View the file

Other files

File Type Posted
Am6.pdf PDF
Am5.pdf PDF
Am4.pdf PDF
Am3.pdf PDF
Am2.pdf PDF
W912PL-09-R-0040.pdf PDF
W912PL-09-R-0040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0001 Jul 7, 2009

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA

W912PL-09-R-0040

Jun 25, 2009

Child Development Center (CDC) at Nellis Air Force Base, Nevada

Amendment 0001 is issued to Solicitation No. W912PL-09-R-0040.

See Revised Bid Schedule and Changes to Section 01 10 10

Section 01 10 10 Page 2

1.1 DOCUMENT INTENT

Section 01 10 10 supplements UFC 4-740-14 and the drawings contained herein. This section was developed to provide typical conditions for large size Air Force Child Development Centers at any location. The requirements in this section are based on a building occupancy of 304 children. In cases where this section is applied to facilities of lesser size any code requirement based on total building occupancy should be adjusted to reflect the actual size of the facility as shown in the drawings that are part of this Request for Proposal. Additional Base specific design and construction requirements are included in Appendix A. In cases of conflict the following order of precedence shall govern; UFC 4-740-14 in all cases except room sizes and arrangements which are governed by the drawings, the clarification to NFPA 72 in paragraph 9.4.8 16.2.3 in section 01 10 10, then the Standard drawings, then the site specific Appendix A and then section 01 10 10.

Section 01 10 10 Page 25

5.5 SPECIFICATIONS

The Contractor shall edit and submit the following UFGS specification sections at a minimum as applicable:

01 57 20.00 Environmental Protection 01 57 23.00 10 Storm Water Pollution Prevention Measures (if not included) 02 41 00 Demolition (as applicable) 32 10 00 Bituminous Concrete Pavement or 32 12 16 Hot-Mix Bituminous Pavement (as applicable) 32 13 14 Concrete Pavements for Small Projects 32 16 13 Concrete Sidewalks and Curbs and Gutters 32 17 24.00 10 Pavement Markings 32 31 13 Chain Link Fence and Gates

Section 01 10 10 Page 49

9.4 ROOM SPECIFIC FINISHES AND ARCHITECTURAL REQUIREMENTS

9.4.9 Laundry:

Requirements for the Laundry Room are as follows:

• Laundry finishes shall be durable, slip resistant flooring that slopes to a floor drain.

• Acoustical ceiling tile Gypsum board ceiling shall be designed for high moisture environment.

• Provide (3)commercial grade stackable front loading machines.

• Provide 1 ABA accessible Dryer.

Provide location for freestanding laundry tub with adjacent folding counter and storage area for supplies. Wall cabinets shall be hung for additional storage above counter.

Section 01 10 10 Page 65

11.2 GENERAL DESIGN REQUIREMENTS

The HVAC systems shall be designed to the latest industry standards, codes, and Government regulations included in this solicitation as well as UFC 3-600-01. The HVAC systems for this facility shall also be designed to be energy efficient and provide a safe and comfortable environment for the children and staff utilizing the facility.

Equipment shall be selected based on Life Cycle performance and not solely on initial cost in accordance with sustainable design principles and UFC 3-400-01. HVAC systems serving the child activity rooms shall be designed to provide individual temperature control to these spaces.

Outside air shall be provided to ensure current UFC 4-740-14 indoor air quality standards for Air Force Child Development Centers and for in accordance with ASHRAE 62.1 are met and take precedence over UFC 4-740-

14. Equipment shall be located to minimize maintenance disruptions within the child activity rooms.

Section 01 10 10 Paragraph 20. ROOM DATA SHEETS

Room Data Sheet 137, 208 Laundry Rooms

ARCH. FINISHES:

Floor Material: Rubber Flooring Base Material: Resilient Base Wall Finish: Epoxy Paint Wall Construction: Gypsum board one-hour fire rated Ceiling/ Height: ACT Gypsum board one-hour fire rated /9’-0”

SECTION 00010 - PRICING SCHEDULE

THE CONTRACTOR SHALL COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN 540

CALENDAR DAYS AFTER THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED.

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO

INCLUDE ALL ATTACHMENTS THERETO.

Item No.

Description

Estimated Quantity

Unit

Unit Price

Amount

Design and Construct MILCON 26,000 SF Child Development Center (CDC), Nellis

AFB, Complete.

1 L.S. **** $ _________________

OPTION 1 – Construct landscape plantingsand irrigation system in non-outdoor play environment areas and install granite rock ground cover.

OPTION 2 – Construct 15 additional parent parking spaces along west side, drive, and sidewalks. See Drawing C – 102. Design shall be included in base bid.

OPTION 3 – Construct north side outdoor play environments with shade structures and landscaping. Design shall be included in Base Bid.

OPTION 4 – Construct south side outdoor play environments, shade structures, and landscaping. Design shall be included in Base Bid

OPTION 5 – Construct paved outdoor courtyard with walls, fencing, and shade structure. See drawing A-101. Design shall be included in Base Bid

OPTION 5 – Construct paved outdoor courtyard with walls, fencing, and shade structure. See drawing A-101. Design shall be included in Base Bid

0008 OPTION 6 – Design and construct main water line loop to Youth Center. See 1 L.S. **** $ _________________

Drawing C-105.

OPTION 7 – Achieve LEED Silver certification from USGBC

TOTAL AMOUNT OF BASE BID (LINE ITEM 0001) $_________________

TOTAL AMOUNT OPTIONS (LINE ITEM NO’S. 0002 THRU 0009): $ _________________

TOTAL AMOUNT BASE BID AND OPTIONS $ _________________

File details come from the government source that posted it. Updated .