FEB 16 W912PL-10-B-0002.pdf
PDF 111 KB Posted
- Solicitation number
- W912PL-10-B-0002
About this file
Abstract of Bids
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am5.pdf | ||
| Plans_Am5.zip | ZIP file | |
| Am4.pdf | ||
| Am3.pdf | ||
| AM03Plans.zip | ZIP file | |
| Am2.pdf | ||
| Am01.pdf | ||
| W912PL10B0002_Plan1.zip | ZIP file | |
| W912PL10B0002_spec.pdf | ||
| W912PL10B0002_Plan4.zip | ZIP file | |
| W912PL10B0002_Plan3.zip | ZIP file | |
| W912PL10B0002_Plan2.zip | ZIP file | |
| W912PL10B0002_Plan5.zip | ZIP file |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers GOVERNMENT ESTIMATE P.O. Box 532711 Los Angeles, CA 90053-2325
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $256,584.00 $256,584.00 0002 Mobilization and Demobilization 1 LS $1,154,627.00 $1,154,627.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $641,459.00 $641,459.00 0004 Removal, Disposal and Installation of Levee 1 LS $44,902.00 $44,902.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $12.83 $115,470.00 0006 Excavation, Levee Toe 338,000 CY $3.21 $1,084,980.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $38.49 $6,004,440.00 0008 Miscellaneous Fill 265,000 CY $1.28 $339,200.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.57 $282,700.00 0010 18'' Riprap Toedown Protection 295 CY $109.00 $32,155.00 0011 Grout Protection 10 CY $257.00 $2,570.00 0012 Removal of the Existing ABC, Levee Road 1 LS $64,146.00 $64,146.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $51.00 $158,100.00 0014 Survey Marker Installation 1 LS $6,415.00 $6,415.00 0015 RCB and RCP Culverts 1 LS $218,096.00 $218,096.00 0016 As-Built Drawings 1 LS $12,829.00 $12,829.00 0017 Mobilization and Demobilization 1 LS $128,292.00 $128,292.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,194.00 $3,865,828.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $513.00 $45,144.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $19,244.00 $19,244.00 0021 Installation of New 4'' ABC, Levee Road 340 CY $77.00 $26,180.00
Total Estimated Amount (Items 0001-0021) $14,503,361.00
Wood Bros Inc PO Box 216: 14147 18th Ave Lemoore, CA 93245
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $179,600.00 $179,600.00 0002 Mobilization and Demobilization 1 LS $1,170,015.00 $1,170,015.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $55,660.00 $55,660.00 0004 Removal, Disposal and Installation of Levee 1 LS $11,220.00 $11,220.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $3.96 $35,640.00 0006 Excavation, Levee Toe 338,000 CY $1.55 $523,900.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $25.70 $4,009,200.00 0008 Miscellaneous Fill 265,000 CY $0.29 $76,850.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $0.29 $31,900.00 0010 18'' Riprap Toedown Protection 295 CY $14.00 $4,130.00 0011 Grout Protection 10 CY $447.50 $4,475.00 0012 Removal of the Existing ABC, Levee Road 1 LS $12,600.00 $12,600.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $29.17 $90,427.00 0014 Survey Marker Installation 1 LS $4,335.00 $4,335.00 0015 RCB and RCP Culverts 1 LS $122,315.00 $122,315.00 0016 As-Built Drawings 1 LS $42,240.00 $42,240.00 0017 Mobilization and Demobilization 1 LS $110,000.00 $110,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,908.00 $5,123,896.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,430.00 $125,840.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $2,100.00 $2,100.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $31.60 $10,744.00
$11,747,087.00
West-Tech Contracting, Inc.
