DEPARTMENT OF THE ARMY
UNITED STATES ARMY GARRISON ITALY
DARBY MILITARY COMMUNITY
PUBLIC WORKS OFFICE
APO AE 09613
Project
MS 00225-7P
TITLE
INSTALL FIRE ALARM BLDG 5016
S&M Area
TECHNICAL SPECIFICATIONS
Consisting of 33 pages
Ing. GIANLUCA LUCETTI Chief, Engineering Services Branch
Prepared by: STEPHEN L. DONNELLY, PE Public Works Manager
On 9 January 2020 APPROVAL DATE ________________
SECTION Ia
GENERAL PROVISIONS
1a-01 WORK PHASING.
a. Work Schedule. Whenever the nature of the contract and the work location are such that the work is to be performed in an area assigned to activities and services that cannot be interrupted, work shall be scheduled with concurrence of COR in such a manner as to cause the least possible inconvenience to the normal operations of mentioned activities and services. Contractor shall submit his proposed work schedule to the COR at the time of the pre-construction conference.
Work start shall be contingent upon schedule approval.
b. Utilities Cut-Offs. As a rule, cut-off of power and other utilities (water, sewage, heating system, etc.) is not allowed. All temporary connections necessary to insure continuous power distribution shall be provided. If cut-offs are necessary, they shall not exceed the period of time strictly needed to make the temporary connections. Cut-off shall be scheduled with the COR not less than 15 days ahead of time.
c. Alarm, Telephone and Televisions Systems. Deenergizing of alarm, telephone and television systems is strictly prohibited. Should these systems, which may not appear on the drawing interfere with the contract work, they shall be temporarily diverted and fed by means of temporary connections to be adequately protected. Written approval must be obtained from COR prior to doing any temporary work.
d. System Reactivating. At the completion of the work, all existing systems, including water, electrical and heating systems, shall be reactivated and placed in their original locations.
e. Temporary Protections. Floors, carpets, and equipment that cannot be removed shall be adequately protected by temporary tarpaulins to be furnished and installed at no cost to the US Government. In addition, temporary protections shall be furnished and installed in some particular areas so as to allow performance of activities that cannot be interrupted or transferred.
Also, the Contractor shall be responsible for removing, protecting, and reinstalling all furniture, shelves and furnishings that may interfere with the work course. A wrong or no evaluation of all requirements specified above does not constitute grounds for a request for additional compensation.
1a-02 JOBSITE CLEAN UP AND DUST CONTROL. The contractor shall have sufficient trash/waste bins on site, and shall clean the worksite so that all discarded materials, debris and trash are placed in these bins at the end of each workday, and not left or allowed to accumulate anywhere else on the jobsite. These waste bins shall not be allowed to overflow with debris, and shall be emptied as soon as they become full. Haul roads shall be watered sufficiently to prevent excessive dust. The work area shall be swept regularly to prevent accumulation of debris.
Equipment, construction materials and excavated soil shall be stored in a safe and orderly manner on the jobsite, in accordance with the contractor's approved area use plan.
1a-03 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. The contractor is considered the waste generator of all salvage, re-usable, re-cyclable and disposable materials derived from the demolition and removal works included in this contract and shall handle these materials as hereinafter indicated.
a. Salvage Material. All salvage end items that the COR will have considered in good operating conditions shall be disassembled without damage, cleared of all dirt and scaling and then transported to the DPW Warehouse, Building 5156, Depot, where they shall be handled over undamaged.
b. Re-usable Material. End items removed during contract accomplishment which cannot be re-utilized in future construction but which still have a commercial value shall be delivered to the DRMO, through DD Form 1348-1a. This material includes, but it is not limited to, canvas, textile consisting of scrap clothing, scrap aluminum including doors, windows and frames, copper, brass, bronze, and stainless steel, cables, electric motors, light and heavy metals in different sizes and thicknesses that the DRMO contractor can handle (3-4 m long), electrical and electronic equipment, and kitchen appliances. All the above material must be free of hazardous property and need to be segregated. The scraps generated in the Supply & Maintenance Area shall be transported to the DRMO yard only on Monday and Tuesday from 08:00 am to 15:00 pm by appointment through the COR. The scraps generated from other installations must be kept in place. DRMO will arrange the removal. However, the contractor shall request a pre-inspection of the material by DRMO through the COR.
c. Recyclable Material. All construction and demolition recyclable waste material shall be delivered to authorized treatment facilities by the contractor.
d. Special Waste. All special waste, either hazardous or not hazardous, shall be delivered by the contractor to authorized disposal facilities.
e. Waste Storage. Construction and demolition waste shall be stored in waste specific containers provided by the contractor. Containers will be in good conditions, free from severe rusting, bulging, or structural defects. Containers shall be placed in area identified by COR.
Containers shall be removed once full or on COR’s decision.
f. Certificates and Authorizations.
(1) Recyclable Materials. As regards to recyclable materials, the Contractor shall submit copy of the authorization of the treatment facility which they are delivered to and will certify that waste have been removed in compliance with applicable law requirements.
