QUANTITIES_CAB.pdf

PDF 1 MB Posted

Attached to
Custodial Services, Chievres Air Base and Caserne Daumerie, Belgium
Solicitation number
W912PA-17-T-0016
Issued by

About this file

Quantities Chievres Air Base (CAB)

View the file

Other files

File Type Posted
W912PA-18-Q-0001_Amendment_0001.pdf PDF
QUANTITIES_CD.pdf PDF
PWS-_Rev3_(Final).pdf PDF
QUANTITIES_NSHQ.pdf PDF
W912PA-18-Q-0001.pdf PDF
DRAWINGS_CAB.pdf PDF
DRAWINGS_NSHQ.pdf PDF
DRAWINGS_CD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENG DIVISION - DESIGN SEctION cAB

PrEPArED By Ph. NOEl DAtE : NOVEmBEr 2006 PAGE 1Of2

20053 20052 20048 20046 20031 20030 20028 20027 20025 20024 20023 20012 20010 20009 20006 20004 20003 20002 20001 CAB

TOTAL

30.0 49.8 79.1 410.0 142.7 53.2 54.7 17.1 11.9 134.6 16.4 12.7 1133.7 461.2 112.2 166.8 vinyl (M2)

62.2 41.0 54.5 249.0 243.0 238.3 61.0 247.9 75.3 179.8 294.5 368.0 203.2 carpet (M2)

22.7 290.0 3.9 8.5 395.0 449.3 682.0 72.0 32.0 tiles (M2)

2380 rubber (M2)

19.3 wood (M2) Toilet floor

9.0 1.8 6.6 vinyl (M2) carpet (M2)

18.8 8.6 5.0 9.3 17.1 17.4 22.8 10.7 20.3 16.8 26.5 7.8 126.4 184.0 47.1 37.7 37.5 tiles (M2) Breakroom floor

98.6 63.0 vinyl (M2)

33.2 carpet (M2)

14.7 18.5 10.9 tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

71.5 8.6 136.3 88.4 460.0 214.3 319.6 335.2 317.8 270.5 151.4 79.2 336.6 104.3 1944.4 3307.8 1253.3 589.9 439.5 Total floor

10 58 17 70 82 43 75 62 6 49 16 129 569 130 98 96 wall tiles(M2)

3 3 2 3 1 2 2 3 1 5 2 1 5 1 11 17 9 8 4 sink (ea)

1 2 1 2 1 2 2 2 1 3 2 1 3 1 6 13 6 3 3 toil.bowl (ea)

2 2 1 2 2 1 3 2 3 4 4 4 2 2 urinal (ea

2 1 1 1 1 2 4 1 5 27 1 2 2 shower (ea)

4 1 1 2 1 1 3 1 1 2 2 1 7 1 7 16 9 5 1 mirror (ea)

3 1 2 4 1 3 4 3 2 5 6 2 6 2 16 24 11 6 5 dispenser(ea)

1 1 1 1 1 2 1 1 1 2 9 3 2 2 hyg.cont. (ea)

80.5 338.7 38.3 36.2 20.5 92.0 98.0 95.7 85.0 205.7 124.0 6.1 133.2 97.6 857.0 223.6 231.3 196.1 198.0 ext.glass(M2)

6.8 7.0 7.0 52.0 20.6 5.1 9.6 8.6 25.3 107.9 255.8 58.8 74.6 int.glass (M2)

6 1 6 10 10 16 18 12 16 7 15 3 68 45 37 19 10 radiator (ea)

2 12 5 1 1 7 18 11 6 52 4 31 69 64 ven.blind(ea)

CRADLE

PrEPArED By Ph. NOEl DAtE : NOVEmBEr 2006 PAGE 2Of2

TOTAL 20201 20195 20186 20185 20182 20138 20134 20133 20105 20104 20081 20056 CAB

TOTAL

3488.3 116.3 301.3 64.50 68.27 51.9 vinyl (M2)

2851.5 103.1 12.0 243.0 175.7 carpet (M2)

2801.6 128.9 13.0 23.4 21.6 412.3 168.0 36.6 42.4 tiles (M2)

2380.0 rubber (M2)

19.3 wood (M2) Toilet floor

60.4 43.0 vinyl (M2) carpet (M2)

728.9 10.2 6.6 7.0 3.3 14.4 32.6 4.52 24.1 12.3 tiles (M2) Breakroom floor

182.2 20.6 vinyl (M2)

33.2 carpet (M2)

51.0 6.9 tiles (M2) Barrack floor vinyl (M2) carpet (M2)

2192.2 2192.2 tiles (M2)

14788.5 255.4 19.6 30.4 24.9 2611.0 64.5 463.8 72.79 192.1 286.0 36.6 302.9 Total floor

1902.0 42 10 38 15 60 79 24.72 125 wall tiles(M2)

120 3 1 2 1 8 8 2 4 4 4 sink (ea)

82 2 1 2 1 3 6 1 5 3 3 toil.bowl (ea)

42 1 1 3 2 1 urinal (ea

53 2 1 shower (ea)

91 1 2 1 3 5 1 3 4 5 mirror (ea)

144 2 2 2 3 8 1 9 6 5 dispenser(ea)

41 1 1 1 3 2 1 2 2 hyg.cont. (ea)

3945.1 48.96 26.50 13.74 28.50 220.0 9.11 126.7 10.36 39.40 6.00 258.3 ext.glass(M2)

756.6 2.5 108.0 5.0 2.0 int.glass (M2)

389 6 5 35 11 10 1 22 radiator (ea)

325 2 5 26 6 3 ven.blind(ea)

186.0 186 CRADLE

PrEPArED By LIBrE D DAtE : NOVEmBEr 2006 PAGE 1Of1

TOTAL 115 114 113 112-B 112-A 111 109 108 107-C 107-B 107-A 106-B 106-A 105 104 102 101 CAB # 20001 office office toilet toilet VIP kitch office office office hall office first floor

166.8 120.0 46.8 vinyl (M2)

203.2 36.7 54.0 38.0 38.0 36.5 carpet (M2)

