Attachment 3 - Bidding Schedule.pdf

PDF 515 KB Posted

Attached to
Dike & Revetment - USACE St. Louis District
Solicitation number
W912P921R0010
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

MRM 300-195

0001 Mobilization and Demobilization 1 EA 0002 Structure Construction, Graded Stone A

a. first 2,900 tons 2,900 TN

b. all over 2,900 tons 1,930 TN

0003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 12,660 tons 12,660 TN

b. all over 12,660 tons 8,440 TN

0004 Revetment/Bankline Repairs, Graded Stone A

a. first 900 tons 900 TN

b. all over 900 tons 600 TN

0005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 6,360 tons 6,360 TN

b. all over 6,360 tons 4,240 TN

0006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

0012 Mobilization and Demobilization 1 EA 0013 Structure Construction, Graded Stone A

a. first 4,190 tons 4,190 TN

b. all over 4,190 tons 2,790 TN

0014 Revetment/Bankline Repairs, Graded Stone A

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0015 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0016 Structure Removal, 0-25 ft Depth 1 DY 0017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

0018 Mobilization and Demobilization 1 EA 0019 Structure Construction, Graded Stone A

a. first 6,260 tons 6,260 TN

b. all over 6,260 tons 4,180 TN

0020 Revetment/Bankline Repairs, Graded Stone A

W912P921R0010 Bidding Schedule

BASE YEAR

a. first 1,950 tons 1,950 TN

b. all over 1,950 tons 1,300 TN

0021 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0022 Structure Removal, 0-25 ft Depth 1 DY 0023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

0024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

0025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

0026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

0027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

0028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

0029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 0030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 0031 Remnant Pile Dike Removal 1 JA

MRM 300 - 0.0

0032 Land Based Stone Placement, RM 33.0, Graded Stone 2,500lb Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0033 Quality Control Surveys 1 EA 0034 Debris Removal 1 DY 0035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job TN Ton DY Day

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

0001 Mobilization and Demobilization 1 EA 0002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

0003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

0004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

0005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

0006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

0012 Mobilization and Demobilization 1 EA 0013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

0014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

0015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0016 Structure Removal, 0-25 ft Depth 1 DY 0017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

0018 Mobilization and Demobilization 1 EA 0019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

0020 Revetment/Bankline Repairs, Graded Stone A

OPTION YEAR 1

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

0021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0022 Structure Removal, 0-25 ft Depth 1 DY 0023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

0024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

0025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

0026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

0027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

0028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

0029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 0030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 0031 Remnant Pile Dike Removal 1 JA

MRM 300 - 0.0

0032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

0033 Quality Control Surveys 1 EA 0034 Debris Removal 1 DY 0035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

0001 Mobilization and Demobilization 1 EA 0002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

0003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

0004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

0005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

0006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

0012 Mobilization and Demobilization 1 EA 0013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

0014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

0015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0016 Structure Removal, 0-25 ft Depth 1 DY 0017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

0018 Mobilization and Demobilization 1 EA 0019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

OPTION YEAR 2

0021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0022 Structure Removal, 0-25 ft Depth 1 DY 0023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

0024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

0025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

0026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

0027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

0028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

0029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 0030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 0031 Remnant Pile Dike Removal 1 JA

MRM 300 - 0.0

0032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

0033 Quality Control Surveys 1 EA 0034 Debris Removal 1 DY 0035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

0001 Mobilization and Demobilization 1 EA 0002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

0003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

0004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

0005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

0006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

0012 Mobilization and Demobilization 1 EA 0013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

0014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

0015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0016 Structure Removal, 0-25 ft Depth 1 DY 0017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

0018 Mobilization and Demobilization 1 EA 0019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

OPTION YEAR 3

0021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0022 Structure Removal, 0-25 ft Depth 1 DY 0023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

0024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

0025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

0026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

0027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

0028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

0029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 0030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 0031 Remnant Pile Dike Removal 1 JA

MRM 300 - 0.0

0032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

0033 Quality Control Surveys 1 EA 0034 Debris Removal 1 DY 0035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job

Quantity

Unit Unit Price Estimated Amount

MRM 300-195

0001 Mobilization and Demobilization 1 EA 0002 Structure Construction, Graded Stone A

a. first 2,150 tons 2,150 TN

b. all over 2,150 tons 1,430 TN

0003 Structure Construction, Graded Stone A, Shallow Draft Work Sites

a. first 11,270 tons 11,270 TN

b. all over 11,270 tons 7,520 TN

0004 Revetment/Bankline Repairs, Graded Stone A

a. first 2,230 tons 2,230 TN

b. all over 2,230 tons 1,490 TN

0005 Revetment/Bankline Repairs, Graded Stone A, Shallow Draft Work Sites

a. first 7,220 tons 7,220 TN

b. all over 7,220 tons 4,810 TN

0006 Notch Existing Structure and Recycle Stone

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0007 Notch Existing Structure and Recycle Stone, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0008 Structure Construction, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0009 Structure Construction, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0010 Gradual Slope Revetment, Graded Stone C

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

0011 Gradual Slope Revetment, Graded Stone C, Shallow Draft Work Sites

a. first 600 tons 600 TN

b. all over 600 tons 400 TN

MRM 195-98.6

0012 Mobilization and Demobilization 1 EA 0013 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

0014 Revetment/Bankline Repairs, Graded Stone A

a. first 15,000 tons 15,000 TN

b. all over 15,000 tons 10,000 TN

0015 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0016 Structure Removal, 0-25 ft Depth 1 DY 0017 Structure Removal, 26-45 ft Depth 1 DY

MRM 98.6-0

0018 Mobilization and Demobilization 1 EA 0019 Structure Construction, Graded Stone A

a. first 12,000 tons 12,000 TN

b. all over 12,000 tons 8,000 TN

OPTION YEAR 4

0021 Notch Existing Structure and Recycle Stone

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,040 TN

0022 Structure Removal, 0-25 ft Depth 1 DY 0023 Structure Removal, 26-45 ft Depth 1 DY

BIOLOGICAL OPINION WORK MRM 300-0.0

0024 Structure Construction, Graded Stone A, 195-0

a. first 3,600 tons 3,600 TN

b. all over 3,600 tons 2,400 TN

0025 Revetment/Bankline Repairs, Graded Stone A, 195-0

a. first 3,100 tons 3,100 TN

b. all over 3,100 tons 2,070 TN

0026 Notch Existing Structure and Recycle Stone, RM 300-195, Shallow Draft Work

a. first 1,560 tons 1,560 TN

b. all over 1,560 tons 1,030 TN

0027 Notch Existing Structure and Recycle Stone, RM 195-98.6

a. first 30,350 tons 30,350 TN

b. all over 30,350 tons 20,230 TN

0028 Notch Existing Structure and Recycle Stone, RM 98.6-0

a. first 11,000 tons 11,000 TN

b. all over 11,000 tons 7,340 TN

0029 Notch and drag stone, 0-25 ft Dig Depth 1 DY 0030 Notch and drag stone, 26-45 ft Dig Depth 1 DY 0031 Remnant Pile Dike Removal 1 JA

MRM 300 - 0.0

0032 Land Based Stone Placement, Graded Stone 2,500 lb Stone

a. first 5,000 tons 5,000 TN

b. all over 5,000 tons 3,000 TN

0033 Quality Control Surveys 1 EA 0034 Debris Removal 1 DY 0035 Bonds 1 JA

TOTAL

ABBREVIATIONS

EA Each JA Job

File details come from the government source that posted it. Updated .