568 North Tulip St.
Escondido, CA 92025
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $33,474.53 $33,474.53 0002 Mobilization and Demobilization 1 LS $515,918.71 $515,918.71 0003 Foundation Preparation, Soil Cement Levee 1 LS $89,491.34 $89,491.34 0004 Removal, Disposal and Installation of Levee 1 LS $7,072.05 $7,072.05
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $2.83 $25,470.00 0006 Excavation, Levee Toe 338,000 CY $2.04 $689,520.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $30.38 $4,739,280.00 0008 Miscellaneous Fill 265,000 CY $1.49 $394,850.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.24 $246,400.00 0010 18'' Riprap Toedown Protection 295 CY $26.48 $7,811.60 0011 Grout Protection 10 CY $125.00 $1,250.00 0012 Removal of the Existing ABC, Levee Road 1 LS $33,106.35 $33,106.35 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $39.89 $123,659.00 0014 Survey Marker Installation 1 LS $2,511.63 $2,511.63 0015 RCB and RCP Culverts 1 LS $66,686.14 $66,686.14 0016 As-Built Drawings 1 LS $1,500.00 $1,500.00 0017 Mobilization and Demobilization 1 LS $70,000.00 $70,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,700.00 $4,757,400.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,700.00 $149,600.00
0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,497.40 $3,497.40 0021 Installation of New 4'' ABC, Levee Road 340 CY $39.89 $13,562.60
$11,972,061.35
Cushman Contracting Corporation P.O. Box 147 Goleta, CA
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $850,680.00 $850,680.00 0002 Mobilization and Demobilization 1 LS $507,450.00 $507,450.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $408,800.00 $408,800.00 0004 Removal, Disposal and Installation of Levee 1 LS $11,400.00 $11,400.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $6.30 $56,700.00 0006 Excavation, Levee Toe 338,000 CY $2.35 $794,300.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $28.70 $4,477,200.00 0008 Miscellaneous Fill 265,000 CY $0.25 $66,250.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.35 $258,500.00 0010 18'' Riprap Toedown Protection 295 CY $55.00 $16,225.00 0011 Grout Protection 10 CY $350.00 $3,500.00 0012 Removal of the Existing ABC, Levee Road 1 LS $15,000.00 $15,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $60.00 $186,000.00 0014 Survey Marker Installation 1 LS $3,500.00 $3,500.00 0015 RCB and RCP Culverts 1 LS $105,000.00 $105,000.00 0016 As-Built Drawings 1 LS $26,520.00 $26,520.00 0017 Mobilization and Demobilization 1 LS $599,000.00 $599,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,115.00 $3,726,630.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,090.00 $95,920.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $10,000.00 $10,000.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $60.00 $20,400.00
$12,238,975.00
Legacy Construction & Development Inc.
340 Falcon Ridge Parkway #700 Mesquite, NV 89027
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $205,000.00 $205,000.00 0002 Mobilization and Demobilization 1 LS $820,000.00 $820,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $350,000.00 $350,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $41,000.00 $41,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $5.00 $45,000.00 0006 Excavation, Levee Toe 338,000 CY $2.80 $946,400.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $29.50 $4,602,000.00 0008 Miscellaneous Fill 265,000 CY $0.70 $185,500.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.10 $121,000.00 0010 18'' Riprap Toedown Protection 295 CY $50.00 $14,750.00 0011 Grout Protection 10 CY $350.00 $3,500.00 0012 Removal of the Existing ABC, Levee Road 1 LS $31,000.00 $31,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $44.00 $136,400.00 0014 Survey Marker Installation 1 LS $4,000.00 $4,000.00 0015 RCB and RCP Culverts 1 LS $48,000.00 $48,000.00 0016 As-Built Drawings 1 LS $12,000.00 $12,000.00 0017 Mobilization and Demobilization 1 LS $220,500.00 $220,500.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,560.00 $4,510,720.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,425.00 $125,400.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,500.00 $3,500.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $44.00 $14,960.00
$12,440,630.00
Alpine Diversified Inc.
PO Box 51: 770 E. Bush St.