32.0 17.4 14.6 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

37.5 7.5 30.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

439.5 120.0 36.7 7.5 30.0 54.0 17.4 38.0 38.0 46.8 14.6 36.5 Total floor

96.0 16 80 wall tiles(M2)

4.0 1 2 1 sink (ea)

3.0 1 2 toil.bowl (ea)

2.0 2 urinal (ea

2.0 1 1 shower (ea)

5.0 1 4 mirror (ea)

5.0 2 3 dispenser(ea)

2.0 1 1 hyg.cont. (ea)

198.0 16.8 10.6 5.2 35.8 12.7 12.7 13.8 7.2 17.9 13.7 6.2 12.7 18.0 2.0 12.7 ext.glass(M2)

74.6 70.0 2.3 2.3 int.glass (M2)

10.0 1 2 1 2 1 1 2 radiator (ea)

64.0 16 6 3 14 6 6 6 1 6 ven.blind(ea) ext.clean(M2)

PrEPArED By LIBrE D DAtE : NOVEmBEr 2006 PAGE 1Of2

108-B 108-A 107 106 105-E 105-D 105-C 105-B 105-A 104-F 104-E 104-D 104-C 104-B 104-A 103 102-B 102-A 101 CAB # 20002 toilet toilet brkr. office corr. office office office corr. office train. office wait. corr. hall office First floor

20.9 9.8 60.0 7.0 6.5 8.0 vinyl (M2)

21.9 23.5 7.0 20.1 13.0 9.3 36.7 carpet (M2)

63.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

9.0 28.7 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

9.0 28.7 63.0 20.9 9.8 21.9 23.5 60.0 7.0 20.1 13.0 9.3 7.0 6.5 8.0 36.7 Total floor

50 48 wall tiles(M2)

2 4 1 sink (ea)

1 2 toil.bowl (ea)

1 1 urinal (ea

1 1 shower (ea)

2 3 mirror (ea)

2 4 dispenser(ea)

1 1 hyg.cont. (ea)

11.6 5.2 8.7 17.6 16.8 12.6 8.9 8.4 12.0 ext.glass(M2)

17.6 0.1 0.6 16.8 0.6 int.glass (M2)

2 1 2 2 1 1 1 1 radiator (ea)

3 9 4 7 6 5 4 ven.blind(ea)

PrEPArED By LIBrE D DAtE : NOVEmBEr 2006 PAGE 2Of2

TOTAL 114 113-A 113 112-B 112-A 111 110 109 CAB # 20002

office office office office office kitch First floor

112.2 vinyl (M2)

368.0 12.3 22.7 58.5 68.0 36.5 38.5 carpet (M2)

72.0 9.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

37.7 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

589.9 12.3 22.7 58.5 68.0 36.5 47.5 Total floor

98.0 wall tiles(M2)

8.0 1 sink (ea)

3.0 toil.bowl (ea)

2.0 urinal (ea

2.0 shower (ea)

5.0 mirror (ea)

6.0 dispenser(ea)

2.0 hyg.cont. (ea)

196.1 16.8 3.0 10.1 16.8 22.4 12.6 12.6 ext.glass(M2)

58.8 23.1 int.glass (M2)

19.0 1 1 2 2 1 1 radiator (ea)

69.0 1 2 8 11 6 3 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 1Of2

118-A 117 116-B 116-A 115 114 113 112 111 110 109 108 107 106 105 104 103 102 101 CAB # 20003 office hall office office CIF sales office heat. comp toilet toilet corr brkr. ofice office office office office office First floor

23.2 16.9 15.1 21.6 110.0 vinyl (M2) carpet (M2)

110.0 105.6 54.5 11.4 5.5 19.3 68.8 10.5 10.5 39.9 49.2 16.8 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

5.2 5.2 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

23.2 16.9 15.1 21.6 220.0 105.6 54.5 11.4 5.2 5.2 5.5 19.3 68.8 10.5 10.5 39.9 49.2 16.8 Total floor wall tiles(M2)

1 1 sink (ea)

1 1 toil.bowl (ea) urinal (ea shower (ea)

1 1 mirror (ea)

2 2 dispenser(ea)

1 hyg.cont. (ea)

17.0 22.0 12.0 3.9 18.0 20.5 7.8 14.5 17.4 3.9 10.8 ext.glass(M2)

3.2 0.8 42.2 8.1 6.0 4.8 4.4 8.8 int.glass (M2)

2 1 1 4 3 2 1 1 1 3 2 1 1 radiator (ea)

3 1 2 4 3 2 2 1 1 4 1 2 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 2Of2

TOTAL 123 122 121 120 119-B 119-A 118-B CAB # 20003

PDO stor toilet brkr. office office office First floor

351.0 14.7 94.5 55.0 vinyl (M2) carpet (M2)

682.0 180.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

47.1 36.7 tiles (M2) Breakroom floor

63.0 63.0 vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

1143.1 180.0 36.7 63.0 14.7 94.5 55.0 Total floor

130.0 130 wall tiles(M2)

9.0 7 sink (ea)

6.0 4 toil.bowl (ea)

4.0 4 urinal (ea

1.0 1 shower (ea)

9.0 7 mirror (ea)

11.0 7 dispenser(ea)

3.0 2 hyg.cont. (ea)

227.9 25.0 5.5 17.1 32.5 ext.glass(M2)

225.2 40.0 21.1 0.3 9.6 0.9 75.0 int.glass (M2)

35.0 5 1 3 3 radiator (ea)

27.0 1 ven.blind(ea)

PrEPArED By PH. NOEL DAtE : JULy 2016 PAGE 1Of1

TOTAL 213 212 211C 211B 211A CAB # 20003

stair hall office office office Second floor

110.15 10.00 40.48 30.03 14.82 14.82 vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

110.15 10.00 40.48 30.03 14.82 14.82 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

3.42 1.71 1.71 ext.glass(M2)

30.56 10.29 10.90 1.82 7.55 int.glass (M2)

2.0 1 1 radiator (ea)

4.0 2 2 ven.blind(ea)

