AS_BUILT_Ventilation.PDF

PDF 5 MB Posted

Attached to
Indoor Firing Range Inspection and Maintenance
Solicitation number
W912PF-17-T-0054
Issued by

About this file

As Built Ventilation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

iturco Casella di testo

AS_BUILT

APRIL 2014

N A

V A

L

FA

C

IL

IT

IE

S E

U R

O P

E

S O

U

TH

W E

S T

A S

IA

M U

LT

IP

LE

F

A C

IL

IT

IE

S

C O

M P

LE

X

TR

A

IN

IN

G F

A C

IL

IT

Y B

LD

G iturco Casella di testo

AS_BUILT

APRIL 2014

iturco Poligono iturco Casella di testo

OPEN NEW DOOR

Linea

AS_BUILT

APRIL 2014

iturco Poligono iturco Casella di testo

OPEN NEW DOOR

iturco Linea iturco Poligono iturco Casella di testo

OPEN NEW DOOR

Linea

ETA-10-0109 Hilti Firestop Foam CFS-F-FX[1].pdf
MEMBER OF EOTA
I LEGAL BASIS AND GENERAL CONDITIONS
II SPECIFIC CONDITIONS OF THE EUROPEAN TECHNICAL APPROVAL
1 Definition of product and intended use
1.1 Definition of the construction product
1.1.1 Hilti Firestop Foam CFS-F FX
1.1.2 Additional components
1.2 Intended use and use category
1.2.1 Intended use
1.2.2 Use category
2 Characteristics of products and methods of verification
2.1 Reaction to fire
2.2 Resistance to fire
2.3 Air permeability, and permeability regarding some other gases
2.4 Water permeability
2.5 Dangerous substances
2.6 Mechanical resistance and stability
2.7 Resistance to impact/movement
2.8 Adhesion
2.9 Airborne sound insulation
2.10 Thermal insulation
2.11 Water vapour permeability
2.12 Durability and serviceability
2.12.1 Durability
2.12.2 Serviceability
3 Evaluation and attestation of conformity and CE marking
3.1 System of attestation of conformity
3.2 Responsibilities
3.2.1 Tasks of the manufacturer
3.2.1.1 Factory production control
3.2.1.2 Other tasks of manufacturer

3.2.2 Tasks of approved bodies

3.3 CE-marking
3.4 Other marking and/or information
4 Assumptions under which the fitness of the product for the intended use was favourably assessed
4.1 Manufacturing
4.2 Installation
4.2.1 General
4.2.2 Cable seals
4.2.3 Pipe seals
4.2.4 Design
4.2.5 Tool and equipment for application
4.2.6 Applications including Hilti Firestop Bandage CFS-B
5 Indications to the manufacturer and supplier
5.1 Packaging, transport and storage
5.2 Use, maintenance and repair
AMEND0003_C5_TRAINING_TECH_SPECS_w_red_lines.pdf
COVER
INDEX OF SECTION
PROJECT TABLE OF CONTENTS
PACK_C_e_D_22 07 19.00 40_with_red_lines
22 07 19.00 40 - PLUMBING PIPING INSULATION
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 SYSTEM DESCRIPTION
1.4 PERFORMANCE REQUIREMENTS
1.5 SUBMITTALS
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Adhesives
2.1.1.1 Cloth Adhesives
2.1.1.2 Vapor-Barrier Material Adhesives
2.1.1.3 Cellular Elastomer Insulation Adhesive
2.1.2 Coatings
2.1.2.1 Outdoor Vapor-Barrier Finishing
2.1.2.2 Indoor Vapor-Barrier Finishing
2.1.2.3 Outdoor and Indoor Nonvapor-Barrier Finishing
2.1.2.4 Cellular-Elastomer Insulation Coating
2.1.2.4 Coating Color
2.1.3 Insulating Cement
2.1.3.1 General Purpose Insulating Cement
2.1.3.2 Finishing Insulating Cement
2.1.4 Calking
2.1.5 Corner Angles
2.1.6 Insulation Materials
2.1.6.1 Mineral Fiber
2.1.6.2 Pipe BarrelPhenolic Foam Pipe Insulation
2.1.6.3 Pipe Fittings
2.1.6.4 Flexible Blankets
2.1.6.5 Cellular Elastomer
2.1.6.5 Cellular Glass
2.1.6.7 Calcium Silicate
2.1.7 Jacketing
2.1.7.1 Aluminum Jackets
2.1.7.2 Glass Cloth Jackets
2.1.7.3 PVC Jackets
2.1.7.4 3-Ply Laminate