Lemoore, CA 93245
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $47,250.00 $47,250.00 0002 Mobilization and Demobilization 1 LS $1,440,696.00 $1,440,696.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $57,200.00 $57,200.00 0004 Removal, Disposal and Installation of Levee 1 LS $11,250.00 $11,250.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $4.10 $36,900.00 0006 Excavation, Levee Toe 338,000 CY $1.60 $540,800.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $27.25 $4,251,000.00 0008 Miscellaneous Fill 265,000 CY $0.45 $119,250.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.60 $176,000.00 0010 18'' Riprap Toedown Protection 295 CY $15.40 $4,543.00 0011 Grout Protection 10 CY $455.00 $4,550.00 0012 Removal of the Existing ABC, Levee Road 1 LS $13,305.00 $13,305.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $30.15 $93,465.00 0014 Survey Marker Installation 1 LS $5,226.00 $5,226.00 0015 RCB and RCP Culverts 1 LS $122,530.00 $122,530.00 0016 As-Built Drawings 1 LS $44,375.00 $44,375.00 0017 Mobilization and Demobilization 1 LS $115,000.00 $115,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,180.00 $5,603,160.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,870.00 $164,560.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $2,250.00 $2,250.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $32.05 $10,897.00
$12,864,207.00
SEMA Construction, Inc.
6 Orchard, Ste. 150 Lake Forest, CA 92630
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $20,000.00 $20,000.00 0002 Mobilization and Demobilization 1 LS $1,000,000.00 $1,000,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $200,000.00 $200,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $30,000.00 $30,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $10.00 $90,000.00 0006 Excavation, Levee Toe 338,000 CY $2.70 $912,600.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $32.00 $4,992,000.00 0008 Miscellaneous Fill 265,000 CY $1.00 $265,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.00 $220,000.00 0010 18'' Riprap Toedown Protection 295 CY $25.00 $7,375.00 0011 Grout Protection 10 CY $300.00 $3,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $20,000.00 $20,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $50.00 $155,000.00 0014 Survey Marker Installation 1 LS $2,500.00 $2,500.00 0015 RCB and RCP Culverts 1 LS $170,000.00 $170,000.00 0016 As-Built Drawings 1 LS $2,500.00 $2,500.00 0017 Mobilization and Demobilization 1 LS $250,000.00 $250,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,500.00 $4,405,000.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,850.00 $162,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,000.00 $3,000.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $50.00 $17,000.00
$12,927,775.00
MJ Avila Company, Inc.
7258 W. Rialto Ave Fresno, CA 93723
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $320,358.06 $320,358.06 0002 Mobilization and Demobilization 1 LS $758,670.13 $758,670.13 0003 Foundation Preparation, Soil Cement Levee 1 LS $160,144.88 $160,144.88 0004 Removal, Disposal and Installation of Levee 1 LS $27,890.69 $27,890.69
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $10.68 $96,120.00 0006 Excavation, Levee Toe 338,000 CY $1.87 $632,060.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $32.04 $4,998,240.00 0008 Miscellaneous Fill 265,000 CY $0.91 $241,150.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.20 $352,000.00 0010 18'' Riprap Toedown Protection 295 CY $75.44 $22,254.80 0011 Grout Protection 10 CY $491.35 $4,913.50 0012 Removal of the Existing ABC, Levee Road 1 LS $62,862.06 $62,862.06 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $41.76 $129,456.00 0014 Survey Marker Installation 1 LS $2,967.09 $2,967.09 0015 RCB and RCP Culverts 1 LS $103,239.90 $103,239.90 0016 As-Built Drawings 1 LS $32,624.96 $32,624.96 0017 Mobilization and Demobilization 1 LS $118,510.44 $118,510.44 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,990.01 $5,268,397.62 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,591.11 $140,017.68 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $9,165.95 $9,165.95
0021 Installation of New 4'' ABC, Levee Road 340 CY $55.31 $18,805.40
$13,499,849.16
Earth Construction & Mining 11542 Knott St., #10 Garden Grove, CA 92841
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $295,000.00 $295,000.00 0002 Mobilization and Demobilization 1 LS $985,500.00 $985,500.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $275,000.00 $275,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $42,500.00 $42,500.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $16.50 $148,500.00 0006 Excavation, Levee Toe 338,000 CY $1.80 $608,400.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $32.20 $5,023,200.00 0008 Miscellaneous Fill 265,000 CY $1.00 $265,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.60 $286,000.00 0010 18'' Riprap Toedown Protection 295 CY $45.00 $13,275.00 0011 Grout Protection 10 CY $380.00 $3,800.00 0012 Removal of the Existing ABC, Levee Road 1 LS $12,500.00 $12,500.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $46.00 $142,600.00 0014 Survey Marker Installation 1 LS $2,400.00 $2,400.00 0015 RCB and RCP Culverts 1 LS $95,000.00 $95,000.00 0016 As-Built Drawings 1 LS $9,000.00 $9,000.00 0017 Mobilization and Demobilization 1 LS $275,000.00 $275,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,800.00 $4,933,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,850.00 $162,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $12,500.00 $12,500.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $46.00 $15,640.00
$13,607,215.00
Rodney Williams Construction 107 North H St.
