Amendment_0005.pdf

PDF 511 KB Posted

Attached to
Lease of temp facility Federal contract opportunity
Solicitation number
W912PB19Q3140
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Bavaria 409th CSB

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Lease of temp facility, newest first.
File Type Posted
Revised_07292019_Scope_of_work_(SOW)_W912PB19Q3140.pdf PDF
602_TEMPFAC_Layout.pdf PDF
Distribution_Panel_Interior_MP3.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Revised_Scope_of_work_(SOW)_W912PB19Q3140.pdf PDF
Amendment_0002.pdf PDF
Site_Visit_invitation__W912PB19Q3140.pdf PDF
Photo_of_Parking_Lot_III.pdf PDF
602_TEMPFAC_SCHEMATIC_SI_UNIT_-_W912PB19Q3140.pdf PDF
W912PB19Q3140.pdf PDF
Amendment_0001.pdf PDF
602_TEMPSTRUCT_Layout_-_W912PB19Q3140.pdf PDF
602_TEMPFAC_Layout_-_W912PB19Q3140.pdf PDF
Scope_of_work_(SOW)_W912PB19Q3140.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011354249

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See attached summary of changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PB19Q3140

X 9B. DATED (SEE ITEM 11)

27-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2019

CODE

RCO BAVARIA

AMERIKANISCHE BESCHAFFUNGSSTELLE

GEB 542

92655 GRAFENWOEHR LAGER

GERMANY

W912PB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PB19Q3140

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

The purpose of this amendment is to:

1. re-open the solicitation and to extend from 15-Jul-2019 10:00 AM to 30-Jul-2019 04:00 PM CET.

2. revise “Addendum to Clause 52.212-4” by adding Installation Access, OPSEC Training and iWATCH Training.

3. correct FAR 52.217-9 (c) by changing from 36 month to 39 month.

4. attach the revised II scope of work.

5. reference DFAR 252.225-7020 and 252.225-7021 request the provision of the country of origin.

6. All other terms and conditions remain unchanged.

ADDENDA

Addendum to Clause 52.212-4:

Paragraph (a) Inspection/Acceptance: Inspection and acceptance will be performed at the address, shown in block 15 of the Standard Form 1449.

Paragraph (b) Assignment is replaced by DFARS 252.232-7008 ASSIGNMENT OF CLAIMS (OVERSEAS).

Paragraph (k) TAXES is replaced by Clause DFARS 252.229-7000 INVOICES EXCLUSIVE OF TAXES OR

DUTIES

Paragraph (w) “CORRESPONDENCE IN ENGLISH” is herewith incorporated:

The Contractor should ensure that all contract correspondence that is addressed to the United States Government is submitted in English or with an English translation

INSTALLATION CLEARANCE REQUIREMENTS

a. Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with AE Regulation 190-16, Installation Access Control, will be grounds for denying access to U.S. installations and controlled areas. The Contractor is responsible to ensure that any Subcontractor used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any Subcontractor utilized by the contractor, are made aware of and comply with these requirements.

b. The Contractor is responsible for being aware of and complying with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control (IAC) processing requirements.

c. The Contractor is responsible for returning installation passes to the issuing Installation Access Control Office (IACO) when the contract is completed or when a contractor employee no longer requires access.

d. AE Regulation 190-16 (and AE Regulation 190-16-G German translation) can be found on the following websites:

http://www.409csb.army.mil/library/AER-190-16.pdf and http://www.409csb.army.mil/Library/AER-190-16-G.pdf.

1. Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:

http://www.eur.army.mil/aepubs/publications/AER190-16-G.pdf?publisheddate=20170427 http://www.eur.army.mil/aepubs/

Installation Access Control Office:

Location: Grafenwoehr, Building 244, Room 129 DSN Phone: 475-8414 or 8415 Commercial Phone: +49 9641 83 8414 or 8415

2. OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) of days of employment under this contract. Verification of the training shall be provided to the POC within ten (10) days after completion of the training. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the POC within after completion of the training.

If training cannot be conducted on the website, the Contractor shall coordinate with the POC, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the POC within ten (10) of days after completion of the training.

3. iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the POC. This training shall be completed within thirty (30) days after the contract is awarded and within thirty

(30) days after new employees commence contract performance, with the results reported to the POC within thirty

(30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance. Verification of the training shall be provided to the POC within thirty (30) days after completion of the training. Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

Addendum to block 18a “Payment will be made by” of Standard Form 1449:

NOTE TO CONTRACTORS:

Contractors are required to submit their invoices through Wide Area Workflow (WAWF)

Payment inquiries can be submitted to dfas.rheinland-pfalz.jht.mbx.dgk-vendorpay@mail.mil

Payment status can be viewed within WAWF (PIEE)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor no less than 15 days prior to contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 calendar days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not Exceed 39 month.

(End of clause)

Regional Contracting Office POC Contract Specialist: Evelyn Butter

COMM: (+49) 09641-83-5137

DSN: 314-475-5137

E-mail: evelyn.butter.ln@mail.mil

(End of Summary of Changes)

File details come from the government source that posted it.