This amendment to a solicitation provides updates for a facilities infrastructure construction and maintenance indefinite delivery/indefinite quantity contract opportunity with the U.S. Army Corps of Engineers Engineering District St Louis. The solicitation seeks a small business contractor to provide services such as clearing and grubbing, earthwork, site grading, stone placement, site improvements, turf establishment, concrete work, structural and building repairs, signage, painting, and beach and dock maintenance at Lake Shelbyville, Illinois. The contract consists of five annual ordering periods with an optional six-month extension. Bids are due on December 19, 2023 with evaluation based on price alone. Questions must be submitted by December 12th and the bid opening will be held on December 19th. The amendment provides an updated site visit date, questions and answers from offerors, and clarifies the need for a letter of commitment from the offeror's surety rather than a bid guarantee.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0004 is for:
1. Update language from Bid Guarantee to Letter of Surety in Instructions to Bidders (See Red Font)
2. Insert Questions and Answ ers to the 2nd Submission of Inquiry.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Dec-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P923B0009
X 9B. DATED (SEE ITEM 11)
20-Oct-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Dec-2023
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P923B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
The following have been modified:
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO BIDDERS
1. General Information
This Invitation for Bid (IFB) is for a Firm Fixed Priced, Indefinite Delivery/Indefinite Quantity (IDIQ) (SATOC) consutruction contract to provide facilites maintence for Lake Shelbyville, IL The work covered by this contract and its respective task orders shall consist of Clearing and Grubbing/Debris Disposal, Earthwork, Site Grading, Stone Aggregate Protection Furnish/Delivery/Placement, Site Improvements, Turf Establishment, Playground Area, Trench & Backfilling, Culverts, Sewer & Water, Winterization/Dewinterization of Facilities, Road Boring, Pothole Repair, Concrete, structural/Building/Fixture Repairs, Signage, Painting, Beach & Sand/Furnish/ Delivery/Placement/Maintenance, Courtesy Dock,Sealant & Caulking. This contract will have five (5) annual ordering periods and optional six-month (6) ordering period.
Delivery schedules will be outlined in each individual task order Pre-priced line item estimate quantities will be used to evaluate overall price.
Ordering Period Duration: 5 Year IDIQ with Ordering Periods from Time of Award and Optional 6 month Ordering Period Extension
Note: Actual Period of Performance will be reflected at the time of award
One award will be made from this Invitation For Bid (IFB) FAR Subpart 14.1.
This procurement is 100% set-aside for Small Business, NAICS 237990, PSC Z2QA
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. The Bidders should include in the bid the address to which payment should be mailed, if that address is different from that of the bidder.
2. Site Visit
SITE VISIT HIGHLY RECOMMENDED
A site visit will be held for interested vendors to come out and view the site on:
November 14, 2023 at 9:00AM CST
Lake Shelbyville Visitor Center 1989 State Highway IL-16
Shelbyville IL 62565 Project Office: 217-774-3951, On-Site POC: Matthew Miller
All questions will be documented and answered with a Solicitation Amendment posted on www.sam.gov.
Please submit all questions in writing to Contract Specialist Marla Sawyer, marla.j.sawyer@usace.army.mil, Questions will not be answered at the Site Visit.
3. Submission of Inquiries
First Round Of Inquires:
Inquiries should be emailed to Marla Sawyer, marla.j.sawyer@usace.army.mil no later than Thursday, November 16, 2023, by 1:00PM CST. The inquiries/answers will be available within 24-48 hours in an amended solicitation posted to www.sam.gov .
Second Round of Inquires:
Inquiries should be emailed to Marla Sawyer, marla.j.sawyer@usace.army.mil no later than Tuesday, December 12, 2023, by 1:00PM CST. The inquiries/answers will be available within 24- 48 hours in an amended solicitation posted to www.sam.gov .
4. Evaluation of Bids
FAR 14.101(d). Evaluation of bids. Bids shall be evaluated without discussion.
FAR 14.101(e) Contract award. After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price and the price-related factors included in the invitation.
5. Responsible Propspective Contractors
In accordance with FAR 9.104-1. General Standards. The Contracting Officer will also examine responsibility criteria to determine if the low bidder is responsible. See Determination of Responsibility Requirements for more information.
To be determined responsible, a prospective contractor must –
(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104- 3(a)).
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
(c) Have a satisfactory performance record (see 9.104-3(b) and subpart 42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2.