(2) Disposable Materials. As regards to material delivery to disposal facilities, the contractor will provide the COR and DPW Environmental Office with copies of the following documents:
• Authorization to transport construction and demolition waste;
• Authorization of the landfill;
• 4th copy of Formulario di Identificazione del Rifiuto.
(3) Waste Manifest. All transported waste will be accompanied by the
Formulario di Identificazione del Rifiuto (waste manifest) to ensure a complete audit trail from point of origin to ultimate disposal. The waste manifest must be completed in quadruplet, all dated and signed by the waste generator and countersigned by the transporter. The first copy of the manifest will remain with the waste generator; of the remaining three copies, (countersigned and dated by the receiver), the second copy will remain with the transporter, the third copy will remain with the receiver, and the fourth copy must be returned by the transporter to the waste generator within 3 months of delivery of the waste to the disposal/treatment facility.
g. Costs. All operations included in this paragraph shall be carried out by the contractor with no additional cost to the US Government.
1a-04 AUTHORIZATION FOR INSTALLATION OF MATERIAL AND EQUIPMENT.
Before installing any material or equipment mentioned in the specifications, approval shall be obtained from the COR. Contractor shall submit material samples, shop drawings, manufacturer's literature, etc., to the COR 10 days prior to installation and shall proceed with installation only after receiving written approval from the COR. All material installed without COR's approval shall be removed.
1a-05 ISPESL AND CEI STANDARDS. All work described in these specifications shall be accomplished in strict compliance with the ISPESL (Superior Institute of Prevention and Assurance of Work) and CEI (Italian Electrotechnical Committee) standards. In particular, if the work under contract, such as roof repairs, building painting, etc., may cause Contractor's personnel or other individuals to come in contact with non insulated electric lines, these shall be temporarily protected by use of appropriate spiral plastic tubes available on the market.
1a-06 TRANSLATION AND TITLE ABBREVIATION. The terms COR and "Direzione dei Lavori" used in the Italian version of these specifications are equivalent to the American term "Contracting Officer's Representative," which in the English version is indicated by the letters COR.
1a-07 DIGGING PERMIT. The Contractor shall obtain a digging permit for all work areas affected by this contract (to insure that all the as-built information for underground services is received). This permit and related drawings must be received by the Contractor prior to starting any work. After receipt of the digging permit, the Contractor shall immediately notify, in writing the Contracting Officer of the permit receipt. The Contractor will be held responsible for any damages caused to existing services, as indicated on the digging permit and related drawings, and will repair such damages at his own expense.
1a-08 ASBESTOS. No handling of asbestos containing material is included in this project. Use of asbestos containing materials is forbidden.
1a-09 PARTICULAR REQUIREMENT FOR WORK IN HEATING PLANTS. When the contract requires the work to be performed inside heating plants, the contractor shall provide a new cylinder in the door lock and shall deliver two keys of the new cylinder and the removed cylinder to the personnel in charge of the maintenance. At the work end the contractor shall restore the lock to the original conditions and the temporary cylinder will remain his own property.
1a-10 ANTI-TERRORISM TRAINING. The Contractor shall comply with the following security requirements:
a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: httQ://jko.jten.mil.
b. OPSEC Training. According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.
The contractor will develop an OPSEC standing operating procedure (SOP)/plan within 90 calendar days after the contract is awarded, to be reviewed and approved by the responsible Government OPSEC officer, according to AR 530-1. This SOP/plan will include the Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor will ensure this individual becomes OPSEC Level II certified according to AR 530-1.
c. Access and general protection/security policy and procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
d. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO).This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.
This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 40 calendar days after contract award.
1a-11 ENVIRONMENTAL PROTECTION SYSTEM. The contractor will provide the following information semi-annually to be used by the Government to address environmental performance relative to the goals of the USAG Vicenza Environmental Management System.
Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or government furnished). Reports for January – June will be submitted by 15 July and reports for July-December will be submitted by 15 January each year.
Media Report Element #1 Report Element #2
Non-Hazardous Solid Waste
Total Waste Generated (Kg)
Amount of Waste Diverted from Landfill (Kg)
Construction Debris/Demolition Materials
Total Waste Generated (Kg)
Amount of Waste Diverted from Landfill (Kg)
Compostable/Organic Material
Total Waste Generated (Kg)
Amount of Waste Diverted from Landfill (Kg)
Hazardous Materials Total Used (Kg) Hazardous Waste Total Generated (Kg) Total Recycled (Kg) Energy Consumption - Electricity
Total Energy Consumed (MBtu)
Energy Consumption - Fuel
Total Fuel Consumed (L)
Renewable/Alternative Energy
Total Consumed
(MW)
Facility Construction/Renovation
Number of Buildings LEED Certified Silver or Higher
SqFt of buildings LEED Certified
SECTION XIIIa
ELECTRICAL SYSTEMS
13a.1 GENERAL DIRECTIVES AND REFERENCE NORMS
13a-1.1 Reference norms The publications listed below are an integrative part of these specifications as applicable and in the version governing at the contract award.
Italian publications
- All applicable norms of the Comitato Elettrotecnico Italiano (CEI).
European publications
- All applicable norms of the European Committee for Electrotechnical Standardization
(CENELEC).
