Text version

EMR 2019_Attachment 8 - Work Description PM.docx 1 / 13

ATTACHMENT 8

Work Description - Preventive Maintenance for ITEM NO 001AA to 009AA (13 Pages)

Explanation: Following maintenance descriptions are mandatory for all USAG Bavaria Military

Communities - Tower Barracks, Rose Barracks, Hohenfels and Garmisch

ITEM NO:

001AA - FAN

Disassemble fan if necessary. Lubricate all movable mechanical components.

Change oil, if necessary (oil will be paid separately). Check oil- level in motor, if necessary. Add oil or grease if necessary (oil or grease will be paid separately).

Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

Test the electrical load of the motor and document data.

Check belt-drives and couplings for breaks, for evidence of wear, and for proper tension. Replace damaged belts.

Check pulleys for proper alignment and for cleanliness. Adjust and clean. (Belts will be paid separately)

Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary. (Material will be paid separately).

Inspect casing for water and its source.

Clean all drains and siphons of the casings to the point of the next T- connection.

Cleaned all parts to the level of “function preserving cleaning”- means that the casing has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside.

The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The usage of a high pressure cleaner is not allowed. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

001AB - HEAT EXCHANGER

001AC - COOLING COIL

Check all mechanical supports, bolts and nuts for fastening. Refastening of loosen parts is included. Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary.

Inspect casing for water and its source.

Clean all drains and siphons of the casings to the point of the next T- connection.

Clean all parts to the level of “function preserving cleaning”. That means that the casing has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside.

The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The heat exchanger need to be cleaned also. The usage of a high pressure cleaner is not allowed. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method, before the system will be operated again.

At units without filters clean the heat exchanger with a vacuum cleaner.

001AD - HEAT RECOVERY SYSTEM

Check all mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included. Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary.

Check tightness between outside air part and exhaust air.

Check cleaning mechanism and refill cleaning fluid.

Inspect casing for water and its source.

Clean all drains and siphons of the casings to the point of the next T- connection.

Clean all parts to the level of “function preserving cleaning”. That means that the casing has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside.

EMR 2019_Attachment 8 - Work Description PM.docx 2 / 13

The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The heat exchanger need to be cleaned also. The usage of a high pressure cleaner is not allowed. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method, before the system will be operated again.

Check expansion tank, pump and drive, test and report antifreeze concentration and refill if required.

001AE - OUTSIDE AIR FILTER,

001AF - AIR FILTER

Check all mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included. Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary.

Check tightness between filter and casing.

Inspect casing for water and its source.

Check the functioning of the measuring device for the differential pressure.

Check current condition of the filter element and decide, if maintenance schedule is sufficient. If not. Clean all drains and siphons of the casings to the point of the next T- connection.

Clean all parts to the level of “function preserving cleaning”. That means that the casing has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside.

The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The heat exchanger need to be cleaned also. The usage of a high pressure cleaner is not allowed. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

Replace filter element by using a filter element of same type and size (i. e. class F7).

Check tightness between filter and casing.

Remark: One filter chamber can consist of more than one single filter element.

001AG – HUMIDIFIER STEAM

Check all mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included. Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary.

Inspect casing for water and its source.

Clean all drains and siphons of the casings to the point of the next T- connection. Clean all strainers.

Clean all parts to the level of “function preserving cleaning”. That means that the casing has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside. The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The usage of a high pressure cleaner is not allowed.

After the regular cleaning the humidifier chamber need to be disinfected. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

Check current condition of the steam cylinder and steam lance. Decide, if maintenance schedule is sufficient.

Replace steam cylinder and steam lance if necessary, using genuine parts of same type and manufacturer. Check the functioning of conductivity measuring cell.

Check the humidifier chamber for condensate 3 times (on a monthly basis) and clean and dry out the humidifier chamber, if necessary.

The control for hygienic will be described and paid under a different position.

001AH - HUMIDIFIER WATER (EVAPORATION AND SPRAY)

Check all mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included. Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary.

Inspect casing for water and its source.

Check current condition of sprayers. Decide, if maintenance schedule is sufficient.

Clean all drains and siphons of the casings to the point of the next T-connection.

Clean all strainers. Check and adjust water level regulators.

EMR 2019_Attachment 8 - Work Description PM.docx 3 / 13

Clean all parts to the level of “function preserving cleaning”. That means that the casing has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside. The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The usage of a high pressure cleaner is not allowed.

After the regular cleaning the humidifier chamber need to be disinfected. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

Replace sprayers if necessary, using genuine parts of same type and manufacturer. Check the functioning of conductivity measuring cell.

