L24-25_MGate_Anchorage_As_Advertised_Dwgs__Part1.pdf
PDF 9 MB Posted
- Attached to
- LD 24 & 25 Miter Gate Anchorage
- Solicitation number
- W912P9-19-R-0033
About this file
Contract Drawings Part 1
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001 LOCKS AND DAMS NO. 24 & 25 - COVER SHEET M-L25-19_G-001.DGN B-501 LOCK AND DAM NO. 25 - MONOLITH 206 - INCLINOMETER DETAIL M-L25-19_B-501.DGN
G-002 LOCKS AND DAMS NO. 24 & 25 - INDEX OF DRAWINGS M-L25-19_G-002.DGN
G-003 LOCK AND DAM NO. 24 - GENERAL SYMBOLS, ABBREVIATIONS, AND NOTES M-L25-19_G-003.DGN
G-004 LOCK AND DAM NO. 24 - PROJECT LOCATION & VICINITY MAPS M-L25-19_G-004.DGN
G-005 LOCK AND DAM NO. 25 - PROJECT LOCATION & VICINITY MAPS M-L25-19_G-005.DGN
G-006 LOCK AND DAM NO. 24 - GENERAL LAYOUT WORK AND STORAGE AREAS M-L25-19_G-006.DGN G-007 LOCK AND DAM NO. 25 - GENERAL LAYOUT WORK AND STORAGE AREAS M-L25-19_G-007.DGN
S-001 LOCKS AND DAMS NOS. 24 AND 25 - GENERAL STRUCTURAL NOTES M-L25-19_S-001.DGN H-001 LOCK AND DAM NO. 24 - POOL AND TAILWATER STAGE HYDROGRAPHS 1939 TO 1953 M-L25-19_H-001.DGN SD101 LOCKS AND DAMS NO. 24 - DEMOLITION MONOLITH 120 M-L25-19_SD101.DGN H-002 LOCK AND DAM NO. 24 - POOL AND TAILWATER STAGE HYDROGRAPHS 1954 TO 1968 M-L25-19_H-002.DGN SD102 LOCKS AND DAMS NO. 24 - DEMOLITION MONOLITH 206 M-L25-19_SD102.DGN H-003 LOCK AND DAM NO. 24 - POOL AND TAILWATER STAGE HYDROGRAPHS 1969 TO 1983 M-L25-19_H-003.DGN SD103 LOCKS AND DAMS NO. 24 - DEMOLITION MONOLITH 140 M-L25-19_SD103.DGN H-004 LOCK AND DAM NO. 24 - POOL AND TAILWATER STAGE HYDROGRAPHS 1984 TO 1998 M-L25-19_H-004.DGN SD104 LOCKS AND DAMS NO. 24 - DEMOLITION MONOLITH 227 M-L25-19_SD104.DGN H-005 LOCK AND DAM NO. 24 - POOL AND TAILWATER STAGE HYDROGRAPHS 1999 TO 2013 M-L25-19_H-005.DGN SD105 LOCK AND DAM NO. 25 - DEMOLITION MONOLITH 126 M-L25-19_SD105.DGN H-006 LOCK AND DAM NO. 24 - POOL AND TAILWATER STAGE HYDROGRAPHS 2014 TO PRESENT M-L25-19_H-006.DGN SD106 LOCK AND DAM NO. 25 - DEMOLITION MONOLITH 206 M-L25-19_SD106.DGN H-007 LOCK AND DAM NO. 25 - POOL AND TAILWATER STAGE HYDROGRAPHS 1939 TO 1953 M-L25-19_H-007.DGN SD107 LOCK AND DAM NO. 25 - DEMOLITION MONOLITH 148 M-L25-19_SD107.DGN H-008 LOCK AND DAM NO. 25 - POOL AND TAILWATER STAGE HYDROGRAPHS 1954 TO 1968 M-L25-19_H-008.DGN SD108 LOCK AND DAM NO. 25 - DEMOLITION MONOLITH 227 M-L25-19_SD108.DGN H-009 LOCK AND DAM NO. 25 - POOL AND TAILWATER STAGE HYDROGRAPHS 1969 TO 1983 M-L25-19_H-009.DGN SB101 LOCK AND DAM NO. 24 - RECONSTRUCTION MONOLITH 120 M-L25-19_SB101.DGN H-010 LOCK AND DAM NO. 25 - POOL AND TAILWATER STAGE HYDROGRAPHS 1984 TO 1998 M-L25-19_H-010.DGN SB102 LOCK AND DAM NO. 24 - RECONSTRUCTION MONOLITH 206 M-L25-19_SB102.DGN H-011 LOCK AND DAM NO. 25 - POOL AND TAILWATER STAGE HYDROGRAPHS 1999 TO 2014 M-L25-19_H-011.DGN SB103 LOCK AND DAM NO. 24 - RECONSTRUCTION MONOLITH 140 M-L25-19_SB103.DGN H-012 LOCK AND DAM NO. 25 - POOL AND TAILWATER STAGE HYDROGRAPHS 2015 TO PRESENT M-L25-19_H-012.DGN