Lompoc, CA 93436
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $658,000.00 $658,000.00 0002 Mobilization and Demobilization 1 LS $1,273,445.00 $1,273,445.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $649,255.00 $649,255.00 0004 Removal, Disposal and Installation of Levee 1 LS $32,715.00 $32,715.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $7.94 $71,460.00 0006 Excavation, Levee Toe 338,000 CY $2.82 $953,160.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $29.50 $4,602,000.00 0008 Miscellaneous Fill 265,000 CY $0.25 $66,250.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.50 $165,000.00 0010 18'' Riprap Toedown Protection 295 CY $49.60 $14,632.00 0011 Grout Protection 10 CY $895.00 $8,950.00 0012 Removal of the Existing ABC, Levee Road 1 LS $56,265.00 $56,265.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $29.90 $92,690.00 0014 Survey Marker Installation 1 LS $1,820.00 $1,820.00 0015 RCB and RCP Culverts 1 LS $159,835.00 $159,835.00 0016 As-Built Drawings 1 LS $3,250.00 $3,250.00 0017 Mobilization and Demobilization 1 LS $118,235.00 $118,235.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,590.50 $4,564,461.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,315.00 $115,720.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $12,155.00 $12,155.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $29.90 $10,166.00
$13,629,464.00
C.A. Rasmussen, Inc.
28548 Livingston Ave.
Valencia, CA 91355
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $6,900.00 $6,900.00 0002 Mobilization and Demobilization 1 LS $250,000.00 $250,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $22,000.00 $22,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $33,000.00 $33,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $12.00 $108,000.00 0006 Excavation, Levee Toe 338,000 CY $2.10 $709,800.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $37.00 $5,772,000.00 0008 Miscellaneous Fill 265,000 CY $0.91 $241,150.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.20 $242,000.00 0010 18'' Riprap Toedown Protection 295 CY $140.00 $41,300.00 0011 Grout Protection 10 CY $300.00 $3,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $25,000.00 $25,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $105.00 $325,500.00 0014 Survey Marker Installation 1 LS $3,100.00 $3,100.00 0015 RCB and RCP Culverts 1 LS $175,000.00 $175,000.00 0016 As-Built Drawings 1 LS $1,500.00 $1,500.00 0017 Mobilization and Demobilization 1 LS $30,000.00 $30,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,300.00 $5,814,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $2,100.00 $184,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $5,700.00 $5,700.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $105.00 $35,700.00
$14,030,050.00
Altfillisch Contractors, Inc. DBA ACI 13300 Citrus Street Corona, CA 92880
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $415,000.00 $415,000.00 0002 Mobilization and Demobilization 1 LS $800,000.00 $800,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $422,000.00 $422,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $14,000.00 $14,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $3.59 $32,310.00 0006 Excavation, Levee Toe 338,000 CY $2.67 $902,460.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $35.44 $5,528,640.00 0008 Miscellaneous Fill 265,000 CY $0.40 $106,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $4.31 $474,100.00 0010 18'' Riprap Toedown Protection 295 CY $268.00 $79,060.00 0011 Grout Protection 10 CY $217.00 $2,170.00 0012 Removal of the Existing ABC, Levee Road 1 LS $8,400.00 $8,400.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $50.00 $155,000.00 0014 Survey Marker Installation 1 LS $5,000.00 $5,000.00 0015 RCB and RCP Culverts 1 LS $189,000.00 $189,000.00 0016 As-Built Drawings 1 LS $7,800.00 $7,800.00 0017 Mobilization and Demobilization 1 LS $110,000.00 $110,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,950.00 $5,197,900.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,850.00 $162,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,250.00 $3,250.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $50.00 $17,000.00
$14,631,890.00
Yerba Buena Engineering & Construction, Inc.