Check the humidifier chamber for dirt and the bacterial count (by dip slides).

Inform the COR, if the bacterial count is higher than 1000 KBE/ml.

The cleaning, disinfection and dry out the humidifier chamber will be ordered by the COR as necessary repair work.

The control for hygienic will be described and paid under a different position.

001AJ – FLAPS / VOLUME DAMPERS

All movable mechanical components need to be lubricated. Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary. Inspect casing for water and its source.

All parts need to be cleaned to the level of “function preserving cleaning”. That means that the casing and the flap

(only, where accessible without dismounting) has to be cleaned with a dry cleaning method (sweeping or wiping) from the outside. The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The usage of a high pressure cleaner is not allowed. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

001AK - CONTROL PANEL

Perform function test of the instruments and lamps, main switches, freezing protection sensor, drives, couplings and leverages for flaps, volume dampers and frequency converters. Check for damage, rust or dirt. Clean the panels inside and outside.

Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

001AL – FIRE PROTECTION FLAPS

The contractor shall schedule work performance with Emergency & Fire Service and

O & M – Utilities – UEMCS Section.

Dismount the flap if necessary for the maintenance and inspection work.

All movable mechanical components need to be lubricated.

Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

Check, repair or replace all lock mechanisms and gaskets on all doors of the casing.

Check the electrical functioning, means all drives, control- and signal- components.

Clean all parts to the level of “function preserving cleaning”. That means that the casing and the flap has to be cleaned with a dry cleaning.

Check condition of release unit and replace it, if required by manufacturer instructions or conditions.

A signed work certificate and report shall be submitted to the COR.

001AM – AIR INLETS / AIR OUTLETS

Check all mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included. Inspect casing for water and its source.

Dismount the grid for cleaning.

The casing and the connection to the duct (ca. 30 cm) have to be cleaned with a dry cleaning method (sweeping, vacuum or wiping). The grid has to be cleaned by wet- wiping by using of pH- neutral detergents. The usage of a high pressure cleaner is not allowed.

After the cleaning work inside, the grid has to get dried out by a usable method.

EMR 2019_Attachment 8 - Work Description PM.docx 4 / 13

Mount the grid, inform COR about damaged grids or those that could not get cleaned sufficiently.

001AN - VDI 6022 INSPECTION

Perform a hygienic inspection according to the VDI 6022, as follows:

Walk through the technical rooms and rooms supplied by this air handling/ ventilation unit.

Measurement of temperature, humidity, air flow at 5 representative points

Measure of the bacteria count on 5 points of the unit and the duct system

Measure of the bacteria count at the humidifier chamber.

Measure of legionella- concentration in the humidifier circuit

Documentation of results in a written report to the COR in German and English language.

Transmittal of written advices for better hygienic in the system.

002AA - AC COMPRESSOR UNIT UP TO 20 KW,

002AB - AC COMPRESSOR UNIT FROM 20 TO 50 KW,

002AC - AC COMPRESSOR UNIT FROM 50 TO 100 KW,

002AD - AC COMPRESSOR UNIT ABOVE 100 KW,

Check for dirt, damage, and rust, clean, repair or repaint if necessary.

Check the compressor for proper operation and noise, check oil level, check and test the acid content of the oil, check the oil pressure with a gauge. Check and test the high pressure and low pressure with a gauge. Check and test the high and low pressure switches for correct function. Check the tightness of components containing refrigerant.

Check filters and dryer for clogging.

Fan Motor and Condenser, Check the motor and fan blade for proper function and noise, clean the ribs with a brush or vacuum cleaner. Check piping and insulation for outside damage and leaks. Electrical Connections, Check condition of all electrical connections, switches, electronic control components, power cables, and distributor cables.

002AE - WATER COOLING UNIT UP TO 100 KW,

002AF - WATER COOLING UNIT ABOVE 100 KW

Cooling set oil filter change, Dryer applications change, if necessary. Check seals in the Motor terminal board of the compressor and if necessary pull tight. Check electrical links at the motor terminal for tightness. Check function of the electrical expansion valves. Check oil and refrigerant status and if necessary refill. Visual inspection on possible leakage and if required eliminates. Check the temperatures and pressure of the condensing water entering and leaving the condenser. Check the temperature of the liquid refrigerant leaving the condenser. Check high and low pressure conditions of the system. Clean unit and condenser if required. Check condenser fans for function, if necessary clean fans and covering grid plates. Check chilled water secondary cycle system. Check circulation pump and engine mixing valves for function and tightness. Check splashguards clean, if necessary. Check all armatures and valves for function and tightness. Check insulation of the lines for damages. Check seat of the freeze protection sensor control and if necessary fasten. Check expansion tank, pump and drive, test and report antifreeze concentration and refill if required.

