747,087.00

PO Box 216: 14147 18th Ave Lemoore, CA 93245

West-Tech Contracting, Inc. $11,972,061.35 568 North Tulip St.

Escondido, CA 92025

Cushman Contracting Corporation $12,238,975.00 P.O. Box 147 Goleta, CA

Legacy Construction & Development Inc. $12,440,630.00 340 Falcon Ridge Parkway #700

Mesquite, NV 89027

Alpine Diversified Inc. $12,864,207.00 PO Box 51: 770 E. Bush St.

Lemoore, CA 93245

SEMA Construction, Inc. $12,927,775.00 6 Orchard, Ste. 150

Lake Forest, CA 92630

MJ Avila Company, Inc. $13,499,849.16 7258 W. Rialto Ave Fresno, CA 93723

Earth Construction & Mining $13,607,215.00 11542 Knott St., #10

Garden Grove, CA 92841

Rodney Williams Construction $13,629,464.00 107 North H St.

Lompoc, CA 93436

C.A. Rasmussen, Inc. $14,030,050.00 28548 Livingston Ave.

Valencia, CA 91355

Altfillisch Contractors, Inc. DBA ACI $14,631,890.00 13300 Citrus Street Corona, CA 92880

Yerba Buena Engineering & Construction, Inc. $14,790,300.00 1340 Egbert Ave.

San Francisco, CA 94124

Ace Engineering, Inc. $14,920,048.00 1880 Wright Ave.

La Verne, CA 91750

USS Cal Builders, Inc. $14,986,130.00 8051 Main Street

Stanton, CA 90680

Specialty Construction, Inc. $15,082,248.00 645 Clarion Ct.

San Luis Obispo, CA 93401

Proven Management, Inc. $15,169,525.00 712 Sansome Street

San Francisco, CA 94111

Ceres Environmental Services $15,251,683.24 3825 85th Ave N.

Brooklyn Park, MN 55443

Morgen & Oswood Construction Co., Inc. $15,480,712.50 1321 8THH Ave N. Ste 204

Great Falls, MT 59403

Gov
Wood Bros Inc
West-Tech
Cushman
Legacy
Alpine
SEMA
MJ AV
Earth
Rodney
C.A. RAS
ALTF
Yerba
ACE
USS
Specialty
Proven
Ceres
Morgen
Sheet5

File details come from the government source that posted it. Updated .