119 118 117 116 115 114 113 112 111 110 109 108 107 106 105 104 103 102 101 CAB # 20004 toilet corr toilet office libr recre hall stor heat stor office office office corr toilet kitch kitch recre toilet First floor vinyl (M2)

15.0 66.0 carpet (M2)

20.0 90.0 13.2 73.3 13.7 10.0 11.6 14.2 8.1 36.4 80.0 tiles (M2)

2100 rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

29.1 9.6 7.2 24.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

29.1 20.0 9.6 15.0 66.0 2190 13.2 73.3 13.7 10.0 11.6 14.2 7.2 8.1 36.4 80.0 24.0 Total floor

67 30 47 45 100 wall tiles(M2)

2 1 3 6 sink (ea)

1 1 2 5 toil.bowl (ea)

2 urinal (ea

3 1 shower (ea)

2 1 2 6 mirror (ea)

4 2 4 6 dispenser(ea)

2 1 1 3 hyg.cont. (ea)

34.8 17.6 19.1 10.5 5.8 6.9 11.1 25.3 3.3 ext.glass(M2)

5.5 6.0 7.0 42.4 4.0 7.7 8.0 10.3 int.glass (M2)

2 1 1 2 2 2 1 1 1 1 2 1 4 2 radiator (ea) ven.blind(ea)

TOTAL 127 126 125 124 123 122 121 120 CAB # 20004

fitn libr office toilet corr toilet stor toilet First floor vinyl (M2)

294.5 86.3 110.0 17.2 carpet (M2)

449.3 18.0 60.8 tiles (M2)

2380.0 280.0 rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

184.0 58.3 31.7 24.1 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

3307.8 366.3 110.0 17.2 58.3 18.0 31.7 60.8 24.1 Total floor

569.0 121 95 64 wall tiles(M2)

17.0 1 2 2 sink (ea)

13.0 1 2 1 toil.bowl (ea)

4.0 2 urinal (ea

27.0 10 9 4 shower (ea)

16.0 1 2 2 mirror (ea)

24.0 2 4 2 dispenser(ea)

9.0 2 hyg.cont. (ea)

223.6 44.0 45.2 ext.glass(M2)

107.9 0.6 9.0 4.0 3.4 int.glass (M2)

45.0 5 5 1 1 1 3 3 3 radiator (ea)

4.0 4 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 1Of3

112-A 111 110-B 110-A 109 108' 108-B 108-A 107-C 107-B 107-A 106 105-B 105-A 104-A 103 102-B 102-A 101 CAB # 20006 office brkr. hall hall corr. office office office office office office First floor

65.0 39.9 3.9 10.4 15.7 15.7 30.6 36.4 vinyl (M2)

17.9 17.7 carpet (M2)

3.9 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

65.0 39.9 3.9 3.9 10.4 15.7 15.7 30.6 36.4 17.9 17.7 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) o hyg.cont. (ea)

9.9 9.9 0.8 9.9 4.8 1.0 9.9 24.3 10.6 14.8 11.2 14.8 29.6 14.8 14.8 29.6 ext.glass(M2)

0.6 1.9 2.1 1.7 0.5 0.5 3.0 3.4 0.3 2.9 1.0 3.4 3.0 2.5 int.glass (M2)

2 1 1 1 1 1 1 1 1 radiator (ea)

2 1 4 2 2 1 2 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 2Of3

124-B 124-A 123 122 120 119 118 117-D 117-C 117-B 117-A 116 115-C 115-B 115-A 114-A 113 112-B 112-A' CAB # 20006 brkr. brkr. office office office office office office office office office corr. office office office office hall First floor

37.1 30.0 36.1 15.0 15.3 15.8 15.3 27.1 3.8 29.7 16.5 12.0 35.4 4.0 vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2)

10.9 24.8 tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

10.9 24.8 37.1 30.0 36.1 15.0 15.3 15.8 15.3 27.1 3.8 29.7 16.5 12.0 35.4 4.0 Total floor wall tiles(M2)

1 sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea)

1 dispenser(ea) hyg.cont. (ea)

14.8 14.8 14.8 11.6 8.5 14.8 11.9 9.9 9.9 7.6 10.9 9.9 19.8 9.9 2.0 ext.glass(M2)

1.7 0.9 3.0 2.8 0.5 2.2 4.8 0.8 int.glass (M2)

2 1 1 2 2 1 1 1 1 1 1 1 1 1 radiator (ea)

2 2 2 4 1 2 1 1 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 3Of3

TOTAL 138 132 130 128 127 126 125 124-C CAB # 20006

corr. lockr. toilet stor. toilet brkr. First floor

510.7 vinyl (M2)

35.6 carpet (M2)

163.0 158.1 1.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

126.4 92.0 11.3 23.1 tiles (M2) Breakroom floor vinyl (M2) carpet (M2)

109.5 73.8 tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

945.2 158.1 92.0 11.3 1.0 23.1 73.8 Total floor

129.0 54 35 40 wall tiles(M2)

10.0 4 2 3 sink (ea)

6.0 2 4 toil.bowl (ea)

4.0 4 urinal (ea

5.0 4 1 shower (ea)

6.0 4 1 1 mirror (ea)

16.0 6 2 7 dispenser(ea)

2.0 2 hyg.cont. (ea)

593.1 14.8 170.0 26.5 ext.glass(M2)

90.6 21.1 0.6 18.6 6.8 int.glass (M2)

36.0 2 1 1 5 radiator (ea)

29.0 ven.blind(ea)

206.0 ext.clean(M2)

218 217 216 215 214 213 212 211 210-B 210-A 209 208 207 206 205 204 203 202 201 CAB # 20006 office office office office office office conf. office comp. comp. office office office office office office office office office Second floor

26.4 26.4 26.4 26.4 26.4 7.7 18.0 40.2 13.3 22.4 22.4 25.4 25.4 25.4 22.6 22.3 vinyl (M2)

26.4 26.4 26.4 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 7.7 18.0 40.2 13.3 22.4 22.4 25.4 25.4 25.4 22.6 22.3 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

9.5 9.5 9.5 9.5 9.5 9.5 9.5 9.5 13.1 16.2 16.2 16.2 16.2 16.2 16.2 16.2 ext.glass(M2)