002AG – EVAPORATOR

Check cooler coil for dirt, hygienic condition, corrosion and clean if required, check liquid temperature at the inlet and outlet. Check the functioning of the expansion valve and the function of the control and regulating device, adjust if necessary. Ventilation motors, perform function test, clean, adjust, and lubricate if necessary. Defrost system;

check all components for correct functioning. Adjust if necessary. Remote control, check adjustments and functioning, replace batteries if necessary. Check current condition of the filter element and decide if maintenance schedule is sufficient. Accessory, check condense water drain pipe, condensate water pump.

002AJ - VDI 6022 INSPECTION see 001AN

004AE - COMPRESSOR UNIT UP TO 10 KW, see ITEM NO 002AA

EMR 2019_Attachment 8 - Work Description PM.docx 5 / 13

004AF - COMPRESSOR ABOVE 10 KW, see ITEM NO 002AA

004AG - EVAPORATOR WITH SINGLE OR SEVERAL FANS, see ITEM NO 002AG

002AH - CONTROL PANEL

004AH - CONTROL PANEL

Perform function test of the instruments and lamps, main switches, speed control unit, remote control unit where available, drives. Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included. Check for damage, rust or dirt. Clean the panels inside and outside. Check all switches, contacts, and relays for good function and proper contact.

003AA - AC WINDOW TYPE UNIT

Ensure equipment is firmly mounted in position. Check electrical connections, switches, relays, and thermostat, remote control for possible defects. Clean the ribs of the condenser and evaporator. Check the condition of the fan blade and air flaps. Check the filter, clean or replaced.

Check the compressor, fan for proper operation and noise, check and test the high pressure and low pressure with a gauge, check and test the high and low pressure switches for correct function. Check the tightness of components containing refrigerant, check refrigerant filter and dryer for clogging. Check and clean condensate drain, pipe and catch basin, including freeze protection heating system.

003AB - VDI 6022 INSPECTION, see ITEM NO 001AN

004AA - WALK IN REFRIGERATOR CELL UP TO 1200 CU.FT,

004AB - WALK IN FREEZER CELL UP TO 1200 CU.FT,

004AC - WALK IN REFRIGERATOR CELL FROM 1201 up to 4000 CU.FT, 004AD - WALK IN FREEZER CELL FROM 1201 up to 4000 CU.FT

Cooling Cell, check foundations. Check that roof is firmly affixed and no leaks are apparent and condition of insulation. If entrance is easily gained by unauthorized persons ensure door can be locked, Lubricate hinges. Cooling lines check condition of insulation.

Externally erected refrigerators, Check that outside walls do not leak, repair and paint to ensure that rain water does not seep into the refrigerator, or run down the walls from the roof. Ensure outside area of box is free of rubbish.

Check that drains for the runoff of condensed and melted water are free. If slide runners are fitted check those runners are firmly seated and the slides move easily. Check cleanliness.

Alarm and safety mechanism, doors on all walk-in refrigerated box must be able to open from the

Inside and have an alarm that can be operated from the inside. Check function.

Doors, Ensure doors close and vacuum pressure mechanism, oil door hinges. Check door gaskets exchange if necessary. Visual inspection of power operated door and report. Check door frame and floor heating device.

005AA - CLEANING OF FAN

Inspect fan for correct functioning. This includes the measurement of the air flow. The air flow rate needs to be documented at the inspection report.

The fan and its casing need to be cleaned from grease and dirt. This includes the dissembling of the fan, whether this is necessary, and the transport to a place where the cleaning can be performed. For the cleaning the contractor has to choose a method, that meets the standards of the WHG §19 and is usable without any damage to the fan and the environment, where the cleaning will be done. All necessary work for the cleaning, i.e. covering of floors and machines with plastic foil, is included in this position. That means also the supply of cleaning detergents.

The cleaning residues have to be collected and disposed of by the contractor. Resultant disposal fees are to the contractor’s expense.

EMR 2019_Attachment 8 - Work Description PM.docx 6 / 13

The contractor has to prepare documentation about the cleaning conditions before and after the cleaning. The documentation needs to show the COR, if the cleaning schedule is sufficient and if any damages are present.