2.1.8 Tape

2.2 PIPING SYSTEMS
2.2.1 Dual-Temperature Hot- and Chilled- Water Piping
2.2.1 Domestic Hot-Water, Steam, and CondensateHot Water-Return Piping
2.2.2 Domestic Cold-Water, Condensate-Drain, and Roof Drain Piping
2.2.4 Refrigerant Suction Piping
2.2.5 Cooling-Tower Circulating Water Piping
2.2.6 Steam and Condensate Piping, 350 psig
2.2.7 Hot Water Heating Converter
2.2.8 Chilled-Water and Dual-Temperature Pumps
2.2.9 Low-Pressure Steam and Condensate, Weather-Exposed
2.2.10 Steam & Condensate, Weather-Exposed, 861 kilopascal
2.2.11 Steam & Condensate, Weather-Exposed, 2.4 Megapascal
PART 3 EXECUTION
3.1 INSTALLATION OF INSULATION SYSTEMS
3.2 SYSTEM TYPES
3.2.1 Type T-1, Mineral Fiber with Vapor-Barrier Jacket
3.2.2 Type T-2, Mineral Fiber with Glass Cloth Jacket
3.2.3 Type T-3, Cellular Elastomer
3.2.3 Type T-4, Cellular Glass with Vapor-Barrier Jacket
3.2.5 Type T-5, Calcium Silicate with Glass Cloth Jacket Piping
3.2.4 Type T-6, Mineral Fiber with Aluminum Jacket
3.2.7 Type T-7, Calcium Silicate with Glass Cloth Jacket Surfaces
3.2.8 Type T-9, Cellular Elastomer
3.2.5 Type T-10, Mineral-Fiber Fill
3.2.10 Type T-17, Calcium Silicate Weatherproof Jacket
3.2.6 Phenolic Foam
3.2.6.1 General Installation Requirements:
3.2.6.2 Insulation Installation on Straight Piping
3.2.6.3 Insulation Installation on Pipe Flanges
3.2.6.4 Insulation Installation on Pipe Fittings and Elbows
3.2.6.5 Insulation Installation on Valves and Pipe Specialties

3.3 ACCEPTANCE

PACK_C_e_D_23 07 00.00 42_with_red_lines
23 07 00.00 42 - MECHANICAL INSULATION
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 SYSTEM DESCRIPTION
1.3.1 Packaging and Labeling
1.3.2 Surface Burning Characteristics
1.4 SUBMITTALS
1.4.1 LEED Requirements

