LIST_OF_WORK_FEATURES_-_ATTACHMENT__1.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Furnish and Install New Electrical Transformer Station in the DOL area, Caserma Ederle, Vicenza, Italy.
- Solicitation number
- W912PF-17-R-0002
About this file
List of Work Features ) Excel format text) ATTACHMENT #1
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Quantity/Quantità | Material Cost/Costo Materiale | Labor Cost/Costo Manodopera | Total Cost/Costo Totale | ||||||||||
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| Unità | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro |
| 1 | Total civil work - Totale lavoro civile | € 0.00 | € 0.00 | € 0.00 |
| 2 | Total electrical work - Totale lavoro elettrico | € 0.00 | € 0.00 | € 0.00 |
| 3 | Total communication work - Totale lavoro di comunicazioni | € 0.00 | € 0.00 | € 0.00 |
| 4 | Design efforts | % | 6.00% | 6.00% | € 0.00 | € 0.00 | € 0.00 |
| GRAND TOTAL WORK | € 0.00 | € 0.00 | € 0.00 | ||||
| $0.00 | $0.00 | $0.00 |
RATE $1.0000 = € 0.9049
1 CIVIL WORK - LAVORI CIVILI
1.01 New prefabricated Transformer Station in reinforced concrete with new concrete slab with appropriate cable channels L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
1.02 Six-Four and Two-way underground reinforced concrete duct bank, including excavation, backfilling and restoration of area L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
| 1.03 | New electrical and communication manholes | 1.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | |
| € 0.00 | |||||||
| Total civil work - Totale lavoro civile | € 0.00 | € 0.00 | € 0.00 |
2 ELECTRICAL WORK - LAVORI ELETTRICI
2.01 Cables M.V. type RG7H1R 12/20kV, size 95 sqmm L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.02 Termination for RG7H1R 12/20kV cables, size 95 sqmm N. 6.00 € 0.00 € 0.00 € 0.00 € 0.00
2.03 Outgoing unit ABB UniAir P1/E (750x1190x1950mm)or equivalent to be aligned/connected to the existing M.V. Omnibus cells in Bldg 278 with motorized control, COMBI_SENSOR, protection relay ABB REF542plus with communication card MODBUS-RS485 N. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.04 Incoming unit ABB UNISEC "SDC/ H01" and “SBC/H02" (measurements and transformer protection), 24 kV, 630 A, 16 kA/1”, with sulphur hexafluoride circuit breaker (SF6) with motorized control, COMBI_SENSOR, protection relay ABB REF542plus with communication card MODBUS-RS485 N. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.05 Cast-Resin transformer 1600 kVA ± 2 x (2 x 2,5%), 20 kV primary, 1000 kVA at 400 V and 600 kVA at 230 V secondary, type Dyn11, including thermal probes control and transformer box unit and/or protection fence N. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.06 Power factor correction Unit N. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.07 Auxiliary panel with battery backup N. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.08 Uninterruptible power supply (UPS) 8 kVA to feed the auxiliary circuits N. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.09 400 V main panel with motorized main circuit breaker with protection relay LSIG and communication card MODBUS-RS485, including accessories and connections L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.10 230 V main panel with motorized main circuit breaker with protection relay LSIG and communication card MODBUS-RS485, including accessories and connections L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.11 L.V. equipment like fluorescent light fixtures, outlets, roof mounted exhaust fan with thermostat, etc. L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.12 L.V. cables type FG7OR 0.6/1 kV, three phases + neutral + ground, to connect Bldgs 266, 263F, new Paint Booth, 238 and 210A L.S 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.13 Interior and exterior grounding system L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2.14 Commissioning and Testing L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
Total electrical work - Totale lavori elettrici € 0.00 € 0.00 € 0.00
3 COMMUNICATION WORK - LAVORI DI COMUNICAZIONI
4.01 Connection to the existing DPW dedicated LAN, to include fiber optic, HP-ProCurve Switch 2510-24 and UPS L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
4.02 Integration of the new M.V. protection relays REF542plus and of the two new L.V. protection relays into the supervision system SW-View (SCADA ABB), both on the server located in O&M Division and on the server located in the Electrical Shop L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
4.03 Upgrade of the Software for the prioritized substations management and integration of the new Transformer Station into the logic selectivity of the M.V. distribution of Caserma Ederle L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
4.04 Furnish and install SM fiber, Patch Panel SC Duplex, Pigtail, Fiber Patch cable Singlemode SC and LC duplex 3mt orange L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00
4.05 Furnish, install, test 30 Pr, Copper cable for telephone , patch panel and PET L.S. 1.00 € 0.00 € 0.00 € 0.00 € 0.00
4.06 Cabinet Rack Nr 4.00 € 0.00 € 0.00 € 0.00 € 0.00
Total communication work - Totale lavori di comunicazioni € 0.00 € 0.00 € 0.00