Acceptable methods are digital photos (jpeg- format) or digital videos (mpeg- format) recorded to a CD, which needs to be transferred to the COR with the inspection report.

The outside and inside of the casing with all its air- ducting parts has to be cleaned. The usage of a high pressure cleaner shall be avoided. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

The contractor needs to use methods that are friendly to the environment and clean the components without any long-term damages.

Immediately after the cleaning the contractor has to start with the maintenance work.

005AB – CLEANING OF FLAPS

Inspect the flaps for correct functioning.

The flap and its casing need to be cleaned from grease and dirt.

This includes the dissembling of the flap, whether this is necessary, and the transport to a place where the cleaning can be performed.

For the cleaning the contractor has to choose a method, that meets the standards of the WHG §19 and is usable without any damage to the flap and the environment, where the cleaning will be done. All necessary work for the cleaning, i.e. covering of floors and machines with plastic fill, is included in this position. That means also the supply of cleaning detergents.

The cleaning residues have to be collected and disposed of by the contractor. Resultant disposal fees are to the contractor’s expense.

The contractor has to prepare documentation about the cleaning conditions before and after the cleaning. The documentation needs to show the COR, if the cleaning schedule is sufficient and if any damages are present.

Acceptable methods are digital photos (jpeg- format) or digital videos (mpeg- format) recorded to a CD, which needs to be transferred to the COR with the inspection report.

The contractor needs to use methods that are friendly to the environment and clean the components without any long-term damages.

The outside and inside of the casing with all its air- ducting parts has to be cleaned. The usage of a high pressure cleaner shall be avoided. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method (before the system will be operated again).

005AC CLEANING OF AIR VENTILATION DUCT UP TO INNER WIDTH 0.5 m²

005AD CLEANING OF AIR VENTILATION DUCT FROM 0.5 m² UP TO 2m² INNER WIDTH

The duct needs to be cleaned from grease and dirt at the inside and outside. This includes the dissembling of single segments, whether this is necessary for access and the transport to a place where the cleaning can be performed.

For the cleaning the government prefers a method, that is based on the cleaning with saturated steam (dry vapor) and chemicals. The method needs to meet the standards of the WHG §19 and has to be usable without any damage to the duct and the environment.

The usage of a high pressure cleaner should be avoided. After the cleaning work inside, the casing with all its air-ducting parts has to get dried out by a usable method. (Before the system will be operated again.) All necessary work for the cleaning, i.e. covering of floors and machines with plastic fill, is included in this position. That means also the supply of cleaning detergents.

The cleaning residues have to be collected and disposed of by the contractor. Resultant disposal fees are to the contractor’s expense.

The contractor has to prepare documentation about the conditions before and after the cleaning. The documentation needs to show the COR, if the cleaning schedule is sufficient and if any damages are present. Acceptable methods are digital photos (jpeg- format) or digital videos (mpeg- format) recorded to a CD, which needs to be transferred to the COR with the inspection report. The inspection report includes also the transmittal of a report of certification

(report of no objection) for the operation of this system to the COR.

Check all electrical connections (potential grounding), mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

EMR 2019_Attachment 8 - Work Description PM.docx 7 / 13

Check, repair or replace all lock mechanisms and gaskets on all doors of the casing. Check lights inside the chamber and replace, if necessary.

005AE – GREASE FILTER SERVICE

All grease filters existing in the kitchen exhaust system need to be replaced by clean filters from same type and size.

The filters need to be clean from grease and dirt.

The government’s intention is that the contractor is reusing the filters, by cleaning and providing them to the government during the next service. The government advises that the contractor is using specialized companies for this service.

The filters need to be dismounted. This includes the dissembling of single segments, whether this is necessary for access and the transport to a place where the cleaning can be performed.

It is strictly not allowed to use U.S. facilities and utilities to perform the cleaning.

The contractor has to check, if all necessary filter elements for this system are existing.

The contractor has to install the clean filters and to check the tightness between filters and casing.

The inspection report includes also the transmittal of a report of certification (report of no objection) for the operation of this system to the COR.

Remark: The number of the existing filter elements is written in the specific attachment with the inventory matrix.

005AF - CLEANING OF HOODS

The hood needs to be inspected for correct functioning.

The hood and its fire suppression system need to be cleaned from grease and dirt.

For the cleaning the contractor has to choose a method, that meets the standards of the WHG §19 and is usable without any damage to the hood and the environment, where the cleaning will be done. All necessary work for the cleaning, i.e. secure fire suppression system or covering of floors and machines with plastic fill, is included in this position. That means also the supply with cleaning detergents etc.