1.4 IDENTIFICATION OF NEW ASBESTOS-FREE INSULATION

PART 2 PRODUCTS
2.1 SOURCE MANUFACTURERS
2.1.1 Mechanical Insulation
2.2 PIPING INSULATION AND JACKET
2.2.1 Fibrous Glass Preformed Insulation
2.2.2 Phenolic Foam Pipe Insulation
2.2.3 Flexible Cellular Preformed Pipe Insulation
2.2.4 Cellular Glass
2.2.5 Piping Insulation Jacket
2.2.6 Aluminum Jacket
2.1.7 PVC Jacket
2.3 DUCT INSULATION AND JACKET
2.3.1 Blanket Type Duct Insulation
2.3.2 Rigid Type Duct Insulation
2.3.3 Duct Insulation Jacket
2.4 EQUIPMENT INSULATION AND JACKET
2.4.1 Mineral Fiber Block and Board Insulation
2.4.2 Calcium Silicate Block and Board Insulation
2.4.3 Phenolic Block and Board Insulation
2.4.4 Equipment Insulation Jacket
2.5 BOILER STACK INSULATION AND JACKET For CEP Building Only
2.5.1 Mineral Fiber Preformed Pipe Insulation
2.5.2 Calcium Silicate Preformed Pipe Insulation
2.5.3 Aluminum Jacket
PART 3 EXECUTION
3.1 INSTALLATION OF MECHANICAL INSULATION
3.2 PIPING INSULATION
3.2.1 Insulation for Water Piping
3.2.1.1 Heating Hot Water piping, and Hot and Cold Domestic Water Piping
3.2.1.2 Cold Drain Piping
3.2.1.3 Roof Drain Piping
3.2.1.2 Water Piping With Electric-Resistance Heater Cable
3.2.2 Insulation for Chilled Water Piping and Chilled-Hot Water Piping
3.2.2.1 Cellular Glass
3.2.2.2 Phenolic Foam
3.2.2.3 Elastomeric Cellular
3.2.3 Insulation for Refrigerant Suction and Condensate Drain Piping
3.2.4 Insulation for Steam Piping and Condensate Piping For CEP
3.2.5 Piping Insulation Covering
3.2.5 Piping Insulation Covering Exposed to the Weather
3.3 DUCT INSULATION
3.3.1 Blanket Duct Insulation
3.3.2 Rigid Duct Insulation
3.3.3 Vapor Barrier
3.4 WEATHERPROOF DUCT INSULATION
3.5 EQUIPMENT INSULATION
3.5.1 Pumps
3.5.2 Expansion Tanks, Receivers, Converters, and Storage Tanks
3.6 BOILER STACK INSULATION AND JACKET
3.7 FIELD INSPECTIONS
C5_TRAINING_23 20 23.00 42_with_red_lines
23 20 23.00 42 - CHILLED, CONDENSER, OR DUAL SERVICE WATER PIPING
PART 1 GENERAL
1.1 REFERENCES
1.2 Related Requirements
1.3 GENERAL REQUIREMENTS
1.3.1 Description of Work
1.3.2 Associated Work
1.3.3 System Design Temperatures, Pressures, and Classes
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Defective Welds