SB104 LOCK AND DAM NO. 24 - RECONSTRUCTION MONOLITH 227 M-L25-19_SB104.DGN
SB105 LOCK AND DAM NO. 25 - RECONSTRUCTION MONOLITH 126 M-L25-19_SB105.DGN
SB106 LOCK AND DAM NO. 25 - RECONSTRUCTION MONOLITH 206 M-L25-19_SB106.DGN
SB107 LOCK AND DAM NO. 25 - RECONSTRUCTION MONOLITH 148 M-L25-19_SB107.DGN
SB108 LOCK AND DAM NO. 25 - RECONSTRUCTION MONOLITH 227 M-L25-19_SB108.DGN
SB201 LOCK AND DAM NO. 24 - RECONSTRUCTION - EMBEDDED METALS MONOLITH 120 AND 206 M-L25-19_SB201.DGN SB202 LOCK AND DAM NO. 25 - RECONSTRUCTION - EMBEDDED METALS MONOLITH 126 AND 206 M-L25-19_SB202.DGN SB203 LOCK AND DAM NO. 25 - RECONSTRUCTION - EMBEDDED METALS MONOLITH 148 AND 227 M-L25-19_SB203.DGN SR501 LOCK AND DAM NO. 24 - REINFORCING - MONOLITH 120 - SHEET 1 OF 2 M-L25-19_SR501.DGN SR502 LOCK AND DAM NO. 24 - REINFORCING - MONOLITH 120 - SHEET 2 OF 2 M-L25-19_SR502.DGN
SR503 LOCK AND DAM NO. 24 - REINFORCING - MONOLITH 206 M-L25-19_SR503.DGN
SR504 LOCK AND DAM NO. 24 - REINFORCING - MONOLITH 140 M-L25-19_SR504.DGN
SR505 LOCK AND DAM NO. 24 - REINFORCING - MONOLITH 227 M-L25-19_SR505.DGN
SR506 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 126 - SHEET 1 OF 2 M-L25-19_SR506.DGN SR507 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 126 - SHEET 2 OF 2 M-L25-19_SR507.DGN SR508 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 206 - SHEET 1 OF 2 M-L25-19_SR508.DGN SR509 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 206 - SHEET 2 OF 2 M-L25-19_SR509.DGN SR510 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 148 - SHEET 1 OF 2 M-L25-19_SR510.DGN SR511 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 148 - SHEET 2 OF 2 M-L25-19_SR511.DGN SR512 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 227 - SHEET 1 OF 2 M-L25-19_SR512.DGN SR513 LOCK AND DAM NO. 25 - REINFORCING - MONOLITH 227 - SHEET 2 OF 2 M-L25-19_SR513.DGN
SC001 LOCK AND DAM NOS. 24 AND 25 - SURVEY CONTROL POINTS M-L25-19_SC001.DGN
SC501 LOCK AND DAM NO. 24 - UPSTREAM ANCHORAGE GRATING MODIFICATIONS - PLAN M-L25-19_SC501.DGN SC502 LOCK AND DAM NO. 25 - UPSTREAM ANCHORAGE GRATING MODIFICATIONS - PLAN M-L25-19_SC502.DGN SC503 LOCK AND DAM NOS. 24 AND 25 - UPSTREAM ANCHORAGE RECESS MODIFICATIONS - PLAN AND SECTION M-L25-19_SC503.DGN SC504 LOCK AND DAM NO. 24 - DOWNSTREAM ANCHORAGE GRATING MODIFICATIONS - PLAN M-L25-19_SC504.DGN SC505 LOCK AND DAM NO. 25 - DOWNSTREAM ANCHORAGE GRATING MODIFICATIONS - PLAN M-L25-19_SC505.DGN SC506 LOCK AND DAM NOS. 24 AND 25 - DOWNSTREAM ANCHORAGE RECESS MODIFICATIONS - PLAN AND SECTION M-L25-19_SC506.DGN SC507 LOCK AND DAM NOS. 24 AND 25 - UPSTREAM AND DOWNSTREAM ANCHORAGE RECESS - SECTIONS AND DETAILS M-L25-19_SC507.DGN SC508 LOCK AND DAM NOS. 24 AND 25 - UPSTREAM AND DOWNSTREAM NEW ANCHORAGE ASSEMBLY - SECTIONS AND DETAILS M-L25-19_SC508.DGN SC509 LOCK AND DAM NO. 24 - DOWNSTREAM SECONDARY ANCHORAGE MODIFICATIONS - SECTIONS AND DETAILS M-L25-19_SC509.DGN SC510 LOCK AND DAM NO. 25 - DOWNSTREAM SECONDARY