Amendment # 0002

View the file

Other files for this federal contract opportunity

Other files attached to Convert Building Heating System to Heat Pump, newest first.
File Type Posted
W912PF18Q00370004.pdf PDF
W912PF18Q0037-0003.pdf PDF
Amendment_0001.pdf PDF
Enclosure4_Format_of_a_Bid_Bond.doc DOC document
Attachment_2_b_-_B__9_and_44_Tormeno_Heat-Pump_bid_schedule.xlsx XLSX spreadsheet
Enclosure3_Antimafia_Self_Certification.docx DOCX document
Attachment_2_a_-_B_246_Caserma_Ederle_Heat_-Pump_bid_schedule.xlsx XLSX spreadsheet
Enclosure1_Construction_Project_Information_Sheet.docx DOCX document
Attachment_2_c_-__B_9__and_10_Longare_Heat-_Pump_bid_schedule.xlsx XLSX spreadsheet
Attachment__1_SOW_Heat_Pumps.pdf PDF
W912PF18Q0037.pdf PDF
Enclosure2_PastPerformanceQuestionnaire_(PPQ).docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011206163 E8-47061-8J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

a. to correct the solicitation delivery requirement; and

b. to delete Sections L and Section M in their entirety and replace them w ith the attached Sections L and M

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF18Q0037

X 9B. DATED (SEE ITEM 11)

04-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2018

CODE

414TH CSB - PARC AFRICA

ATTN: PATRIZIA MENEGUZZO

VIA DELLA PACE #197

VICENZA (VI) 36100

W912PF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PF18Q0037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by reference:

52.204-7 System for Award Management OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

MAR 2015

The following have been added by full text:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A site visit has been scheduled for Tuesday 21 August 2018 at 09:30 hrs. Participants will meet at ASP#7 Entrance, Tormeno.

OFFERORS ARE REMINDED THAT NO ACCESS IS GRANTED TO OFFERORS WHOSE NAMES HAVE

NOT BEEN PRIOR DELIVERED TO RCO OR WHOSE PASSES DO NOT AUTHORIZE THE ACCESS TO

THIS INSTALLATION.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

The following have been modified:

A. QUOTE SUBMISSION GENERAL GUIDELINES

1. Offerors should be registered in the System for Award Management (http://www.sam.gov) upon submission of quote. The System for Award Management (SAM) is a Federal Government owned and operated free web site that consolidates the capabilities in the Central Contractor Registration (CCR) FedReg, ORCA, and EPLS.

2. Joint Ventures or A.T.I. (Associazione Temporanea d'Imprese, Temporary Association of Firms) are not allowed.

B. GENERAL INSTRUCTIONS

1. Offerors shall strictly adhere to the requirements in this Section when preparing the quote to be submitted in response to this Request for Quote (RFQ). All proposals shall be in English. The Government will not reimburse any Offeror any cost incurred in response to this RFQ. Quotes that fail to comply with the quote submittal requirements addressed in this section of the solicitation may be determined unacceptable. To assure timely and equitable evaluation of quotes, Offerors must follow the instructions contained herein.

2. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the quote all requested information specified in this section of the Request for Quote (RFQ) at or before the exact date and time specified. There will be no public opening of the quotes received as a result of this RFQ.

Failure to meet a requirement may result in a quote being ineligible for award.

3. All RFQ documents will be posted to the Federal Business Opportunities (FedBizOpps) website (https://www.fbo.gov) and made available for viewing. All amendments will be posted to FedBizOpps and made available for viewing. It shall be the Offeror’s responsibility to check the website for any amendments and updates to the solicitation.

4. The Government will award one contract for all line items to the responsible offeror whose quote represents the best value to the Government. Awards will be based on the best value – utilizing the Lowest Price Technically Acceptable approach. This process permits no tradeoffs among cost or price and non-cost factors. Award will be made to the offeror whose offer is evaluated as “acceptable” for all technical factors and whose quote has the lowest price.

5. Quotes received by the Government after the date and time set for receipt of quotes will be handled in accordance with FAR 15.208.

C. QUOTE SUBMISSION INSTRUCTIONS:

1. Quotes may be submitted by firms formally organized as design-build entities, or by construction contractors and designers/design firms that have associated specifically for this contract. For the purpose of this solicitation, no distinction is made between formally organized design-build entities and contract-specific design-build associations.

Both are referred to as the design-build offeror (or simply “Offeror”), or the design/build contractor, (or simply, “Contractor”), after award of the contract.

2. General Requirements: The quote shall be clear, concise, and shall include sufficient detail for effective evaluation. The quote shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet the requirements. Offerors shall assume that the Government has no prior knowledge of their facilities or experience, and will base its evaluation only on the information presented in the Offeror’s quote.

3. Offeror(s) shall provide quotes in English in accordance with the instructions below. Quotes shall consist of two

(2) electronic copies (documents PDF format) with the bid guarantee provided as an original. The electronic copy (PDF format on a CD or DVD) will be delivered to the following address: ATTN.: Ms. Patrizia Meneguzzo or Ms.

