A02 UPDATED Appendix H - Drawings.pdf
PDF 586 KB Posted
- Solicitation number
- W912P920R0055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A12 Questions and Answers.doc | DOC document | |
| A12. Past Performance Questionnaire.docx | DOCX document | |
| A02 Appendix E.PDF | ||
| A02 Appendix H - Drawings.pdf | ||
| A02 Appendix D.pdf | ||
| A02 Appendix B.pdf | ||
| A02 Appendix G-1 - Transmittal Form.pdf | ||
| A02 Appendix G-2 - Transmittal Form.pdf | ||
| A02 Appendix F.PDF | ||
| A12 Solicitation .pdf | ||
| A02 Appendix C1.pdf | ||
| A02 Appendix-A Accident Prevention Plan (002).pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
A N
S I
D
T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P R
O J E
C T N
U M
B E
R
F
IL
E N
A M
E
IN
IA
N C
R E
E K G
R O
U P C
A M
P G
R O
U N
D
GENERAL SHEET NOTES
E L E
C T
R
IC
A L
D .R .G
D .R .G
W P -X
X -X -X
X X
W P -X
X -X -X
X X
X
E-101
COMFORT STATION #1
COMFORT STATION #2
EXISITNG
UTILITY TRANSFORMER
EXISITNG
UTILITY TRANSFORMER
HIKING TRAIL
HIKING TRAIL
HIKING TRAIL
ELECTRIC
SITES 1 - 13
ELECTRIC
SITES 31 - 37
ELECTRIC
SITES 14 - 18
NON-ELECTRIC
SITES 19 - 30
INDIAN CREEK GROUP CAMPGROUND - SITE PLAN
A1
IA
N C
R E
E K G
R O
U P C
A M
P G
R O
U N
D
S
IT
E P
L A
N
E L E
C T
R
IC
A L U
P G
R A
D E
S
M O
N R
O E C
IT
Y
M
IS
S O
U R I
M A
R K T
W A
IN
L
A K
E P
R O J E
C T
SCALE 1" = 50'
CODES AND REGULATIONS
1. NFPA 70, NATIONAL ELECTRICAL CODE (2017)
JUST OUTSIDE COMFORT STATION #2. SEE DRAWING E-103
ELECTRICAL SITES 14 - 18 SHALL BE SOURCED FROM NEW PDP#2 LOCATED5.
STATION #1. SEE DRAWING E-102.
DISTRIBUTION PANEL #1 (PDP#1) LOCATED JUST OUTSIDE COMFORT
ELECTRIC SITES 1 - 13 AND 31 - 37 SHALL BE SOURCED FROM NEW POWER 4.
PEDESTAL.
SHALL BE DIRECT-BURIAL AND FIELD ROUTED BETWEEN SOURCE PANEL AND
PRIOR TO INSTALLATION OF NEW BRANCH CIRCUIT WIRING. ALL CABLING
CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES3.
SEE PARAGRAPH 3.5.1 OF SECTION C TECHNICAL SPECIFICATIONS.
EXISTING SOURCE PANEL. CABLING SHALL BE ABANDONED IN PLACE.
30A BRANCH CIRCUIT CABLING SHALL BE DISCONNECTED AND PULLED OUT OF
BECOME PROPERTY OF THE CONTRACTOR AND DISPOSED OFF-SITE. EXISTING
ALL MATERIAL AND EQUIPMENT TO BE REMOVED BY THE CONTRACTOR SHALL 2.
POWER DISTRIBUIT PANELS.
AND INSTALLATION OF NEW FEEDERS FROM UTILITY TRANSFORMER TO NEW
WITH POWER UTILITY COMPANY FOR UPGRADE OF EXISTING TRANSFORMERS,
INSTALLATION OF TWO NEW POWER DISTRIBUTION PANELS, COORDINATION
POSTS, INSTALLATION AND TERMINATIOIN OF NEW BRANCH CIRCUIT CABLING,
AND MOUNTING POSTS, INSTALLATION OF NEW 50A PEDESTALS AND MOUNTING
EXISTING PEDESTAL BRANCH CIRCUITS, REMOVAL OF EXISTING 30A PEDESTALS
NOT LIMITED TO THE FOLLOWING: DE-ENERGIZING AND DISCONNECTING
30A POWER SUPPLY PEDESTALS TO 50A PEDESTALS. WORK INCLUDES BUT IS
ELECTRICAL WORK INCLUDES UPGRADING EXISTING ELECTRIC RV SITES FROM1.