The cleaning residues have to be collected and disposed of by the contractor. Resultant disposal fees are to the contractor’s expense

The contractor has to prepare documentation about the cleaning conditions before and after the cleaning. The documentation needs to show the COR, if the cleaning schedule is sufficient and if any damages are present.

Acceptable methods are digital photos (jpeg- format) or digital videos (mpeg- format) recorded to a CD, which needs to be transferred to the COR with the inspection report.

The outside and inside of the hood has to be cleaned. The government prefers the dry steam cleaning method. The usage of a high pressure cleaner should be avoided.

The complete hood shall be polished by using adequate polish fluids and tools to a blank and shiny condition.

After the cleaning work, the hood with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

Check lights inside the hood and replace, if necessary.

Check all grease drains for functioning.

005AG – CLEANING OF HEAT RECOVERY SYSTEM

The heat recovery system and its casing need to be cleaned from grease and dirt. This includes the dissembling of the heat exchanger, whether this is necessary, and the transport to a place where the cleaning can be performed. For the cleaning the contractor has to choose a method, that meets the standards of the WHG §19 and is usable without any damage to the fan and the environment, where the cleaning will be done. All necessary work for the cleaning, i.e. covering of floors and machines with plastic fill, is included in this position. That means also the supply of cleaning detergents. The cleaning residues have to be collected and disposed of by the contractor. Resultant disposal fees are to the contractor’s expense

The contractor has to prepare documentation about the cleaning conditions before and after the cleaning. The documentation needs to show the COR, if the cleaning schedule is sufficient and if any damages are present.

Acceptable methods are digital photos (jpeg- format) or digital videos (mpeg- format) recorded to a CD, which needs to be transferred to the COR with the inspection report.

EMR 2019_Attachment 8 - Work Description PM.docx 8 / 13

The outside and inside of the casing with all its air- ducting parts has to be cleaned. The usage of a high pressure cleaner shall be avoided. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

The contractor needs to use methods that are friendly to the environment and clean the components without any long-term damages.

At systems with components for an automatic periodically cleaning process the maintenance of these systems is included within this position inclusive the refill of cleaning detergents.

005AH – CLEANING OF FIRE PROTECTION FLAPS

Dismount flap, if necessary. The flap and its casing need to be cleaned from grease and dirt.

This includes the dissembling of the flap, whether this is necessary, and the transport to a place where the cleaning can be performed.

For the cleaning the contractor has to choose a method, that meets the standards of the WHG §19 and is usable without any damage to the flap and the environment, where the cleaning will be done. All necessary work for the cleaning, like covering of floors and machines with plastic fill, is included in this position. That means also the supply of cleaning detergents.

The cleaning residues have to be collected and disposed of by the contractor. Resultant disposal fees are to the contractor’s expense. The contractor has to prepare documentation about the cleaning conditions before and after the cleaning. The documentation needs to show the COR, if the cleaning schedule is sufficient and if any damages are present. Acceptable methods are digital photos (jpeg- format) or digital videos (mpeg- format) recorded to a CD, which needs to be transferred to the COR with the inspection report.

The outside and inside of the casing with all its air- ducting parts has to be cleaned. The usage of a high pressure cleaner shall be avoided. The contractor needs to use methods that are friendly to the environment and clean the components without any long-term damages. After the cleaning work inside, the casing with all its air- ducting parts has to get dried out by a usable method before the system will be operated again.

006AA – PASSIVE SMOKE- AND HEAT- EXHAUST SYSTEMS

Maintain the passive smoke- and heat- exhaust systems according to the manufacturer instructions (DIN 18232 and

DIN 10833), the instructions of the installation company (VdS/CEA- Richtlinie 4020) and the VDMA 24186.

The exact scope of the maintenance comes out of the manufacturer and system- specific maintenance instructions.

The system needs to be checked for any modifications on constructions, openings or the installation of new walls etc.

During the maintenance the complete system needs to be activated at the alarm panel. The correct functioning of all components shall be inspected closed to a real alarm situation.

All functioning of the alarm panel, like power outage, battery failure, wire breaks, opening status signal, and the electrical resist of the alarm circuits need to be checked.

Used materials during the test alarm and the maintenance (CO2- cartouches, alarm buttons) shall be replaced.

Thermal alarm detectors shall be checked and cleaned for dirt and inspected for the correct temperature class of the fire detection element (glass element or melting element).

Components with a limited lifetime shall be checked for necessary replacement. The contractor shall replace components if required.

