SCHARNIER

HINGE

SCHARNIER

HINGE

CJB FRONT VIEW

CJB VORDERANSICHT

31230

CJB TOP VIEW

CJB DRAUFSICHT

CJB SIDE VIEW

CJB SEITENANSICHT

BOLT M5 x 30

BOLZEN M5 x 30

BOLT M5 x 30

BOLZEN M5 x 30

BOLZEN M8

BOLT M8

50 50 m a x i m a l m m

CABLE JUNCTION BOX PERSONNEL TARGET

CJB FRONT VIEW

CJB VORDERANSICHT

DATA

DATEN

POWER

ELEKTRO

KABELANSCHLUSSKASTEN PERSONENZIEL

OPENING POWER

OEFFNUNG ELEKTRO

DATA OPENINGS AS REQUIRED

DATEN-OEFFNUNGEN WIE BENOETIGT

BOLZEN M8 ERDUNG

GROUNDING BOLT M8

NOTES / ANMERKUNGEN :

4. ALL CABLE LEAD-IN TO BE WATER TIGHT, IN STEEL.

6. THE INSTALLATION CARRIER MUST BE EQUPPED WITH FOUR BOLTS M5 X 30MM FOR LATER

SLOPE OF THE BOX APPR. 1:10

NEIGUNG DES KASTEN CA. 1:10

CABLE AT THE POINT OF ENTRANCE.

1. ENCLOSURE SHALL BE HIGH-GRADE STEEL, DIMENSIONS: 500mm x 4OOmm x 210mm.

GEHAEUSE AUS EDELSTAHL, ABMESSUNGEN: 500mm x 400mm x 210mm, IP 66, NEMA 4X

ALLE KABELEINFUEHRUNGEN SIND WASSERDICHT, IN EDELSTAHL, AUSZUFUEHREN.

ALL OPENINGS WITHOUT CABLES MUST BE CLOSED WITH PLASTIC BLIND STOPPER

TO BE WATER TIGHT.

ALLE OEFFNUNGEN OHNE KABEL SIND MIT KUNSTSTOFFBLINDSTOPFEN, WASSERDICHT, ZU SCHLIESSEN.

UM DIE MONTAGE DER VIER GEWINDEBOLZEN M5 X 30MM (PARAGRAPH 6) ZU ERMOEGLICHEN.

DIE MONTAGEPLATTE IST MIT VIER STEHBOLZEN M5 X 30MM ZU BESTUECKEN ZUR SPAETEREN

8. DATACABLES MUST BE GROUNDED AT THE CJB CASING

DATENKABELSCHIRME AM GEHAEUSE DATENANSCHLUSSKASTEN ERDEN

IP 66, NEMA 4X

DECKELSCHARNIERE LINKS, BZW. RECHTS MONTIERT, ABHAENGIG VOM MONTAGEORT DES KASTENS IN DER

ZIELGRUBE

3. DOOR HINGES MOUNTED LEFT, RESPECTIVELY RIGHT SIDE, DEPENDING ON THE LOCATION OF THE BOX AT

THE TARGET EMPLACEMENT

INSTALLATION OF AN ADDITIONAL CARRIER FOR ELECTRONIC EQUIPMENT.

MONTAGE EINER ZUSAETZLICHEN MONTAGEPLATTE FUER ELEKTRONIKBAUTEILE.

ALLE FREIEN KABELENDEN SIND DAUERHAFT, AN DER EINLASS-STELLE, ZU KENNZEICHNEN.