USA publications (civil and military ones)
- NFPA 70 National Electric Code
- NFPA 780 Installation of Lightning Protection System
- NFPA 101 Life Safety Code
- UFC 3-520-01 Unified Facilities Criteria – Interior Electrical Systems
- UFC 3-530-01 Unified Facilities Criteria – Interior and Exterior Lighting and Controls
- UFC 3-550-01 Unified Facilities Criteria – Exterior Electrical Power Distribution
- UFC 3-570-03N Unified Facilities Criteria – Power Distribution Systems
- UFC 3-570-02N Unified Facilities Criteria – Electrical Engineering Cathodic Protection
- UFC 1-200-02 Unified Facilities Criteria – High performance and sustainable building requirement
- UFC 4-010-01 Unified Facilities Criteria – DoD Minimum Antiterrorism Standards for
Buildings
- UFC 4-022-01 Unified Facilities Criteria – Security Engineering: Entry Control
Facilities/Access Control Points
International publications
- All applicable norms of the International Electrotechnical Commission (IEC).
In case of conflict between the norms listed above, the more stringent norms as to safety shall apply.
13a-1.2 Requirements of the firm installing the systems The firm in charge of the installation shall have all the qualifications required by Decree n. 37 of 22 January 2008 “Regolamento concernente l’attuazione dell’articolo 11-quaterdecies, para. 13, a) della legge n. 248 del 2 dicembre 2005, recante riordino delle disposizioni in materia di attivita’ di installatione degli impianti all’interno degli edifici” (regulations on implementation of article 11-quaterdecies, para. 13 a) of law n. 248 of 2 December 2005 for the modification of the requirements on the installation of systems inside buildings):
- The firm shall be inserted in the roll of firms as per Decree of the President of the Republic 7 December 1995, n. 581 and subsequent modifications, or in the Provincial Roll of handicraft firms as per law 8 August 1985, n. 443.
- The firm shall have all certifications acknowledging the technical-professional requirements, as per the models approved by Decree of the Minister of Industry, Trade and Handicraft of 11 June 1992. In particular the firm shall have the authorization to work on systems as per letter “a” of article 1 of DM 37/08.
The installing firm shall provide the COR with all certifications mentioned above, attesting the suitability to the performance of the work.
13a-1.3 Statement of compliance At the completion of the work and after the checks required by the governing norms, including the ones on the system operation, the firm in charge of the installation shall provide the COR with 2 copies on paper of the statement of compliance pertaining to the system installed as per the norms of article 6 of Decree n. 37 of 22 January 2008. The report containing the types of materials to be used, as well as the project as per article 5 of Decree n. 37, are part of the report, which has to be prepared as shown on enclosure I of the decree, as modified by DM 19 May 10 “Modifica degli allegati al decreto 22 gennaio 2008, n. 37, concernente il regolamento in materia di attivita’ di installazione degli impianti all’interno di edifici (modification to the enclosures of decree 22 January 2008, n. 37, on the regulation of installation of systems inside buildings). Statements of compliance on different forms and/or lacking the pertaining documentation to be enclosed will not be accepted. In addition, the installing firm shall provide the COR with a .pdf file deriving from scanning the original statement, stamped and signed, with the enclosures.
13a-1.4 Materials to be installed All electrical materials and equipments to be installed shall be in compliance and installed as indicated by the manufacturers or by the installing firms, and as indicated at paragraph 1.1, complete with CE brand. In no case the material, the equipment or the method of installation shall be inferior to the standards established by the latest edition of the applicable norms. The equipment defective or damaged during the installation or the final tests shall be replaced or repaired as approved by the COR. The contract drawings show the extension and general location of the system. If variations with respect to the contract drawings or to the specifications are deemed necessary by the contractor to make the system in compliance with the norms mentioned above, these variations and their reason for shall be submitted to the COR for their technical approval as soon as possible. No variation shall be performed without the preventive written approval by the Contracting Officer.
Unless otherwise indicated in writing by the COR, the materials to be furnished under these specifications shall be unused, first grade commercial quality standard products of a reputable manufacturer regularly engaged in the production of such equipment and shall be the manufacturer's latest standard design that complies with the specification requirements. Where two or more units of the same class of equipment are required, these units shall be the products of a single manufacturer; however, all component parts of the equipment need not be the products of a same manufacturer.
13a-1.5 Submission of materials for approval With reference to paragraph 1a-04, the Contractor shall submit a complete list, in triplicate, of the materials, fixtures and equipment to be utilized in the work, to the COR’s approval. The list shall include the country of origin, name of manufacturer, catalog numbers, pictures, diagrams, drawings, and any other necessary description of technical data. In case the factory literature does not describe the material in sufficient detail to ensure conformance with the specifications, samples of the materials shall be submitted for approval. In the case of special made-to-order equipment, or shop fabricated items standard components, shop drawings showing fabrication details, material specifications, finishing, installation methods, etc. shall be submitted in triplicate. No consideration will be given to partial lists submitted from time to time. Any listed material, fixtures, and equipment that are not of first grade commercial quality or not in accordance with the specifications requirements shall be subject to rejection. Descriptive literature and shop drawings covering approved material and equipment will remain in the possession of the US Government and material or equipment samples will be retained until the required quantities of approved material or equipment have been delivered to the building site or until determined by the COR.
