A02_Appendices A-F Revised Aug 16.docx
DOCX document 3 MB Posted
- Solicitation number
- W912P922R0048
About this file
This document includes appendices outlining the requirements for a water and sewer services contract at Wappapello Lake. Key details include:
The contractor shall provide all labor, equipment, transportation and materials necessary to operate, inspect, test and maintain the wastewater system including a wastewater land application plant, sewer lift stations, drinking water chlorinator disinfection systems, pressure sewers, gravity sewers, beach water sampling and testing, potable water sampling and testing, and land application plant sampling and testing. Services shall also include unplugging all fixtures and sewer lines at public use areas. Appendices provide maps of the facilities, descriptions of the facilities and services to be maintained, quality assurance plans, checklists, and definitions. The pre-bid site visit will take place on August 25, 2022 and questions are due by August 30, 2022. Quotes must be submitted by September 9, 2022 to the Army Corps of Engineers District office in St. Louis, Missouri.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
Description of Services
| Average Monthly Quantity |
| U/M |
Peoples Creek Lower Campground and Recreation area. Inspection, operation, and maintenance of six lift stations and wastewater collection system, including dump station. Weekly Beach Water Sampling (April – September)
DAYS
Peoples Creek Upper Campground. Inspection, operation, and maintenance of two lift stations and wastewater collection points.
Includes 19 full service campsites.
DAYS
Eagle Point Recreation Area. Inspection, operation and maintenance of one lift station and wastewater collection.
DAYS
Wastewater Land Application System. Operation and maintenance of wastewater land application system, includes quarterly testing of lagoon water, cutting/vegetation removal (June and October) and irrigation field soil test (October).
DAYS
Redman Creek Recreation Area, Visitor Center, Redman East and West campgrounds, and Management office area Inspection, operation, and maintenance of eight lift stations and wastewater collection points, including 109 full service campsites. Weekly Beach Water Sampling (April – September).
DAYS
Spillway Recreation Area and Outlet Channel Inspection, operation and maintenance of two Lift stations, fishing cleaning station and the wastewater collection system.
DAYS
Chaonia Landing Recreation Area. Inspection, operation, and maintenance of wastewater collection system, chlorinator and well operation and monthly potable water samples.
DAYS
Greenville Campground and Recreation Area. Inspection, operation, and maintenance of two pumping stations at shower house and dump station, xx lift stations and wastewater collection systems, well operation and chlorinator and monthly potable water samples.
DAYS
Rockwood Point Recreation Area. Inspection, operation and maintenance of one lift station and the wastewater collection system. Weekly Beach Water Sampling (April – September)
DAYS
Below the Dam Recreation Area. Inspection, operation and maintenance of the wastewater collection system.
DAYS
Sundowner Recreation Area. Inspection, operation and maintenance of lift station and the wastewater collection system.
DAYS
Monthly Workload Estimates - Peak Service Months April – October (7 Months) Service Days: Monday, Thursday, Friday, Saturday and Sunday
APPENDIX A (Cont.)
Monthly Workload Estimates – Non - Peak Service Months November – March (5 months) Service Days: Friday, Saturday and Sunday
Description of Services
| Average Monthly Quantity |
| U/M |
Peoples Creek Lower Campground and Recreation area. Inspection, operation, and maintenance of six lift stations and wastewater collection system, including dump station.
DAYS
Peoples Creek Upper Campground. Inspection, operation, and maintenance of two lift stations and wastewater collection points.
Includes 19 full service campsites.
DAYS
Eagle Point Recreation Area. Inspection, operation and maintenance of one lift station and wastewater collection.
DAYS
Wastewater Land Application System. Operation and maintenance of wastewater land application system, includes quarterly testing of lagoon water.
DAYS
Redman Creek Recreation Area, Visitor Center, Redman East and West campgrounds, and Management office area Inspection, operation, and maintenance of eight lift stations and wastewater collection points, including 109 full service campsites.
DAYS
Spillway Recreation Area and Outlet Channel Inspection, operation and maintenance of two Lift stations, fishing cleaning station and the wastewater collection system.
DAYS
Chaonia Landing Recreation Area. Inspection, operation, and maintenance of wastewater collection system, chlorinator and well operation and monthly potable water samples.
DAYS
Greenville Campground and Recreation Area. Inspection, operation, and maintenance of two pumping stations at shower house and dump station, xx lift stations and wastewater collection systems, well operation and chlorinator and monthly potable water samples.
