03_Drawing_Sheet_1_of_4.pdf
PDF 52 KB Posted
- Solicitation number
- W912PB19Q8013
About this file
Drawing, Sheet 1 of 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04_Drawing_Sheet_2_of_4.pdf | ||
| 05_Drawing_Sheet_3_of_4.pdf | ||
| 06_Drawing_Sheet_4_of_4.pdf | ||
| 01_Solicitation_W912PB19Q8013.pdf | ||
| 02_Attachment_I,_Specification_14Mar19.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEVENTH ARMY JOINT MULTINATIONAL TRAINING COMMAND
DEPARTMENT OF THE ARMY
SHEET TITLE
1 OF
2 OF
3 OF
4 OF
1 : 25000
GRAFENWOEHR TRAINING AREA
FREIHUNG
GRAFENWOEHR
ESCHENBACH
KIRCHENTHUMBACH
HILL 459
KUERMREUTH
SORGHOF
AUERBACH
SITE 17
GRAFENWOEHR
MAIN CAMP
SOUTH CAMP
VILSECK
LOCATION PLAN
LAGEPLAN
SCALE 1 : 25000
MASSTAB 1 : 25000
6 OF
5 OF
COVER SHEET
COVER SHEET
DECKBLATT
RANGE 206
SCHIESSBAHN 206
7 OF
INSTALLATION
PROJECT TITLE
SHEET TITLE
DATE
DATE
DATE
DATE
DRAWN BY PROJECT ENGR CHECKED BY
DATE PROJECT NO
SHEET
OF
SIGNATURE SIGNATURE
SIGNATURE
Training Area Grafenwoehr GM 31P
SIGNATURE
SIGNATURE
MASTER PLANNERRES SECTION
ENGINEERING DIV
ERWIN SCHMIEGERERWIN SCHMIEGER
DATE DESCRIPTION DRAWN BY APPROVEDREV NO
USER/RANGE OPERATIONS
RTLPSAFETY
SIGNATURE
DATE
ERWIN SCHMIEGER, RES DESIGNER
DATE
USA GARRISON BAVARIA
JOHN A. HOWARD, C/Engr Div
SCALE
REVIEW: PREFINAL 19 NOVEMBER 2018
JEFFREY F. ANDERSON, LTC, FA, C/RANGE OPS
DUWAIN S. MARING, C/RTLP
USAG BAVARIA/RES BRANCH/ENG DIV
PROJECT NO. TI-00620-8J
TI-00620-8J14 NOV 2018
DAVID A. TASKER, C/Master Planning
REPAIR ELECTRICAL AND DATA SYSTEM, RANGE 206
Repair Electrical and Data System, Range 206
LAYOUT RANGE 206/CABLE DITCH
SCHEME DATA CABLING/ELECTRICAL DISTRIBUTIONS
TARGET EMPLACEMENTS WITH ELECTRICAL & DATA INSTALLATIONS/CJB
JOHN S. DARLINGTON, SAFETY DIRECTOR
FINAL SUBMISSION: 24 JANUARY 2019
File details come from the government source that posted it.