L .R .F
M A
R K T
W A
IN
L
A K
E
B3ECDDRG
Typewritten Text
APPENDIX H-1
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
A
S I
T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P R
O J E
C T N
U M
B E
R
F
IL
E N
A M
E
IA
N C
R E
E K G
R O
U P C
A M
P G
R O
U N
D
E L E
C T
R
IC
A L
D .R .G
D .R .G
W P -X
X -X -X
X
W P -X
X -X -X
X X
X
E-102 A1
IA
N C
R E
E K G
R O
U P C
A M
P G
R O
U N
D
E L E
C T
R
IC
A L U
P G
R A
D E
S
M O
N R
O E C
IT
Y
M
IS
S O
U R I
M A
R K T
W A
IN
L
A K
E P
R O J E
C T
SHEET KEYNOTES
1234567 8910111213
31 32 33 34
COMFORT STATION #1
6,8
PDP#1
GENERAL SHEET NOTES
P O
L E
S
T R
IP
A M
P S
N O
N O
T R
IP
A M
P S
P O
L E
S
TYPE
FRAME
MINIMUM BREAKER INTERRUPTING CAPACITY (RMS SYM AMPS)
MAIN BUS RATING
TYPE
AMPS
VOLTS-
BRANCH CIRCUIT
L 1
TOTAL
TOTAL DEMAND LOAD
TOTAL CONNECTED LOAD
L 2
AMPS
VOLTS-
BRANCH CIRCUIT DEVICE
DESTINATION
9 10
COPPER
11 12
(VOLT - AMPS)
PHASE LOAD
7 8
5 6
3 4
1 2
TRIP
PEDESTAL 3, 4
10,000VOLTAGE
MAIN BREAKER: NO. OF POLES
PANEL
120/240
PDP#1
PANEL SCHEDULE
1-PHASE, 3-WIRE, NEMA 3R 600A
600A
1,3
PDP#1
5,7
PDP#1
9,11
PDP#1
13,15
PDP#1
2,4
PDP#1
10,12
PDP#1
14,16
PDP#1
DESTINATION
PEDESTAL 1, 2
PEDESTAL 5, 6, 7
PEDESTAL 8, 9, 10
PEDESTAL 11, 12, 13
PEDESTAL 36, 37
PEDESTAL 34, 35
PEDESTAL 31, 32, 33
E1
PDP#1 - PANEL SCHEDULE
SCALE N.T.S.
SCALE 1" = 20'
POWER DISTRIBUTION PANEL #1 - POWER PLAN
P D
P P
O W
E R P
L A
N
650A
SITE 13 SITE 12 SITE 11 SITE 10
SITE 37SITE 36SITE 35SITE 34SITE 33SITE 32SITE 31
SITE 1SITE 2SITE 3SITE 4SITE 5SITE 6SITE 7SITE 8SITE 9
#1 AWG, AL (TYP.)
#350 AWG, AL #350 AWG, AL
#350 AWG, AL #300 AWG, AL #300 AWG, AL
#350 AWG, AL
#300 AWG, AL
#300 AWG, AL
125 100SPARE SPARE
19 20
SPACE
SPACE
SPACE SPACE
SPACE
SPACE
2 2
(TYP OF 5)
ALL CONDUCTORS SHALL BE TYPE USE-2 W/ XLPE INSULATION RATED 600V.4.
CU = COPPER CONDUCTORS, AL = ALUMINUM CONDUCTORS. 3.
IN ADDITION TO SPARES INDICATED TO BE INSTALLED IN PANEL SCHEDULE.
CONTRACTOR SHALL PROVIDE TWO SPARE BREAKERS OF EACH TYPE/RATING2.
ALL HOME RUN CIRCUITS SHALL BE DIRECT-BURY AND FIELD ROUTED TO PDP#1.1.
SHEET LEGEND
XXXX
YYYY
#,# = CIRCUIT NUMBER
XXXX = SOURCE PANEL
YYYY = SIZE PHASE CONDUCTOR
INDICATED BY NUMBER OF LINES
PHASE CONDUCTOR, QUANTITY
EQUIPMENT GROUND, #4 AWG
TWO 2.5" PVC (SCH 80) CONDUIT
PARALLEL 350KCMIL, CU
L .R .F
M A
R K T
W A
IN
L
A K
E
ROUTED THROUGH NEW 3" CONDUIT.
ROAD MEETING REQUIREMENTS OF NFPA 70. EACH HOME RUN CIRCUIT SHALL BE
UNDER EXISTING ROAD. CONDUITS SHALL BE INSTALLED BY BORING UNDER
NEW 3" PVC (SCH 80): PROVIDE AND INSTALL FIVE NEW 3" PVC (SCH 80) CONDUITS5.