DAYS
Rockwood Point Recreation Area. Inspection, operation and maintenance of one lift station and the wastewater collection system.
DAYS
Below the Dam Recreation Area. Inspection, operation and maintenance of the wastewater collection system.
DAYS
Sundowner Recreation Area. Inspection, operation and maintenance of lift station and the wastewater collection system.
DAYS
APPENDIX B
APPENDIX B
Vicinity Map
APPENDIX C
Facilities to be Serviced and Maintained
1. WASTEWATER LAND APPLICATION SYSTEM – Operation, inspection and maintenance.
| 1 April through 31 October (5 days/week)- off days Tue and Wed |
| 1 November Through 31 March (3 days/week) - off days Mon, Tues, Wed and Thur. |
| Testing of soil in irrigation field: Once per year. (Third week in October) |
| Lagoon Nitrogen Testing: once per quarter (4 times per year) |
Cutting/Haying of Irrigation Field (2 time per year)
2. LIFT STATIONS/PUMPING STATIONS – Operation, inspection and maintenance. Schedule dependent on the opening and closing of seasonal facilities.
| 1 April through 31 October (5 days/week)- off Tue and Wed |
| 1 November - 31 March (3 days/week) - off Mon, Tues, Wed, Thur. |
| # OF | # OF | ||||||||
| LOCATION | STATIONS | PUMPS | |||||||
| Rockwood Beach | 1 | 2 | |||||||
| Eagle Point Restroom - | 1 | 1 | |||||||
| Sundowner | 1 | 2 | |||||||
| Peoples Creek Lower Campground Shower house - | 1 | 2 | |||||||
| Peoples Creek Dump Station | 1 | 2 | |||||||
| Peoples Creek Beach - | 1 | 2 | |||||||
| Peoples Creek Lower Campground - | 1 | 2 | |||||||
| Peoples Creek Park Attendant - | 1 | 1 | |||||||
| Peoples Creek Boat Ramp, top of hill- | 1 2 | ||||||||
| Peoples Creek Boat Ramp restroom- | 1 | 2 | |||||||
| Peoples Creek Upper Campground - | 2 4 | ||||||||
| Visitor Center | 2 | 4 | |||||||
| Spillway Restroom - | 1 | 2 | |||||||
| Outlet Channel Area - | 1 2 | ||||||||
| Redman Creek Picnic Restroom - | 1 2 | ||||||||
| Redman Creek Beach Restroom - | 1 2 | ||||||||
| Redman Creek Boat Ramp - | 1 | 2 | |||||||
| Management Office/Maintenance Shop - | 1 | 2 | |||||||
| Land Treatment Plant - | 2 3 | ||||||||
| Redman Creek East Side Campground - | 5 10 | ||||||||
| Redman Creek West Side Campground - | 2 | 4 | |||||||
| Greenville shower house Septic System - | 2 2 | ||||||||
| Greenville Dump station septic | 1 | 1 | |||||||
| Greenville Day Use | 1 | 2 | |||||||
| Greenville Park Attendant | 1 | 1 | |||||||
| Greenville Campground Restrooms (3) | 3 | 6 | |||||||
| Greenville Campsites | 27 | 27 | |||||||
| Fish Cleaning Station | 1 | 1 | |||||||
| Chaonia Landing | 1 | 2 | |||||||
| TOTALS: | 66 | 97 |
3. DRINKING WATER WELL HOUSES - The water wells and chlorination disinfection systems at the Greenville Recreation Area and the Chaonia Landing Recreation Area shall be inspected for proper operation included the testing of chlorination system.