5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 3.8 3.8 7.9 1.8 3.6 3.6 3.6 3.6 3.6 3.6 3.6 int.glass (M2)

1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 radiator (ea)

3 3 3 3 3 3 3 ven.blind(ea)

TOTAL 225 224 223 222 221 220-B 220-A 219 CAB # 20006

copy conf. office h+st. h+st. stor. office office Second floor

623.0 181.0 39.1 25.8 vinyl (M2)

144.2 65.0 carpet (M2)

232.0 21.2 68.7 131.0 11.1 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

999.2 181.0 65.0 21.2 68.7 131.0 11.1 39.1 25.8 Total floor wall tiles(M2)

1.0 1 sink (ea) toil.bowl (ea) urinal (ea shower (ea)

1.0 1 mirror (ea) dispenser(ea) hyg.cont. (ea)

263.9 16.2 16.2 5.0 14.5 9.5 ext.glass(M2)

174.7 6.0 2.0 4.5 26.1 43.6 5.0 5.0 int.glass (M2)

32.0 4 2 1 1 radiator (ea)

23.0 2 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 1Of1

TOTAL 107 106 105 104 103 102 101 CAB # 20009

toilet toilet office office hall office First floor

4.2 4.2 vinyl (M2)

43.3 21.9 9.9 11.5 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

7.8 2.0 5.8 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

55.3 2.0 5.8 21.9 9.9 4.2 11.5 Total floor

15.6 6 10 wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea

1.0 1 shower (ea)

1.0 1 mirror (ea)

2.0 1 1 dispenser(ea)

1.0 1 hyg.cont. (ea)

91.6 60.5 1.5 5.7 8.6 4.3 1.0 10.0 ext.glass(M2)

8.6 4.3 4.3 int.glass (M2)

3.0 1 1 1 radiator (ea)

TOTAL 204 203 202 201 CAB # 20009

office office off+st Second floor

8.5 8.5 vinyl (M2)

32.0 15.0 17.0 carpet (M2)

8.5 8.5 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

49.0 15.0 17.0 17.0 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

6.0 3.0 3.0 ext.glass(M2) int.glass (M2) radiator (ea)

2.0 1 1 ven.blind(ea)

TOTAL 114 113 112 110 109 108 107 106 105 104 103-A 103 101-A CAB # 20010

show toilet toilet office office office corr. kitch loung. office First floor vinyl (M2)

87.4 26.5 12.3 12.8 16.3 19.5 carpet (M2)

3.9 3.9 tiles (M2) rubber (M2) wood (M2) Toilet floor

6.6 6.6 vinyl (M2) carpet (M2)

26.5 4.4 22.1 tiles (M2) Breakroom floor vinyl (M2)

33.2 33.2 carpet (M2)

18.5 18.5 tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

176.1 6.6 4.4 22.1 26.5 12.3 12.8 20.2 18.5 33.2 19.5 Total floor

49.2 31 11 7 wall tiles(M2)

5.0 1 3 1 sink (ea)

3.0 1 2 toil.bowl (ea)

3.0 3 urinal (ea

4.0 3 1 shower (ea)

7.0 1 3 1 1 1 mirror (ea)

6.0 2 3 1 dispenser(ea)

1.0 1 hyg.cont. (ea)

108.9 45.0 6.0 13.5 1.5 4.5 9.0 4.5 11.4 13.5 ext.glass(M2)

9.6 1.4 1.1 1.1 2.3 3.7 int.glass (M2)

9.0 1 1 1 1 1 1 2 1 radiator (ea)

6.0 1 3 2 ven.blind(ea)

TOTAL 204 203 202 201 CAB # 20010

stor. train. bunk corr. Second floor vinyl (M2)

160.5 11.0 113.0 31.5 5.0 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

160.5 11.0 113.0 31.5 5.0 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

24.3 3.6 14.5 6.2 ext.glass(M2) int.glass (M2)

6.0 3 2 1 radiator (ea)

PrEPArED By D. LIBrE DAtE : jANuAry 98 PAGE 1Of1

TOTAL 104 103 102-B 102-A 102 CAB # 20012

brkr. office office suppl office First floor

16.4 3.2 13.2 vinyl (M2)

61.0 13.0 9.3 14.5 24.2 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor

1.8 1.8 vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

79.2 18.0 9.3 14.5 13.2 24.2 Total floor

6.0 6 wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea shower (ea)

1.0 1 mirror (ea)

2.0 2 dispenser(ea) hyg.cont. (ea)

6.1 1.3 2.4 2.4 ext.glass(M2) int.glass (M2) radiator (ea)

TOTAL 111 110 109 108 107 106 105 104 103 102-A 102 101 CAB # 20023

corr. office toilet toilet office office office comp brkr hall First floor

134.6 12.4 23.1 16.5 22.7 22.5 7.4 15.6 14.4 vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) vinyl (M2) carpet (M2)

16.8 7.2 9.6 tiles (M2) vinyl (M2) carpet (M2) tiles (M2) vinyl (M2) carpet (M2) tiles (M2)

151.4 12.4 23.1 7.2 9.6 16.5 22.7 22.5 7.4 15.6 14.4 Total floor

61.5 29 33 wall tiles(M2)

2.0 1 1 sink (ea)

2.0 1 1 toil.bowl (ea)

2.0 2 urinal (ea shower (ea)

2.0 1 1 mirror (ea)

6.0 3 3 dispenser(ea)

1.0 1 hyg.cont. (ea)

124.0 45.0 14.0 17.3 11.5 17.3 11.5 7.4 ext.glass(M2)

5.1 1.1 4.0 int.glass (M2)

7.0 1 1 1 1 1 1 1 radiator (ea)

11.0 3 2 3 2 1 ven.blind(ea)

TOTAL 111 110 109 108 107 106 105 104 103 102 101 CAB # 20024

hall corr toilet office wait office office office comp office First floor

11.9 2.5 9.4 vinyl (M2)

238.3 33.1 29.1 24.2 24.8 23.3 14.8 89.0 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