1340 Egbert Ave.
San Francisco, CA 94124
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $20,000.00 $20,000.00 0002 Mobilization and Demobilization 1 LS $1,275,000.00 $1,275,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $330,000.00 $330,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $20,000.00 $20,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $6.00 $54,000.00 0006 Excavation, Levee Toe 338,000 CY $4.00 $1,352,000.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $38.00 $5,928,000.00 0008 Miscellaneous Fill 265,000 CY $1.00 $265,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.00 $110,000.00 0010 18'' Riprap Toedown Protection 295 CY $40.00 $11,800.00 0011 Grout Protection 10 CY $300.00 $3,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $15,000.00 $15,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $40.00 $124,000.00 0014 Survey Marker Installation 1 LS $5,000.00 $5,000.00 0015 RCB and RCP Culverts 1 LS $200,000.00 $200,000.00 0016 As-Built Drawings 1 LS $1,000.00 $1,000.00 0017 Mobilization and Demobilization 1 LS $100,000.00 $100,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,750.00 $4,845,500.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,300.00 $114,400.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $3,000.00 $3,000.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $40.00 $13,600.00
$14,790,300.00
Ace Engineering, Inc.
1880 Wright Ave.
La Verne, CA 91750
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $54,297.00 $54,297.00 0002 Mobilization and Demobilization 1 LS $212,972.00 $212,972.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $269,479.00 $269,479.00 0004 Removal, Disposal and Installation of Levee 1 LS $50,728.00 $50,728.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $9.71 $87,390.00 0006 Excavation, Levee Toe 338,000 CY $2.51 $848,380.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $46.99 $7,330,440.00 0008 Miscellaneous Fill 265,000 CY $0.41 $108,650.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.27 $359,700.00 0010 18'' Riprap Toedown Protection 295 CY $129.00 $38,055.00 0011 Grout Protection 10 CY $238.00 $2,380.00 0012 Removal of the Existing ABC, Levee Road 1 LS $73,715.00 $73,715.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $49.29 $152,799.00 0014 Survey Marker Installation 1 LS $15,033.00 $15,033.00 0015 RCB and RCP Culverts 1 LS $81,274.00 $81,274.00 0016 As-Built Drawings 1 LS $15,033.00 $15,033.00 0017 Mobilization and Demobilization 1 LS $244,260.00 $244,260.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,776.00 $4,891,312.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $478.00 $42,064.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $24,067.00 $24,067.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $53.00 $18,020.00
$14,920,048.00
USS Cal Builders, Inc.
8051 Main Street Stanton, CA 90680
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $275,000.00 $275,000.00 0002 Mobilization and Demobilization 1 LS $440,000.00 $440,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $660,000.00 $660,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $50,000.00 $50,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $6.60 $59,400.00 0006 Excavation, Levee Toe 338,000 CY $1.98 $669,240.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $35.20 $5,491,200.00 0008 Miscellaneous Fill 265,000 CY $1.38 $364,375.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $2.20 $242,000.00 0010 18'' Riprap Toedown Protection 295 CY $77.00 $22,715.00 0011 Grout Protection 10 CY $550.00 $5,500.00 0012 Removal of the Existing ABC, Levee Road 1 LS $24,200.00 $24,200.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $33.00 $102,300.00 0014 Survey Marker Installation 1 LS $165,000.00 $165,000.00 0015 RCB and RCP Culverts 1 LS $220,000.00 $220,000.00 0016 As-Built Drawings 1 LS $44,000.00 $44,000.00 0017 Mobilization and Demobilization 1 LS $165,000.00 $165,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,300.00 $5,814,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,760.00 $154,880.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $5,500.00 $5,500.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $33.00 $11,220.00
$14,986,130.00
Specialty Construction, Inc.
