Door 2019 Attachment 2 - Work Description mod 20191017.pdf

PDF 123 KB Posted

Attached to
M&R Safety Inspection of Doors
Solicitation number
W912PB20Q3004
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Door 2019_Attachment 2 - Work Description mod 20191017

ATTACHMENT 2

WORK DESCRIPTION - PREVENTIVE MAINTENANCE ON DOOR SYSTEMS

Minimum requirement for the PM - PM has to be accomplished with at least the following tasks at each individual Door System including all attached system components:

- Cleaning of all systems, particularly the gate doors, without using abrasives or solvents

- Cleaning of guide rails and motors

- Lubricating of gears and bearings, for chain wheel gears checking of chain tension, if necessary, clamping and lubrication of chain, inspection of slipping clutch and tension of v belt

- Checking of all ropes and screw joints, lubrication of roll axis and hinges, inspection and, if necessary, adjusting of roll holder and springs.

- Cleaning and setting, respectively adjusting of the electrical switches and the operation controls, adjusting of control gear (limit switch, etc.)

- Maintenance and adjustment of special equipment, e.g. automatic controls, light barriers, arresting locks, accident protection strip, and other additional safety equipment

- Measuring of the force progression of the protection strips

- Performance of function tests

- Attaching Safety Inspection Label

- Documentation of services

File details come from the government source that posted it. Updated .