20.3 20.3 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

270.5 2.5 33.1 20.3 29.1 24.2 24.8 23.3 14.8 9.4 89.0 Total floor

75.0 75 wall tiles(M2)

5.0 5 sink (ea)

3.0 3 toil.bowl (ea)

3.0 3 urinal (ea

2.0 2 shower (ea)

2.0 2 mirror (ea)

5.0 5 dispenser(ea)

2.0 2 hyg.cont. (ea)

205.7 80.0 18.0 13.0 19.2 19.2 11.5 6.4 38.4 ext.glass(M2)

20.6 2.5 4.8 10.8 0.5 2.0 int.glass (M2)

16.0 2 2 2 1 2 1 1 1 4 radiator (ea)

18.0 3 3 3 2 1 6 ven.blind(ea)

TOTAL 109 108 107 106 105 104 103 102 101 CAB # 20025

office toilet corr stor stor stor stor sales entry First floor

17.1 17.1 vinyl (M2) carpet (M2)

290.0 12.2 46.0 22.8 46.4 48.0 96.0 18.6 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

10.7 10.7 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

317.8 17.1 10.7 12.2 46.0 22.8 46.4 48.0 96.0 18.6 Total floor wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea)

1.0 1 urinal (ea shower (ea)

1.0 1 mirror (ea)

2.0 2 dispenser(ea) hyg.cont. (ea)

85.0 5.7 12.9 4.1 6.4 17.3 38.6 ext.glass(M2)

52.0 8.4 29.6 14.0 int.glass (M2)

12.0 1 1 3 3 1 3 radiator (ea)

7.0 4 3 ven.blind(ea)

TOTAL 118 117 116 115 114 113 112-B 112-A 112 108 106 105 104 103-A 103 102 101 CAB # 20027 corr. office office office office laund office office corr. toilet kitch. loung office office office office First floor

54.7 51.2 3.5 vinyl (M2)

243.0 18.6 19.0 19.3 19.3 13.0 38.2 34.5 7.5 14.8 39.0 19.8 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

22.8 4.6 18.2 tiles (M2) Breakroom floor vinyl (M2) carpet (M2)

14.7 14.7 tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

335.2 51.2 18.6 19.0 19.3 19.3 3.5 13.0 38.2 4.6 18.2 14.7 34.5 7.5 14.8 39.0 19.8 Total floor

43.0 43 wall tiles(M2)

3.0 2 1 sink (ea)

2.0 2 toil.bowl (ea)

2.0 2 urinal (ea

1.0 1 shower (ea)

1.0 1 mirror (ea)

3.0 3 dispenser(ea)

1.0 1 hyg.cont. (ea)

95.7 2.9 6.0 6.0 6.0 6.0 6.0 6.0 12.0 6.0 6.0 8.8 6.0 12.0 6.0 ext.glass(M2) int.glass (M2)

18.0 3 1 1 1 1 1 2 1 1 2 1 2 1 radiator (ea)

1.0 1 ven.blind(ea)

TOTAL 113 112 111 110 109 108 107 106 105 104 103 102 101 CAB # 20028

toilet hall hall brief. office conf. office office office office office First floor

53.2 20.2 13.6 6.2 13.2 vinyl (M2)

249.0 67.4 19.2 38.4 12.3 19.1 19.2 55.1 18.3 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

17.4 17.4 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

319.6 17.4 20.2 13.6 67.4 19.2 38.4 18.5 19.1 19.2 68.3 18.3 Total floor

82.0 82 wall tiles(M2)

2.0 2 sink (ea)

2.0 2 toil.bowl (ea)

2.0 2 urinal (ea

1.0 1 shower (ea)

3.0 2 1 mirror (ea)

4.0 4 dispenser(ea)

1.0 1 hyg.cont. (ea)

98.0 6.0 6.0 1.0 1.0 18.0 6.0 12.0 6.0 6.0 6.0 18.0 6.0 6.0 ext.glass(M2)

7.0 2.8 3.5 0.7 int.glass (M2)

16.0 1 1 1 3 1 2 1 1 1 3 1 radiator (ea)

1.0 1 ven.blind(ea)

TOTAL 112-E 112-D 112-C 112-B 112-A 109 108 107-B 107-A 106 104 103 102-B 102-A 101 CAB # 20030 corr corr toilet surg stor. ken. stor. rec. stor. stor. stor. First floor

142.7 4.9 24.8 19.4 18.6 18.7 18.6 37.7 vinyl (M2)

54.5 8.8 8.6 37.1 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

17.1 17.1 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

214.3 4.9 24.8 17.1 19.4 18.6 18.7 18.6 37.7 8.8 8.6 37.1 Total floor

70.0 70 wall tiles(M2)

2.0 2 sink (ea)

2.0 2 toil.bowl (ea) urinal (ea

1.0 1 shower (ea)

1.0 1 mirror (ea)

3.0 3 dispenser(ea)

1.0 1 hyg.cont. (ea)

92.0 10.4 11.4 6.0 1.0 6.0 6.0 6.0 6.0 6.0 6.0 9.2 6.0 12.0 ext.glass(M2)

7.0 1.0 1.0 3.0 0.5 0.9 0.2 0.4 int.glass (M2)

10.0 1 1 1 1 1 1 2 1 1 radiator (ea)

PrEPArED By LIBrE D DAtE : NOVEmBEr 2006 PAGE 1Of1

TOTAL 105 104 103 102 101 CAB # 20031

sales toilet office hall sales First floor

410.0 118.0 292.0 vinyl (M2)

41.0 19.0 8.0 14.0 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor

9.0 9.0 vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

460.0 118.0 9.0 19.0 8.0 306.0 Total floor

17.0 17 wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea shower (ea)

1.0 1 mirror (ea)

1.0 1 dispenser(ea)

1.0 1 hyg.cont. (ea)

20.5 4.0 7.0 1.0 8.5 ext.glass(M2) int.glass (M2) radiator (ea)

TOTAL 109 108 107 106 105 104 103 102 101 CAB # 20046

corr office office hall toilet kitch office First floor

79.1 8.3 22.4 17.4 8.0 13.7 9.3 vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