ANCHORAGE MODIFICATIONS - SECTIONS AND DETAILS M-L25-19_SC510.DGN SC511 LOCK AND DAM NOS. 24 AND 25 - UPSTREAM AND DOWNSTREAM ANCHORAGE PIN PLATES - SECTIONS AND DETAILS M-L25-19_SC511.DGN SC512 LOCK AND DAM NOS. 24 AND 25 - LADDER, WALL ARMOR AND TOW HAULAGE - SECTIONS AND DETAILS M-L25-19_SC512.DGN SC513 LOCK AND DAM NO. 24 - FLOATING MOORING BITT MODIFICATIONS M-L25-19_SC513.DGN SC514 LOCK AND DAM NO. 25 - FLOATING MOORING BITT MODIFICATIONS M-L25-19_SC514.DGN SC515 LOCK AND DAM NOS. 24 AND 25 - MISCELLANEOUS DETAILS - SHEET 1 OF 2 M-L25-19_SC515.DGN SC516 LOCK AND DAM NOS. 24 AND 25 - MISCELLANEOUS DETAILS - SHEET 2 OF 2 M-L25-19_SC516.DGN SC600 LOCK AND DAM NOS. 24 AND 25 - MITER GATE LAYDOWN ARRANGEMENT M-L25-19_SC600.DGN
SC601 LOCK AND DAM NOS. 24 AND 25 - GFE TURNING FOOT DETAILS M-L25-19_SC601.DGN
SC602 LOCK AND DAM NOS. 24 AND 25 - MAIN LOCK UPSTREAM BULKGEAD ARRANGEMENT M-L25-19_SC602.DGN SC603 LOCK AND DAM NOS. 24 AND 25 - MITER GATE ARRANGEMENT ON GOVERNMENT FURNISHED BARGE M-L25-19_SC603.DGN
M-001 LOCK AND DAM NOS. 24 AND 25 - MECHANICAL ISOMETRIC M-L25-19_M-001.DGN
M-501 LOCK AND DAM NOS. 24 AND 25 - MECHANICAL ANCHOR BAR DETAILS M-L25-19_M-501.DGN M-502 LOCK AND DAM NOS. 24 AND 25 - MECHANICAL GUDGEON LINK AND ASSEMBLY DETAILS M-L25-19_M-502.DGN M-503 LOCK AND DAM NOS. 24 AND 25 - MECHANICAL ANCHORAGE CONNECTING PIN DETAILS M-L25-19_M-503.DGN M-504 LOCK AND DAM NOS. 24 AND 25 - MECHANICAL ANCHORAGE BUSHINGS DETAILS M-L25-19_M-504.DGN M-511 LOCK AND DAM NOS. 24 AND 25 - MECHANICAL PIN CONNECTION ASSEMBLIES M-L25-19_M-511.DGN
E-001 ELECTRICAL GENERAL NOTES & ABBRIVIATIONS M-L25-19_E-001.DGN
E-101 LOCK AND DAM NO. 24 - ELECTRICAL PLAN, MONOLITH 120 M-L25-19_E-101.DGN
E-102 LOCK AND DAM NO. 24 - ELECTRICAL PLAN, MONOLITH 206 M-L25-19_E-102.DGN
E-103 LOCK AND DAM NO. 24 - ELECTRICAL PLAN, MONOLITH 140 M-L25-19_E-103.DGN
E-104 LOCK AND DAM NO. 24 - ELECTRICAL PLAN, MONOLITH 227 M-L25-19_E-104.DGN
E-105 LOCK AND DAM NO. 25 - ELECTRICAL PLAN, MONOLITH 126 M-L25-19_E-104.DGN
E-106 LOCK AND DAM NO. 25 - ELECTRICAL PLAN, MONOLITH 206 M-L25-19_E-104.DGN
E-107 LOCK AND DAM NO. 25 - ELECTRICAL PLAN, MONOLITH 148 M-L25-19_E-104.DGN
E-108 LOCK AND DAM NO. 25 - ELECTRICAL PLAN, MONOLITH 227 M-L25-19_E-104.DGN
INDEX
GENERAL
ELECTRICAL
STRUCTURAL
MECHANICAL
GEOTECHNICAL
HYDRAULIC
RS-100 LOCK AND DAM NO. 24 & NO. 25 - REFERENCE DRAWING - L24 LOWER GATE DS ELEV AND SECTIONS M-L25-19_RS-100.DGN RS-101 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 LOWER GATE U.S. ELEV AND VERT GIRDER M-L25-19_RS-101.DGN RS-102 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - SKIN PL, INTERCOSTALS SECTS & DETAILS M-L25-19_RS-102.DGN RS-103 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 TOP GIRDER PLAN SECTIONS AND DETAILS M-L25-19_RS-103.DGN RS-104 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L 24 BOTTOM GIRDER MITER SEAL PLAN & DET M-L25-19_RS-104.DGN RS-105 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 