The contractor shall perform additional inspections like pressure tests of CO2- lines, inspections of batteries, electrical lines and measure of the filling level of CO2- cartouches etc. Screwed connections shall be checked for fastening. Moving parts shall be cleaned and lubricated.

All sealing shall be checked for tightness, cleaned and maintained/ conditioned.

The maintenance shall be performed inclusive all additional components like wind spoilers, accessories, pipes, cables, electronic parts, dampers and lock mechanisms.

All moving parts shall be checked for proper condition and function and be lubricated.

EMR 2019_Attachment 8 - Work Description PM.docx 9 / 13

All windows and light domes shall be cleaned with soft clothes or sponges by using water with a neutral cleaning detergent. Harder dirt shall be removed by non- lubricant plastic cleaners. Same procedure shall be used for sensors in the outside area (rain sensors). The usage of abrasive cleaners is strictly prohibited.

All electrical and mechanical connections shall be checked for fastening and refastened if necessary.

006AB – MECHANICAL SMOKE- AND HEAT- EXHAUST SYSTEMS

The contractor shall maintain the passive smoke- and heat- exhaust systems according to the manufacturer instructions (DIN 18232 and DIN 10833), the instructions of the installation company (VdS/CEA- Richtlinie 4020) and the VDMA 24186.

The exact scope of the maintenance comes out of the manufacturer and system- specific maintenance instructions.

The system needs to be checked for any modifications on constructions, openings or the installation of new walls etc.

Disassemble fan if necessary. All movable mechanical components need to be lubricated.

Change oil, if necessary. Check oil- level in motor, if necessary. Add oil or grease if necessary.

Check all electrical connections, mechanical supports, bolts and nuts for fastening. The refastening of loosen parts is included.

Test the electrical load of the motor and document data.

Check belt- drives and couplings for breaks, for evidence of wear, and for proper tension. Replace damaged belts.

Check pulleys for proper alignment and for cleanliness. Adjust and clean.

Inspect fan for water and its source.

Clean all parts to the level of “function preserving cleaning”. That means that the components shall be cleaned with a dry cleaning method (sweeping or wiping).

During the maintenance the complete system needs to be activated at the alarm panel. The correct functioning of all components shall be inspected closed to a real alarm situation.

All functioning of the alarm panel, like power outage, battery failure, wire breaks, opening status signal, and the electrical resist of the alarm circuits need to be checked.

Used materials during the test alarm and the maintenance (alarm buttons) shall be replaced.

Thermal alarm detectors shall be checked and cleaned for dirt and inspected for the correct temperature class of the fire detection element (glass element or melting element).

Components with a limited lifetime shall be checked for necessary replacement. The contractor shall replace components if required.

007AA - COOLING DISPENSER DRINKING WATER

Check for outside damage, dirt, and oxide on the valves and outlet nozzle, repair and clean if Necessary. Check the water outlet temperature in accordance with the manufacturer's Instructions.

Cooling and condensing elements, check for dirt and corrosion, clean the fins and the inside of Equipment. Check the compressor for proper operation. Check cooling system for leakage. Check the temperature of the cooling system. Check fan blade for cleanliness, damage, and Secure mounting, clean or repair if necessary.

Cable, plug, and control components, check condition of cable and plugs. Test, check adjusts and clean controls, relays, and other accessories attached to the system.

Check drain pipes for dirt, damage, and loose connections. Clean when necessary.

007AB - COOLING DISPENSER BEVERAGE

Check for outside damage, dirt, and oxide on the valves and outlet nozzle, repair and clean if Necessary. Check the beverage outlet temperature in accordance with the manufacturer's Instructions. Cooling and condensing elements, check for dirt and corrosion, clean the fins and the inside of equipment. Check the compressor for proper operation.

Check cooling system for Leakage. Check the temperature of the cooling system. Check fan blade for cleanliness, damage, and secure mounting. Cable, plug, and control components, check condition of cable and plugs. Test, check adjusts and clean controls, relays, and other accessories attached to the system.

Check drain pipes for dirt, damage, and loose connections.

008AA - GAS LEAK DETECTION SYSTEM

EMR 2019_Attachment 8 - Work Description PM.docx 10 / 13

Maintenance Description Gas Detection System

- Visual check for dirt, mechanical damages and free gas intake

- Calibration of zero point and sensibility

- Inspection with alarm gas

- Warning signal release

- Check the connected blinking lights and sirens, ventilation as well as forward reporting to fire department, i.e. main control

- Check reporting unit for malfunction

- Check sensor heaters (if present)

008AB – Other Special Equipment

Description Preventive Maintenance TISA, Bldg. 295

Walk-in freezer/refrigerator:

Check for damage and corrosion, repair or repaint if necessary. Check insulation and anti-freeze-heat-system

(bottom-sole). Check lighting-system inside, change lamps if necessary.