9.3 9.3 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

88.4 8.3 22.4 17.4 8.0 9.3 13.7 9.3 Total floor

58.0 58 wall tiles(M2)

3.0 2 1 sink (ea)

2.0 2 toil.bowl (ea)

1.0 1 urinal (ea shower (ea)

2.0 2 mirror (ea)

4.0 4 dispenser(ea)

1.0 1 hyg.cont. (ea)

36.2 9.0 1.0 5.4 4.8 2.4 8.8 4.8 ext.glass(M2)

6.8 3.4 2.4 1.0 int.glass (M2)

10.0 1 2 2 1 2 1 1 radiator (ea)

5.0 2 1 1 1 ven.blind(ea)

TOTAL 108 107 106 105 104 103 102 101 CAB # 20048

ldy office stor kitch toilet lab. office First floor

49.8 24.8 25.0 vinyl (M2)

62.2 6.6 7.6 48.0 carpet (M2) tiles (M2) rubber (M2)

19.3 12.2 7.1 wood (M2) Toilet floor vinyl (M2) carpet (M2)

5.0 5.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

136.3 6.6 12.2 7.6 7.1 5.0 24.8 73.0 Total floor

10.0 10 wall tiles(M2)

2.0 1 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea

1.0 1 shower (ea)

1.0 1 mirror (ea)

2.0 2 dispenser(ea) hyg.cont. (ea)

38.3 4.5 7.5 3.4 1.0 3.6 1.0 17.3 ext.glass(M2) int.glass (M2)

6.0 1 1 1 1 2 radiator (ea)

12.0 3 1 1 7 ven.blind(ea)

TOTAL 112-C 112-A 111 109 108-B 108-A 107 106 105 104 103 101 CAB # 20052

toilet First floor vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

8.6 8.6 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

8.6 8.6 Total floor wall tiles(M2)

3.0 3 sink (ea)

2.0 2 toil.bowl (ea)

2.0 2 urinal (ea shower (ea)

1.0 1 mirror (ea)

1.0 1 dispenser(ea) hyg.cont. (ea)

338.7 9.5 12.1 6.2 10.1 10.1 4.9 4.0 11.3 6.2 15.1 1.2 248.0 ext.glass(M2) int.glass (M2)

1.0 1 radiator (ea)

TOTAL 108 107 106 105 104 103 102 101 CAB # 20053

toilet toilet toilet office First floor vinyl (M2) carpet (M2)

14.1 14.1 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

18.8 1.0 9.8 8.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

32.9 1.0 9.8 8.0 14.1 Total floor wall tiles(M2)

2.0 2 sink (ea)

1.0 1 toil.bowl (ea)

2.0 2 urinal (ea

2.0 2 shower (ea)

4.0 2 2 mirror (ea)

2.0 2 dispenser(ea) hyg.cont. (ea)

57.1 1.0 3.4 5.0 5.0 23.7 12.4 6.6 ext.glass(M2) int.glass (M2)

3.0 1 1 1 radiator (ea)

2.0 2 ven.blind(ea)

TOTAL 201 CAB # 20053

brkr. Second floor

30.0 30.0 vinyl (M2) carpet (M2)

8.6 8.6 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

38.6 38.6 Total floor wall tiles(M2)

1.0 1 sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea)

1.0 1 dispenser(ea) hyg.cont. (ea)

23.4 23.4 ext.glass(M2) int.glass (M2)

3.0 3 radiator (ea)

TOTAL 118 117 116 115 114 113 112 111 109 108 107 106 105 103 102 101-B 101-A CAB # 20056 stair show toilet toilet hall eqp. corr. brkr kitch office office First floor

42.6 37.5 5.1 vinyl (M2)

37.8 24.8 13.0 carpet (M2)

10.6 5.0 1.0 4.6 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

8.3 7.1 1.2 tiles (M2) Breakroom floor

20.6 11.9 8.7 vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

119.9 5.0 1.0 7.1 1.2 4.6 37.5 5.1 11.9 8.7 24.8 13.0 Total floor wall tiles(M2)

3.0 1 1 1 sink (ea)

2.0 1 1 toil.bowl (ea)

1.0 1 urinal (ea

1.0 1 shower (ea)

4.0 2 1 1 mirror (ea)

3.0 1 1 1 dispenser(ea) hyg.cont. (ea)

93.7 1.3 0.6 0.5 3.1 3.1 33.8 8.5 1.7 1.7 3.4 7.3 3.9 21.9 2.9 ext.glass(M2) int.glass (M2)

9.0 1 1 3 1 1 1 1 radiator (ea)

3.0 3 ven.blind(ea)

TOTAL 501 403 402 401 303 302 301 204 203 202 201 CAB # 20056

cntrl h+st. toilet office h+st. stor h+st. office office 2,3,4,5 floor

9.3 9.3 vinyl (M2)

137.9 46.5 30.6 30.6 10.9 19.3 carpet (M2)

31.8 5.0 12.5 14.3 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

4.0 4.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

183.0 46.5 14.3 4.0 30.6 12.5 30.6 14.3 10.9 19.3 Total floor wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea shower (ea)

1.0 1 mirror (ea)

2.0 2 dispenser(ea) hyg.cont. (ea)

164.6 109.0 3.9 3.1 16.0 1.5 3.8 11.0 1.5 3.8 6.3 4.7 ext.glass(M2) int.glass (M2)

13.0 4 1 1 4 1 1 1 radiator (ea)

TOTAL 101 CAB # 20081

office First floor vinyl (M2) carpet (M2)

36.6 36.6 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

36.6 36.6 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

6.0 6.0 ext.glass(M2) int.glass (M2)

1.0 1 radiator (ea)

TOTAL 106 105 104 103 102 101 CAB # 20104

office train. train. toilet toilet hall First floor vinyl (M2)

243.0 12.0 74.0 74.0 83.0 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor

43.0 21.0 22.0 vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

286.0 12.0 74.0 74.0 21.0 22.0 83.0 Total floor wall tiles(M2)

4.0 2 2 sink (ea)

3.0 2 1 toil.bowl (ea)