QUOIN GIRDER & DS DIAGONALS EL & SECT M-L25-19_RS-105.DGN RS-106 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 MITER GIRDER & US DIAGONALS EL & SECT M-L25-19_RS-106.DGN RS-107 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 DOWNSTREAM ELEVATION AND SECTIONS M-L25-19_RS-107.DGN RS-108 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 U.S. ELEVATION AND VERTICAL GIRDER M-L25-19_RS-108.DGN RS-109 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - SKIN PL INTERCOSTALS & VERT BEAM SECT+DET M-L25-19_RS-109.DGN RS-110 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 TOP GIRDER PLAN SECTIONS AND DETAILS M-L25-19_RS-110.DGN RS-111 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 BOTTOM GIRDER MITER SEAL PLAN & DETAILS M-L25-19_RS-111.DGN RS-112 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 QUOIN GIRDER & D.S. DIAGONALS EL + SECTS M-L25-19_RS-112.DGN RS-113 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 MITER GIRDER & U.S. DIAGONALD ELEV + SECTS M-L25-19_RS-113.DGN RS-114 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 U.S. DIAGOLALS AND PARTS DETAILS M-L25-19_RS-114.DGN RS-115 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 D.S. DIAGONALS AND PARTS DETAILS M-L25-19_RS-115.DGN RS-116 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 ANCHOR BARS AND RELATED PARTS DETAILS M-L25-19_RS-116.DGN RS-117 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 PINTLE DETAILS AND ASSEMBLY M-L25-19_RS-117.DGN RS-118 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 GUDGEON PIN DETAILS AND ASSEMBLY M-L25-19_RS-118.DGN RS-119 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L 24 WALKWAY M-L25-19_RS-119.DGN RS-120 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 LOCATION GATE ANCHOR & RECESS-QUOIN SHOE M-L25-19_RS-120.DGN RS-121 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 LOCATION GATE ANCHOR & RECESS-QUOIN SHOE M-L25-19_RS-121.DGN RS-122 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 GATE ANCHOR U.S. & AUX. RECESS DTLS M-L25-19_RS-122.DGN RS-123 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 GATE ANCHOR U.S. & AUX. RECESS DTLS M-L25-19_RS-123.DGN RS-124 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 GATE ANCHOR MODIFICATION DETAILS M-L25-19_RS-124.DGN RS-125 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 GATE ANCHOR U.S. & AUX. RECESS DTLS M-L25-19_RS-125.DGN RS-126 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 D.S. ANCHORAGE RECESS M-L25-19_RS-126.DGN RS-127 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 D.S. ANCHORAGE RECESS M-L25-19_RS-127.DGN RS-128 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 D.S. ANCHORAGE RECESS M-L25-19_RS-128.DGN RS-129 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 D.S. ANCHORAGE ASSEMBLY M-L25-19_RS-129.DGN RS-130 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 D.S. ANCHORAGE ASSEMBLY M-L25-19_RS-130.DGN RS-131 