13a-1.6 Equipment installation The contractor shall perform all operations of uncrating, assembly, setting in place, levelling, anchoring, testing and adjusting for perfect operation of all machinery and equipment items, except for items to be installed by the US Government agencies. The locations shown on the drawings may be subject to minor deviations to avoid interference with utility lines or architectural features of the building. Measurements for mounting bolts, platforms or recesses will not be taken from the drawings but will be confirmed from approved equipment manufacturer's shop drawings or directly from the machinery or equipment. The electric circuits and services for other utilities will be installed as indicated on the drawings. The exact location of machinery connection boxes, conduit pipe or tubing risers will be confirmed on the field, prior to installation to provide the most convenient accessibility to the connection on the machines. If the manufacturer does not provide machines with connection boxes, the Contractor shall supply and install the proper boxes to ensure satisfactory enclosed connections.
13a.2 REMOVAL
Included in the electrical removal are all circuits with relative surface mounted or recessed raceways, and all equipment connected to them, such as electrical panels, light fixtures, switches, receptacles, junction boxes, etc., complete with ancillary fastenings, and any other material not necessary in the new system. Partial removal of the electrical system shall be carried out so that electrical circuits in the rooms adjacent to the areas where work is performed remain operational.
All existing masonry work or utility lines damaged during the removal shall be adequately restored to match the original conditions.
13a.3 GROUNDING SYSTEM
13a-3.1 General The grounding system shall be installed in compliance with norms CEI EN 50522, CEI 64-8 and with handbook CEI 64-12. When the grounding system is used as a lightning protection system, also standard CEI EN 62305 and NFPA 780 shall be complied with.
13a-3.2 Cases in which grounding is forbidden Grounding is forbidden in the following cases (unless otherwise indicated):
- Class II equipment (provided with double insulation);
- Equipment fed by isolation transformers (protected for electrical isolation); in case the isolating circuit feeds more than one user, masses shall be interconnected through a unipotential conductor insulated from grounding.
- Equipment fed by safety transformer (SELV protection).
13a-3.3 Protective conductor (PE) shall be of copper, flexible, insulated, yellow-green, minimum cross sectional areas as indicated below:
CROSS SECTIONAL AREA OF PHASE
CONDUCTOR
CROSS SECTIONAL AREA OF
PROTECTIVE CONDUCTOR
Up to 16 sq mm same as phase conductor Between 16 and 35 sq mm 16 sq mm Over 35 sq mm One half of the phase conductor
NOTE: When the protective conductor is not included in the conduit of the phase conductor, the protective conductor shall be no less than:
2.5 sq mm, when a mechanical protection is required;
4 sq mm, when a mechanical protection is not required.
13a-3.4 Conductors for equipotential bonding shall be of insulated flexible copper strand, yellow-green color. The minimum cross sectional areas of these conductors shall be as indicated below:
EQUIPOTENTIAL
CONDUCTORS
MAIN PROTECTING CONDUCTOR CROSS
SECTIONAL AREA PE
CONDUCTOR
EQUIPOTENTIAL
CROSS SECTION
Main EQP
≤ 10 sq mm 6 sq mm = 16 sq mm 10 sq mm = 25 sq mm 16 sq mm ≥ 35 sq mm 25 sq mm
Additional EQS:
mass-mass connection
EQS ≥ PE with the smallest cross sectional area;
When two masses belong to circuits having the cross sectional areas of protecting conductors very different, fault currents could occur such as to strain thermically and excessively the EQS conductor (of dimensions suitable to the cross sectional area of the minor protection conductor). In this case it is advisable to increase the cross section of the EQS conductor based on the actual fault current.
Additional EQS:
mass-foreign mass connection
EQS = 1/2 of the section of the corresponding conductor PE
Note In any case the cross section of the EQS conductor shall be as follows:
• ≥ 2.5 sq mm if mechanically protected
• ≥ 4 sq mm if not mechanically protected
• In medical rooms a minimum 6 sq mm cross section is always required.
Mass Conductive part of the electrical system. Under normal insulating condition, this part is not energized; however, in case of failure of main insulation, it may become energized and may be touched (e.g. water heater, domestic appliances, etc.)
Foreign mass Conductive part, unrelated to the electrical system, with a good electrical connetion to the ground, adequate to feed the ground potential (buried water pipe, reinforcement of concrete, metal bearing structures of buildings, etc.)
or other potential.
13a.4 RACEWAYS FOR INDOOR INSTALLATION AND ELECTRICAL CABLES
13a-4.1 General requirements Maximum cross sectional area utilized in raceways and installation of cables.
In raceways the area taken by the power cables shall not exceed 50% of the usable section.
The interior diameter of pipes shall be at least equal to 1.3 times the diameter of the circle circumscribed of the beam of cables contained therein.
Electrical circuits shall be laid in conduits only when the raceway system is completely installed, so that the electrical system may be pulled out without damage to conduits or wiring.