2.0 2 urinal (ea shower (ea)

4.0 2 2 mirror (ea)

6.0 3 3 dispenser(ea)

2.0 2 hyg.cont. (ea) ext.glass(M2) int.glass (M2)

10.0 2 2 2 1 1 2 radiator (ea)

TOTAL 111 110 109 108 107 106 105 103 102 101 CAB # 105

toilet hall toilet toilet hall office office office hall class. First floor vinyl (M2) carpet (M2)

168.0 21.0 21.0 11.0 23.0 92.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

24.1 7.1 3.7 2.4 9.6 1.3 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

192.1 7.1 3.7 2.4 9.6 1.3 21.0 21.0 11.0 23.0 92.0 Total floor

125.0 39 19 14 46 8 wall tiles(M2)

4.0 1 1 1 1 sink (ea)

5.0 2 1 2 toil.bowl (ea)

3.0 3 urinal (ea shower (ea)

3.0 1 1 1 mirror (ea)

9.0 4 2 3 dispenser(ea)

2.0 2 hyg.cont. (ea)

39.4 2.0 1.1 0.9 5.9 5.9 5.9 17.7 ext.glass(M2)

2.0 0.3 0.2 0.1 0.3 0.2 0.1 0.1 0.1 0.5 0.1 int.glass (M2)

11.0 1 1 1 1 1 1 2 3 radiator (ea)

PrEPArED By PHILIPPE NOEL DAtE : JANUAry 2016 PAGE 1Of1

TOTAL 107 106 105 104 103 102 101 CAB # 20133

Toilet Kitchen Office Office Office Office Office first floor

68.27 4.17 15.45 12.36 11.65 12.23 12.41 vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

4.52 4.52 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

72.79 4.52 4.17 15.45 12.36 11.65 12.23 12.41 Total floor

24.72 22.26 2.46 wall tiles(M2)

2.00 1.00 1.00 sink (ea)

1.00 1.00 toil.bowl (ea) urinal (ea shower (ea)

1.00 1.00 mirror (ea)

1.00 1.00 dispenser(ea)

1.00 1.00 hyg.cont. (ea)

10.36 0.25 0.63 3.16 1.58 1.58 1.58 1.58 ext.glass(M2) int.glass (M2) radiator (ea)

6.00 1.00 1.00 1.00 1.00 1.00 1.00 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 1Of3

110-C 110-B 110-A 109 108-C 108-A 107 106 105 104 103 102 101 100-F 100-E 100-D 100-C 100-B 100-A CAB # 20134 office Jail office office toilet MP hall lockr. office toilet office toilet corr. corr. cor. corr. corr. hall First floor vinyl (M2)

12.0 carpet (M2)

4.0 4.0 10.4 10.8 8.0 6.0 13.2 13.2 20.5 5.6 28.0 57.0 37.0 2.8 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

4.0 10.4 10.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

4.0 4.0 10.4 10.8 4.0 12.0 8.0 6.0 13.2 10.4 13.2 10.0 20.5 5.6 28.0 57.0 37.0 2.8 Total floor

25 30 wall tiles(M2)

1 1 1 1 sink (ea)

1 2 toil.bowl (ea)

1 urinal (ea

1 1 shower (ea)

1 1 mirror (ea)

2 3 dispenser(ea)

1 hyg.cont. (ea)

1.0 4.7 4.7 1.0 4.7 4.7 4.7 1.7 1.0 1.0 4.0 ext.glass(M2)

1.0 1.0 2.0 1.0 int.glass (M2)

1 1 1 1 1 1 1 2 1 1 2 radiator (ea)

1 1 1 1 1 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 2Of3

128 127 126 125 124 123-B 123-A 122 121 120 119 118 117 116 115 114 113 112 111 CAB # 20134 office office office office office evid. wait. office toilet office conf hall office recp. office office office Jan First floor vinyl (M2) carpet (M2)

8.4 8.0 6.6 4.3 6.6 2.0 3.9 6.6 18.0 22.5 3.0 12.0 13.3 11.2 12.0 12.6 1.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

4.2 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

8.4 8.0 6.6 4.3 6.6 2.0 3.9 6.6 4.2 18.0 22.5 3.0 12.0 13.3 11.2 12.0 12.6 1.0 Total floor

14 wall tiles(M2)

1 1 sink (ea)

1 toil.bowl (ea) urinal (ea shower (ea)

1 mirror (ea)

1 dispenser(ea) hyg.cont. (ea)

4.7 4.7 4.7 4.7 4.7 4.7 9.4 4.7 4.7 4.7 4.2 4.7 4.7 ext.glass(M2) int.glass (M2)

1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 radiator (ea)

1 1 1 1 1 1 2 1 1 1 2 1 1 ven.blind(ea)

PrEPArED By D. LIBrE DAtE : NOVEmBEr 2006 PAGE 3Of3

TOTAL 135 134 133 132 131 130 129 CAB # 20134

toilet office office office office office break First floor vinyl (M2)

12.0 carpet (M2)

412.3 8.6 9.0 6.6 6.6 9.0 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

32.6 4.0 tiles (M2) Breakroom floor vinyl (M2) carpet (M2)

6.9 6.9 tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

463.8 4.0 8.6 9.0 6.6 6.6 9.0 6.9 Total floor

79.0 10 wall tiles(M2)

8.0 2 sink (ea)

6.0 2 toil.bowl (ea)

1.0 urinal (ea

2.0 shower (ea)

5.0 2 mirror (ea)

8.0 2 dispenser(ea)

2.0 1 hyg.cont. (ea)

126.7 4.7 4.7 4.7 4.7 4.7 4.7 ext.glass(M2)

5.0 int.glass (M2)

35.0 1 1 1 1 1 1 radiator (ea)

26.0 1 1 1 1 1 1 ven.blind(ea)

PrEPArED By PHILIPPE NOEL DAtE : NOVEMBEr 2015 PAGE 1Of1

TOTAL 103B 103A 102 101 CAB # 20138

Office Hall Stor. Office first floor

64.50 34.87 3.64 12.76 13.23 vinyl (M2) carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2) tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