2. SECURE GROUND WIRE TO BOX UNDER AT EXTERIOR BOLT, M8. PROVIDE GROUNDING CONNECTION

OF THE BOX DOOR AND THE BOX ITSELF

ERDLEITER AM AEUSSEREN BOLZEN, M8, DES KASTENS FESTKLEMMEN. ERDUNGSVERBINDUNG ZWISCHEN

GEHAEUSETUER UND DEM GEHAEUSE HERSTELLEN

5. INSTALLATION CARRIER MUST BE INSTALLED AT BOLTS AND EQUIPPED WITH 12 SEPARATION

BESTUECKT MIT VIER EDELSTAHLLASCHEN, MIT BOHRLOCH ZUR MONTAGE AUF DEN BODEN

9. ALL CABLE PIGTAILS WILL BE TAGGED WITH PERMANENT TAGS ATTACHED TO THE

STEEL SUPPORTS, WITH HOLE FOR MOUNTING TO GROUND

CABLE JUNCTION BOX CJB

KABELANSCHLUSSKASTEN CJB

INSTALLATION

PROJECT TITLE

SHEET TITLE

DATE

DATE

DATE

DATE

DRAWN BY PROJECT ENGR CHECKED BY

DATE PROJECT NO

SHEET

OF

SIGNATURE SIGNATURE

SIGNATURE

Training Area Grafenwoehr GM 31P

SIGNATURE

SIGNATURE

MASTER PLANNERRES SECTION

ENGINEERING DIV

ERWIN SCHMIEGERERWIN SCHMIEGER

DATE DESCRIPTION DRAWN BY APPROVEDREV NO

USER/RANGE OPERATIONS

RTLPSAFETY

SIGNATURE

DATE

ERWIN SCHMIEGER, RES DESIGNER

DATE

USA GARRISON BAVARIA

JOHN A. HOWARD, C/Engr Div

SCALE

REVIEW: PREFINAL 19 NOVEMBER 2018

JEFFREY F. ANDERSON, LTC, FA, C/RANGE OPS

DUWAIN S. MARING, C/RTLP

USAG BAVARIA/RES BRANCH/ENG DIV

DAVID A. TASKER, C/Master Planning

7. MOUNTING OF THE BOX AT CONCRETE BASE (PERSONNEL TARGETS) - BOX EQUIPPED WITH FOUR HIGH GRADE

DER KASTEN WIRD AUF EINE BETONBODENPLATTE MONTIERT (PERSONENZIELE) - KASTEN

TERMINALS, 2 GROUNDING TERMINALS AND 3 ELECTRICAL TERMINATIONS, MOUNTED AT A CARRIER RAIL. NOTICE

MINIMUM SIZE OF THE CARRIER TO ALLOW THE INSTALLATION OF THE TREADED BOLTS M5 X 30MM (PARAGRAPH 6).

DIE MONTAGEPLATTE IST AUF STEHBOLZEN ZU MONTIEREN UND MIT 12 TRENNKLEMMEN, 2 ERDUNGSKLEMMEN UND

3 ELEKTRO-REIHENKLEMMEN AUF TRAGSCHIENE ZU BESTUECKEN. MINDESTABMESSUNG DER MONTAGEPLATTE BEACHTEN,

10. PROVIDE 50 CM OF SLACK DATA CABLES IN THE CJB.

50 cm KABELLAENGE DER DATENKABEL IM ANSCHLUSSKASTEN AUFROLLEN.

ELECTRICAL POWER PANEL

NIEDERSPANNUNGSVERTEILER

TOP VIEW

DRAUFSICHT

DATA CONNECTION BOX

DATENANSCHLUSSKASTEN

POTENTIAL EQUALIZATION BUSBAR

POTENTIALAUSGLEICHSSCHIENE

RUBBER MAT

GUMMIMATTE

ELECTRICAL POWER PANEL

NIEDERSPANNUNGSVERTEILER

CJB

CJB

POTENTIAL EQUALIZATION BUSBAR

A A

DATA CABLES

DATENKABEL

POTENTIALAUSGLEICHSSCHIENE

SECTION A-A, SAT

SCHNITT A-A, SAT

VEHICLE TARGET PIT (SAT)

FAHRZEUGZIELGRUBE (SAT)

SIDE VIEW

ELECTRICAL POWER PANEL

NIEDERSPANNUNGSVERTEILER

POTENTIAL EQUALIZATION BUSBAR

POTENTIALAUSGLEICHSSCHIENE

CJB

RUBBER MAT

GUMMIMATTE

SEITENANSICHT

TOP VIEW

ELECTRICAL POWER PANEL

NIEDERSPANNUNGSVERTEILER

DRAUFSICHT

POTENTIAL EQUALIZATION BUSBAR

POTENTIALAUSGLEICHSSCHIENE

CJB

BETONFERTIGTEIL BESTAND

CONCRETE PREFAB ELEMENT EXISTING

PERSONNEL TARGET PIT (SIT)

PERSONENZIEL (SIT)

1 : 20

SCALE

MASSTAB

1 : 20

SCALE

MASSTAB

SCALE

MASSTAB

1 : 5

CONCRETE PREFAB ELEMENT EXISTING

BETONFERTIGTEIL BESTAND

Details: Target Emplacements with electrical/data installations, CJB

Details: Zielgruben mit Elektro/Dateneinbauten, CJB

Repair Electrical and Data System, Range 206

TI-00620-8J1 : 20, 1 : 514 NOV 2018

ELECTRICAL POWER PANEL

NIEDERSPANNUNGSVERTEILER

POTENTIAL EQUALIZATION BUSBAR

POTENTIALAUSGLEICHSSCHIENE

PROTECTION CONDUIT

KABELSCHUTZROHR

CONCRETE PREFAB ELEMENT

BETONFERTIGTEIL

BALKENWINKEL

BEAM SUPPORT

PROTECTION TIMBER 25/15

SCHUTZHOLZ 25/15

1 : 20

SCALE

MASSTAB

L-SHAPE ELEMENT LIMIT MARKER

L-FORM FERTIGTEIL BEGRENZER

JOHN S. DARLINGTON, SAFETY DIRECTOR

FINAL SUBMISSION: 24 JANUARY 2019