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 MITER GATE D.S. ELEV & SECTS M-L25-19_RS-131.DGN RS-132 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 U.S. GATE ELEV. & VERT GIRDER PLAN M-L25-19_RS-132.DGN RS-133 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 SKIN PL, INTERCOSTALS & VERT BEAM M-L25-19_RS-133.DGN RS-134 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 TOP GIRDER PLAN, ELEVATION & DETAILS M-L25-19_RS-134.DGN RS-135 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 BOTTOM GIRDER MITER SEAL PLAN & DETAILS M-L25-19_RS-135.DGN RS-136 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 QUOIN GIRDER & D.S. DIAGONALS ELEV & SECTS M-L25-19_RS-136.DGN RS-137 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 MITER GIRDER U.S. DIAGONALS EL & SECTS M-L25-19_RS-137.DGN RS-138 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. ELEVATION AND SECTIONS M-L25-19_RS-138.DGN RS-139 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 U.S. ELEVATION & VERT GIRDERS M-L25-19_RS-139.DGN RS-140 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 SKIN PL,INTERCOSTALS & VERT BM SECT & DET M-L25-19_RS-140.DGN RS-141 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 TOP GIRDER PLAN, SECT AND DETAILS M-L25-19_RS-141.DGN RS-142 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 BOTT GIRDER, MITER SEAL PLAN AND DETAILS M-L25-19_RS-142.DGN RS-143 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 QUOIN GIRDER D.S. DIAGONALS ELEV & SECTS M-L25-19_RS-143.DGN RS-144 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 MITER GIRDER & U.S. DIAGONALS ELEV & SECTS M-L25-19_RS-144.DGN RS-145 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 DIAGONALS & MISC PARTS AND DETAILS M-L25-19_RS-145.DGN RS-146 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 DIAGONALS AND MISC PARTS & DETAILS M-L25-19_RS-146.DGN RS-147 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 PINTLE DETAILS AND ASSEMBLY M-L25-19_RS-147.DGN RS-148 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 GUDGEON PIN DETAILS AND ASSEMBLY M-L25-19_RS-148.DGN RS-149 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 WALKWAY PLAN AND DETAILS M-L25-19_RS-149.DGN RS-150 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 LOCATION OF GATE ANCHORAGE & QUOIN SHOE M-L25-19_RS-150.DGN RS-151 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 LOCATION-GATE ANCHOR & QUOIN SHOE RECESS M-L25-19_RS-151.DGN RS-152 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 DTLS GATE ANCHOR, QUOIN & PINTLE SHOE M-L25-19_RS-152.DGN RS-153 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. M-GATE ANCHORAGE RECESS DTLS SHT1 M-L25-19_RS-153.DGN RS-154 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. GATE ANCHORAGE RECESS DTLS SHT 2 M-L25-19_RS-154.DGN RS-155 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. M-GATE ANCHORAGE RECESS DTLS SHT 3 M-L25-19_RS-155.DGN RS-156 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. M- GATE