1.5.2 Previous Welder Qualifications
1.5.3 Welding Procedure
1.5.4 Performance Qualification Record
1.5.5 List of Welders' Names and Symbols
1.5.6 Backflow Preventer Certificate
1.5.7 Posted Operating Instructions
1.6 SPECIMENS, CORROSION PREVENTION OF FERROUS METALS
1.7 SAFETY PRECAUTIONS
1.7.1 Rotating Equipment Safety
1.7.2 Welding and Cutting Safety
PART 2 PRODUCTS
2.1 SOURCE MANUFACTURERS
2.1.1 Water Piping, Fittings, and Accessories
2.1.2 Valves
2.1.3 Miscellaneous Components
2.1.4 Pumps
2.1.5 Tanks
2.1.6 Expansion Joints
2.1.7 Backflow Preventers
2.2 WATER PIPING, FITTINGS, AND ACCESSORIES
2.2.1 Chilled Water Piping
2.2.2 Condenser Water Piping
2.2.3 Hot and Cold Water Dual Service Piping
2.2.2 Fittings and Flanges for Steel Piping
2.2.2.1 Sizes 3 to 50 Millimeters
2.2.2.2 Sizes 65 Millimeters and Above
2.2.3 Fittings for Copper Tubing
2.2.4 Unions
2.2.4.1 Unions Threaded for Steel Pipe
2.2.4.2 Unions for Copper Tubing
2.2.4.3 Dielectric Union
2.2.5 End Connections
2.2.5.1 Steel Piping
2.2.5.2 Joints for Copper Tubing
2.2.6 Valves and Related Equipment
2.2.6.1 Gate, Valves
2.2.6.2 Globe and Angle Valves
2.2.6.3 Check Valves
2.2.8.4 Water Temperature Mixing Valves
2.2.8.5 Water Pressure-Reducing Valves
2.2.6.4 Plug Valves
2.2.6.5 Ball Valves
2.2.6.6 Drain Valves
2.2.6.7 Air Vent Valves
2.2.8.10 Automatic Flow Control Valves
2.2.6.8 Butterfly Valves
2.2.8.12 Solenoid Valves
2.2.8.13 Automatic Water Regulating Valves
2.2.8.14 Float Valves
2.2.6.9 Safety Relief Valves
2.2.6.10 Balancing Valves
2.2.7 Miscellaneous Components for Piping System
2.2.7.1 Strainers
2.2.7.2 Flexible Hose
2.2.7.3 Flow Measuring Equipment
2.2.7.4 Pipe Hangers and Supports
2.2.7.5 Pipe Guides
2.2.7.6 Pipe Sleeves
2.2.7.7 Condensate Drains
2.2.9.8 Cooling Coil Drain Pans
2.2.8 Pumps
2.2.8.1 Pump Motors
2.2.8.2 Motor Starters
2.2.9 Tanks
2.2.9.1 Expansion Tank
2.2.9.2 External Air Separation Tank
2.2.10 Instrumentation
2.2.10.1 Pressure and Vacuum Gages
2.2.12.2 Tank Gages
2.2.10.2 Indicating Thermometers
2.2.12.4 Remote Reading Thermometers
2.2.10.3 Pressure/Temperature Test Ports
2.2.11 Expansion Joints
2.2.11.1 Guided Slip Tube Expansion Joints
2.2.11.2 Flexible Ball Expansion Joints
2.2.13.3 Bellows Expansion Joints