| 1 April through 31 October (5 days/week)- off Tue and Wed |
| 1 November Through 31 March (3 days/week) - off Mon, Tues, Wed, and Thur. |
4. WASTEWATER COLLECTION SYSTEM – All wastewater collection systems shall be inspected, and proper operation insured when the facility is open as estimated below:
| 1 April through 31 October (5 days/week)- off Tue and Wed |
| 1 November Through 31 March (3 days/week) - off Mon, Tues, Wed and Thur. |
RESTROOM/SHOWER BUILDING CHASES APPROXIMATE OPEN/CLOSE
| Below the Dam | Mid-March – 1st week November | |||||
| Rockwood Point Beach | Open Year Round | |||||
| Redman Creek East Side shower house | Mid-March – 1st week November | |||||
| Redman Creek East Side front mini shower | Mid-March – 1st week November | |||||
| Redman Creek East Side back mini shower | Mid-April – 1st week November | |||||
| Redman Creek West Side shower house | Open Year Round | |||||
| Redman Creek Picnic Area restroom | 1st week April – End of October | |||||
| Redman Creek Beach restroom | 1st week April – End of October | |||||
| Redman Creek Recreation Area Restroom | Open Year Round | |||||
| Visitor Center/Overlook Shelter restroom | Open Year Round | |||||
| Spillway Picnic Recreation Area Restroom | Open Year Round | |||||
| Spillway Outlet Channel | Open Year Round | |||||
| Eagle Point Recreation Area Restroom | Open Year Round | |||||
| Sundowner | Open Year Round | |||||
| Peoples Creek Upper shower house | Open Year Round | |||||
| Peoples Creek beach restroom | Mid-April - End of September | |||||
| Peoples Creek Boat Ramp | Open year round | |||||
| Peoples Creek Lower shower house | Mid-April - End of October | |||||
| Chaonia Landing restroom with shower | Open Year Round | |||||
| Greenville Campground restroom #1 | Mid-March - End of Deer Season | |||||
| Greenville Campground restroom #2 | Mid-March - End of Deer Season | |||||
| Greenville Campground restroom #3 | Mid-March - 1st week of November | |||||
| Greenville Campground shower house | Mid-March - End of Deer Season | |||||
| Greenville Day Use restroom | Open year round | |||||
| Fish cleaning station & restroom | Mid-March - 1st week of November |
Full hookup campsites:
| Redman Campground, sites 1-109. |
| Peoples Creek Upper Campground, sites 39-57. |
| Greenville Campground sites 1-107 |
Sewage Dump Stations:
| Redman Creek Campground |
| Peoples Creek Campground |
| Greenville Campground |
5. BEACH TESTING
Beaches to be tested are located at Peoples Creek, Redman Creek, and Rockwood Point Recreation Areas. Tests shall be performed weekly (Monday) when the beaches are open (testing begins one week prior to opening) from approximately last week of April through mid-September. Beach testing shall be included in the monthly bid price. No additional payment will be made for tests.
6. WATER SAMPLES
Potable water bacteriological samples shall be taken from the following water systems monthly. Scheduled dates for sampling will be provided. A Sample will also be taken after a well is turned on but prior to providing water to the public. This is usually one week prior to the opening of the area. Water sample testing shall be included in the monthly bid price. No additional payment will be made for tests.
a. Chaonia Landing Recreation Area (year-round). #MO-4110115
b. Greenville Recreation Area and Campground (year-round). #MO-4112213
7. CUTTING/HAYING
During the traditional haying seasons, the entire irrigation field (5 acres) shall be cut 2 different times and vegetation clippings removed. Haying should occur during late spring or early summer and for a second time late summer or early fall. After cutting, vegetation around the sprinklers will be trimmed. The Contractor shall furnish the government with the total weight of the vegetation removed after each cutting. Cutting/Haying of irrigation field shall be included in the monthly bid price. No additional payment will be made for cutting/haying of the irrigation field.
APPENDIX D
Definitions
6. DEFINITIONS - As used throughout this description/specification, the following terms shall have the meaning set forth below:
a. Contractor - The term Contractor refers to the prime Contractor and all Contractor employees and personnel. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
b. Contractor Representative- A foreman or superintendent, assigned to represent the interest of the Contractor with regards to all matters involving the contract.
c. Contracting Officer (KO) - The term "Contracting Officer" means the person executing this contract on behalf of the government, and any other officer or civilian employee who is properly designated Contracting Officer; and the term includes, except as otherwise provided in this contract, the authorized representative of a Contracting Officer acting within the limits of their authority.
d. Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to be responsible for administration of the contract and quality assurance representative, and the term includes, the authorized representative of a COR acting within the limits of their authority.
e. Quality Control - Action taken by the Contractor and/or their personnel to document, inspect, and control performance of services to insure they meet the specifications and requirements of this contract.
f. Quality Assurance – Action taken by the Government to ensure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this contract.
g. Quality Assurance Surveillance Plan (Q.A.S.P.) – An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance in accordance with contract requirements and performance standards.