645 Clarion Ct.
San Luis Obispo, CA 93401
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $15,000.00 $15,000.00 0002 Mobilization and Demobilization 1 LS $1,038,200.00 $1,038,200.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $95,250.00 $95,250.00 0004 Removal, Disposal and Installation of Levee 1 LS $19,650.00 $19,650.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $12.35 $111,150.00 0006 Excavation, Levee Toe 338,000 CY $2.15 $726,700.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $42.50 $6,630,000.00 0008 Miscellaneous Fill 265,000 CY $1.50 $397,500.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.70 $407,000.00 0010 18'' Riprap Toedown Protection 295 CY $30.00 $8,850.00 0011 Grout Protection 10 CY $923.00 $9,230.00 0012 Removal of the Existing ABC, Levee Road 1 LS $25,900.00 $25,900.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $26.00 $80,600.00 0014 Survey Marker Installation 1 LS $1,500.00 $1,500.00 0015 RCB and RCP Culverts 1 LS $88,200.00 $88,200.00 0016 As-Built Drawings 1 LS $26,500.00 $26,500.00 0017 Mobilization and Demobilization 1 LS $107,520.00 $107,520.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $2,909.00 $5,125,658.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,400.00 $123,200.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $8,600.00 $8,600.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $106.00 $36,040.00
$15,082,248.00
Proven Management, Inc.
712 Sansome Street San Francisco, CA 94111
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $50,000.00 $50,000.00 0002 Mobilization and Demobilization 1 LS $200,000.00 $200,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $100,000.00 $100,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $25,000.00 $25,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $15.00 $135,000.00 0006 Excavation, Levee Toe 338,000 CY $3.00 $1,014,000.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $39.00 $6,084,000.00 0008 Miscellaneous Fill 265,000 CY $3.00 $795,000.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.00 $110,000.00 0010 18'' Riprap Toedown Protection 295 CY $75.00 $22,125.00 0011 Grout Protection 10 CY $500.00 $5,000.00 0012 Removal of the Existing ABC, Levee Road 1 LS $50,000.00 $50,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $50.00 $155,000.00 0014 Survey Marker Installation 1 LS $10,000.00 $10,000.00 0015 RCB and RCP Culverts 1 LS $50,000.00 $50,000.00 0016 As-Built Drawings 1 LS $20,000.00 $20,000.00 0017 Mobilization and Demobilization 1 LS $255,000.00 $255,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,300.00 $5,814,600.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,600.00 $140,800.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $100,000.00 $100,000.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $100.00 $34,000.00
$15,169,525.00
Ceres Environmental Services 3825 85th Ave N.
Brooklyn Park, MN 55443
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $82,314.24 $82,314.24 0002 Mobilization and Demobilization 1 LS $1,283,002.13 $1,283,002.13 0003 Foundation Preparation, Soil Cement Levee 1 LS $547,256.54 $547,256.54 0004 Removal, Disposal and Installation of Levee 1 LS $37,394.14 $37,394.14
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $8.04 $72,360.00 0006 Excavation, Levee Toe 338,000 CY $1.61 $544,180.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $33.12 $5,166,720.00 0008 Miscellaneous Fill 265,000 CY $1.32 $349,800.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $3.87 $425,700.00 0010 18'' Riprap Toedown Protection 295 CY $116.62 $34,402.90 0011 Grout Protection 10 CY $510.31 $5,103.10 0012 Removal of the Existing ABC, Levee Road 1 LS $34,311.96 $34,311.96 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $39.21 $121,551.00 0014 Survey Marker Installation 1 LS $9,137.29 $9,137.29 0015 RCB and RCP Culverts 1 LS $63,019.91 $63,019.91 0016 As-Built Drawings 1 LS $10,850.54 $10,850.54 0017 Mobilization and Demobilization 1 LS $688,441.51 $688,441.51 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,168.39 $5,582,703.18 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,996.78 $175,716.64 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $4,189.56 $4,189.56
0021 Installation of New 4'' ABC, Levee Road 340 CY $39.79 $13,528.60
$15,251,683.24
Morgen & Oswood Construction Co., Inc.