Raceway course
Raceways shall be installed parallel to walls, to structural elements and to the intersection lines between vertical surfaces and ceilings. Parallel paths shall be spaced symmetrically and the same distance shall be kept at bends, also increasing the radius of each concentric bend. Minor deviations will be allowed in the raceway course shown on the drawing only if strictly necessary.
In any case the access to the raceways and junction boxes shall be ensured. All deviations shall be previously notified and approved by the COR Installation of raceways
Contractor shall furnish all necessary hangers, brackets and other incidental items to install raceways in a permanent and suitable manner on the type of surface, consistent with the architectural finish of the location. As a rule, when a conduit is parallel to or crosses mechanical system pipings, it shall be installed above the mechanical piping at an adequate safe distance. All necessary precautions shall be taken to avoid lodgment of cement mortar, plaster, dirt or other foreign matters in conduits during the construction. Conduits that have become clogged shall be freed of accumulation or replaced.
Masonry crossings
When penetrations are made through walls or ceilings, holes shall be neatly made. After conduit installation, holes shall be adequately restored to match adjacent surfaces. Any roof crossed by conduit shall receive a new adequate waterproofing membrane. PVC or galvanized iron conduits passing through foundations or concrete members shall be laid inside a sleeve installed to provide access for future installation of conduit. The internal diameter of sleeve shall not be greater than 1-1/2 times the external diameter of conduit to be installed. Whenever raceways cross walls or deck ceilings being part of a fire rated insulating system, adequate fire-break barriers shall be provided to restore the original resistance to fire.
13a-4.2 Galvanized steel pipes Galvanized steel pipes shall have the following characteristics:
- Material: hot-galvanized steel type sendzimir
- Circular cross sectional area
- Minimum exterior diameter 20 mm
- Minimum thickness 1 mm.
Pipelines shall be surface mounted by galvanized steel hangers with lateral hook type opening and threaded hole or with metal brackets. Pipe hangers shall be spaced approximately 1 m o.c. Use of multiple pipe hangers is allowed. Contractor shall furnish all connectors, elbows, joint sleeves, closing sleeves, covers, reductions and any other incidental items necessary for an IP67 protection degree. When cable conduits are to be connected to other equipment provided with threadless entries, electrical continuity between the two metal bodies will be insured by use of bushings and nuts suitable for the purpose. Use of Teflon or hemp in metal pipe connections is strictly prohibited.
13a-4.3 Flexible fittings for steel pipes Flexible fittings for steel pipes shall have the following characteristics:
- Material: Steel sheath covered by vacuum PVC
- Circular cross sectional area
- Minimum exterior diameter 20 mm
- Complete with nickel coated brass fittings at the ends
- IP65 protection degree.
Flexible fittings shall be used where a wiring with steel pipes is required to make bends (where the use of rigid bends is not possible) or to make misalignments between pipes, misalignments close to a junction box or to get over obstacles.
13a-4.4 Metal/plastic cable guides Cable guides shall have the following characteristics:
- Material: of hot-galvanized flexible steel, PVC coated
- Circular cross sectional area
- Minimum exterior diameter 20 mm
- Classification CEI EN 50086:
o Resistance to crushing: class 3 (above 750 N) o Cold impact: class 3 (2 kg from 10 cm) o Resistance to minimum temperature: class 3 (-15°C) o Resistance to maximum temperature: class 1 (+60°C)
- Not fire diffusing as per CEI EN 50086
- Very good resistance to UV rays
- IP65 protection degree through adequate compatible fittings.
Cable guides shall be used with a wiring system of steel pipes for the protection of terminal circuits for the connection to electrical equipment subject to vibrations (i.e. motors, burners, etc.).
13a-4.5 Junction boxes of metallic material Metallic insulating junction boxes shall be used with the wiring system inside steel and shall have the following characteristics:
- In compliance with norm CEI 23-48, EN 60670
- Rectangular or square shape
- Body and cover of aluminum alloy
- IP66 protection degree
- Minimum resistance to shock: IK 08
- Steel screws
- With smooth sides with cable glands or metal fittings.
13a-4.6 Low voltage electrical cables Unless otherwise indicated on the drawing or in the description of the work, electrical cables shall be of the following types:
- FG16OM16 for distribution and terminal circuits
Conductors shall have the color of the insulation in compliance with CEI norms. In any case the protecting conductor PE shall be yellow-green.
Branching off shall be performed only inside junction boxes through adequate insulating clamps.
Conductors of circuits working with voltage higher or equal to 50V shall be installed inside raceways so as to be separated from the ones working at a voltage lower than 50V a.c.
13a.5 N/A
13a.6 N/A
13a.7 N/A
13a.8 DISTRIBUTION PANELS, COMPONENTS, MEASURING SYSTEMS, EMERGENCY VOLTAGE RELEASE
13a-8.1 Modular circuit breakers Unless otherwise indicated on the drawings or in the description of the work, the breaking capacity of the circuit breakers shall be in accordance with norm CEI EN 60947-2.
Whenever circuit breakers with ground fault relays are required, they shall be class “A” in circuits feeding ordinary loads; differential relays in circuits feeding single-phase inverters shall be class “F” or “B”; differential relays in circuits feeding three-phase inverters shall be class “B”.