2.2.14 Backflow Preventers

2.3 WATER TREATMENT SYSTEMS
2.3.1 Tanks
2.3.2 Pumps
2.3.3 Corporation Stop
2.3.4 Pretreatment
2.3.5 Chemicals
2.3.6 Testing Equipment
2.3.7 Timers
2.3.8 Sequence of Operation
2.3.8.1 Timers
2.3.9 Piping
2.3.10 Water Analysis
2.3.1 Pipe Cleaning Chemical
2.3.2 Pipe Cleaning Accessories
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Water Piping
3.2 PIPING SYSTEMS
3.2.1 Flanged Joints
3.2.2 Threaded Joints
3.2.3 Pipe Bends
3.2.3.1 Copper Tubing
3.2.4 Reducing Fittings
3.2.5 Insulation
3.2.6 Brazing and Soldering
3.2.7 Dielectric Unions or Flanges
3.2.8 Pipe Hangers and Supports
3.2.9 Pipe Guides
3.2.10 Flexible Connections
3.2.11 Pipe Sleeves
3.3 WATER PIPING
3.3.1 Fabrication and Assembly of Piping and Components
3.3.1.1 Insulation of Copper Tubing
3.3.1.1 Strainers
3.3.1.3 Shell and Tube Vessels and Clearance
3.3.1.2 Piping, Chilled Water Coils
3.3.1.3 Pumps
3.3.1.4 Valves
3.3.1.5 Air Vent Valves
3.3.1.6 Orifice Flanges
3.3.1.9 Automatic Flow Control Valve
3.3.1.10 Automatic Water Regulating Valves
3.3.1.7 Closed Expansion Tank
3.3.1.8 Instrumentation
3.4 MISCELLANEOUS DRAINS
3.4.1 Condensate Drains
3.4.2 Cooling Coil Drain Pans
3.5 MISCELLANEOUS PIPING
3.5.1 Make-up Water Piping
3.5.2 Drain and Overflow Piping
3.5.3 Water Bleedoff Piping
3.5.4 Cooling Towers and Evaporative Condensers
3.5 ELECTRICAL EQUIPMENT
3.7 WATER CHEMICAL TREATMENT
3.7.1 Supervision
3.7.2 Equipment Placement and Mounting
3.7.3 Operating Instruction
3.7.4 Service
3.7.5 Chemical Parameters
3.6 CLEANING OF SYSTEMS
3.6.1 Safety Procedure
3.7 IDENTIFICATION OF PIPING AND PHYSICAL HAZARDS
3.8 FIELD INSPECTIONS
3.9 FIELD TESTS
3.9.1 Water Piping
3.10 STARTUP AND OPERATIONAL TESTS
3.11 TESTING, ADJUSTING, AND BALANCING
C5_TRAINING_23 21 13.00 42_with_red_lines
23 21 13.00 42 - LOW TEMPERATURE WATER LTW HEATING SYSTEM
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 RELATED REQUIREMENTS
1.4 SYSTEM DESCRIPTION
1.4.1 Hot Water Heating System
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Standard Commercial Product for Terminal Units
1.6.2 Welding
1.6.2.1 Welding Procedures
1.6.2.2 Welder's Qualifications
1.6.2.3 Identification of Welder's Work
1.6.2.4 Previous Qualifications
1.6.3 Brazing and Soldering
1.6.3.1 Brazing Procedure
1.6.3.2 Soldering, Soldering Preparation, and Procedures for Joints

