Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

MRM 300-195

0001 Mobilization and Demobilization 1 EA 0002 Structure Construction, Graded Stone A

a. first 2,900 tons 2,900 TN

b. all over 2,900 tons 1,930 TN

0003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 12,660 tons 12,660 TN

b. all over 12,660 tons 8,440 TN

0004 Revetment/Bankline Repairs, Graded Stone A

a. first 900 tons 900 TN

b. all over 900 tons 600 TN

0005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 6,360 tons 6,360 TN

b. all over 6,360 tons 4,240 TN

0006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

0012 Mobilization and Demobilization 1 EA 0013 Structure Construction, Graded Stone A

a. first 4,190 tons 4,190 TN

b. all over 4,190 tons 2,790 TN

0014 Revetment/Bankline Repairs, Graded Stone A

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0015 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0016 Structure Removal, 0-25 ft Depth 1 DY 0017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

0018 Mobilization and Demobilization 1 EA 0019 Structure Construction, Graded Stone A

a. first 6,260 tons 6,260 TN

b. all over 6,260 tons 4,180 TN

0020 Revetment/Bankline Repairs, Graded Stone A

a. first 1,950 tons 1,950 TN

b. all over 1,950 tons 1,300 TN

0021 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

Bidding Schedule - W912P921R0010

BASE YEAR

b. all over 600 tons 400 TN 0022 Structure Removal, 0-25 ft Depth 1 DY 0023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

0024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

0025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

0026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

0027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

0028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

0029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 0030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 0031 Remnant Pile Dike Removal 1 DY

MRM 300 - 0.0

0032 Land Based Stone Placement, RM 33.0, Graded Stone 2,500lb Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0033 Quality Control Surveys 1 EA 0034 Debris Removal 1 DY 0035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job TN Ton DY Day

B3CT9WRD

Highlight

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

1001 Mobilization and Demobilization 1 EA 1002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

1003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

1004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

1005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

1006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

1007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

1008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

1009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

1010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

1011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

1012 Mobilization and Demobilization 1 EA 1013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

1014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

1015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

1016 Structure Removal, 0-25 ft Depth 1 DY 1017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

1018 Mobilization and Demobilization 1 EA 1019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

1020 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

1021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

OPTION YEAR 1

1022 Structure Removal, 0-25 ft Depth 1 DY 1023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

1024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

1025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

1026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

1027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

1028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

1029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 1030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 1031 Remnant Pile Dike Removal 1 DY

MRM 300 - 0.0

1032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

1033 Quality Control Surveys 1 EA 1034 Debris Removal 1 DY 1035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job TN Ton DY Day

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

2001 Mobilization and Demobilization 1 EA 2002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

2003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

2004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

2005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

2006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

2007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

2008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

2009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

2010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

2011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

2012 Mobilization and Demobilization 1 EA 2013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

2014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

2015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

2016 Structure Removal, 0-25 ft Depth 1 DY 2017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

2018 Mobilization and Demobilization 1 EA 2019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

2020 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

2021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

OPTION YEAR 2

2022 Structure Removal, 0-25 ft Depth 1 DY 2023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

2024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

2025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

2026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

2027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

2028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

2029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 2030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 2031 Remnant Pile Dike Removal 1 DY

MRM 300 - 0.0

2032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

2033 Quality Control Surveys 1 EA 2034 Debris Removal 1 DY 2035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job TN Ton DY Day

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

3001 Mobilization and Demobilization 1 EA 3002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

3003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

3004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

3005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

3006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

3007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

3008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

3009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

3010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

3011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

3012 Mobilization and Demobilization 1 EA 3013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

3014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

3015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

3016 Structure Removal, 0-25 ft Depth 1 DY 3017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

3018 Mobilization and Demobilization 1 EA 3019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

3020 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

3021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

OPTION YEAR 3

3022 Structure Removal, 0-25 ft Depth 1 DY 3023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

3024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

3025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

3026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

3027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

3028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

3029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 3030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 3031 Remnant Pile Dike Removal 1 DY

MRM 300 - 0.0

3032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

3033 Quality Control Surveys 1 EA 3034 Debris Removal 1 DY 3035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job TN Ton DY Day

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

4001 Mobilization and Demobilization 1 EA 4002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

4003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

4004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

4005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

4006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

4007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

4008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

4009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

4010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

4011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

4012 Mobilization and Demobilization 1 EA 4013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

4014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

4015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

4016 Structure Removal, 0-25 ft Depth 1 DY 4017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

4018 Mobilization and Demobilization 1 EA 4019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

4020 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

4021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

OPTION YEAR 4

4022 Structure Removal, 0-25 ft Depth 1 DY 4023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

4024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

4025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

4026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

4027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

4028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

4029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 4030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 4031 Remnant Pile Dike Removal 1 DY

MRM 300 - 0.0

4032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

4033 Quality Control Surveys 1 EA 4034 Debris Removal 1 DY 4035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job TN Ton DY Day

Sheet1