13a.9 N/A
13a.10 CIVIL WORKS RELATED TO THE INSTALLATION OF ELECTRICAL
SYSTEMS
Civil works related to the installation of electrical systems (where applicable) are as follows even though not specifically indicated on the drawings or in the description of the work:
- Opening of trenches in the walls
- Closing of trenches in the walls
- Plastering of the masonry after closing trenches
- Painting of the masonry after closing trenches with a color equal to the remaining wall
- Replacement of the removed tiles for trenches, with tiles equal or similar to the existing ones
- Restoration of the masonry, of plastering and painting after the crossing through masonry surfaces by raceways
- Restoration of the waterproofing after crossing through the roof by raceways
- Restoration of the fire-break compartmentalization after crossing with raceways.
Any damage to buildings, pipes, equipment caused directly or indirectly by the contractor shall be repaired by personnel qualified in the type of work without additional costs to the US Government.
SECTION XIIIb
TELECOMMUNICATION SYSTEM
13b-1 GENERAL PROVISIONS AND REFERENCE NORMS
13b-1.1 Reference norms
The publications listed below are an integrating part of these specifications as applicable.
Italian Publications
- CEI 306-2, “Guida per il cablaggio per telecomunicazioni e distribuzione multimediale negli edifici residenziali” (guide for wiring for telecommunication and multimedia distribution in residential buildings).
European Publications
- CEI EN 50173-1 “Tecnologia dell’informazione. Sistemi di cablaggio generico. Parte 1:
Requisiti generali e uffici (classificazione CEI 306-6) (technology of information; general wiring systems – part 1: general requirements and offices, classification CEI 306-6)
- CEI EN 50174-1 “Tecnologia dell’informazione. Installazione del cablaggio. Parte 1:
specifiche ed assicurazione della qualita’ (technology of information; installation of wiring
– part 1: specifications and quality assurance)
- CEI EN 50174-2 “Tecnologia dell’informazione. Installazione del cablaggio. Parte 2:
Pianificazione e criteri di installazione all’interno degli edifici” (technology of information; installation of wiring – part 2: planning and installation criteria inside buildings).
U.S. and Military Publications
- 2nd Theater Signal Brigade – Implementing Inside and Outside Plant (CDS/ICDS) Cabling Distribution Systems within USAREUR
- U.S. Army in Europe – Cable Distribution System (CDS) Installation Standards
- Department of the Army – United States Army Information System Engineer Command -
Technical Guide for Installation Information Infrastructure Architecture
- UFC 3-580-01 Telecommunications Interior Infrastructure Planning And Design
- NFPA 70 National Electrical Code
Reference these specific norms, we highlight that these documents are available only in English and that it is a contractor’s responsibility to ensure the requirements contained are well understood and applied.
In case of conflict among the norms listed above, the military norms “Cable Distribution System (CDS) Installation Standards” and the “Technical Guide for Installation Information Infrastructure Architecture”, together with the norms to which it makes reference, shall be governing.
13b-1.2 Requirements of the firm installing the systems The installing firm shall have all the requirements required by Decree n. 37 of 22 January 2008 “Regolamento concernente l’attuazione dell’articolo 11-quaterdecies, comma 13, lettera a) della legge n. 248 del 2 dicembre 2005, recante riordino delle disposizioni in material di attivita’ di installazione degli impianti all’interno degli edifici” (Decree n. 37 of 22 January 2008, regulation for the implementation of art. 11) quaterdecies, para. 13, letter a) of law n. 248 of 2 December 2005, pertaining to the reorganization of the norms on the installation of systems inside buildings):
- The installing firm shall be enrolled in the register of firms as per the decree of the President of Italian Republic 7 December 1995, n. 581 and subsequent modifications, or in the provincial register of craftsmen as per law 8 August 1985, n. 443.
- The firm shall have the certificates of the acquired technical and professional skills, as per the models approved with a decree by the Ministry of Industry, Trade and Handicraft of 11 June 1992. Particularly, the firm shall have the authorization to work on the systems specified at letter b. of the article 1 of the DM 37/08.
The installing firm shall be accredited DIN EN ISO 9001.
The installing firm shall provide the COR with the certificates mentioned above to prove its suitability to the performance of the work.
13b-1.3 Statement of Compliance At the completion of the work and after performing the checks required by the laws in force, including the ones for the system functionality, the installing firm shall provide the COR with 2 copies on paper of the statement of compliance for the system as installed in compliance with the norms at article 6 of Decree n. 37 of 22 January 2008. The report containing the type of materials used and the design as per article 5 of Decree n. 37 are an integral part of the statement, provided as established by Enclosure I of the mentioned decree as modified by DM 19/5/10, “Modifica degli allegati al decreto 22 gennaio 2008 n. 37, concernente il regolamento in materia di attivita’ di installazione degli impianti all’interno degli edifici” (modification of enclosures to decree 22 January 2008 n. 37 for the regulation of installation of systems inside buildings). Statements of compliance on different models and/or lacking the pertaining documentation to be enclosed will not be accepted. In addition, the installing firm shall provide the COR with a .pdf file obtained from the scanning of the original copy, stamped and signed, of the statement of compliance, complete with the enclosures.