1.5.4 Backflow Preventer Certification

1.7 SAFETY STANDARDS
1.7.1 Welding
1.7.2 Guards
PART 2 PRODUCTS
2.1 SOURCE MANUFACTURERS
2.1.1 Pipe and Fittings
2.1.2 Valves
2.1.3 Piping Systems Equipment
2.1.4 Terminal Equipment
2.2 PIPE AND FITTINGS
2.2.1 Hot Water Heating Pipe Supply and Return
2.2.2 Fittings
2.2.2.1 Steel or Malleable Iron Pipe
2.2.2.2 Steel, Cast Iron, or Bronze
2.2.2.3 Fittings for Copper Tubing
2.2.3 Mechanical Pipe Coupling System
2.2.3.1 Groove and Check Valves
2.2.3.2 Butterfly Valves
2.2.3.3 Strainers
2.2.4 Unions
2.2.4.1 Steel Pipe
2.2.4.2 Copper Tubing
2.2.4.3 Dielectric Union
2.2.5 Flanges
2.2.5.1 Steel Flanges
2.2.5.2 Cast Iron Screwed Flanges
2.2.5.3 Bronze Screwed Flanges
2.2.6 Drains and Overflows
2.2.6.1 Steel Pipe
2.2.6.2 Copper Tubing
2.2.6.3 PVC Pipe
2.2.7 Valves
2.2.7.1 Gate Valves
2.2.7.2 Globe and Angle Valves
2.2.7.3 Check Valves
2.2.7.4 Temperature Regulating Valves
2.2.7.5 Water Pressure-Reducing Valves
2.2.7.6 Plug Valves
2.2.7.7 Ball Valves
2.2.7.8 Radiator Valves
2.2.7.9 Flow Control Valves
2.2.7.9 Butterfly Valves
2.2.7.10 Butterfly Valves 2 Millimeters and Smaller
2.2.7.11 Relief Valves
2.2.7.12 Valve Operating Mechanisms
2.2.7.13 Balancing Valves
2.2.8 End Connections
2.2.8.1 Flexible Connectors
2.2.8.2 Steel Piping
2.2.8.3 Joints for Copper Tubing
2.2.9 Expansion Joints
2.2.9.1 Packless Type
2.2.9.2 Guided Slip-Tube Type
2.2.10 Instrumentation
2.2.10.1 Pressure and Vacuum Gauges
2.2.10.2 Indicating Thermometers
2.2.10.3 Pressure/Temperature Test Ports
2.2.11 Miscellaneous Pipeline Components
2.2.11.1 Air Vent
2.2.11.2 Strainers
2.2.11.3 Hangers and Supports
2.2.11.4 Pipe Sleeves
2.2.11.5 Escutcheon Plates
2.3 CENTRAL MECHANICAL EQUIPMENT
2.3.1 Boilers
2.3.1 Hot Water Heat Exchangers
2.3.3 Converters
2.4 PIPING SYSTEM EQUIPMENT
2.4.1 Pumps
2.4.2 Expansion Tanks
2.4.3 External Air Separation Tanks
2.4.4 Backflow Preventers
2.4.4 Flow Measuring Equipment
2.5 TERMINAL UNITS
2.5.1 Finned Tube Radiators
2.5.2 Convectors
2.5.2 Unit Heaters
2.5.3 Heating and Ventilating Units
2.6 ELECTRICAL EQUIPMENT
2.7 CONTROLS
2.8 INSULATION
2.9 ASBESTOS PROHIBITION
PART 3 EXECUTION
3.1 PREPARATION
3.2 INSTALLATION
3.2.1 Hangers and Supports
3.2.2 Grading of Pipe Lines
3.2.3 Pipe Sleeves
3.2.4 Flashing for Buildings
3.2.5 Unions and Flanges
3.2.6 Connections for Future Equipment
3.2.7 Changes in Pipe Size
3.2.8 Cleaning of Pipe
3.2.9 Valves
3.2.9.1 Globe Valves
3.2.9.2 Radiators Valves
3.2.9.3 Relief Valves
3.2.10 Pressure Gage
3.2.11 Thermometers
3.2.12 Strainers
3.2.13 Pumps
3.2.14 Equipment Foundations
3.2.15 Equipment Installation
3.2.16 Cleaning of Systems
3.2.17 Painting of Piping and Equipment
3.2.18 Identification of Piping
3.3 FIELD QUALITY CONTROL
3.3.1 Hydrostatic Test of Piping System
3.3.2 Auxiliary Equipment and Accessory Tests
3.3.2.1 Backflow Preventers
3.4 TESTING, ADJUSTING, AND BALANCING
3.4.1 Markings of Settings
3.4.2 Sound Level Tests
C5_TRAINING_23 30 13.00 42_with_red_lines
23 30 13.00 42 - DUCTWORK AND DUCTWORK ACCESSORIES
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 RELATED REQUIREMENTS
1.4 PRESSURE CLASSIFICATION
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Modification of References
PART 2 PRODUCTS
2.1 SOURCE MANUFACTURERS
2.1.1 Metal Ducts
2.1.2 Sound Attenuators
2.1.2 Flexible Ducts
