B01. Abstract of Bids_W912P924B0002 STL CSO_signed.pdf

PDF 262 KB Posted

Attached to
ST. Louis Missouri Combined Sewer Overflow Rehabilitation Project
Solicitation number
W912P924B0002
Issued by

About this file

This document is an abstract of bids for solicitation number W912P924B0002, the St. Louis Missouri Combined Sewer Overflow Rehabilitation Project, issued by the Department of the Army Corps of Engineers Engineering District St. Louis. The solicitation requests bids for rehabilitation and repair of sewer lines and manholes across two base contracts, Harlem Baden 9 and MSD Infrastructure 2023, as well as optional items. Bids were due by December 15, 2023 at 9:00 AM CST and were opened publicly at 2:00 PM CST on the same date. The abstract shows bid prices from three contractors for each contract line item, with low bid totals of $7,965,071 from IGE Insituform Technologies USA, LLC for the base contracts and $21,001 from the same contractor for the optional items. The work involves cured-in-place pipe lining, manhole sealing, cleaning and inspection, service connection and lateral repairs, and other rehabilitation activities across various pipe diameters.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W912P924B0002 Date Issued: 01 Nov 2023

Amendment 0001: 22NOV 2023

Amendment 0001: 07 DEC 2023 Contracting Officer Bids Due: 15 Dec 2023 @ 9am CST Tracy N. Tenholder Public Bid Opening: 15 Dec 2023 @ 2pm CST

Amendments Acknowledged? Yes Yes Bid received by due date/time? Yes Yes Grand Total Prices $10,655,073.60 8,396,557.64$ 7,965,071.00$

CLIN Description Quantity U/M Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

A0001 Mobilization and Demoblization 1 JOB $184,000.00 $184,000.00 133,087.40$ 133,087.40$ $21,000.00 21,000.00$

A0002 Protection and Restoration of Site 1 JOB $260,000.00 $260,000.00 4,050.00$ 4,050.00$ 1.00$ 1.00$ A0003 Manhole Frame Seals 148 EA $1,420.00 $210,160.00 357.37$ 52,890.76$ 300.00$ 44,400.00$ A0004 Manhole Cover Seals 148 EA $548.00 $81,104.00 833.87$ 123,412.76$ 700.00$ 103,600.00$

A0005 CIPP Liner - 6" Dia Pipe 474 LF $38.00 $18,012.00 37.28$ 17,670.72$ 51.00$ 24,174.00$

A0006 CIPP Liner - 8" Dia Pipe 6370 LF $39.50 $251,615.00 31.02$ 197,597.40$ 27.00$ 171,990.00$

A0007 CIPP Liner - 10" Dia Pipe 1021 LF $43.30 $44,209.30 36.77$ 37,542.17$ 32.00$ 32,672.00$

A0008 CIPP Liner - 12" Dia Pipe 3188 LF $51.50 $164,182.00 43.25$ 137,881.00$ 37.00$ 117,956.00$

A0009 CIPP Liner - 15" Dia Pipe 1260 LF $88.00 $110,880.00 69.22$ 87,217.20$ 84.00$ 105,840.00$

A0010 CIPP Liner - 18" Dia Pipe 1135 LF $122.00 $138,470.00 111.49$ 126,541.15$ 89.00$ 101,015.00$

A0011 CIPP Liner - 21" Dia Pipe 912 LF $156.00 $142,272.00 110.22$ 100,520.64$ 126.00$ 114,912.00$

A0012 CIPP Liner - 24" Dia Pipe 601 LF $264.00 $158,664.00 156.36$ 93,972.36$ 130.00$ 78,130.00$

A0013 CIPP Liner - 27" Dia Pipe 277 LF $278.00 $77,006.00 144.24$ 39,954.48$ 138.00$ 38,226.00$

A0014 CIPP Liner - 30" Dia Pipe 410 LF $290.00 $118,900.00 181.91$ 74,583.10$ 224.00$ 91,840.00$

A0015 CIPP Liner - 36" Dia Pipe 435 LF $306.00 $133,110.00 204.61$ 89,005.35$ 233.00$ 101,355.00$

A0016 CIPP Liner - 39" & 42" Dia Pipe 686 LF $313.00 $214,718.00 220.83$ 151,489.38$ 270.00$ 185,220.00$

A0017 CIPP Liner - 48" Dia Pipe 906 LF $325.00 $294,450.00 344.69$ 312,289.14$ 422.00$ 382,332.00$

A0018 Sewer Re-connections 6"-24" Dia 527 EA $142.00 $74,834.00 73.00$ 38,471.00$ 500.00$ 263,500.00$

SAK Construction LLC (O'Fallon, MO)

UEI: 019742368 / CAGE: 58HU5

ST LOUIS COMBINED SEWER OVERFLOW PROJECT

Bid Abstract - Construction

IGE

INSITUFORM TECHNOLOGIES USA, LLC

(Chesterfield, MO)

