This is a Questions and Answers (Q&A) document for a federal service contract solicitation (W912PB27QA003) issued by the U.S. Army for grounds maintenance services at Tower Barracks Grafenwoehr and Rose Barracks Vilseck in Germany.

The solicitation addresses weed control, mulching, and related landscape maintenance services. For weed control (ELIN A008/B008–E008), contractors shall perform treatment on 16.8 km of active tracks exactly twice per year, though the complete track length including closed tracks totals 20 km. Mulching services (ELINs A004–A007) are structured as price tiers with quantities of 1,000 / 5,000 / 10,000 / 40,000 m², allowing contractors to offer different unit prices for each tier. Personnel performing glyphosate work must provide § 9 PflSchG qualification proof and proof that the company has authority to perform herbicide work at German military installations; the AELF Regensburg will grant final approval. Contractors must submit the exception permit under § 12(2) PflSchG with their quote. Required certifications and experience documentation may be held by proposed subcontractors if properly identified in the quotation with signed letters of intent and valid documentation attributable to specific personnel. A separate five-year experience requirement applies to the proposed Contract Manager. Quote submissions must use subject line "Submission of quote W912PB27QA003" and be sent to usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil. A site visit is scheduled for 21 October 2026.

View the file

Other files

File Type Posted
Solicitation W912PB27QA0030001 Conformed Copy.pdf PDF
Solicitation Amendment W912PB27QA0030001 SF 30.pdf PDF
Site Visit Invitation 27QA003.pdf PDF
Solicitation - W912PB27QA003.pdf PDF
Attachment II - ELIN Sheet.xlsx XLSX spreadsheet
3. TE - Inventarliste Vilseck.xlsx XLSX spreadsheet
20. TE -Map V05 Railroad Dams Vilseck.pdf PDF
Attachment I - PWS.pdf PDF
4. TE - Inventarliste Grafenwoehr.xlsx XLSX spreadsheet
7. TE -Map G03 Railroad Dams Grafenwoehr.pdf PDF
8. TE -Map G04 Railroad Dams Grafenwoehr.pdf PDF
9. TE -Map G05 Railroad Dams Grafenwoehr.pdf PDF
15. TE -Map G11 Railroad Dams Grafenwoehr.pdf PDF
17. TE -Map V02 Railroad Dams Vilseck.pdf PDF
19. TE -Map V04 Railroad Dams Vilseck.pdf PDF
10. TE -Map G06 Railroad Tracks Grafenwoehr.pdf PDF
11. TE -Map G07 Railroad Tracks Grafenwoehr.pdf PDF
12. TE -Map G08 Railroad Tracks Grafenwoehr.pdf PDF
13. TE -Map G09 Railroad Tracks Grafenwoehr.pdf PDF
14. TE -Map G10 Railroad Tracks Grafenwoehr.pdf PDF
16. TE -Map V01 Railroad Dams Vilseck.pdf PDF
18. TE -Map V03 Railroad Dams Vilseck.pdf PDF
21. TE -Map V06 Railroad Dams Vilseck.pdf PDF
5. TE-Map G01 Railroad Dams Grafenwoehr.pdf PDF
6. TE -Map G02 Railroad Dams Grafenwoehr.pdf PDF
22. TE -Map V07 Railroad Dams Vilseck.pdf PDF
23. TE - Overview Map -.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: Quantity for Weed Control (ELIN A008/B008–E008), PWS 5.4.1.6: The PWS requires treatment of approx. 16,800 m of track exactly two times per year (approx. 33.6 km per year). The ELIN sheet lists 20 km per year. Which quantity should quoters use for pricing?

Answer 1: The length of all used tracks at Tower Barracks Grafenwoehr and Rose Barracks Vilseck is 16,8 km but the complete length inclusive the closed tracks is 20 km. So, the contractor shall perform at 16,8 km length of tracks.

Question 2: Mulching ELINs A004–A007 (PWS 5.4.2.2): These four items have the same description with quantities of 1,000 / 5,000 / 10,000 / 40,000 m². Please confirm these are price tiers by order size, and that quoters may offer a different unit price for each tier.

