DRAFT RFP_B08-W912PF26RA011_ATT D_ Bidsheet_DRAFT.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation number
W912PF26RA011
Issued by

About this file

This is a draft bid sheet template for a Design-Bid-Build construction project focused on repairing storm water and sanitary sewer systems at Caserma Miotto in Longare, Vicenza, Italy under solicitation number W912PF26RA011. The bid sheet, designated as Attachment D, requires offerors to provide direct costs in Euros for multiple contract line items (CLINs) and is structured in two parts: Part 1 requests unburdened direct costs (labor, materials, equipment only, excluding overhead and profit) for definable features of work organized by CLIN, while Part 2 requests unburdened daily rates for key personnel roles including Project Manager, Quality Control Manager, Site Safety & Health Officer, and Site Superintendent.

The base work (CLINs 0001 and 0002) encompasses storm water system repairs including lamination tanks, retaining walls, wellpoint systems, sewer lines, lift stations, and sanitary sewer line repairs. Four option CLINs are included: CLIN 0003 for asbestos water pipe removal and disposal (300 linear meters), CLIN 0004 for reinstallation of synthetic turf sportfield works, CLIN 0005 for repair of landslide areas with naturalistic interventions and landscaping mitigation, and CLIN 0006 for sedimentation pond installation. Offerors must complete all blue-shaded fields with fully burdened pricing on the SF 1442 form, incorporating all indirect costs, overheads, and profit margins. This is a draft document subject to change, and the Government is not accepting formal proposals at this stage but is soliciting industry feedback through the formal RFP process managed by US Army Garrison Italy.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet

DBB STORM & SANITARY SEWER REPAIR

CASERMA MIOTTO

W912PF26RA011 ATTACHMENT D

DIRECT COST BID SHEET

OFFEROR NAME:

INSTRUCTIONS TO OFFERORS
1Offerors must complete all blue shaded fields. Prices must be proposed in Euros (€).
2Part 1 Direct Costs: Provide the Direct Cost only (e.g., labor, materials, equipment) for each Definable Feature of Work. Do not include profit, home office overhead, field office overhead, or bond costs in this section.
3Part 2 Key Personnel Rates: Provide the unburdened daily rate for the identified Key Personnel. This rate is evaluated for reasonableness but is not included in the Total Evaluated Price (TEP) for tradeoff purposes.
4SF 1442 Total Pricing: Offerors shall take the direct costs from Part 1, apply all applicable indirect costs, overheads, and profit, and enter the final, fully burdened total price for each CLIN (0001, 0002, 0004-0006) directly onto the SF 1442 schedule. For CLIN 0003, enter only the fully burdened Unit Price on the SF 1442.

PART 1: DIRECT COSTS FOR DEFINABLE FEATURES OF WORK

(Note: Provide Direct Costs ONLY in this section. Do not include overhead or profit)

CLINDescription / Definable Feature of WorkQtyUnitUnit Price (€)Cost Sum (€)
0001BASE: Storm Water System Repairs
Laminiation Tanks and Various Structural Works1JobN/A€ - 0
Retaining Walls and Temporary Perimeter Fence1JobN/A€ - 0
TOC1JobN/A€ - 0
Wellpoint System1JobN/A€ - 0
Storm Sewer Line Site Civil/Mechanical Utilities1JobN/A€ - 0
Natural Ditch1JobN/A€ - 0
Concrete Channel & Motor Pool1JobN/A€ - 0
Lift Station #11JobN/A€ - 0
Lift Station #21JobN/A€ - 0
1st Flush System1JobN/A€ - 0
CLIN 0001 Total Direct Cost€ - 0

0002 BASE: Sanitary Sewer Lines Repairs 1 Job N/A € - 0

0003 OPTION #1: Asbestos Water Pipe Removal and Disposal 300 LM € - 0 € - 0

0004OPTION #2: Reinstallation of Existing Sport Field
Synthetic Turf Sportfield1JobN/A€ - 0
Polisportiva Longare Works1JobN/A€ - 0
CLIN 0004 Total Direct Cost€ - 0
0005OPTION #3: Repair of Landslides Areas
Naturalistic Sliding Interventions1JobN/A€ - 0
Landscaping Mitigation Works1JobN/A€ - 0
CLIN 0005 Total Direct Cost€ - 0

0006 OPTION #4: Sedimentation Pond Installation 1 Job N/A € - 0

PART 2: KEY PERSONNEL UNBURDENED DAILY RATES

(Note: These rates must be unburdened base daily rates).

Key Personnel RoleEstimated QtyUnitUnburdened Daily Rate (€)
Project Manager1010Day€ - 0
Quality Control Manager (QCM)1010Day€ - 0
Site Safety & Health Office (SSHO)1010Day€ - 0
Site Superintendent1010Day€ - 0