UEI: HNAMR82LYEJ4 / CAGE: 1L3U1

BASE ITEMS

A0019 Sewer Re-connections over 24" Dia 54 EA $984.00 $53,136.00 235.00$ 12,690.00$ 500.00$ 27,000.00$

A0020 Point Repair - Under 10 Feet Deep - Street 7 EA $14,600.00 $102,200.00 10,125.00$ 70,875.00$ 13,000.00$ 91,000.00$

A0021 Point Repair - Over 10 Feet Deep - Street 5 EA $17,500.00 $87,500.00 15,486.00$ 77,430.00$ 17,000.00$ 85,000.00$

A0022 Cleaning and CCTV - 6-12" Dia Pipe 11053 LF $13.20 $145,899.60 5.00$ 55,265.00$ 6.00$ 66,318.00$

A0023 Cleaning and CCTV - 15" Dia Pipe 1260 LF $16.20 $20,412.00 9.53$ 12,007.80$ 10.00$ 12,600.00$

A0024 Cleaning and CCTV - 18" Dia Pipe 1135 LF $16.20 $18,387.00 10.72$ 12,167.20$ 11.00$ 12,485.00$

A0025 Cleaning and CCTV - 21" Dia Pipe 912 LF $16.20 $14,774.40 15.25$ 13,908.00$ 15.00$ 13,680.00$

A0026 Cleaning and CCTV - 24" Dia Pipe 601 LF $16.20 $9,736.20 17.27$ 10,379.27$ 17.00$ 10,217.00$

A0027 Cleaning and CCTV - 27" Dia Pipe 277 LF $17.40 $4,819.80 21.44$ 5,938.88$ 20.00$ 5,540.00$

A0028 Cleaning and CCTV - 30" Dia Pipe 410 LF $18.50 $7,585.00 23.82$ 9,766.20$ 21.00$ 8,610.00$

A0029 Cleaning and CCTV - 36" Dia Pipe 435 LF $22.10 $9,613.50 27.16$ 11,814.60$ 25.00$ 10,875.00$

A0030 Cleaning and CCTV - 39" & 42" Dia Pipe 686 LF $22.10 $15,160.60 29.78$ 20,429.08$ 28.00$ 19,208.00$

A0031 Cleaning and CCTV - 48" Dia Pipe 906 LF $22.10 $20,022.60 34.54$ 31,293.24$ 32.00$ 28,992.00$

A0032 Service Connection Repair - 6-12" Dia Pipe 402 EA $1,380.00 $554,760.00 1,846.00$ 742,092.00$ 1,500.00$ 603,000.00$

A0033 Service Connection Repair - Over 12-18" Dia Pipe 78 EA

$2,680.00 $209,040.00 5,003.00$ 390,234.00$ 2,500.00$ 195,000.00$

A0034 Service Connection Repair - Over 18-21" Dia Pipe 42 EA

$3,680.00 $154,560.00 6,195.00$ 260,190.00$ 2,750.00$ 115,500.00$

A0035 Service Connection Repair - Over 21-24" Dia Pipe 5 EA

$5,940.00 $29,700.00 8,576.00$ 42,880.00$ 3,500.00$ 17,500.00$

A0049

Manhole Frame and Cover, Remove and Replace (includes 1 foot masonry)

22 EA

$1,600.00 $35,200.00 1,935.00$ 42,570.00$ 2,200.00$ 48,400.00$

A0050 Install Cementitious Lining 1524 LF $127.00 $193,548.00 178.68$ 272,308.32$ 150.00$ 228,600.00$

A0051 Adjust to Grade in Pavement 17 LF $3,300.00 $56,100.00 1,698.00$ 28,866.00$ 1,475.00$ 25,075.00$ A0052 Pavement 780 SY $115.00 $89,700.00 119.12$ 92,913.60$ 20.00$ 15,600.00$ BASE CONTRACT - HARLEM BADEN 9 SUBTOTAL $4,508,441.00 4,034,194.20$ 3,618,363.00$

B001 Mobilization and Demobilization 1 JOB $61,700.00 $61,700.00 30,525.00$ 30,525.00$ 25,000.00$ 25,000.00$ B002 CIPP Liner - 15" Dia Pipe - 07.5 MM 12295 LF $88.00 $1,081,960.00 65.25$ 802,248.75$ 75.00$ 922,125.00$ B003 CIPP Liner - 18" Dia Pipe - 06 MM 170 LF $122.00 $20,740.00 105.45$ 17,926.50$ 120.00$ 20,400.00$ B004 CIPP Liner - 18" Dia Pipe - 07.5 MM 14511 LF $122.00 $1,770,342.00 90.30$ 1,310,343.30$ 81.00$ 1,175,391.00$ B005 CIPP Liner - 18" Dia Pipe - 09 MM 3324 LF $122.00 $405,528.00 83.58$ 277,819.92$ 82.00$ 272,568.00$