1321 8th Ave N. Ste 204 Great Falls, MT 59403
1.1 Bid Items
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 Diversion and Control of Water 1 LS $55,000.00 $55,000.00 0002 Mobilization and Demobilization 1 LS $950,000.00 $950,000.00 0003 Foundation Preparation, Soil Cement Levee 1 LS $55,000.00 $55,000.00 0004 Removal, Disposal and Installation of Levee 1 LS $65,000.00 $65,000.00
Station Posts, Gates, & Fences 0005 Removal of Derrick Stone/Rock Exisiting Groins 9,000 CY $8.60 $77,400.00 0006 Excavation, Levee Toe 338,000 CY $2.70 $912,600.00 0007 Compacted Fill, Soil Cement Levee 156,000 CY $33.75 $5,265,000.00 0008 Miscellaneous Fill 265,000 CY $0.28 $74,200.00 0009 Borrow Material, Soil Cement Levee 110,000 CY $1.45 $159,500.00 0010 18'' Riprap Toedown Protection 295 CY $21.50 $6,342.50 0011 Grout Protection 10 CY $375.00 $3,750.00 0012 Removal of the Existing ABC, Levee Road 1 LS $8,000.00 $8,000.00 0013 Installation of New 4'' ABC, Levee Road 3,100 CY $48.00 $148,800.00 0014 Survey Marker Installation 1 LS $3,000.00 $3,000.00 0015 RCB and RCP Culverts 1 LS $210,000.00 $210,000.00 0016 As-Built Drawings 1 LS $11,000.00 $11,000.00 0017 Mobilization and Demobilization 1 LS $1,500,000.00 $1,500,000.00 0018 Furnish and Install Steel Combi-Wall System 1762.0 LF $3,310.00 $5,832,220.00 0019 Furnish and Install Steel Sheet Pile Wall 88.0 LF $1,400.00 $123,200.00 0020 Removal and Disposal of Existing ABC, Levee Road 1 LS $2,000.00 $2,000.00
0021 Installation of New 4'' ABC, Levee Road 340 CY $55.00 $18,700.00
$15,480,712.50
Bidders Total Estimated Amount Wood Bros Inc $11,747,087.00
PO Box 216: 14147 18th Ave Lemoore, CA 93245
West-Tech Contracting, Inc. $11,972,061.35 568 North Tulip St.
Escondido, CA 92025
Cushman Contracting Corporation $12,238,975.00 P.O. Box 147 Goleta, CA
Legacy Construction & Development Inc. $12,440,630.00 340 Falcon Ridge Parkway #700
Mesquite, NV 89027
Alpine Diversified Inc. $12,864,207.00 PO Box 51: 770 E. Bush St.
Lemoore, CA 93245
SEMA Construction, Inc. $12,927,775.00 6 Orchard, Ste. 150
Lake Forest, CA 92630
MJ Avila Company, Inc. $13,499,849.16 7258 W. Rialto Ave Fresno, CA 93723
Earth Construction & Mining $13,607,215.00 11542 Knott St., #10
Garden Grove, CA 92841
Rodney Williams Construction $13,629,464.00 107 North H St.
Lompoc, CA 93436
C.A. Rasmussen, Inc. $14,030,050.00 28548 Livingston Ave.
Valencia, CA 91355
Altfillisch Contractors, Inc. DBA ACI $14,631,890.00 13300 Citrus Street Corona, CA 92880
Yerba Buena Engineering & Construction, Inc. $14,790,300.00 1340 Egbert Ave.
San Francisco, CA 94124
Ace Engineering, Inc. $14,920,048.00 1880 Wright Ave.
La Verne, CA 91750
USS Cal Builders, Inc. $14,986,130.00 8051 Main Street
Stanton, CA 90680
Specialty Construction, Inc. $15,082,248.00 645 Clarion Ct.
San Luis Obispo, CA 93401
Proven Management, Inc. $15,169,525.00 712 Sansome Street
San Francisco, CA 94111
Ceres Environmental Services $15,251,683.24 3825 85th Ave N.
Brooklyn Park, MN 55443
Morgen & Oswood Construction Co., Inc. $15,480,712.50 1321 8THH Ave N. Ste 204
Great Falls, MT 59403
| Gov |
| Wood Bros Inc |
| West-Tech |
| Cushman |
| Legacy |
| Alpine |
| SEMA |
| MJ AV |
| Earth |
| Rodney |
| C.A. RAS |
| ALTF |
| Yerba |
| ACE |
| USS |
| Specialty |
| Proven |
| Ceres |
| Morgen |