A02 Appendix H - Drawings.pdf

PDF 749 KB Posted

Attached to
INDIAN CREEK GROUP CAMPGROUND UTILITIES REHAB AT MARK TWAIN LAKE
Solicitation number
W912P920R0055
Issued by

View the file

Other files

File Type Posted
A12 Questions and Answers.doc DOC document
A12. Past Performance Questionnaire.docx DOCX document
A02 UPDATED Appendix H - Drawings.pdf PDF
A02 Appendix E.PDF PDF
A02 Appendix D.pdf PDF
A02 Appendix B.pdf PDF
A02 Appendix G-1 - Transmittal Form.pdf PDF
A02 Appendix G-2 - Transmittal Form.pdf PDF
A02 Appendix F.PDF PDF
A12 Solicitation .pdf PDF
A02 Appendix C1.pdf PDF
A02 Appendix-A Accident Prevention Plan (002).pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

A N

S I

D

T L

O U

IS

M

IS

S O

U R I

S T L

O U

IS

D

IS

T R

IC

T

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T N

U M

B E

R

F

IL

E N

A M

E

IN

IA

N C

R E

E K G

R O

U P C

A M

P G

R O

U N

D

GENERAL SHEET NOTES

E L E

C T

R

IC

A L

D .R .G

D .R .G

W P -X

X -X -X

X X

W P -X

X -X -X

X X

X

E-101

COMFORT STATION #1

COMFORT STATION #2

EXISITNG

UTILITY TRANSFORMER

EXISITNG

UTILITY TRANSFORMER

HIKING TRAIL

HIKING TRAIL

HIKING TRAIL

ELECTRIC

SITES 1 - 13

ELECTRIC

SITES 31 - 37

ELECTRIC

SITES 14 - 18

NON-ELECTRIC

SITES 19 - 30

INDIAN CREEK GROUP CAMPGROUND - SITE PLAN

A1

IA

N C

R E

E K G

R O

U P C

A M

P G

R O

U N

D

S

IT

E P

L A

N

E L E

C T

R

IC

A L U

P G

R A

D E

S

M O

N R

O E C

IT

Y

M

IS

S O

U R I

M A

R K T

W A

IN

L

A K

E P

R O J E

C T

SCALE 1" = 50'

CODES AND REGULATIONS

1. NFPA 70, NATIONAL ELECTRICAL CODE (2017)

JUST OUTSIDE COMFORT STATION #2. SEE DRAWING E-103

ELECTRICAL SITES 14 - 18 SHALL BE SOURCED FROM NEW PDP#2 LOCATED5.

STATION #1. SEE DRAWING E-102.

DISTRIBUTION PANEL #1 (PDP#1) LOCATED JUST OUTSIDE COMFORT

ELECTRIC SITES 1 - 13 AND 31 - 37 SHALL BE SOURCED FROM NEW POWER 4.

PEDESTAL.

SHALL BE DIRECT-BURIAL AND FIELD ROUTED BETWEEN SOURCE PANEL AND

PRIOR TO INSTALLATION OF NEW BRANCH CIRCUIT WIRING. ALL CABLING

CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES3.

SEE PARAGRAPH 3.5.1 OF SECTION C TECHNICAL SPECIFICATIONS.

EXISTING SOURCE PANEL. CABLING SHALL BE ABANDONED IN PLACE.

30A BRANCH CIRCUIT CABLING SHALL BE DISCONNECTED AND PULLED OUT OF

BECOME PROPERTY OF THE CONTRACTOR AND DISPOSED OFF-SITE. EXISTING

ALL MATERIAL AND EQUIPMENT TO BE REMOVED BY THE CONTRACTOR SHALL 2.

POWER DISTRIBUIT PANELS.

AND INSTALLATION OF NEW FEEDERS FROM UTILITY TRANSFORMER TO NEW

WITH POWER UTILITY COMPANY FOR UPGRADE OF EXISTING TRANSFORMERS,

INSTALLATION OF TWO NEW POWER DISTRIBUTION PANELS, COORDINATION

POSTS, INSTALLATION AND TERMINATIOIN OF NEW BRANCH CIRCUIT CABLING,

AND MOUNTING POSTS, INSTALLATION OF NEW 50A PEDESTALS AND MOUNTING

EXISTING PEDESTAL BRANCH CIRCUITS, REMOVAL OF EXISTING 30A PEDESTALS

NOT LIMITED TO THE FOLLOWING: DE-ENERGIZING AND DISCONNECTING

30A POWER SUPPLY PEDESTALS TO 50A PEDESTALS. WORK INCLUDES BUT IS

ELECTRICAL WORK INCLUDES UPGRADING EXISTING ELECTRIC RV SITES FROM1.