2.1.3 Diffusers, Registers, and Grilles
2.1.4 Access Doors
2.1.5 Dampers and Louvers
2.1.6 Fire Dampers
2.1.7 Sealing Materials
2.1.8 Fire-Stopping Materials
2.1.9 Accessory Hardware
2.2 Ductwork
2.2.1 Steel Ducts
2.2.2 Aluminum Ducts
2.2.3 Copper Sheets
2.2.4 Corrosion Resisting Stainless Steel Sheets
2.2.5 Duct-Liner Adhesives
2.2.6 Duct Sheet Metal Thickness
2.3 DUCTS OF PRESSURE CLASSES
2.3.1 Construction
2.3.2 Joints
2.3.3 Fittings
2.3.3.1 Test Holes
2.3.3.2 Round Elbows
2.3.4 Round and Oval Ducts
2.3.4.1 Round Duct Fittings Thickness
2.3.4.2 Oval Fitting Construction
2.3.4.3 Sealing
2.3.4.4 Small Diameter Elbows
2.3.4.5 Large Diameter Elbows
2.3.4.6 Die-stamped Elbows
2.3.4.7 Gored Elbows
2.3.4.8 Pleated Elbows
2.3.4.9 Mitered Elbows
2.3.4.10 Diverging Flow Fittings
2.3.4.11 Entrances
2.3.5 Round Ducts
2.3.5.1 Duct Metal Thickness
2.3.5.2 Single-Rib Spiral Duct
2.3.6 Oval Duct
2.3.6.1 Duct Metal Thickness
2.3.6.2 Reinforcement
2.3.7 Joint Sealing of Round and Flat Oval Ductwork
2.3.7.1 Round Supply Joint Construction Diameters less than 900 mm
2.3.7.2 Round Supply Joint Construction diameters 900 mm and greater
2.3.7.3 Oval Supply Joint Construction
2.3.8 Rectangular Ducts
2.3.9 Sound Attenuators Traps
2.3.9.1 Net Noise Reduction Values
2.3.9.2 Factory-Fabricated Sound Attenuators Traps
2.3.9.3 Factory-Fabricated Sound-Attenuator Ducts
2.3.10 Safety Relief Valve
2.3.11 Air Valves
2.4 DUCTS OF PRESSURE CLASSES 750 Pa GAGE OR LESS
2.4.1 Curved Elbows
2.4.2 Laps
2.4.3 Fittings
2.4.4 Round Duct
2.4.5 Acoustical Attenuator Systems
2.4.5.1 Acoustical Duct Lining
2.4.5.2 Net Noise Reduction Values
2.4.5.3 Preformed Duct Liner
2.4.5.4 Factory-Fabricated Sound-Attenuator Ducts
2.4.5.5 Sound Attenuators Traps
2.5 FLEXIBLE DUCTS AND CONNECTORS
2.5.1 Materials
2.5.2 Insulation and Vapor Barrier
2.5.3 Joints
2.6 CASINGS AND PLENUMS
2.7 DIFFUSERS, REGISTERS, AND GRILLES
2.7.1 Material and Finishes
2.7.2 Sound Pressure Level
2.7.3 Throw
2.7.4 Drop
2.7.3 Ceiling Diffusers
2.7.3.1 Circular, Square, and Rectangular Diffusers
2.7.3.2 Perforated Plate Diffusers
2.7.3.3 Linear Diffusers
2.7.4 Registers
2.7.5 Grilles
2.8 TROFFERS
2.8.1 Air Seal
2.8.2 Interior Dampers or Deflectors Finish
2.8.3 Lighting Fixture Characteristics
2.8 DUCT SLEEVES, PREPARED OPENINGS, AND CLOSURE COLLARS
2.8.1 Duct Sleeves
2.8.2 Prepared Openings
2.8.3 Packing
2.8.4 Closure Collars
2.9 DEFLECTORS
2.10 ACCESS DOORS
2.11 DAMPERS AND LOUVERS
2.11.1 Backdraft Dampers Gravity Dampers or Shutters
2.11.2 Manual Volume Dampers
2.11.3 Manual Volume Dampers
2.11.2 Manual Balancing Dampers
2.11.2.1 Square or Rectangular Dampers
2.11.2.2 Round Dampers
2.11.3 Fire Dampers
2.11.4 Automatic Smoke-Fire Dampers
2.11.5 Automatic Smoke Dampers
2.11.7 Dampers
2.11.6 Automatic Dampers
2.11.7 Louvers
2.11.7.1 Bird Screens
2.11.8.2 Louvered Penthouse
2.12 TIE RODS
2.13 SEALING MATERIALS
2.13.1 Joint and Seam Sealants, General
2.13.2 Tape Sealing System
2.13.3 Joint and Seam Sealant
2.13.4 Flanged Joint Mastics
2.14 FIRE-STOPPING MATERIALS
2.14.1 Fire Resistant Sealant
2.15 DUCT HANGERS AND SUPPORTS
2.15.1 Building Attachments
2.15.2 Hangers
2.15.3 Hangers Installed in Corrosive Atmosphere
2.15.4 Duct Attachments
2.16 ACCESSORIES
2.16.1 Instrument Test Holes
2.16.2 Splitter Damper Accessories
2.16.3 Flexible Duct Clamps

