This document contains questions and answers related to a solicitation for water and sewer services at Wappapello Lake. Key details include:

  • The solicitation seeks a contractor to provide labor, equipment, transportation and materials to operate, inspect, test and maintain the wastewater system including the wastewater land application plant, sewer lift stations, drinking water chlorinator disinfection systems, pressure sewers, gravity sewers, beach water sampling and testing, potable water sampling and testing, land application plant required sampling and testing, and the unplugging of all fixtures and sewer lines at public use areas at Wappapello Lake.

  • A pre-bid site visit was scheduled for August 25, 2022 and questions regarding the solicitation were due by August 30, 2022. Quotes are due by September 9, 2022 and are to be submitted to the Contract Specialist at the Department of the Army Corps of Engineers Engineering District St Louis.

  • The questions and answers document clarifies that the certified operator is responsible for performing all contract work, lift stations must be checked every day, and mowing specifications can be found in section 1.2.4.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

Water and Sewer Contract Wappapello Lake

W912P922R0048

30-Aug-2022

Question 1: Where does Hay need to go after cutting?

Answer 1: See Appendix C Section 7 Cutting/Haying, Specs 1.2.8 Cutting and Haying of Irrigation Field

Question 2: Does the certified operator have to be onsite to perform all work? Can contractor hire employee not certified to work under that contractor?

Answer 2: Certified/licensed operator is responsible for performing all work under this contract.

See section (1.9 Contractor Requirements)

Question 3: What about mowing of the levees?

Answer 3: See 1.2.4 for specifications

Question 4: Does everything need to be checked everyday?

Answer 4: See 1.1 Hours of Operation/Work Schedule, 5 Day work week peak season, 3 day work week non-peak season

Question 5: Every day of work do all 66 lift stations need checked?

Answer 5: Yes