L .R .F

M A

R K T

W A

IN

L

A K

E

B3ECDDRG

Typewritten Text

APPENDIX H-1

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

S

L

O U

IS

M

IS

S O

U R I

S T L

O U

IS

D

IS

T R

IC

T

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T N

U M

B E

R

F

IL

E N

A M

E

IA

N C

R E

E K G

R O

U P C

A M

P G

R O

U N

D

E L E

C T

R

IC

A L

D .R .G

D .R .G

W P -X

X -X -X

X

P -X

X -X -X

X X

X

E-102 A1

IA

N C

R E

E K G

R O

U P C

A M

P G

R O

U N

D

E L E

C T

R

IC

A L U

P G

R A

D E

S

M O

N R

O E C

IT

Y

M

IS

S O

U R I

M A

R K T

W A

IN

L

A K

E P

R O J E

C T

SHEET KEYNOTES

1234567 8910111213

31 32 33 34

COMFORT STATION #1

6,8

PDP#1

GENERAL SHEET NOTES

P O

L E

S

T R

IP

A M

P S

N O

N O

T R

IP

A M

P S

P O

L E

S

TYPE

FRAME

MINIMUM BREAKER INTERRUPTING CAPACITY (RMS SYM AMPS)

MAIN BUS RATING

TYPE

AMPS

VOLTS-

BRANCH CIRCUIT

L 1

TOTAL

TOTAL DEMAND LOAD

TOTAL CONNECTED LOAD

L 2

AMPS

VOLTS-

BRANCH CIRCUIT DEVICE

DESTINATION

9 10

COPPER

11 12

(VOLT - AMPS)

PHASE LOAD

7 8

5 6

3 4

1 2

TRIP

PEDESTAL 3, 4

10,000VOLTAGE

MAIN BREAKER: NO. OF POLES

PANEL

120/240

PDP#1

PANEL SCHEDULE

1-PHASE, 3-WIRE, NEMA 3R 600A

600A

1,3

PDP#1

5,7

PDP#1

9,11

PDP#1

13,15

PDP#1

2,4

PDP#1

10,12

PDP#1

14,16

PDP#1

DESTINATION

PEDESTAL 1, 2

PEDESTAL 5, 6, 7

PEDESTAL 8, 9, 10

PEDESTAL 11, 12, 13

PEDESTAL 36, 37

PEDESTAL 34, 35

PEDESTAL 31, 32, 33

E1

PDP#1 - PANEL SCHEDULE

SCALE N.T.S.

SCALE 1" = 20'

POWER DISTRIBUTION PANEL #1 - POWER PLAN

P D

P P

O W

E R P

L A

N

650A

SITE 13 SITE 12 SITE 11 SITE 10

SITE 37SITE 36SITE 35SITE 34SITE 33SITE 32SITE 31

SITE 1SITE 2SITE 3SITE 4SITE 5SITE 6SITE 7SITE 8SITE 9

#1 AWG, AL (TYP.)

#350 AWG, AL #350 AWG, AL

#350 AWG, AL #300 AWG, AL #300 AWG, AL

#350 AWG, AL

#300 AWG, AL

#300 AWG, AL

125 100SPARE SPARE

19 20

SPACE

SPACE

SPACE SPACE

SPACE

SPACE

2 2

(TYP OF 5)

ALL CONDUCTORS SHALL BE TYPE USE-2 W/ XLPE INSULATION RATED 600V.4.

CU = COPPER CONDUCTORS, AL = ALUMINUM CONDUCTORS. 3.

IN ADDITION TO SPARES INDICATED TO BE INSTALLED IN PANEL SCHEDULE.

CONTRACTOR SHALL PROVIDE TWO SPARE BREAKERS OF EACH TYPE/RATING2.

ALL HOME RUN CIRCUITS SHALL BE DIRECT-BURY AND FIELD ROUTED TO PDP#1.1.

SHEET LEGEND

XXXX

YYYY

#,# = CIRCUIT NUMBER

XXXX = SOURCE PANEL

YYYY = SIZE PHASE CONDUCTOR

INDICATED BY NUMBER OF LINES

PHASE CONDUCTOR, QUANTITY

EQUIPMENT GROUND, #4 AWG

TWO 2.5" PVC (SCH 80) CONDUIT

PARALLEL 350KCMIL, CU

L .R .F

M A

R K T

W A

IN

L

A K

E

ROUTED THROUGH NEW 3" CONDUIT.

ROAD MEETING REQUIREMENTS OF NFPA 70. EACH HOME RUN CIRCUIT SHALL BE

UNDER EXISTING ROAD. CONDUITS SHALL BE INSTALLED BY BORING UNDER

NEW 3" PVC (SCH 80): PROVIDE AND INSTALL FIVE NEW 3" PVC (SCH 80) CONDUITS5.

