Layouts # 1 - Floor plan.pdf
PDF 1 MB Posted
- Attached to
- Office Furniture, Grafenwoehr
- Solicitation number
- W912PB20Q3010
About this file
This document contains floor plans for the upgrade and remodel of Building 2060 at Camp Aachen Theater in Grafenwoehr, Germany. The plans show layouts for the hall and stage areas, including details on flooring, walls, doors, windows, seating, lighting, and heating systems. Dimensions and specifications are provided for all architectural elements. The related federal contract opportunity is for the procurement of office furniture for Building 2060. The solicitation is identified as number W912PB20Q3010 and is being conducted by the Department of the Army Materiel Command Army Contracting Command for furniture required at the project location. No further details are included on proposal requirements, pricing terms, or period of performance.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6.
5.
15 20
1.51 4.39 1.51 4.50 1.51 8.22
5.
2.
4.
15 20
2.
1.
1.
1.
F90 Verglasung fire resistant fixed glazing
1.7 VORRAUM / VESTIBULE
BODENAUFBAU SAAL
FLOOR HALL
siehe Detail 4 G see detail 4 G
BODENAUFBAU BÜHNE
FLOOR STAGE
siehe Detail 4 E / F see detail 4 E / F
2 K/L
T90 Tür fire resistant door
2P
2N/O
2F
A 27
A 27
A 27A 27 gelochte Akustikverkleidung acoustic panel
1.14 BÜHNE / STAGE
1.11 SAAL / HALL
2.1 GENERALS OFFICE
Ausführung einer versetzt angeordneten Brandwand
Rauchabzugsöffnung freier Lüftungsquerschnitt 0,78 m2/Stck
Rauchabzugsöffnung freier Lüftungsquerschnitt 0,78 m2/Stck
Rauchabzugsöffnung freier Lüftungsquerschnitt 0,78 m2/Stck
T90-RS-Türe
F90-Festverglasung
-1.05
+4.90
-1.215
+3.94
+4.70
+3.94
+4.70
+3.41
+4.92
+3.85
+4.61
-0.18
+1.085
+4.995 +4.995 +4.995 +4.995+4.995 +4.995 +4.995
±0.00
+2.135
+4.915
-1.19 -1.05
-0.90-0.875 -0.77-0.70 -0.60-0.525 -0.42-0.35 -0.175
±0.00
1.
2.
1.
2.
3.
1.
1.
Heizkörper + 0.175 verschoben
Heizkörper + 0.175 verschoben
Heizkörper + 0.175 verschoben neue Stufe
1.
1.
1.
1.
1.
2.
1.
2.
3.60 2.94 1.875 2.215 1.875 2.325 1.875 2.35 2.20
-0.375
-0.025
+0.325 +0.50
+1.30 +1.475
+1.825
+2.175
+2.50
+3.85+3.85+3.85 +3.85 +3.85
6.
5.
15 20
1.51 4.39 1.51 4.50 1.51 8.22
5.
2.
4.
15 20
2.
1.
1.
1.
F90 Verglasung fire resistant fixed glazing
1.7 VORRAUM / VESTIBULE
BODENAUFBAU SAAL
FLOOR HALL
siehe Detail 4 G see detail 4 G
BODENAUFBAU BÜHNE
FLOOR STAGE
siehe Detail 4 E / F see detail 4 E / F
2 K/L
T90 Tür fire resistant door
2P
2N/O
2F
A 27
A 27
A 27A 27 gelochte Akustikverkleidung acoustic panel
1.14 BÜHNE / STAGE
1.11 SAAL / HALL
2.1 GENERALS OFFICE
Ausführung einer versetzt angeordneten Brandwand
Rauchabzugsöffnung freier Lüftungsquerschnitt 0,78 m2/Stck
Rauchabzugsöffnung freier Lüftungsquerschnitt 0,78 m2/Stck
Rauchabzugsöffnung freier Lüftungsquerschnitt 0,78 m2/Stck
T90-RS-Türe
F90-Festverglasung
-1.05
+4.90
-1.215
+3.94
+4.70
+3.94
+4.70
+3.41
+4.92
+3.85
+4.61
-0.18
+1.085
+4.995 +4.995 +4.995 +4.995+4.995 +4.995 +4.995
±0.00
+2.135
+4.915
-1.19 -1.05
-0.90 -0.77-0.70 -0.60-0.525 -0.42-0.35
-0.175 ±0.00
1.
2.
1.
2.
3.
Heizkörper + 0.175 verschoben
Heizkörper + 0.175 verschoben
Heizkörper + 0.175 verschoben
1.
2.
1.
2.
1.
2.
1.
1.
1.
1.
3.60 2.94 1.875 2.215 1.875 2.325 1.875 2.35 2.20
-0.375
-0.025
+0.325 +0.50
+1.30 +1.475
+1.825
+2.175
+2.50
+3.85+3.85+3.85 +3.85 +3.85
Notausgang mit Panikbeschlag
Notausgang mit Panikbeschlag
T9 0-
RS
(f
h) /E
I2
-S m
C
TÜ
R D oo r fir e-re sis ta nt
, t ig ht /s el f c lo se r N ot au sg an g m it Pa ni kb es ch la g
Lichte Breite >1.05m clear width >1.05m
Li ch te B re ite
1.
m cl ea r w id th
1.
m
Lichte Breite >1.05m clear width >1.05m
5b
OKFFB
OKRFB
+/- 0.00
+ 4.995 + 4.90
1.25
3.