64.50 34.87 3.64 12.76 13.23 Total floor wall tiles(M2) sink (ea) toil.bowl (ea) urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

9.11 4.59 2.27 2.25 ext.glass(M2) int.glass (M2)

5.00 3.00 1.00 1.00 radiator (ea)

5.00 3.00 1.00 1.00 ven.blind(ea)

TOTAL 004 003 002 001 CAB # 20182

lab hall way class room day room ALL FLOORS

301.3 301.3 vinyl (M2)

103.1 42.1 18.9 42.1 carpet (M2) tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

14.4 14.4 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2)

2192.2 16.2 56.0 2120.0 tiles (M2)

2611.0 42.1 18.9 42.1 301.3 16.2 14.4 56.0 2120.0 Total floor

60.0 60 wall tiles(M2)

8.0 3 3 2 sink (ea)

3.0 3 toil.bowl (ea) urinal (ea shower (ea)

3.0 3 mirror (ea)

3.0 3 dispenser(ea)

3.0 3 hyg.cont. (ea)

220.0 ext.glass(M2)

108.0 int.glass (M2)

186.0 EXT. GLASS WITH CRADLE

4.0 2 2 radiator (ea) ven.blind(ea)

Common areas, stairs, landings,corridors, hallslaundryToiletJanitor

TOTAL 104 103 102 101 CAB # 20185

guard toilet office hall First floor vinyl (M2) carpet (M2)

21.6 4.7 13.0 3.9 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

3.3 3.3 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

24.9 4.7 3.3 13.0 3.9 Total floor

15.0 15 wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea shower (ea)

1.0 1 mirror (ea)

2.0 2 dispenser(ea)

1.0 1 hyg.cont. (ea)

28.5 20.0 7.5 1.0 ext.glass(M2) int.glass (M2) radiator (ea)

2.0 2 ven.blind(ea)

ENG DIVISION - DESIGN SECTION CAB

PrEPArED By Ph NOEl DATE : OCTOBEr 2010 PAGE 1Of1

TOTAL 105B 105A 104 103 102 101 CAB # 20186

toilet toilet gar. Tech stock office First Floor vinyl (M2) carpet (M2)

23.35 23.35 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

7.04 3.52 3.52 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

30.39 3.52 3.52 23.35 Total floor

37.92 18.96 18.96 wall tiles(M2)

2.00 1.00 1.00 sink (ea)

2.00 1.00 1.00 toil.bowl (ea) urinal (ea shower (ea)

2.00 1.00 1.00 mirror (ea)

2.00 1.00 1.00 dispenser(ea)

1.00 1.00 hyg.cont. (ea)

13.74 0.25 0.25 6.90 6.34 ext.glass(M2)

2.51 2.51 int.glass (M2)

6.00 1.00 1.00 1.00 1.00 1.00 1.00 radiator (ea)

TOTAL 103 102 101 CAB # 20195

Toilet stor Guard First floor vinyl (M2) carpet (M2)

13.0 2.5 10.5 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

6.6 6.6 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

19.6 6.6 2.5 10.5 Total floor

10.0 10 wall tiles(M2)

1.0 1 sink (ea)

1.0 1 toil.bowl (ea) urinal (ea shower (ea)

1.0 1 mirror (ea)

2.0 2 dispenser(ea)

1.0 1 hyg.cont. (ea)

26.5 2.0 24.5 ext.glass(M2) int.glass (M2) radiator (ea)

PrEPArED By D. LIBrE DAtE : PAGE 1Of1

TOTAL 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 CAB # 20201

office copy office office conf hall toilet janit toilet tech hall teller wait vault vest First floor

116.30 12.60 6.80 13.80 11.80 25.30 11.50 19.90 14.60 vinyl (M2) carpet (M2)

128.90 18.20 5.90 94.00 10.80 tiles (M2) rubber (M2) wood (M2) Toilet floor vinyl (M2) carpet (M2)

10.20 3.30 2.50 4.40 tiles (M2) Breakroom floor vinyl (M2) carpet (M2) tiles (M2) Barrack floor vinyl (M2) carpet (M2) tiles (M2)

255.40 12.60 6.80 13.80 11.80 25.30 18.20 3.30 2.50 4.40 11.50 5.90 19.90 94.00 14.60 10.80 Total floor

41.54 17.52 3.62 20.40 wall tiles(M2)

3.0 1 1 1 sink (ea)

2.0 1 1 toil.bowl (ea)

1.0 1 urinal (ea shower (ea) mirror (ea) dispenser(ea) hyg.cont. (ea)

48.96 4.19 4.19 8.39 0.41 24.95 6.83 ext.glass(M2) int.glass (M2) radiator (ea)

20001.pdf
1 page
20002.pdf
2 pages
20003.pdf
2 pages
20003fst.pdf
2 pages
20003snd.pdf
1 page
20004.pdf
2 pages
20006fst.pdf
3 pages
20006snd.pdf
2 pages
20006fst.pdf
3 pages
20004.pdf
2 pages
20009fst.pdf
1 page
20009snd.pdf
1 page
20010fst.pdf
1 page
20010snd.pdf
1 page
20012.pdf
1 page
20023.pdf
1 page
20024.pdf
1 page
20025.pdf
1 page
20027.pdf
1 page
20028.pdf
1 page
20030.pdf
1 page
20031.pdf
1 page
20046.pdf
1 page
20048.pdf
1 page
20052.pdf
1 page
20053fst.pdf
1 page
20053snd.pdf
1 page
20056fst.pdf
1 page
20056up.pdf
1 page
20081.pdf
1 page
20104.pdf
1 page
20105.pdf
1 page
20133fst.pdf
1 page
20134.pdf
3 pages
20138fst.pdf
1 page
20182.pdf
1 page
20185.pdf
1 page
20186.pdf
1 page
20195.pdf
1 page
20201.pdf
1 page
CABTOTAL.pdf
2 pages
20182.pdf
1 page
CABTOTAL.pdf
2 pages
20134.pdf
3 pages
20134.pdf
3 pages
CABTOTAL.pdf
2 pages

File details come from the government source that posted it. Updated .