Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0004 Jul 17, 2009
US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA
W912PL-09-R-0040
Jun 25, 2009
Child Development Center (CDC) at Nellis Air Force Base, Nevada
Amendment 0004 is issued to Solicitation No. W912PL-09-R-0040.
See the attached 5 sheets for changes to Section 01 10 10.
RECOVERY – CHILD DEVELOPMENT CENTER (CDC) W912PL-09-R-0040
NELLIS AFB, NEVADA
SECTION 01 10 10 – page 5
2.7 DESIGN CODES, STANDARDS AND CRITERIA
The design shall comply with the base specific General Design Guidelines and the Architectural Compatibility Guidelines of that base.
In addition to the specific codes, standards and criteria referenced throughout this RFP, the Contractor shall prepare design and construction documents for all elements of the project in accordance with UFC 4-740-14 and the following codes using the most current editions. Where there is a conflict between the RFP and building codes, the most stringent shall apply. Where conflict between RFP and building codes or there is a conflict between codes, UFC 3-600-01 shall apply.
When codes are in conflict, the most stringent shall apply. This list is not intended to be a complete list. All work shall be designed and constructed to meet all applicable codes, standards and laws.
Reference other sections of this RFP and the UFGS specifications referenced for use for other standards and references not listed below.
SECTION 01 10 10 – page 12
2.10 CODES AND REFERENCES
The Contractor shall use the most current code and/or reference published.
Added reference:
• NFPA 720, Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment
SECTION 01 10 10 – page 16
4.4 CAPILLARY WATER AND VAPOR BARRIERS
Floor slabs-on-grade of all buildings shall be underlain by a minimum 6-inch (loose thickness) aggregate capillary barrier consisting of ASTM C 33 Size No. 57 coarse aggregate or approved equivalent, compacted by at least two passes of a minimum 500-lb vibratory plate compactor.
Floor slabs-on-grade to receive a covering or coating of any kind shall be underlain by a minimum 20-mil ASTM E 1745 Class A poly sheeting vapor barrier, which shall be placed on the aggregate capillary barrier as specified in UFGS Section 03 31 00.00 10. Prior to placing slab reinforcing and concrete, cover the vapor barrier sheeting with a 2-inch to 3-inch layer of damp concrete sand.
1 Amendment 4
SECTION 01 10 10 – page 38
8.5 INTERIOR CONSTRUCTION
8.5.1 Interior Walls: Interior walls shall be constructed of gypsum board assemblies using conventional cold-formed metal studs and concrete masonry units (normal weight). Non load bearing steel stud framing shall be galvanized studs, rigid channels, resilient furring channels, C-studs or Z furring channels as required by design conditions spaced at 16-inches on centers. Comply with ASTM C 645.
Metal studs size to be 2 1/2-inches for furred masonry walls. Metal stud size to be a minimum of 3 5/8-inches or 4-inches for office, administrative, and storage areas located between activity rooms.
Metal studs size to be a minimum of 6-inches for all interior corridor walls and activity room demising walls. Stud gauge shall be as required by height and loading, but shall not be less than 25 gauge for interior walls and 20 gauge for perimeter walls. Use fire-rated, Type X, water-resistant or glass reinforced board as conditions dictate. Comply with ASTM C 36. Minimum gypsum board panel thickness to be 5/8-inch.
Provide fire rated walls where required by governing codes or standards. Walls at laundry rooms, mechanical rooms, the kitchen and electrical rooms shall be a minimum of 1-hour fire-resistive construction. The 1-hour fire rated walls in the laundry room shall extend to the metal roof deck.
SECTION 01 10 10 – page 40
8.5 INTERIOR CONSTRUCTION
8.5.2.2 Door Hardware Groups:
HW-4 (Janitor, Storage, Laundry (no hold-open) Hinges Activity Room Storage) Lockset Closer/Stop/hold-open Protection Plate Wall Stop Door Silencer
SECTION 01 10 10 – page 69
11.3.4 Heating Systems:
11.3.4.1 Heating System Selection Criteria
Heating system for the facility shall be selected based on the Life Cycle Cost Analysis. Life Cycle Cost Analysis shall be performed in accordance with UFC 3-400-01 ‘Design: Energy Conservation’. Heating sources to be evaluated include, but are not limited to, natural gas, all electric, radiant floor system, or combination of these. If natural gas is provided at the facility, carbon monoxide detectors
2 Amendment 4 shall be provided in each occupied space. in accordance with the protected premises carbon monoxide detection system requirements of NFPA 720. Final design shall include a comparison of three or more systems based on the region, building design features and available energy sources. Heating hot water systems can be evaluated as one of the LCCA alternatives to compare constant speed distribution pumping and variable speed distribution pumping systems. The final design shall include a short (a few pages describing results, methods, reason for selection and why, etc.) summary report and Building Life Cycle Cost (BLCC) program output and input. The contractor shall utilize either TRANE Trace version 700 or Carrier Hourly Analysis Program (HAP), latest editions to provide system energy consumptions. Provide reasonably detailed cost estimates for each systems studied as part of the design analysis. This will be the heating system that is being proposed for the facility. The life cycle analysis shall be performed and documented by utilizing the free computer program, BLCC that is available via the US Dept of Energy web sites. The programs reports will document all input and output. The actual site utility costs at the installation shall be input into the BLCC program for the LCC equipment selection. Refer to the RFP Appendices for the current site specific utility rates. The life cycle cost analysis shall run for a minimum of 25 years and shall include any final salvage values and annual costs for operation and maintenance based upon ASHRAE estimation methods for those costs. Salvage costs shall be documented in cost estimates and should generally be restricted to larger equipment items such as boilers, pumps, and large air handlers, for example.
