Office_Furniture_Layout_Revised_20190920.pdf

PDF 2 MB Posted

Attached to
Office Furniture Federal contract opportunity
Solicitation number
W912PB-19-Q-3234
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Bavaria 409th CSB

About this file

Office Furniture Layout Revised

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hub

Hub

CPOF

VIDO

S

M edia

PC

3‐10 3‐9 3‐8

3‐13‐23‐3

3‐43‐53‐63‐7

3‐11

MIS

3‐12

MIS

TAF 3 Enabler

RM 27

A005 ‐ 1 EA

(Replace 3‐11) *Remove/dispose old 3‐11 Work Station

A002 ‐ 1 EA for 3‐11 work station

CPOF

VI

D O S

Sc an ne r

Media PC

FS‐11 FS‐8

FS‐8 FS‐1

FS‐9 FS‐5 FS‐6

FS‐11 FS‐7

FS‐10 FS‐3

MNVR TAF 2, Room 26

A005 ‐ 1 EA (Replace FS‐6) *Vendor will detach FS‐6 “ONLY” from the floor. Unit will relocate FS‐6 to RM T30.

Hub

P ri n te r

S

IG

H T

S

IS

PHONE

520-5661

BASE STATION

NIPR 1

NIPR 5 NIPR 3

NIPR 2

Refrig

IS

U p

E n tr a n ce

PHONE

466-3311

NIPR 4

Hub

07A 10T25T03T07T

SPT

Lead 12T 11T14T13T

IS IS IS IS

ISISIS

IS

MNVR TAF 4 Trailer

A002 ‐ 10 EA

1m.

SM scanneMrediaPC

PC

JM

X

MNVR TAF 3

Room T24

A005 ‐ 12 EA

A009 ‐ 15 EA

A011 ‐ 2 EA

Vendor removes and disposes partition cubicle walls (16 pieces)

MediaPC scanner

SUPPORT TAF 2 Adler Room T30

A005 ‐ 5 EA

A009 ‐ 6 EA

A012 ‐ 1 EA

295 Sf

299 Sf 293 Sf304 Sf

7.12m

3.96m

3.96m M F

Building 1219

A019 - 5 EA

A002 - 2 EA

A009 - 3 EA

6.89m

A016 - 3 EA

A007 - 3 EA

A018 - 3 EA

A002 - 3 EA

A004 - 2 EA

A003 - 4 EA

299 ASf016 - 3 EA

A007 - 3 EA

A018 - 3 EA

A002 - 3 EA

293 Sf

A016 - 3 EA

A007 - 3 EA

A018 - 3 EA

A002 - 3 EA

295 SAf 016 - 3 EA

A007 - 3 EA

A018 - 3 EA

A002 - 3 EA

7.02m

A016 - 3 EA

A007 - 3 EA

A018 - 3 EA

A002 - 3 EA

7.02m

299 Sf 293 Sf

299 Sf 293 Sf304 Sf

7.12m 7.02m 7.02m 6.89m

3.96m

3.96m M F

Building 1220

A017 - 1 EA A014 - 6 EA A017 - 1 EA

299 Sf 293 Sf

299 Sf 293 Sf304 Sf

7.12m 7.02m 7.02m 6.89m

3.96m

3.96m M F

Building 1221

A004 - 1 EA

Building 1223

Kitchen

809Sf 244Sf217Sf 300Sf

244Sf217Sf 300Sf

7.51m 4.88m 12.26m

4.13m

4.13m

Technical Mechanical

A002 - 30 EA

A004 - 1 EA

A007 - 5 EA

10.01m

A023 - 1 EA

A023 - 1 EA

A023 - 1 EA

A023 - 1 EA

Building 1254

9.98m

29.25m

A022 - 1 EA

A003 - 100 EA

A021 - 50 EA

Building 1255

A021 - 50 EA

A022 - 2 EA

A003 - 69 EA

Building 1256

9.98m

29.25m

A003 - 100 EA

A021 - 50 EA

A022 - 1 EA

Technical Mecanical

Latrine Male

Latrine Female Break

RoomLatrine

Storage

Storage

Building 1270

A003 - 30 EA

A007 - 5 EA

A020 - 4 EA

A021 - 4EA

A022 - 1 EA

A002- 4EA

Small Rooms (*) Denotes

4EA / 48

total in small rooms

A002 - 14 EA

F

M

Kitchen

Heating

E lectric al

304305306

Building 1270B

A002 - 6 EA

A002 - 6 EA

A002 - 6 EA

A002 - 6 EA A002 - 6 EA

A015 - 9 EA

A002 - 6 EA

A002 - 3 EA

Building 1168 A010 - 30 EA. Request for A010 to have 2 EA 220V electrical outlets per table. These will not be flip top.

A003 - 60 EA

*Vendor removes/disposes old work stations (30 EA for A010)

File details come from the government source that posted it.