Door 2019 Attachment 2 - Work Description mod 20191017.pdf
PDF 123 KB Posted
- Attached to
- M&R Safety Inspection of Doors
- Solicitation number
- W912PB20Q3004
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Door 2019_Attachment 2 - Work Description mod 20191017
ATTACHMENT 2
WORK DESCRIPTION - PREVENTIVE MAINTENANCE ON DOOR SYSTEMS
Minimum requirement for the PM - PM has to be accomplished with at least the following tasks at each individual Door System including all attached system components:
- Cleaning of all systems, particularly the gate doors, without using abrasives or solvents
- Cleaning of guide rails and motors
- Lubricating of gears and bearings, for chain wheel gears checking of chain tension, if necessary, clamping and lubrication of chain, inspection of slipping clutch and tension of v belt
- Checking of all ropes and screw joints, lubrication of roll axis and hinges, inspection and, if necessary, adjusting of roll holder and springs.
- Cleaning and setting, respectively adjusting of the electrical switches and the operation controls, adjusting of control gear (limit switch, etc.)
- Maintenance and adjustment of special equipment, e.g. automatic controls, light barriers, arresting locks, accident protection strip, and other additional safety equipment
- Measuring of the force progression of the protection strips
- Performance of function tests
- Attaching Safety Inspection Label
- Documentation of services
File details come from the government source that posted it. Updated .