13b-1.4 Materials to be installed All materials and equipment shall be in compliance with and shall be installed as strictly indicated by the materials manufacturers’ or installers’ factories. In no case the materials, the equipment and the installation methods shall be below the standards established by the most recent edition of the applicable norms. The defective equipment or those damaged during the installation or the final tests shall be replaced or repaired as approved by the COR. The contract drawings indicate the extension and the general layout of the system. If some variations with respect to the contract drawings and specifications are deemed necessary by the contractor to install the system in compliance with abovementioned norms, details and the reasons of such variations shall be submitted to the COR for the technical approval as soon as possible. No variation shall be made before obtaining the written approval by the Contracting Officer.
Unless otherwise indicated in writing by the COR, the materials to be provided for these specifications shall be not used and they shall be of first quality, of standard commercial quality, manufactured by factories known and specialized in the production of such materials and shall be the most recent standard product of the factory in compliance with the requirements of the specifications. Whenever two or more units of equipment of the same type are required, these units shall be of one manufacturer; however the single parts making an equipment unit will be allowed to be produced by different manufacturers.
13b-1.5 Submission of the materials for approval Reference paragraph 1.4, the contractor shall submit three copies of a complete list of the materials and equipment to be used for the work. The list shall indicate the country of origin, the name of the manufacturer, the catalog numbers, pictures, drawings and any other necessary descriptive information. In case the factory descriptive material does not cover the material sufficiently to ensure its compliance to the specifications, samples of the material shall be provided for the approval. In case of special equipment custom-made and resulting from the assembling of standard components, three copies of shop drawings showing the assembling details, the norms pertaining to the materials, their finishing degree, the methods of installation, etc., shall be submitted. Partial lists submitted occasionally will not be taken into consideration. The approval of materials and of equipment shall be based on the manufacturer’s rating. Listed materials, equipment and apparatus that are not of first quality or in compliance with the requirements of the specifications will be rejected. The descriptive material and the shop drawings pertaining to the approved material and equipment will be a US Government’s property; the samples of materials will be kept until the necessary quantities of approved materials and equipment are transported into the work site, or until otherwise directed by the COR.
13b-1.6 “As-built” drawings (REDLINE) The contractor shall prepare the “as-built” drawings (called REDLINE) of the entire telecommunication system installed, that shall show the following information (non exhaustive list):
- The cable duct course;
- The location of manholes;
- Cables and the numbering of pairs o inside manholes o at splices o at entrances into buildings
- The location of the telecommunication rack and of components inside the rack;
- The labeling of all components installed.
The contractor shall provide an electronic copy (.dwg or .pdf format) and two copies on paper on a standard A1 size of REDLINE drawings to the COR.
These REDLINE drawings are to be provided in addition to the “as-built” drawings pertaining to the entire project.
13b-2 REMOVALS The removal of the telecommunication system includes all cables with their raceways, both exposed and recessed, all equipment connected to them, such as jacks, junction boxes, patch panels, patch cords, terminal boards, racks, etc, together with their fixing accessories and any other material that is not necessary in the new system. Whenever partial removals of the telecommunication system are needed, the contractor shall perform them while leaving all communication jacks not subject to the removal operative. All masonry and all utilities systems damaged during the removal shall be repaired adequately and restored to their original conditions.
13b-3 N/A
13b-4 COMMUNICATION CABLES
General Note: all the cables installed inside a building must comply with the requirements of the European regulation CPR (UE) 305/2011, class Cca-s1,d1,a1.
13a-4.1 Copper cables for LAN networks These cable shall be of the following type:
- Category 6 or above, band range 250 MHz or above
- F/UTP (exterior shielding of the sheath, no shielding of the single pairs)
- Sheath LSZH (Low Smoke Zero Halogen)
- In compliance with the requirements of standards ISO/IEC11801, EN-50173 and TIA/EIA
568-B.2-1.
Cables U/UTP are not allowed.
13b-5 N/A
13b-6 N/A
13b-7 LABELING
13b-7.1 General requirements Cables shall be labeled at all termination points, splices boxes, PETs, and manholes/hand holes. If there is a splice box in the manhole/hand hole the cables shall be labeled between the splice and the end wall on both sides of a splice canister. For un-spliced (straight through) cables, a label is required at each end where the cable enters and exits the manhole. For cables that penetrate walls or floors a label is required on at least one side of the penetration. Labels will be mechanically generated and not hand written and shall be water resistant.
13b-7.2 LAN cables LAN cables shall be labeled both at the communication jack and in the telecommunication room.
1-1-A01
Sample of labeling on LAN cable in telecommunication room
1-1-A01
Sample of labeling of LAN cable at the communication jack
That means as follows:
- 1= Number of the telecommunication room
- 1= Number of the telecommunication rack
- A01=Number of the patch panel and number of door
Note: Telecommunication rooms (TR) are numbered progressively; the first telecommunication room, the one in which the cables coming from the outside of the building are connected, is the number 1 (TR1). In case there are further telecommunication rooms, they will be numbered as TR2, TR3, etc.