2.17 SEISMIC PROTECTION COMPONENTS FOR DUCTWORK

PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Ductwork
3.1.1.1 Duct Construction
3.1.1.2 Louvers
3.1.1.3 Dampers
3.1.1.4 Deflectors
3.1.1.5 Fire Dampers
3.1.1.6 Access Doors
3.1.1.7 Duct Sleeves, Prepared Openings, and Closure Collars
3.1.1.8 Packing
3.1.2 Duct Hangers and Supports
3.1.2.1 Flexible Ducts
3.1.2.2 Flexible Connectors
3.1.3 Inspection Plates and Test Holes
3.1.4 Acoustical Duct Lining
3.1.5 Flashing
3.1.6 Cleaning of Ducts
3.2 FIELD QUALITY CONTROL
3.3 IDENTIFICATION INSTALLATION REQUIREMENTS
C5_TRAINING_23 34 16.00 42_with_red_lines
23 34 16.00 42 - AIR HANDLING UNITS
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 RELATED REQUIREMENTS
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 SOURCE MANUFACTURERS
2.1.1 Air Handling Units
2.2 FANS
2.2.1 Centrifugal Fans
2.2.2 Propeller Fans
2.2.4 Power Roof and Wall Ventilators
2.2.5 In-Line Tubular Centrifugal Fans
2.2.6 Utility Sets
2.2.7 Air Circulating Fans
2.2.8 Air Curtains
2.3 PACKAGED AIR HANDLING UNITS
2.3.1 Casings
2.3.2 Dampers
2.3.3 Supply Fans
2.3.3.1 Double Width Double Inlet DWDI, Housed Centrifugal Type
2.3.3.2 Single Width Single Inlet SWSI, Plug Type Supply Fans
2.3.4 Vibration Isolation
2.3.5 Filter Sections
2.3.5.1 Replaceable Air Filters
2.3.5.2 Cleanable Air Filters
2.3.5.2 Disposable Cartridge Air Filters
2.3.5.3 Extended Media Pleated Air Filters
2.3.5.5 High Efficiency Particulate HEPA Air Filters
2.3.5.4 Filter Housing
2.3.5.7 Odor Control
2.3.6 Mixing Boxes
2.3.7 Outside-Air Intake
2.3.8 Heating and Cooling Sections
2.3.8.1 Coils
2.3.8.2 Heaters
2.3.8.2 Eliminators
2.3.8.3 Drip Pans
2.3.9 Ultraviolet Disinfection System
2.3.10 Energy Recovery Section
2.3.9 Sprayed Coil Dehumidifiers
2.3.10 Humidifiers
2.3.10.1 Evaporative Pan
2.3.10.2 Steam Grid
2.3.10.3 Mechanical Water-Spray
2.3.10.4 Atomizing or Wetted Element
2.4 GRAVITY VENTILATORS
2.5 FAN COIL UNITS
2.5.1 Casing
2.5.2 Fans
2.5.3 Coils
2.5.4 Drain Pans
2.5.5 Motor
2.5.6 Accessibility
2.5.7 Controls
2.6 ELECTROSTATIC IONIZING AIR FILTERS
2.4 VARIABLE-AIR-VOLUME VAV TERMINAL UNITS
2.4.1 Casings
2.4.2 Insulation
2.4.3 Controls
2.4.4 Air-Volume Regulators
2.4.5 Air Diffusers
2.4.6 Reheat Coils
2.4.6.1 Water Coils
2.7.6.2 Electric Coils
2.5 SERIES FAN POWERED VARIABLE AIR VOLUME VAV TERMINAL UNITS
2.6 ELECTRICAL
2.6.1 Electrical Motors, Controllers, Contactors, and Disconnects
2.6.2 Electrical Work
2.8 ROOF CURBS
2.7 FINISH COATING FOR AIR HANDLING UNIT CASINGS
2.12 CORROSION PROTECTION FOR MARINE ENVIRONMENTS
2.12.1 Polyelastomer or Vinyl Finish Coating
2.12.1.1 Heat Exchanger Coil Including Evaporator Coil Surfaces
2.12.1.2 Uninsulated Interior Surfaces and Exterior Surfaces
2.12.1.3 Insulated Interior Surfaces
2.12.2 Phenolic Finish
2.12.2.1 Heat Exchanger Coil Including Evaporator Coil Surfaces
2.12.2.2 Uninsulated Interior Surfaces and Exterior Surfaces
2.12.2.3 Insulated Interior Surfaces
PART 3 EXECUTION
3.1 INSTALLATION
3.2 FIELD QUALITY CONTROL
3.2.1 Equipment
3.2.1.1 Field Testing
3.2.1.2 Field Acceptance Test Plans
3.2.1.3 Equipment Field Acceptance Testing

3.2.2 Testing and Balancing

File details come from the government source that posted it. Updated .