BASE CONTRACT - MSD INFRASTRUCTURE 2023

B006 CIPP Liner - 18" Dia Pipe - 11 MM 80 LF $122.00 $9,760.00 154.77$ 12,381.60$ 200.00$ 16,000.00$ B007 CIPP Liner - 21" Dia Pipe - 09 MM 5530 LF $156.00 $862,680.00 112.32$ 621,129.60$ 104.00$ 575,120.00$ B008 CIPP Liner - 21" Dia Pipe - 11 MM 314 LF $156.00 $48,984.00 174.84$ 54,899.76$ 111.00$ 34,854.00$ B009 CIPP Liner - 24" Dia Pipe - 10.5 MM 2899 LF $264.00 $765,336.00 165.45$ 479,639.55$ 156.00$ 452,244.00$ B010 Point Repair - Under 10 Feet Deep (not underneath pavement) 2 EA $11,700.00 $23,400.00 8,340.00$ 16,680.00$ 10,500.00$ 21,000.00$ B011 Point Repair - Under 10 Feet Deep - Street 2 EA $14,600.00 $29,200.00 10,125.00$ 20,250.00$ 13,000.00$ 26,000.00$ B012 Point Repair - 10 to 15 Feet Deep (not underneath pavement) 2 EA $17,500.00 $35,000.00 13,105.00$ 26,210.00$ 13,400.00$ 26,800.00$ B013 Point Repair - 10 to 15 Feet Deep - Street 2 EA $21,900.00 $43,800.00 15,486.00$ 30,972.00$ 17,000.00$ 34,000.00$ B014 Install Cured-In-Place Chimney Liner (hazardous) 10 LF $373.00 $3,730.00 595.62$ 5,956.20$ 575.00$ 5,750.00$ B015 Install Chimney Liner (non-hazardous) 50 LF $146.00 $7,300.00 297.81$ 14,890.50$ 250.00$ 12,500.00$ B016 Sewer Re-connections 6"-24" Dia 400 EA $142.00 $56,800.00 193.00$ 77,200.00$ 500.00$ 200,000.00$ B017 Cleaning and CCTV - 15" Dia Pipe 12295 LF $16.20 $199,179.00 8.34$ 102,540.30$ 9.00$ 110,655.00$ B018 Cleaning and CCTV - 18" Dia Pipe 18085 LF $16.20 $292,977.00 9.53$ 172,350.05$ 10.00$ 180,850.00$ B019 Cleaning and CCTV - 21" Dia Pipe 5844 LF $16.20 $94,672.80 13.70$ 80,062.80$ 14.00$ 81,816.00$ B020 Cleaning and CCTV - 24" Dia Pipe 2899 LF $16.20 $46,963.80 14.89$ 43,166.11$ 16.00$ 46,384.00$ B021 Manhole Frame and Cover, Remove and Replace 5 EA $3,370.00 $16,850.00 1,936.00$ 9,680.00$ 2,200.00$ 11,000.00$

B022 Manholes Frame and Cover, Adjustment (includes first food of new masonry)

5 EA $2,100.00 $10,500.00 1,727.00$ 8,635.00$ 950.00$ 4,750.00$

B023 Manhole Masonry (Greater than One Foot) 5 EA $3,810.00 $19,050.00 1,191.00$ 5,955.00$ 950.00$ 4,750.00$ B024 Locate Buried Manholes 10 EA $713.00 $7,130.00 357.00$ 3,570.00$ 625.00$ 6,250.00$ B025 Lateral Repair Non-Person Entry 10 EA $431.00 $4,310.00 405.00$ 4,050.00$ 350.00$ 3,500.00$ B026 Later Repair Person Entry 10 EA $439.00 $4,390.00 1,380.00$ 13,800.00$ 350.00$ 3,500.00$ B027 Install Cementitious Liner 350 LF $127.00 $44,450.00 178.69$ 62,541.50$ 150.00$ 52,500.00$ BASE CONTRACT - MSD INFRASTRUCTURE 2023 SUBTOTAL $5,966,732.60 4,305,423.44$ 4,325,707.00$

C001 Bypass Pumping (over 1000 GPM) 1 JOB $102,000.00 $102,000.00 33,115.00$ 33,115.00$ 1.00$

D001 Heavy Cleaning 1 JOB $77,900.00 $77,900.00 23,825.00$ 23,825.00$ 21,000.00$ OPTIONs SUBTOTAL $179,900.00 56,940.00$ 21,001.00$

TOTAL BASE + OPTIONS $10,655,073.60 8,396,557.64$ 7,965,071.00$

OPTION ITEMS

OPTION 1 - HARLEM BADEN 9

OPTION 2 - MSD INFRASTRUCTURE 2023

$ 1.00

$ 21,000.00

W912P924B0005 Bid Abstract

2023-12-15T12:11:53-0600
Tracy N. Tenholder

File details come from the government source that posted it. Updated .