UNDERGROUND UTILITY LOCATES.
AND APPROVED BY COR REPRESENTATIVE. LOCATION WILL BE DEPENDENT OF
ACTUAL LOCATION SHALL BE FIELD LOCATED WITHIN 10-30FT OF TRANSFORMER
AT LEAST 18" BELOW FINISHED GRADE. PDP LOCATION SHOWN IS APPROXIMATE,
NFPA 70. ALL STUB-UP CONDUITS INTO PDP#1 SHALL BE RGS AND SHALL EXTEND
STRUCTURE TO SECURE NEW PDP MEETING INSTALLATION REQUIREMENTS OF
SCHEDULE. CONTRACTOR SHALL PROVIDE AND CONSTRUCT MOUNTING
AND INCLUDE BRANCH CIRCUIT BREAKERS AS INDICATED IN PDP#1 PANEL
NEW 600A PDP#1: PROVIDE AND INSTALL NEW 600A PDP. PDP SHALL BE RATED4.
COMPANY.
CONTRACTOR. ITEMS SHALL MEET THE REQUIREMENTS OF THE POWER UTILITY
PAD AND STUB-UP CONDUITS SHALL BE THE RESPONSIBILITY OF THE
INSTALLED DUE TO THE TRANSFORMER UPGRADE INCLUDING TRANSFORMER
INCLUDED IN CONTRACT BID. ALL ITEMS NECESSARY TO BE REPLACED OR
ALL COSTS ASSOCIATED WITH UTILITY POWER UPGRADE, COST SHALL BE
TO EXISTING PDP AND NEW 600A PDP#1. CONTRACTOR RESPONSIBLE FOR
TO UPGRADE TRANSFORMER AS NEEDED TO PROVIDE 120/240V, 1-PHASE POWER
EXISTING UTILITY TRANSFORMER: COORDINATE WITH POWER UTILITY COMPANY3.
TO EXISTING 30A PEDESTALS.
EXISTING 400A PDP: DE-ENERGIZE AND DISCONNECT EXISTING BRANCH CIRCUITS2.
DIRECT BURIED CABLES.
BE PROVIDED WITH A PVC (SCH80) ENTRY CONDUIT PER NEC 551.80 TO PROTECT
CIRCUIT CONDUCTORS SHALL BE INSTALLED PER NEC 551. PEDESTALS SHALL
50A PEDESTALS. TYPICAL OF 20. NEW POWER SUPPLY PEDESTALS AND BRANCH
RV ELECTRIC PEDESTAL (TYP): REPLACE EXISTING 30A PEDESTALS WITH NEW1.
B3ECDDRG
APPENDIX H-2
G
F
E
D
C
B
A
1 I 2
PANEL PDP#2
MAIN BREAKER: NO. OF POLES
I 3
PANEL SCHEDULE
TYPE 1-PHASE, 3-WIRE, NEMA 3R
2 FRAME 250A
I
TRIP
MAIN BUS RATING 20 0A
20 0A TYPE COPPER
VOLTAGE 120/24 0 MINIMUM BREAKER INTERRUPTING CAPACITY (RMS SYM AMPS) 10,000
I
BRANCH CIRCUIT BRANCH CIRCUIT DEVICE
(I) f/) c.. C..- w VOLTS - 0:::i: a::: ....I DESTINATION <( I- 0 AMPS z c..
125 2 PEDESTAL 14, 15, 16 1
125 2 SPARE 5
2 SPACE 9
2 SPACE 13
SPACE 17
TOTAL
PHASE LOAD
(VOLT - AMPS)
L 1 L 2
0 VOLTS - DESTINATION
z AMPS
2 PEDESTAL 17, 18 4
6 SPARE 8
10 SPACE 12
16 SPACE
18 SPACE
TOTAL CONNECTED LOAD
TOTAL DEMAND LOAD
@f--
S-�AD_LE�-T-�--
2_-_ P_ A_N_E_L _S_C_H_E _D_UL_ E_
PDP#2
1,3
__ ---, 16
PDP#2
2,4 #300AWG,AL
,( #1 AWG, AL (TYP.)
,>--..,,--,-------t,,____
\,,,---.__r � 1
#350 AWG, AL C / /-
SITE 15
SITE 14
, / SITE16
181/
/ SITE17
SITE 18
(TYP OF 2)
___ Q� p-<::(__ 4 /0AWG, CU
©-J PVC (SCH 80) CONDUIT
COMFORT STATION #2
;>-E 1
�_R_D_ I _S _TR_ I B_U _T _IO _N_PA_N_E_ L_#_2 _- _ P_O_W_E _R_P_L _A _N _
(I) f/) c.. w C..-....I :::i: a:::0 <( I-c..