UNDERGROUND UTILITY LOCATES.

AND APPROVED BY COR REPRESENTATIVE. LOCATION WILL BE DEPENDENT OF

ACTUAL LOCATION SHALL BE FIELD LOCATED WITHIN 10-30FT OF TRANSFORMER

AT LEAST 18" BELOW FINISHED GRADE. PDP LOCATION SHOWN IS APPROXIMATE,

NFPA 70. ALL STUB-UP CONDUITS INTO PDP#1 SHALL BE RGS AND SHALL EXTEND

STRUCTURE TO SECURE NEW PDP MEETING INSTALLATION REQUIREMENTS OF

SCHEDULE. CONTRACTOR SHALL PROVIDE AND CONSTRUCT MOUNTING

AND INCLUDE BRANCH CIRCUIT BREAKERS AS INDICATED IN PDP#1 PANEL

NEW 600A PDP#1: PROVIDE AND INSTALL NEW 600A PDP. PDP SHALL BE RATED4.

COMPANY.

CONTRACTOR. ITEMS SHALL MEET THE REQUIREMENTS OF THE POWER UTILITY

PAD AND STUB-UP CONDUITS SHALL BE THE RESPONSIBILITY OF THE

INSTALLED DUE TO THE TRANSFORMER UPGRADE INCLUDING TRANSFORMER

INCLUDED IN CONTRACT BID. ALL ITEMS NECESSARY TO BE REPLACED OR

ALL COSTS ASSOCIATED WITH UTILITY POWER UPGRADE, COST SHALL BE

TO EXISTING PDP AND NEW 600A PDP#1. CONTRACTOR RESPONSIBLE FOR

TO UPGRADE TRANSFORMER AS NEEDED TO PROVIDE 120/240V, 1-PHASE POWER

EXISTING UTILITY TRANSFORMER: COORDINATE WITH POWER UTILITY COMPANY3.

TO EXISTING 30A PEDESTALS.

EXISTING 400A PDP: DE-ENERGIZE AND DISCONNECT EXISTING BRANCH CIRCUITS2.

DIRECT BURIED CABLES.

BE PROVIDED WITH A PVC (SCH80) ENTRY CONDUIT PER NEC 551.80 TO PROTECT

CIRCUIT CONDUCTORS SHALL BE INSTALLED PER NEC 551. PEDESTALS SHALL

50A PEDESTALS. TYPICAL OF 20. NEW POWER SUPPLY PEDESTALS AND BRANCH

RV ELECTRIC PEDESTAL (TYP): REPLACE EXISTING 30A PEDESTALS WITH NEW1.

B3ECDDRG

APPENDIX H-2

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

S

L

O U

IS

M

IS

S O

U R I

S T L

O U

IS

D

IS

T R

IC

T

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T N

U M

B E

R

F

IL

E N

A M

E

IA

N C

R E

E K G

R O

U P C

A M

P G

R O

U N

D

E L E

C T

R

IC

A L

D .R .G

D .R .G

W P -X

X -X -X

X

P -X

X -X -X

X X

X

E-103 A1

IN

D

IA

N C

R E

E K G

R O

U P C

A M

P G

R O

U N

D

E L E

C T

R

IC

A L U

P G

R A

D E

S

M O

N R

O E C

IT

Y

M

IS

S O

U R I

M A

R K T

W A

IN

L

A K

E P

R O J E

C T

SHEET KEYNOTES

GENERAL SHEET NOTES

P O

L E

S

T R

IP

A M

P S

N O

N O

T R

IP

A M

P S

P O

L E

S

TYPE

FRAME

MINIMUM BREAKER INTERRUPTING CAPACITY (RMS SYM AMPS)

MAIN BUS RATING

TYPE

AMPS

VOLTS-

BRANCH CIRCUIT

L 1

TOTAL

TOTAL DEMAND LOAD

TOTAL CONNECTED LOAD

L 2

AMPS

VOLTS-

BRANCH CIRCUIT DEVICE

DESTINATION

9 10

COPPER

11 12

(VOLT - AMPS)

PHASE LOAD

7 8

5 6

3 4

1 2

TRIP

17SPACE SPACE

10,000VOLTAGE

MAIN BREAKER: NO. OF POLES

PANEL

120/240

PDP#2

PANEL SCHEDULE

1-PHASE, 3-WIRE, NEMA 3R 200A

200A

DESTINATION

E1

PDP#2 - PANEL SCHEDULE

SCALE N.T.S.