ANCHORAGE ASSEMBLY SHT 1 M-L25-19_RS-156.DGN RS-157 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. M-GATE ANCHORAGE ASS'Y SHT 2 M-L25-19_RS-157.DGN RS-158 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 D.S. M- GATE ANCHORAGE ASSEMBLY SHT 3 M-L25-19_RS-158.DGN RS-159 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 UPPER GATE DOWNSTREAM ELEV. AND SECTS. M-L25-19_RS-159.DGN RS-160 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L24 - UPSTREAM 25 FT MITER GATE M-L25-19_RS-160.DGN RS-161 LOCK AND DAM NOS. 24 AND 25 - REFERENCE DRAWING - L25 UPSTREAM 27 FT MITER GATE M-L25-19_RS-161.DGN
RE101 LOCK AND DAM NO. 24 - REFERENCE ELECTRICAL PLAN L24 M-L25-19_RE101.DGN
RE102 LOCK AND DAM NO. 25 - REFERENCE ELECTRICAL PLAN L25 M-L25-19_RE102.DGN
INDEX
REFERENCE DRAWINGS
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E l m
E l m
E l m
F F
8+
F H
G a t e
G I
E
E
C O
F H
S
S
S
P P
E
D
E l m
Rock
Gate
W W W W W WWW
WW
WWW
W
W
SS
S
S
S
AIRAIR AIR AIR
AIR AIR
AI
R
A I R
AIRAIR
W
W
W
DS: c:\users\b3eddwjm\pw_working\mvs\d0196767\AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg
2019/05/25
2019/05/25
L
IN
C O
L N C
O U
N T
Y
M
IS
S O
U R I
U P
P E
R M
IS
S
IS
S
IP
P I
R
IV
E R
S T
E V
E N M
H O
B B
S P .E
L O
C K A
N D D
A M N
O
G-007
W P -X
X -X
X X
X
A N
S I
T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W O
R K A
N D S
T O
R A
G E A
R E
A S
G E
N E
R A
L L
A Y
O U
T
C1 SCALE: 1" = 40'
N
P R
O J E
C T N
U M
B E
R
F
IL
E N
A M
E
LOCK AND DAM NO. 24 - GENERAL LAYOUT - WORK AND STORAGE AREAS
M -L
-1
G -0
.d g n
M -L
-1
J U
N E
M
IT
E R G
A T
E A
N C
H O
R A
G E R
E P
L A
C E
M E
N T
L O
C K A
N D D
A M N
O N
O
50' 100'0
MODIFICATIONS
ANCHORAGE
MITER GATE
ANCHORAGE
NEW MITER GATE
MODIFICATIONS
ANCHORAGE
MITER GATE
ANCHORAGE
NEW MITER GATE
ANCHORAGE
NEW MITER GATE
ANCHORAGE
NEW MITER GATE
ANCHORAGE
NEW MITER GATE
ANCHORAGE
NEW MITER GATE
CROSSOVER
CROSSOVER
C MAIN LOCKL
SILL
BULKHEAD
BUILDING
CONTROL
OFFICE
LOCKMASTERS
BUILDINGS
MAINTENANCE
C AUX. LOCKL
GATE
SECURITY
GATE
SECURITY
BNSF RIGHT-OF-WAY
BNSF RAILROAD TRACK
WALL
INTERMEDIATE
WALL
LAND
MARINE STAGING AREA
RIVER SIDE ONLY
PARKING
LIMITED CONTRACTOR LAYDOWN AREA
PARKING AND CONSTRUCTION
LIMITED CONTRACTOR
GATE SILL
UPSTREAM MITER
GATE SILL
DOWNSTREAM MITER
B .M .M
W .J .M
A .L .S
THE LOCK FLOOR AND CROSSOVERS.
USE OF FLOATING PLANT SPUDDING OPERATION TO PREVENT DAMAGE TO
5. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY DURING
STORAGE AREAS.
CONTRACTOR IS RESPONSIBLE FOR SNOW REMOVAL IN WORK AND 4.
TO ACCUMULATE.
WORK AND STORAGE AREAS. DEBRIS AND WASTE SHALL NOT BE ALLOWED
CONTRACTOR RESEPONSIBLE FOR DAILY HOUSEKEEPING CLEANUP OF 3.
CONTRACT.
CONTRACTOR STORAGE AREAS ARE AVAILABLE FOR DURATION OF 2.
COMPLETION OF THE PROJECT.
STAGING SHALL BE RESTORED TO THEIR ORIGINAL CONDITION FOLLOWING
1. ALL AREAS USED FOR CONSTRUCTION LAYDOWN OR CONSTRUCTION
GENERAL SHEET NOTES
P -1
-R -0
SEE TABLE 1.