Sliding door, electric:

Check for correct function, adjust if necessary, lubricate wheels, castors and chains. Check gasket, repair or change if necessary. Check handle, lock system and inside release, repair if necessary.

Cooler-unit:

Check for function, dirt, damage and corrosion, clean or repair if necessary. Check drain- and pan-heaters, change if necessary. Check solenoid valves, expansions valves, reducing valves and hand valves, repair or change if necessary. Check fan-motors, fan grid and suspension. Check hot gas defrost process.

Compound system:

Change dehydrators, filters, oil filters (inside compressors), change compressor oil.

Check for dirt, damage and corrosion, clean or repair if necessary. Check all eliminators, solenoid valves, hand valves, reducing valves, rotalock valves, pm valves, safety valves, oil separators, pressure control (high- middle- low pressure), manometers, transmitters, indicators, oil regulators, safety switches, oil pressure switches, electric contacts, low cylinder volume regulation, intermediate cylinder volume regulation, compressor soft start regulation, freon pumps, condenser fans, condenser pressure regulation, adjust or change if necessary. Check complete system for leakages, repair if necessary. Check for correct Insulation (suction lines, low pressure cylinder, intermediate pressure cylinder) change if necessary. Clean condenser if necessary.

Measure compressor circuit, high pressure, low pressure, oil pressure, expansions temperature, freon float temperature, suction gas temperature, condensate temperature, compressor head temperature, room temperature, Control panel:

Check micro-processors, adjustability controls, contactors, motor relays, timers, relays, control lamps, fuses, wiring and clamps, change or adjust if necessary. Clean control panel inside and outside.

Temperature printer:

Check for correct function, adjust or clean if necessary, change paper or print head if necessary.

008AC – SPECIAL HUMIDIFIER IN BLDG # 100 IN HOHENFELS

The system consists of the following components: Nozzle system. Post evaporation unit. Central unit with silver ionization, connection box. Humidifier housing and water container.

Check the spray pattern of the spray nozzles. Check hoses and connections for sealing.

Check ceramic plates for breakage. Check silver ionization and the hoses und connections for

Sealing, check the water container and humidifier housing for soiling. Check the water container

Behind the post evaporation unit for collection of residual water. Read off the operating

Parameters and enter the values on the maintenance record sheet. The maintenance service has to be performed according manufacturer manuals.

EMR 2019_Attachment 8 - Work Description PM.docx 11 / 13

008AD – HYGENE SERVICE ON SPECIAL HUMIDIFIER IN BLDG # 100 IN HOHENFELS

Perform a hygienic inspection according to the VDI 6022, as follows:

Walk through the technical rooms and rooms supplied by this air handling/ ventilation unit.

Measurement of temperature, humidity, air flow at 5 representative points. Measure of the bacteria count on 5 points of the unit and the duct system. Measure of the bacteria count at the humidifier chamber. Inform the COR, if the bacterial count is higher than 1000 KBE/ml.

Measure of legionella-concentration in the humidifier circuit. Documentation of results in a written report to the

COR in German and English language. Transmittal of written advices for better hygienic in the system.

Check the humidifier chamber for dirt. Check current condition of sprayers. Replace sprayers if necessary, using genuine parts of same type and manufacturer. Decide, if maintenance schedule is sufficient. Clean all drains and siphons of the casings to the point of the next T- connection.

Clean all strainers. Inspect casing for water and its source. Check and adjust water level regulators. Clean all parts to the level of “function preserving cleaning”. That means that the casing has to be cleaned with a dry cleaning method

(sweeping or wiping) from the outside. The inside of the casing with all its air- ducting parts has to be cleaned by wet- wiping by using of pH- neutral detergents. The usage of a high pressure cleaner is not allowed. After the regular cleaning the humidifier chamber need to be disinfected. After the cleaning work inside, the casing with all its air-ducting parts has to get dried out by a usable method, (before the system will be operated again). Check the functioning of conductivity measuring cell.