SCALE 1" = 20'

POWER DISTRIBUTION PANEL #2 - POWER PLAN

P D

P P

O W

E R P

L A

N

COMFORT STATION #2

1,3

PDP#2

2,4

PDP#2

250A

PEDESTAL 17, 18PEDESTAL 14, 15, 16

SPARE SPARE

SPACE

SPACE

SPACE

SPACE

SITE 14

SITE 15

SITE 16

SITE 17

SITE 18

SHEET LEGEND

XXXX

YYYY

#,# = CIRCUIT NUMBER

XXXX = SOURCE PANEL

YYYY = SIZE PHASE CONDUCTOR

INDICATED BY NUMBER OF LINES

PHASE CONDUCTOR, QUANTITY

EQUIPMENT GROUND, #4 AWG

#350 AWG, AL

#300 AWG, AL

#1 AWG, AL (TYP.)

PVC (SCH 80) CONDUIT

4/0 AWG, CU

ALL CONDUCTORS SHALL BE TYPE USE-2 W/ XLPE INSULATION RATED 600V.4.

CU = COPPER CONDUCTORS, AL = ALUMINUM CONDUCTORS. 3.

IN ADDITION TO SPARES INDICATED TO BE INSTALLED IN PANEL SCHEDULE.

CONTRACTOR SHALL PROVIDE TWO SPARE BREAKERS OF EACH TYPE/RATING2.

ALL HOME RUN CIRCUITS SHALL BE DIRECT-BURY AND FIELD ROUTED TO PDP#2.1.

(TYP OF 2)

M

R K T

W A

IN

L

A K

E

ROUTED THROUGH NEW 3" CONDUIT.

ROAD MEETING REQUIREMENTS OF NFPA 70. EACH HOME RUN CIRCUIT SHALL BE

UNDER EXISTING ROAD. CONDUITS SHALL BE INSTALLED BY BORING UNDER

NEW 3" PVC (SCH 80): PROVIDE AND INSTALL FIVE NEW 3" PVC (SCH 80) CONDUITS5.

UNDERGROUND UTILITY LOCATES.

AND APPROVED BY COR REPRESENTATIVE. LOCATION WILL BE DEPENDENT OF

ACTUAL LOCATION SHALL BE FIELD LOCATED WITHIN 10-30FT OF TRANSFORMER

AT LEAST 18" BELOW FINISHED GRADE. PDP LOCATION SHOWN IS APPROXIMATE,

NFPA 70. ALL STUB-UP CONDUITS INTO PDP#2 SHALL BE RGS AND SHALL EXTEND

STRUCTURE TO SECURE NEW PDP MEETING INSTALLATION REQUIREMENTS OF

SCHEDULE. CONTRACTOR SHALL PROVIDE AND CONSTRUCT MOUNTING

AND INCLUDE BRANCH CIRCUIT BREAKERS AS INDICATED IN PDP#2 PANEL

NEW 200A PDP#1: PROVIDE AND INSTALL NEW 200A PDP. PDP SHALL BE RATED4.

COMPANY.

CONTRACTOR. ITEMS SHALL MEET THE REQUIREMENTS OF THE POWER UTILITY

PAD AND STUB-UP CONDUITS SHALL BE THE RESPONSIBILITY OF THE

INSTALLED DUE TO THE TRANSFORMER UPGRADE INCLUDING TRANSFORMER

INCLUDED IN CONTRACT BID. ALL ITEMS NECESSARY TO BE REPLACED OR

ALL COSTS ASSOCIATED WITH UTILITY POWER UPGRADE, COST SHALL BE

TO EXISTING PDP AND NEW 200A PDP#2. CONTRACTOR RESPONSIBLE FOR

TO UPGRADE TRANSFORMER AS NEEDED TO PROVIDE 120/240V, 1-PHASE POWER

EXISTING UTILITY TRANSFORMER: COORDINATE WITH POWER UTILITY COMPANY3.

TO EXISTING 30A PEDESTALS.

EXISTING 400A PDP: DE-ENERGIZE AND DISCONNECT EXISTING BRANCH CIRCUITS2.

DIRECT BURIED CABLES.

BE PROVIDED WITH A PVC (SCH80) ENTRY CONDUIT PER NEC 551.80 TO PROTECT

CIRCUIT CONDUCTORS SHALL BE INSTALLED PER NEC 551. PEDESTALS SHALL

50A PEDESTALS. TYPICAL OF 5. NEW POWER SUPPLY PEDESTALS AND BRANCH

RV ELECTRIC PEDESTAL (TYP): REPLACE EXISTING 30A PEDESTALS WITH NEW1.

B3ECDDRG

APPENDIX H-3

File details come from the government source that posted it. Updated .