MONOLITH 206.
SEE TABLE 1.
MONOLITH 120.
SEE TABLE 1.
MONOLITH 227.
SEE TABLE 1.
MONOLITH 140.
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: c:\users\b3eddwjm\pw_working\mvs\d0196767\AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg
2019/05/27
2019/05/27
L
IN
C O
L N C
O U
N T
Y
M
IS
S O
U R I
U P
P E
R M
IS
S
IS
S
IP
P I
R
IV
E R
S T
E V
E N M
H O
B B
S P .E
L O
C K A
N D D
A M N
O
G-008
W P -X
X -X
X X
X
A N
S I
T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W O
R K A
N D S
T O
R A
G E A
R E
A S
G E
N E
R A
L L
A Y
O U
T
C1 SCALE: 1" = 40'
N
INTERMEDIATE WALL
C MAIN LOCKL
P R
O J E
C T N
U M
B E
R
F
IL
E N
A M
E
LOCK AND DAM NO. 25 - GENERAL LAYOUT - WORK AND STORAGE AREAS
PLATFORM
OBSERVATION
BUILDING
MAINTENANCE
HOUSE
CENTRAL CONTROL
L
MITER GATES (NOT USED)
C AUXILLARY LOCK
GUARDWALL
LAND WALL
LC
P
IN
T L E A
U X L
O C
K S
T A
M -L
-1
G -0
.d g n
M -L
-1
J U
N E
M
IT
E R G
A T
E A
N C
H O
R A
G E R
E P
L A
C E
M E
N T
L O
C K A
N D D
A M N
O N
O
50' 100'0
MARINE STAGING AREA
RIVER SIDE ONLY
SILL
BULKHEAD
GATE SILL
UPSTREAM MITER
GATE SILL
DOWNSTREAM MITER
BUILDING
MAINTENANCE
GATE
SECURITY
B .M .M
W .J .M
A .L .S
THE LOCK FLOOR AND CROSSOVERS.
USE OF FLOATING PLANT SPUDDING OPERATION TO PREVENT DAMAGE TO
5. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY DURING
STORAGE AREAS.
CONTRACTOR IS RESPONSIBLE FOR SNOW REMOVAL IN WORK AND 4.
TO ACCUMULATE.
WORK AND STORAGE AREAS. DEBRIS AND WASTE SHALL NOT BE ALLOWED
CONTRACTOR RESEPONSIBLE FOR DAILY HOUSEKEEPING CLEANUP OF 3.
CONTRACT.
CONTRACTOR STORAGE AREAS ARE AVAILABLE FOR DURATION OF 2.
COMPLETION OF THE PROJECT.
STAGING SHALL BE RESTORED TO THEIR ORIGINAL CONDITION FOLLOWING
1. ALL AREAS USED FOR CONSTRUCTION LAYDOWN OR CONSTRUCTION
GENERAL SHEET NOTES
MACHINERY AND PLATFORM
EXISTING CULVERT VALVE
GATE ANCHORAGE
NEW PRIMARY MITER
GATE ANCHORAGE
NEW SECONDARY MITER
GATE ANCHORAGE
NEW PRIMARY MITER
GATE ANCHORAGE
NEW SECONDARY MITER
GATE ANCHORAGE
NEW PRIMARY MITER
GATE ANCHORAGE
NEW PRIMARY MITER
ANCHORAGE MODIFICATIONS
SECONDARY MITER GATE
ANCHORAGE MODIFICATIONS
SECONDARY MITER GATE
CROSSOVER
CROSSOVER
P -1
-R -0
LAYDOWN AREA
AND CONSTRUCTION
CONTRACTOR PARKING
SEE TABLE 1.
MONOLITH 206.
SEE TABLE 1.
MONOLITH 126.
SEE TABLE 1.
MONOLITH 227.
SEE TABLE 1.
MONOLITH 148.
| M-L25-19_G-002 |
| M-L25-19_G-003 |
| M-L25-19_G-004 |
| M-L25-19_G-005 |
| M-L25-19_G-006 |
| M-L25-19_S-001 |
File details come from the government source that posted it.