Answer 2: This is correct. According to several task orders the quantities can be differently, but the work is the same.

Question 3: Certifications, Sub-Factor A (PWS 1.12): May the AELF Regensburg certificate and the § 9 PflSchG proof of qualification be provided for the personnel of the proposed subcontractor who will perform the work?

Answer 3: The AELF Regensburg will give the approval to perform work with Glyphosate at the installations. The contractor must provide the qualification proof for the personnel who will perform the work with Glyphosate

Question 4: Exception permit under § 12(2) PflSchG (PWS 1.12): Must this permit be submitted with the quote, or is it required only before herbicide work begins after award?

Answer 4: The contractor shall proof with the offer that the company has the authority to perform work with Glyphosate at German tracks.

Question 5: Email subject line: The Addendum to 52.212-1 states the subject line shall be "Submission of quote W912PB-26-Q-A127." Should quoters use this subject line, or "Submission of quote W912PB27QA003"?

Answer 5: Please use subject line "Submission of quote W912PB27QA003".

Question 6: Submission mailbox: The SAM.gov notice lists usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@mail.mil, while the solicitation lists the same mailbox @army.mil. Please confirm the correct address.

Answer 6: The correct address for submission is army.mil: usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil.

Question 7: Site visit (FAR 52.237-1): We request a site visit of the work areas at Tower Barracks Grafenwoehr and Rose Barracks Vilseck. Please advise available dates and access procedures.

Answer 7: A site visit has been scheduled for 21 October 2026. Please refer to the attached invitation for detailed information regarding attendance and access procedures.

Question 8: Please confirm whether ELIN A008's 20 km is the total annual billable treatment quantity or 20 km for each of the two annual applications required by PWS

5.4.2.6. A008 cites 5.4.2.3, which describes stump milling.

Answer 8: The length of all used tracks at Tower Barracks Grafenwoehr and Rose Barracks

Question 9: Also, are A004 through A007 separate estimated quantities totaling 56,000 m², all included in the evaluated annual price?

Answer 9: The length of all used tracks at Tower Barracks Grafenwoehr and Rose Barracks

Question 10: Our remaining questions are the correct submission mailbox and subject reference (RFQ page 46 versus the notice) ?

Answer 10: The correct address for submission is army.mil: usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil.

mailto:usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@mail.mil mailto:usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@mail.mil mailto:usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil mailto:usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil mailto:usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil mailto:usarmy.rheinland-pfalz.409-contr-spt-bde.mbx.rco-bavaria-solicit@army.mil

Question 11: Acceptance of the executing subcontractor's certificates with its signed letter of intent, and the five-year experience wording on pages 50 and 56. PWS 1.12 separately requires five years for the contract manager. We will attribute each credential and reference to its actual holder.

Answer 11: The Government will accept required certificates and qualification documentation held by personnel of a proposed subcontractor, provided that:

1. the subcontractor is identified in the quotation as required under Factor 4, Subcontracting Information;

2. the quotation identifies the work the subcontractor and its proposed personnel will perform;

3. the subcontractor provides a signed LOI on its letterhead, as required by the solicitation;

and

4. the submitted certificates and qualification documentation are valid and are attributable to the specific personnel proposed to perform the applicable services.

For Sub-Factor B, relevant experience may be demonstrated by either the quoter or a proposed subcontractor. The quoter shall clearly identify the entity performing the cited experience and provide the required supporting information for each referenced contract.

The five-year requirement for the Contract Manager in PWS paragraph 1.12 is a separate personnel qualification requirement. It applies to the individual proposed as Contract Manager. It does not replace the Sub-Factor B requirement for relevant organizational experience of the quoter or proposed subcontractor.

Question 12: Please also confirm the process and available dates for a qualified local subcontractor to attend a site visit.

Answer 12: A site visit has been scheduled for 21 October 2026. Please refer to the attached invitation for detailed information regarding attendance and access procedures.