DRAFT RFP_B08-W912PF26RA011_ATT B_ Experience_DRAFT.docx

DOCX document 58 KB Posted

Attached to
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation number
W912PF26RA011
Issued by

About this file

This is a draft Construction Experience Project Data Sheet (Attachment B) template for the Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems at Caserma Miotto, Longare, Vicenza, Italy (Solicitation Number W912PF26RA011). The template is designed to collect detailed past performance information from offerors and is part of the draft RFP issued by US Army Garrison (USAG) Italy through the Department of the Army Materiel Command Army Contracting Command. Prospective contractors must complete up to five project data sheets documenting their relevant construction experience.

The template requires offerors to provide comprehensive project information including firm identification (name, address, UEI number, CAGE code), role classification (prime contractor, subcontractor, or joint venture), contract details (number, title, location), work type (new construction, renovation, repair, or alteration), contract timeline (award date through actual completion), and financial data (initial contract price, final contract price, modifications, and percentage price growth). Offerors must also provide detailed narratives describing the work performed, project relevance to RFP requirements, self-performed work, technical and logistical challenges encountered, and management of modifications impacting project schedule and budget. This template is part of the draft solicitation feedback process; the Government is not accepting formal proposals at this time and requests industry comments on the draft RFP through the designated question and comment form by the specified response date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBB STORM & SANITARY SEWER REPAIR ATTACHMENT B

CASERMA MIOTTO

W912PF26RA011

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

1. Experience for: Offeror Joint-Venture Other (Explain)

a. Firm Name:

b. Address:

c. Phone Number:

d. UEI Number:

e. Cage Code:

f. Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Subcontractor Joint Venture Other (Explain)

a. Percent of project work performed by your firm:

b. If subcontractor, who was prime (Name/Phone #):

c. Provide detailed description of work performed by your firm in block 9.

3. Contract information:

a. Contract Number / Delivery or Task Order Number:

b. Title:

c. Location:

4. Type of work:
New ConstructionRenovationRepairAlterationOther (explain):

5. Contract Duration (Time):

a. Award Date (mm/dd/yy):

b. Contract Completion Date (mm/dd/yy):

c. Actual Completion Date (mm/dd/yy):

d. Detailed explanation if actual completion date occurred before or after contract completion date:

6. Contract Value (Value) :

a. Initial Contract Award Price:

b. Final Contract Price (including all Modifications):

c. Total Net Value of Modifications (b minus a):

d. Percentage Price Growth ([c divided by a] x 100):

7. Modifications: Provide a detailed explanation detailing the root cause, necessity, and final resolution of any modifications executed during this project. Specifically address the primary drivers for these changes and describe how your firm managed the impact of these modifications on the overall project schedule and budget.

8. Provide a detailed description of the project and its relevancy to the project requirements of this RFP:

9. Provide a detailed description of what work your firm self-performed on this project:

10. Provide a concise narrative detailing significant technical, logistical, or administrative challenges encountered during performance and the specific actions your firm took to overcome them and mitigate impacts to project cost, schedule, and quality.

11. Other Information:

File details come from the government source that posted it. Updated .