(d) Have a satisfactory record of integrity and business ethics (for example, see subpart 42.15).
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
(See 9.104-3(a).)
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and (g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations (see also inverted domestic corporation prohibition at 9.108).
All contractors must be registered in the System for Award Management (www.sam.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website www.sam.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity
Identifier, one can be obtained from www.sam.gov. Refer to www.sam.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
Please begin the www.sam.gov registration process immediately in order to avoid delay of the contract award should your firm be selected.
6. Submission of Bids.
Bids are due DECEMBER 19, 2023 at 9:00AM CST. Fax and mail submittals will not be accepted.
Electronic submittals will be accepted and may be emailed to marla.j.sawyer@usace.army.mil
In accordance with FAR 14.202-8 and FAR Part 4.5, bidders will be required to submit their bids in response to this IFB solicitation by the date and time listed on the Standard Form 1442 via electronic means to include bid bonds. Physical copies of bid bonds will not be required to be submitted unless otherwise requested by the Contracting Officer at a later date.
Bidders shall submit their bids via email to Contract Specialist, Marla Sawyer at marla.j.sawyer@usace.army.mil by the date and time listed on the SF 1442.
7. Withdrawal of submitted bid.
In accordance with FAR 14.402-1, the Public Bid Opening will be held via Webex at the link/info below on 28 NOVEMBER 2023, 2:00PM CST. In accordance with FAR 14.403, the Abstract of Offers will be documented during this Public Bid Opening, and posted to SAM.gov within twenty-four (24) hours for public inspection.
A bid may be withdrawn by email to marla.j.sawyer@usace.army.mil . Withdraw of the bid shall be received no later than DECEMBER 19, 2023 at 9:00AM CST.
8. Bid Opening
Bid Opening will be DECEMBER 19, 2023, at 2:00PM CST. The following WebEx will host the bid opening:
https://usace1.webex.com/meet/rebekah.lamb | 27646188304
Join by phone +1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 2764 618 8304
In accordance with FAR Subpart 14.3, bids shall include the following:
Complete Entire Solicitaiton SF1442 Document, Sign As Required.
Complete Representations & Certifications Form Complete FAR Provision and Clause Fill-In Information.
Complete Pre-Priced Line Items Base Unit Price and Extended Amount.
Submit Letter of Surety. See Details in Questions & Answers from 12/12/2023.
Partnering With Us! https://www.usace.army.mil/Business-With-Us/Partnering/
Note: Page numbering in this document may not be accurate.
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been added by full text:
QUESTION/ANSWER FROM 12/12/23
Lake Shelbyville Park Facilities Infrastructure Construction and Maintenance IDIQ 2nd Submission of Question & Answers
12/12/2023 Solicitation W912P923B0009
1. Regarding the Bonding Letter of Commitment Given on page 127/127 of Paragraph 1 which
Removes bond Guarantee and requires Bonding letter of Commitment is there any standard form of the letter that is required or Form. We have a letter of Commitment from our Bonding company for this Project and believe it meets all the requirements of the Paragraph. We just want to make sure it is acceptable or there are no other requirements.
The typical bondability letter contains the following information:
a.) How long the bond company has been providing bonding for the contractor, b.) The A.M. Best rating of the bond company (typically required to be “A” or above), c.) Confirms that the bond company is on the U.S. Treasury approved list, and that the bond company is licensed in the state where the work is to be performed, d.) Provides the single and aggregate bond limits that the bond company will support the contractor, e.) Includes contact information of the bond agent for follow-up if the owner or general contractor has additional questions.
2. We have seen huge boulders in IDIQ and we believe that they are being placed around the shore. Is there an access route to place boulders along the shore or should we use rafts to place them?
Decorative Boulder Supply and Placement requirements are indicated in Section 32 00 00. Rip Rap Placement requirements are indicated in Section 32 22 40. These two sections do no require floating plant for placement. If a need arises for utilization of floating plant to place stone it will be negotiated at the task order level utilizing applicable line items associated with Section 32 40 00. If access roads do not currently exist for placement of stone and are required, the requirements for installation and removal of access roads shall be identified in the task order scope of work and the contractor shall use applicable line items of the IDIQ and propose quantities required to install such access roads in accordance with the task order scope of work.
Line items and quantities proposed for such access road work would be evaluated and negotiated as required at the task order level.
(End of Summary of Changes)