3.
1.
2.
1.
3.
OKFFB
OKRFB
F= U=
OKFFB
OKRFB
SAAL
AUDITORIUM
+ 4.90 + 4.995
Linoleum/linoleum
- 1.05
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB- 1.17 - 1.05 - 0.91 - 0.565- 0.755
3.7 7
4.
1.
4.
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
+/- 0.00
- 0.375
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
+/- 0.00
- 1.17
- 1.05
- 1.05 - 0.91 - 0.375- 1.215
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
OKFFB
OKRFB
+/- 0.00
- 1.17
- 1.05
- 1.05 - 0.91 - 0.375- 1.215
6.
6.
1.
6.
2.
6.
1.
1.
6.
2.
6.
1.
1.
6.
2.
6.
1.
1.
6.
2.
6.
1.
FFB neu +0,00 FFB alt -0,14
FFB neu +0,00 FFB alt -0,14
UKRDE
UKDE
UKRDE
UKDE
UKRDE
UKDE
2.
5.
2.
Entwässerung innenliegend, DN70 drain line, interior
OD05
OD05
5.45
5.45
2.655 2.675 40
-0,02
-0,02
OKFFB
OKRFB
- 0.175
- 0.565
OKFFB
OKRFB
- 0.175
- 0.565
- 1.195
- 0.18
1.11
22 1.26 2.135
5.58
2.085
2.06
2.06
4.165
4.945
5.58
2.085
2.06
2.06
4.165
4.945
- 0.70 - 0.525 - 0.35 +/- 0.00
- 1.05
OKFFB
OKRFB
- 0.875
- 1,19 - 0.90 - 0.77
- 0.175
- 0.60 - 0.42
OKFFB
OKRFB
- 1.05
- 1.215
+/- 0.00- 0.175- 0.35- 0.525- 0.70
- 0.70 - 0.525 - 0.35
OKFFB
OKRFB
- 1.05
- 1.215
OKFFB
OKRFB - 1.215
OKFFB
OKRFB
- 1.05
- 1.215
- 0.875 - 0.70 - 0.525 - 0.175 +/- 0.00
OKFFB
OKRFB
OKFFB
OKRFB
+/- 0.00
- 0.375
- 0.41- 0.60- 0.77- 0.91- 1.02
OKFFB
OKRFB
OKFFB
OKRFB
+/- 0.00
- 0.375
OKFFB
OKRFB
- 0.875
- 1.215
1.95
1.95
1.95
1.95
4.44
1.98
- 0.70 - 0.525 - 0.35
- 0.35
2.695
1.95
1.95
1.95
1.95
1.95
3.345
1.
6.
1.
1.
6.
1.
52.695
1.95
1.95
1.95
1.95
1.95
3.345
22 1.26 2.135
W
AN
DH
Ö
H E
2.
m neue Stufe
Stufe entfällt
Stufe entfällt
Stufe entfällt neue Stufe
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 2.61 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 15.23 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 8.05 mbar
Röhrenradiator H/L/T 2000 / 920 / 100
91.1 kg/h / 2656 Watt EVR: 29.01 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 4.7 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 2.61 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 15.23 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 8.05 mbar
Röhrenradiator H/L/T 2000 / 920 / 100
91.1 kg/h / 2656 Watt EVR: 29.01 mbar
Röhrenradiator H/L/T 2000 / 920 / 100 91 kg/h / 2656 Watt EVR: 4.7 mbar
Trasse SIPR mittig
Trasse CIPR + NIPR
Tisch
Draufsicht
Stufe
Tisch
0,300,12
0,08
0,50
0,17
0, 3 2 3
4 5
1 Datensäule
2 Profil U 6040
3 Winkelverbinder
5 Gitterrinne 200/60
4 Ankerschiene
Legende
BY
TEL.09621/307-0 FAX 09621/307/188
BY
GRAFENWÖHR / GERMANY
SUBMITTED
SHEET
REVISION
DESIGNED
FILE NO.
SCALE
CONTRACT NO.
CHECKED
DRAWN
MASSN.-NR
DATE DESCRIPTION
STAATL. BAUAMT AMBERG SULZBACH
ARCHIVSTRASSE 1 92224 AMBERG
ARCHITEKT, DIPL.-ING. (FH)
MARTIN ZIRNGIBL
BR KICK
MAIN CAMP
USAG BAVARIA
DPW, DPM BRANCH
APO AE 09114
PREIHSL UND SCHWAN
Beraten und Planen GmbH
KREUZBERGWEG 1A
93133 BURGLENGENFELD
W564 KV-15-C-0148
61201 R 0131
UPGRADE AND REMODEL BUILIDING #2060
AUFRÜSTUNG UND MODERNISIERUNG VON
GEBÄUDE #2060
PN: TA-00948-5J
AFU-BAU II
CORRECTED FINAL DESIGN
SCHNITT HALLE, GRUNDRISS HALLE
SECTION HALL, FIRST FLOOR HALL
1:50
A - 29
28.10.2019
A 28.10.2019 ALLGEMEINE HÖHENÄNDERUNGEN / ÄNDERUNG WANDHEIZKÖRPER JK JK
SCHNITT X-X
SCHNITT X-X
SCHNITT X-X - TREPPEN RANDBEREICH
SCHNITT Y-Y
SCHNITT Y-Y
SCHNITT Y-Y - PODEST MITTE
File details come from the government source that posted it. Updated .