SECTION 01 10 10 – page 87-88
12.2 GENERAL DESIGN REQUIREMENTS
The plumbing systems for this facility shall be designed to be energy efficient and provide a safe and user accommodating environment for the children and staff utilizing the facility. UFC 4-740-14 addresses the unique criteria for this type of facility where young children are the primary occupants. Equipment shall be located to minimize maintenance disruptions within the child activity rooms.
Plumbing system shall be designed and installed in accordance with the International Plumbing Code (IPC), latest edition. Inspection and testing of the plumbing system shall be performed as prescribed in the IPC. The plumbing system shall conform with the applicable rules of the International Building Code, governing venting of plumbing fixtures, sizing of waste, vents, drains, and water systems. Backflow preventers shall be provided at the building entrance, located in an accessible location inside the building. All backflow prevention devices shall be International Association of Plumbing and Mechanical Officials (IAPMO)-approved devices and carry an attached or imprinted IAPMO seal of approval. (See AFI 32-1066, Para 5.1 for alternative acceptable backflow prevention devices). All backflow prevention devices shall be installed in accordance with the current uniform Plumbing Code (UPC) and UPC illustrated Training Manual. Under no condition shall backflow prevention devices be installed below grade (i.e. in a valve pit). Exterior devices shall be located as close to the building as possible to facilitate blending with the landscape.
3 Amendment 4
(See AFI 32-1066,Para 6. "Use and Installation of Backflow Prevention Devices). Fixture count shall be as required by International Building Code. All piping shall be labeled, color coded, titled, and indicate direction of flow. All shutoff/isolation valves and water hammer arresters shall be accessible from the floor level and be labeled. If installed above hard ceilings, access doors shall be provided. UFGS Section 22 00 00 PLUMBING, GENERAL PURPOSE shall be the basis for the plumbing system specifications. UFGS Section 23 11 23.00 10 GAS PIPING SYSTEMS shall be the basis for the natural gas piping system specifications, if natural gas is used.
SECTION 01 10 10 – page 92
12.7 NATURAL GAS SYSTEMS (where approved)
AFSVA would prefer that all new Child Development Centers have all electric services. Where this is not possible natural gas can be used.
Natural Gas shall be connected to the existing underground gas system, and shall be routed to a new gas meter and pressure reducing station located adjacent to the building at the mechanical room.
Polyethylene pipe shall be utilized with pre-manufactured, anodeless risers to eliminate need for cathodic protection requirement on the gas service.
Natural gas shall be provided to the heating hot water boiler(s), domestic water heater, and kitchen cooking appliances. If natural gas is provided at the facility, carbon monoxide detectors are to be provided in each occupied space. in accordance with the protected premises carbon monoxide detection system requirements of NFPA 720. Gas piping within the building shall be above grade. Concealed piping or piping which is not easily accessible shall have welded connections.
Gas line connections to each item of equipment shall have a shut off valve and dirt leg. Piping within building shall be low pressure piping (less than 1/2 psig). Natural gas piping shall be schedule 40 steel with screwed or welded fittings. Piping within building shall be minimized.
SECTION 01 10 10 – page 116
16.2.3 Fire Detection and Alarm System: The building shall be protected with a fire detection and alarm system and mass notification system installed in accordance with NFPA 72 and UFC 4-021-01. Fire detection and alarm systems shall be designed in accordance with UFC 3600-01, NFPA 72, NFPA 20 and other applicable NFPA Standards and Codes. The Mass Notification System (MNS) shall be designed in accordance with UFC 4-021-01 and NFPA 72. The fire alarm system and MNS shall be a combination system as described in UFC 4-021-01 unless the base standard design is to utilize a MNS that is stand-alone as described in UFC 4-021-01. The building MNS shall be compatible with and be provided with an interface to the base-wide MNS.
4 Amendment 4
5 Amendment 4
Provide a complete addressable, 2-wire supervised system. All fire alarm control panels shall provide a trouble signal and continues to operate as an alarm circuit after one fault has occurred in the wiring.
As a minimum mMeet the following:
Initiating circuit – Class B, Style C Notification circuit – Class B, Style Y Signaling Circuits – Class B, Style 3.5
SECTION 01 10 10 – page 118
Add new paragraph:
16.2.12. Carbon Monoxide Detection System: Provide a protected premises carbon monoxide detection system in accordance with NFPA 720 for each building provided with natural gas at the facility. The carbon monoxide system shall include the following required features:
• Automatic carbon monoxide alarm signal initiation.
• Notification of carbon monoxide alarms to building occupants using the audible and visual appliances of the mass notification system.
• Transmission of carbon monoxide alarms to the Base Fire Department as a supervisory signal in accordance with NFPA 72.
• Transmission of carbon monoxide detection system trouble and supervisory signals to the Base Fire Department in accordance with NFPA 72.
• Combination-type carbon monoxide detection systems that are integrated in operation with the building mass notification system and fire alarm system, and that meet the requirements of NFPA 72 for combination systems.
• Class B initiating device circuits, notification appliance circuits, and signaling line circuits.
• Carbon monoxide detectors installed in accordance with the manufacturer’s published instructions on the ceiling in the same room as all permanently installed fuel-burning appliances. Also provide at least one carbon monoxide detector centrally located within the building when the building is provided with a one-zone HVAC system. Provide at least one detector centrally located in each HVAC zone when more than one HVAC zone is provided in the building.