Dee Cavanaugh, 414th CSB, Regional Contracting Officer (RCO), Caserma Ederle, Building 3, Room 104, Viale della Pace 193, 36100 Vicenza in an envelope clearly marked with the solicitation number. Government personnel may not be available to pick up quotes at the gate. It is the contractor's responsibility to ensure delivery to the location specified.

4. BID GUARANTEE: Offerors will provide a bid guarantee in the amount and format as required under this section of the solicitation (Euro 10,000.00). The offeror shall furnish a bid guarantee in the form of a firm commitment supported by a registered bank or by a primary credit union company recognized by a bank ("istituto bancario, azienda di credito autorizzata o assicurazione autorizzata a norma di legge"), using the format provided as Enclosure # 4. The Contracting Officer will return bid guarantees:

a. To unsuccessful offerors as soon as practicable after the award of the contract; and

b. To the successful offeror upon execution of all contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the quote as accepted. Failure to submit a valid Bid Guarantee will result in an incomplete quote which will not be evaluated.

5. The submittals shall be formatted as follows, each tab confined under a Volume:

Volume Factor / Documents

1 Factor I: TECHNICAL

Subfactor 1: Construction Experience / Enclosure 1 “Construction Project Information Sheet.”

Subfactor 2: SOA Certification

1 Factor II: Past Performance / Enclosure 2 “Past Performance Questionnaire”

Factor III: Price / Completed SF1442 with all amendments (signed) and Attachment 1 “Bid Schedule”

Documentation for Determination of Responsibility, Chamber of Commerce and Anti- Mafia Self-Certification, Bid Guarantee

D. ADDITIONAL SUBMITTAL INSTRUCTIONS

1. FACTOR I – TECHNICAL. Offerors shall ensure correct phone numbers and email addresses are provided for the client point of contact for each sheet.

a. SUBFACTOR 1: CONSTRUCTION EXPERIENCE. Offerors shall utilize the Construction Project Information Sheet (Enclosure 1) included in this solicitation in order to submit information for this subfactor.

Offerors shall submit at least one relevant and recent project but not more than three projects. One experience sheet shall be submitted per project. Relevant and recent projects are projects that meet the following minimum criteria:

(1) Were construction projects “same or similar” in scope to the project in this solicitation

“Same or similar” scope projects are projects which include one or more of the following: heating systems and/or heating pumps installation and or maintenance.

(2) Had a contract value which equals or exceeds €20,000

(3) Were completed within five (5) years from the date of this solicitation

(4) Were completed in Italy

b. SUBFACTOR 2: SOA Certification. Offerors shall provide a current (as of the date of this solicitation) copy of the SOA OG11 classification I or higher.

2. FACTOR II – PAST PERFORMANCE (Volume 1)

a. Completed Past Performance Questionnaires (PPQ) shall be submitted with your quote for each project the offeror submits for evaluation under this factor. The past performance information shall be recent and relevant to this requirement. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before RFQ closing date, the offeror shall complete and submit with the quote the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

b. Offerors shall submit at least one, but not more than three relevant and recent projects for this evaluation factor utilizing the Past Performance Questionnaires (Enclosure 2). Offerors shall submit past performance questionnaire on the same relevant and recent projects submitted under Subfactor 1, Construction Experience.

Recent past performance is defined as projects which have been completed within five (5) years from the date of this solicitation. The definition of relevant for this evaluation factor is the same as that for subfactor 1.

3. FACTOR III – PRICE (Volume 2)

a. Each offeror shall provide a total price in Euro and without IVA tax for each line item listed in Section B - SUPPLY OR SERVICES AND PRICES/COSTS of the request for quote.

b. Each offeror shall return ATTACHMENT #2, BID SCHEDULE, duly filled out.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

DEPARTMENT OF THE ARMY

414TH CSB, REGIONAL

CONTRACTING OFFICE VIALE

DELLA PACE, 193

36100 VICENZA (ITALY)

(b) The copy of any protest shall be received in the office designated within one day of filing a protest with the GAO.

The following have been deleted:

52.204-7 System for Award Management OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

MAR 2015

52.236-27 Site Visit (Construction) FEB 1995 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

A. BASIS OF AWARD / EVALUATION

1. The Government plans to award one contract to the responsible offeror whose quote represents the best value to the Government. Awards will be based on the best value – Lowest Price Technically Acceptable approach. This process permits no tradeoffs among cost or price and non-cost factors. Award will be made to the offeror whose quote meets all “acceptable” technical factors and whose quote has the lowest price.

2. Numerical scores and other point-scoring techniques will not be used in the evaluation process. Each factor will receive an acceptable or unacceptable rating. The Government will evaluate quote in accordance with the evaluation factors described in this section.

3. The Government reserves the right to discuss aspects of quotes with Offerors in the competitive range. Offerors are advised that the Government may make award without discussions, clarifications, or any contact concerning the quotes received. Offerors shall not assume that they will be contacted or afforded an opportunity to clarify, discuss or revise their quotes.