008AE – HEATING SYSTEMS (PUMPS, VALVES, PRESSURE MAINTENANCE )

Maintenance Description Sensor System

- Check pumps for proper functioning

- Check controllers and actuators for correct adjustments, times and functioning

- Check pressure level, refill water if necessary, check safety valve

- Check strainers, clean out if required

008AF – HEATING BURNERS UP TO 50 KW (CNG, LPG & FUEL)

- Dismount / remount burner

- Clean out vessel/fire cell

- Check ignition

- Check fans, actuators

- Measure exhaust gas for proper values, print certificate, place it near the vessel

- Check out for tightness of fuel/gas supply lines at the heating room

008AG – SENSOR SYSTEMS SEWAGE TREATMENT VILSECK

- Visual check for dirt and mechanical damages

- Calibration of zero point and sensibility

- Inspection/testing in accordance to manufacturer Hach/Lange

- Check reporting for malfunctions and correct values

008AH – PROPANE GAS TANK (UNDERGROUND AND ABOVE GROUND)

- Perform visual inspection in and outside according to TRF 1996

- Check tanks for corrosion, proper coating and correct labeling

- Check cathodic protection system for functioning

- Check all above ground lines for tightness (leakage spray)

- Inspections by certified personal/judges will be paid separately

EMR 2019_Attachment 8 - Work Description PM.docx 12 / 13

008AJ – HEATING BURNERS ABOVE 50 KW (CNG, LPG & FUEL)

- Dismount / remount burner

- Clean out vessel/fire cell

- Check ignition

- Check fans, actuators

- Measure exhaust gas for proper values, print certificate, place it near the vessel

- Check out for tightness of fuel/gas supply lines at the heating room

Switches and Control Knobs, free all switches, knobs, and connections of dirt and fat. Repair loose connections.

Exchange damaged cables, pipes, switches, and knobs.

Thermostat and Heat Elements, with a sensitive thermometer, test thermostat for accuracy and capability to maintain desired temperature. Test heat elements and connections. Adjust as necessary. Control Lamps, exchange black or burned-out bulbs. Check cables for loose connections. Power Cable Connection and Magnetic Safety Switch, check condition of magnetic safety switch, including connections and heating elements. Clean dirt and fat from cables and connections.

009AA – FIRE ALARM SYSTEM (BMZ) GARMISCH, only

Inspection of Fire Alarm Systems acc. to DIN 14675 The inspection or maintenance of fire alarm systems is to be performed according to DIN 14675 and DIN VDE

0833-1 / 0833-2. The performing company has to be certified in accordance with DIN 14675.

The inspection interval is once annually.

Prior to an inspection the user must be informed about the scope of work and should organize measure accordingly, i.e. fire guard.

Work and Remarks prior to Maintenance Work:

Scheduling with user, gate guard, security and responsible point of contact

Proclaim the temporary disconnection of unit components, i.e. fire extinguishers, UEMCS, lines leading to the fire department

Disconnection of external control units, i.e. signal sounds

Registration of maintenance work at the unit, fire department or other assisting agencies, security

Work and Remarks after completion of Maintenance Work

Report completion to the fire department and other assisting agencies, Take all disconnected system components back into operation;

Update operational logbook

Report completion to the customer, user or the responsible point of contact (signature)

Inspection of Fire Alarm Systems acc.to DIN 14675 and DIN VDE 0833

The following test have to be performed at a minimum:

Testing of the Power Supply o Check power-outage function o Check batteries acc. to manufacturer’s guidelines o Check battery load voltage at the conductors

EMR 2019_Attachment 8 - Work Description PM.docx 13 / 13 o Check battery outage function

Testing of the alarm counter o Compare alarm counter meter with the listing of the logbook and investigate reasons for malfunction o Check back ground memory / incident memory for discrepancies and special incidents

Testing of transmission lines / Detector testing o For each transmission line (primary line) the quarterly testing of one detector is sufficient, if all testable detectors and transmission lines were tested without disturbance annually, to include:

Transmission path for respective function

Checking of manual fire alarm

Checking of automatic fire alarm

Detector testing

Checking of controls (elevators, ventilations, …)

Checking of alarm units (Sirens / flashing lights)

Checking of power supply

Function test of Alarm o All visual and acoustic alarm units o Periphery unit like fire department key depot o Fire department control unit, Fire department info center o Check transmission path for remote alarm main detector to fire department o Check transmission unit for malfunction transmission o Check control units (extinguishing unit, ventilation, elevator)

Visual Testing / Walk-thru o Check for changes of room utilization. Check if rooms which are not included in the monitoring, are safe.

o Check free space around the detectors (0,5 m) o Check all detector for safe connection and for mechanical damages

(Nothing Follows)

File details come from the government source that posted it.