2 100
2 100
5 I 6 I 7 I 8 9 I 10
GENERA L SHEE T NO TES
1. ALL HOME RUN CIRCUITS SHALL BE DIRECT-BURY AND FIELD ROUTED TO PDP#2.
2. CONTRACTOR SHALL PROVIDE TWO SPARE BREAKERS OF EACH TYPE/RATING
IN ADDITION TO SPARES INDICATED TO BE INSTALLED IN PANEL SCHEDULE.
3. CU = COPPER CONDUCTORS, AL= ALUMINUM CONDUCTORS.
4. ALL CONDUCTORS SHALL BE TYPE USE-2 WI XLPE INSULATION RATED 600V.
0 SHEE T KEYNO TES
1. RV ELECTRIC PEDESTAL (TYP): REPLACE EXISTING 30A PEDESTALS WITH NEW
50A PEDESTALS. TYPICAL OF 5. NEW POWER SUPPLY PEDESTALS AND BRANCH
CIRCUIT CONDUCTORS SHALL BE INSTALLED PER NEC 551. PEDESTALS SHALL
BE PROVIDED WITH A PVC (SCH80) ENTRY CONDUIT PER NEC 551.80 TO PROTECT
DIRECT BURIED CABLES.
2. EXISTING 400A PDP: DE-ENERGIZE AND DISCONNECT EXISTING BRANCH CIRCUITS
TO EXISTING 30A PEDESTALS.
3. EXISTING UTILITY TRANSFORMER: COORDINATE WITH POWER UTILITY COMPANY
TO UPGRADE TRANSFORMER AS NEEDED TO PROVIDE 120/240V, 1-PHASE POWER
TO EXISTING PDP AND NEW 200A PDP#2. CONTRACTOR RESPONSIBLE FOR
ALL COSTS ASSOCIATED WITH UTILITY POWER UPGRADE, COST SHALL BE
INCLUDED IN CONTRACT BID. ALL ITEMS NECESSARY TO BE REPLACED OR
INSTALLED DUE TO THE TRANSFORMER UPGRADE INCLUDING TRANSFORMER
PAD AND STUB-UP CONDUITS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. ITEMS SHALL MEET THE REQUIREMENTS OF THE POWER UTILITY
COMPANY.
4. NEW 200A PDP#1: PROVIDE AND INSTALL NEW 200A PDP. PDP SHALL BE RATED
AND INCLUDE BRANCH CIRCUIT BREAKERS AS INDICATED IN PDP#2 PANEL
SCHEDULE. CONTRACTOR SHALL PROVIDE AND CONSTRUCT MOUNTING
STRUCTURE TO SECURE NEW PDP MEETING INSTALLATION REQUIREMENTS OF
NFPA 70. ALL STUB-UP CONDUITS INTO PDP#2 SHALL BE RGS AND SHALL EXTEND
AT LEAST 18" BELOW FINISHED GRADE. PDP LOCATION SHOWN IS APPROXIMATE,
ACTUAL LOCATION SHALL BE FIELD LOCATED WITHIN 10-30FT OF TRANSFORMER
AND APPROVED BY COR REPRESENTATIVE. LOCATION WILL BE DEPENDENT OF
UNDERGROUND UTILITY LOCATES.
5. NEW 3" PVC (SCH 80): PROVIDE AND INSTALL TWO NEW 3" PVC (SCH 80) CONDUITS
UNDER EXISTING ROAD. CONDUITS SHALL BE INSTALLED BY BORING UNDER
ROAD MEETING REQUIREMENTS OF NFPA 70. EACH HOME RUN CIRCUIT SHALL BE
ROUTED THROUGH NEW 3" CONDUIT.
SHEET LEGEND
XXXX XXXX = SOURCE PANEL
# # #,#=CIRCUIT NUMBER
' �yyyy
YYYY = SIZE PHASE CONDUCTOR
-------------· PHASE CONDUCTOR, QUANTITY
, INDICATED BY NUMBER OF LINES
'------------ EQUIPMENT GROUND, #4 AWG
US Army Corps of Engineers® z ::J z ii':
u z c..
::iE ....I c3 <i! c..c.. () Cl:'.
::J - w a::: $'.
a::: b o (!) w c..
::.:: ....IN
w W f W O a::: c..
z z
SHEET ID
E-103
B3ECDDRG
APPENDIX H-3
File details come from the government source that posted it. Updated .