13b-7.3 Communication jacks RJ45 Communication jacks RJ45 installed in rooms shall be labeled as shown below:
Numbering for two-position plate
The numbering procedure of jacks is in two phases:
- First phase: the numbering of the room shall be made starting from the first room immediately on the left of the telecommunication room (while living the room) and proceding clockwise on each storey.
- Second phase: when entering each room, jacks shall be numbered in sequence clockwise by starting from the partition on the left. If in a room there are two or more access doors, the first access on the left will be the starting point.
13b-8 INSTALLATION OF TELECOMMUNICATION SYSTEM INSIDE BUILDINGS
1-1-A01 1-1- A02
No. telecommunication rack No. telecommunication room
No. patch panel No. port
13b-8.1 General requirements All components of the telecommunication system installed inside buildings shall be category 6 or above.
The connection of category 6 new cables to existing patch panels of lower category is forbidden.
If there is a protected distribution system (PDS) inside the building, the new communication system shall not interfere with it (also providing adequate separation among cables, raceways, pipes, boxes and jacks of the two systems).
In offices at least a pair of communication jacks RJ45 spaced 4 m o.c. shall be installed along the perimeter of the rooms.
13b-8.2 Cable raceways Cable raceways shall have the following characteristics depending on their location of installation:
- Fully closed metal cable trays and wire metal cable trays
- Insulating material raceways
- Metal pipes
- Insulating material pipes
Unless otherwise indicated on the drawings or in the description of the work, in office spaces or in similar rooms insulating material raceways and pipes shall be installed, while in shops/warehouses (including mechanical rooms) metal pipes shall be used.
Raceways shall be filled up to 60% maximum of the available cross sectional area.
The insulating material raceways to be used for wiring offices spaces or similar rooms shall be at least 120 mm high.
All metal containers shall be made equipotential and connected to the main bus bar of the building MGB or on the grounding bar for telecommunications (TMGB or TGB).
Communication cables and power cables laid in the same raceway shall be divided by a separator.
Communication cables and power cables laid on a bridge shall be kept at 5 cm minimum distance by using adequate separators on the same tray or by installing separate trays.
As to other characteristics of raceways and to further installation requirements (general and specific ones), reference to paragraph 4 of Section XIIIa (Electrical Systems) as applicable.
13b-8.3 Communication jacks Communications jacks shall be of the type RJ45 F/UTP and shall be installed in groups of two. If a higher number of jacks is required, groups of 4 or 6 jacks can be used.
All terminations shall be in compliance with standard TIA/EIA 568A, as shown hereinafter:
Connection in compliance with standard TIA/EIA 568A
Pair Assigned Pin Colors of conductors 1 5 and 4 White-blue and blue 2 3 and 6 White-orange and orange 3 1 and 2 White-green and green 4 7 and 8 White-brown and brown
Table for the connection of pairs
Inside each box in which jacks are installed leave at least 15 cm of spare cable for each jack.
Communication jacks shall be of the same brand, series and color of the installed electrical outlests, including the finishing plate.
13b-9 N/A
13b-10 N/A
13b-11 CIVIL WORKS FOR INSTALLATION OF TELECOMMUNICATION
SYSTEMS
Even though not specifically indicated on the drawings or in the work description, civil works for installation of telecommunication systems are as follows (where applicable):
- Opening of chases in the walls;
- Closing of chases in the walls;
- Plastering of the masonry involved in the closing of chases;
- Painting of the part of masonry after closing chases with a color equal to the remaining wall;
- Replacement of the tiles removed for the chases with others equal or similar to the existing ones;
- Restoration of masonry, plastering and painting after the crossing the masonry with raceways;
- Restoration of the waterproofing after crossing the roof with raceways;
- Restoration of fire-break system after crossing the fire-break areas with raceways.
Any damage to buildings, pipes, equipment directly or indirectly caused by the contractor shall be repaired by personnel skilled in the specific type of work without additional costs to the US Government.
13b-12 FINAL TESTS
13b-12.1 General The contractor is 100% responsible for the testing all components of the installed telecommunication system, including the grounding system. In case acceptability values are not satisfied, the contractor shall replace the defective cables and/or other components and shall repeat the tests to the full satisfaction of the required values. All material necessary to the final tests, all instruments and everything else necessary for the final tests and to solve possible problems shall be provided by the contractor without any additional expenses to the Government.
13b-12.2 Final test of LAN cables Tests on LAN cables shall be performed as per standards TIA/EIA 568 to verify the compliance with the requirements of category 6.
The Permanent or Basic link is the only authorized test: in no case the Channel link test is authorized.
All LAN cables shall be subject to the following tests:
- Wire Map
- Length
- Attenuation
- NEXT
- PSNEXT
- ACR
- PSACR
- ELFEXT
- PSELFEXT
- RETURN LOSS
13b-12.3 Documentation to be provided at completion of final test At the completion of the final test the contractor shall provide the COR with a final test report, stamped and signed by the firm that performs the final test. The report shall indicate all tests performed in compliance with the directions provided above; the data resulting from the tests shall be indicated on a table on which each cable or component to which the measure is referred is identified clearly (using the code indicated on…