h. Control Deficiency Report (C.D.R.) - a written record of unsatisfactory performance
I. Cleaned- Refers to facilities and structures free of, but not limited to, dirt, garbage, paper, metal, trash, debris, driftwood, plastic, cigarette butts, rocks, animal remains, tree limbs, sticks, algae, moss, glass, bottle caps, pull tabs, tape, thumb tacks, push pins, gravel, mud, sand, grass, vegetation growth (includes growing within cracks and expansion joints in sidewalks, roadways, parking lots, and next to buildings), cut grass, leaves, graffiti, grease, tar, spots, stains, dust, food particles, defecation of any kind, residues, bird droppings, insects, spiders, and all nests, webs, ashes, charred wood, soap scum, mold, mildew, mineral and hard water deposits, water spots, streaks, smears, standing water, detergent residue, slippery conditions.
APPENDIX E
Quality Assurance Surveillance Plan
Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.
1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in the Performance Work Statement (PWS).
2. Performance Standards
a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.
b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.
3. Surveillance methods. The methods of surveillance used to monitor performance of this contract will include periodic validations, planned inspection, 100% inspection, and validated customer complaints.
a. Periodic Validation Method. Surveillance by Periodic Inspection is designed to inspect some part, but not all the contract service requirements. This method is a “spot check” style of evaluation. Periodic validations will be conducted on a scheduled basis (daily, weekly, or monthly) and may be adjusted, based on quality trends.
b. Validated Customer Complaints. Customer complaints will be investigated by QA personnel. To be considered valid, complaints must be set forth in writing and detail the nature of the complaint and what contract requirements have been violated. All valid customer complaints will be forwarded to the Contractor and must investigated and resolved by the Contractor and COTR. Exhibit A below shall be used to document valid complaints.
4. Performance Measurement. Performance will be measured in accordance with the Service Delivery Summary in the following table:
| PERFORMANCE OBJECTIVE |
| PWS PARA. |
| PERFORMANCE THRESHOLD |
| REMEDY |
| METHOD OF ASSESSMENT |
SDS-1
WASTEWATER LAND APPLICATION PLANT
| Para. 1.2 |
| No more than two (2) valid defects per month |
| Re-performance within 8 hours of notification, or a mutually acceptable timeframe to CO, COR and Contractor |
| Periodic Validation |
SDS-2
SEWER LIFT STATIONS
| Para. 1.3 |
| No more than two (2) defects per month |
| Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor |
Periodic Validation or Customer Complaint
SDS-3
WASTEWATER COLLECTION SYSTEMS
| Para. 1.4 |
| No more than two (2) defects per month |
| Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor |
| Periodic Validation or Customer Complaint |
SDS-4
DRINKING WATER WELL HOUSES
| Para. 1.5 |
| No more than two (2) defects per month |
| Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor |
| Periodic Validation or Customer Complaint |
SDS-5
DOCUMENTATION OF WORK)
Para. 1.6
| No more than two (2) defects per month |
| Contractor shall complete a written corrective action report |
| Periodic Validation |
SDS-6
REPAIRS
| Para. 1.7 |
| No more than two (2) defects per month |
| Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor |
| Periodic Validation or Customer Complaint |
SDS-7
BEACH WATER SAMPLING
Para. 1.8
| No more than two (2) defects per month |
| Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor |
| Periodic Validation or Customer Complaint |
5. Failure to meet Performance Threshold. For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer and distributed to the Contractor by the KO. The contractor must reply in writing within 5 working days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the KO will determine if any further action such as payment deductions, issuing a warning or letter of concern is deemed necessary.
EXHIBIT A (QASP)
CUSTOMER COMPLAINT RECORD
Date and Time of Complaint:
Location of Complaint:
Source of Complaint Organization:
Individual :(i.e. lab worker, etc.)
Nature of Complaint:
Contract Reference:
Validation:
Date and Time Contractor Informed of Complaint:
Action Taken by Contractor:
Received and validated by:
APPENDIX F
Abbreviated Accident Prevention Plan Checklist (CESO Checklist A-01, Sept 2014) Activity Hazard Analysis (CELRL Form 1259) image4.jpg image5.emf
Microsoft_Word_Document.docx
Appendix A-4
Accident Prevention Plan image1.jpeg image1.emf image2.jpg image3.jpg
File details come from the government source that posted it. Updated .