B. EVALUATION FACTORS AND RATINGS

1. Quotes will be evaluated using the evaluation factors listed below:

FACTOR I – Technical

Subfactor 1 – Construction Experience Subfactor 2 – SOA Certification

FACTOR II – Past Performance

FACTOR III – Price

All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

2. FACTOR I: TECHNICAL

c. FACTOR I, SUBFACTOR 1: Construction Experience. The Government will evaluate this subfactor utilizing only the Construction Experience Sheets provided with the solicitation. If the offeror submits more than three (3) Construction Experience Sheets with their quote, the government will only evaluate the first three (3) Construction Experience Sheets in an offeror’s quote. Any additional projects submitted will not be evaluated. The Government will evaluate the Offeror’s construction experience on relevant and recent projects. For purposes of evaluation of this subfactor, relevant and recent projects are projects that meet the following minimum criteria as a standard of proof:

(1) Were construction projects “same or similar” in scope to the project in this solicitation.

“Same or similar” scope projects are projects which include one or more of the following: heating systems and/or heating pumps installation and or maintenance.

(2) Had a contract value which equals or exceeds €20,000

(3) Were completed within five (5) years from the date of this solicitation

(4) Were completed in Italy.

d. FACTOR I, SUBFACTOR 2: SOA Certification. The Government will evaluate SOA certifications to determine if the offeror possesses the mandatory certification outlined in Section L which certifies that the company satisfies all requirements pursuant to Italian law.

EVALUATION. Factor I: Technical. All offerors will receive one of the following Adjectival Ratings for Factor I:

Adjectival Rating Description

Acceptable Quote meets the requirements of the solicitation

Unacceptable Quote does not meet the requirements of the solicitation

When evaluating subfactor 1, the government evaluation team will review the project(s) submitted on the Construction Experience Sheet(s) and verify that each project, individually, meets the criteria as a standard of proof for relevant and recent. In consensus, if a project submitted for evaluation fails to meet one or more of the criteria for standard of proof, that project will not be considered relevant and recent. In order to receive an acceptable rating in this subfactor, at least one project submitted must be evaluated as relevant and recent.

When evaluating subfactor 2, the government evaluation team will review the offeror’s SOA category and classification to verify that the OG11 certification is current and classification I or higher. In order to receive an acceptable rating in this subfactor the offeror must have a current OG11 certification that is classification I or higher.

3. FACTOR II: PAST PERFORMANCE. The past performance evaluation is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance provided in the offeror’s Past Performance Questionnaires outlined in Section L. The Government will evaluate the relative merits of each Offeror’s past performance on the same relevant projects submitted and evaluated under Subfactor 1, Construction Experience. Please note that “Construction Experience” measures “what you have done” while “Past Performance” measures “how well you have done it”.

a. The Government will evaluate each offeror’s past performance to determine how well it conforms to specifications and standards of good workmanship, adheres to contract schedules including administrative aspects of the performance, exhibits reasonable and cooperative behavior and a commitment to customer satisfaction and has a businesslike concern for the interests of the customer.

b. Recent past performance is defined as projects which have been completed within five (5) years from the date of this solicitation. Since the projects that will be submitted for past performance will be the same as those projects submitted for Factor I, Past Experience, the definition of relevant is the same.

c. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror shall be determined to have unknown (or neutral) past performance.

d. Evaluators may consider any data in the above in determining the performance rating in conjunction with the completed surveys provided by past customers. Government evaluators may contact your points of contact/references for the projects submitted to verify an Offeror’s past performance on these projects. In addition, the Government may use personal knowledge or information from other sources, such as agency performance databases and Government construction administration personnel, in its evaluation of an Offeror’s past performance.

The Government may use data provided by the Offeror and data obtained from other sources. While the Government may elect to consider data obtained from other sources, the burden of providing thorough and complete past performance information rests with the Offeror.

e. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s quote, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

f. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

EVALUATION. Factor II: Past Performance. All offerors will receive one of the following Adjectival Ratings for Factor II:

Adjectival Rating Description

Acceptable

Based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort or the offeror's performance record is unknown. (See note below)

Unacceptable

Based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

To receive an “ACCEPTABLE” rating for Factor II, the Government has must have a reasonable expectation that the offeror will successfully perform the required effort or the offeror's performance record is unknown. Offerors with unknown past performance will receive a neutral evaluation, resulting in an “ACCEPTABLE” rating.

5. FACTOR III – PRICE. The lowest price technically acceptable offer will be awarded the contract for this solicitation. Only a responsible offer in accordance with FAR 9.1 will be eligible for award.

a. The price quote will be evaluated separately from the non-price factors. An assessment of the reasonableness of each proposed price will be made. In the evaluation of the price, various techniques and procedures may be used to ensure a fair and reasonable price. However, if the Contracting Officer determines that information on competitive offered prices or previous contract prices is not available or is insufficient to determine that the price is fair and reasonable, the Contracting Officer may use technique as appropriate to the circumstances applicable to this acquisition.

b. Unrealistic, unbalanced, or unreasonable pricing may cause a quote to be determined unacceptable.

Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques.

(End of Summary of Changes)