AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0003 Jul 17, 2009
US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA
W912PL-09-R-0040
Jun 25, 2009
Child Development Center (CDC) at Nellis Air Force Base, Nevada
Amendment 0002 is issued to Solicitation No. W912PL-09-R-0040.
See Revised Bid Schedule, Drawing Sheet A-101, and text Changes attached to this Amendment.
Design-Build (NAF/EI) Child Development Center (CDC) Spec Number: 1702 Nellis AFB, NV PN RKMF080044
BID SCHEDULE
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE
0001 BASE BID – Design and Construct NAF Child
Development Center, Nellis Air Force Base, Complete.
1 LS
0002 OPTION 1 – Install landscape rock mulch ground cover and boulders in non-outdoor play environment areas.
0003 OPTION 2 – Construct 33 additional staff parking spaces and sidewalks as shown on Drawing C-102. Design shall be included in Base Bid.
0004 OPTION 3 - Construct infant outdoor play environments with shade structures, landscaping and irrigation. Design shall be included in Base Bid.
0005 OPTION 4 - Construct Infant Room #8
(includes rooms 256, 243, and 246 and extension of Corridor #1), complete. See Drawing A-101. Design shall be included in
0006 OPTION 5 - Construct Infant Room #7
(includes rooms 255, 130, and 131 and extension of Corridor #1), complete. See Drawing A-101. Design shall be included in
0007 OPTION 6 – CCTV and Intercom system equipment and cabling. Conduit, pathways, and complete system design shall be included in Base Bid.
Note: Options are not listed in order of priority.
-- End of Section --
Bid Schedule - 1 Amendment 3
RECOVERY – CHILD DEVELOPMENT CENTER (CDC) W912PL-09-R-0040
NELLIS AFB, NEVADA
Appendix A – Page 8
A.8 ARCHITECTURAL
A.8.4.3 Roof: The roof of the Child Development Center (CDC) Facility shall be integrally colored concrete roofing tiles with tile bird stops at the eaves. Color and profile of concrete roof tile shall match Monier Lifetile Slate, California Mission Blend.
Facility shall have hip roofs with a roof slope of 3:12. If contractor design has roof mounted exhaust fan, fan shall be easily maintained and shall be completely hidden from view. Roof where fan is located shall be flat and access shall be via an internal ladder and roof hatch. All building elevations and especially the front elevation shall be aesthetically pleasing and the location of the kitchen, mechanical rooms, and mechanical yards shall not be obvious from the exterior.
The dominant architectural focal point of the facility shall be the entry canopy, vestibule, and lobby.
The roof overhang shall be 6’-0” at activity rooms and 4’-0” at other locations for solar control. The roof overhang shall have soffit of medium density overlay plywood. See A-101 for more information.
The roofing system shall consist of materials and requirements as defined by Nellis AFB Design Compatibility Guide (DCG).
Appendix A – Page 12
A.11.1 GENERAL DESIGN REQUIREMENTS
Life cycle cost analysis (LCCA) shall be required for HVAC system selection as indicated in the Section 01 10 10. Provide documentation and calculations as required.
Utilities for the proposed building site are not easily accessible.
Specifically, the connection for natural gas line is approximately 1,600 feet from the building. The life cycle cost analysis for natural gas heating options shall include the costs associated with the installation of a natural gas line to the proposed building site. Also, the additional cost of a larger electrical service and conductors shall be included an all electric options.
Provide documentation and calculations showing conformance to EPACT 05.
Calculations should clearly show that the proposed design has an energy consumption rate at least 30% less than the ASHRAE 90.1 energy consumption rate.
The HVAC system materials and requirements shall be as defined by the Nellis AFB Design Compatibility Guideline.
Design and installation of mechanical equipment on roof tops shall be minimized and requires the approval of the Base Civil Engineer.
Provide safe access to the roof for maintenance of such items. The roof over the kitchen and mechanical room has been proposed as flat.
1 Amendment 3
RECOVERY – CHILD DEVELOPMENT CENTER (CDC) W912PL-09-R-0040
NELLIS AFB, NEVADA
2 Amendment 3
However, the final roof plan and building elevation studies will be performed during the design phase.
The HVAC system shall be determined by the life cycle cost analysis.
Swamp coolers are not permitted and cannot be an option in the analysis. An under floor radiant heating system is not required.
However, this does not preclude the designer from considering an under floor heating system in the life cycle cost analysis.
Appendix A – Page 21
A.20. ROOM DATA SHEETS
Room Data Sheets immediately follow.
The following rooms listed in the Room Data Sheets are not used.
Room 103 Resource Center Room 104 Facility Supervisor Room 111,114,135,142,145 Infant Activity Room Room 112,133,143 Nursing Room Room 113,115,136,144,146,218,223,226,234 Activity Room Storage Room 116 Mechanical Room Room 127,225,230 Nursing Room Room 148,209,251 Storage Room 203 Vestibule Room 205,213,253 Corridor Room 208 Laundry Room Room 210,247 Unisex Toilet Room 211,212,228,248,250 Outdoor Storage Room 222 Pre-School Activity Room Room 217,224 Toddler Activity Room Room 235 Pre-Toddler Activity Room
The following rooms are to be added to the Room Data Sheets.
Room 254 Buggy Storage (this is the same as room 249 Buggy Storage)