A22_Attachment_3_Specs_for_Kaskaskai_Scour_Repair.pdf

PDF 2 MB Posted

Attached to
Jerry F. Costello Lock & Dam Upstream Scour Repair Kaskaskia River
Solicitation number
W912P918R0026
Issued by

About this file

Specifications for Kaskaskia Scouring Repair

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers St. Louis District

JERRY F. COSTELLO LOCK AND

DAM

UPSTREAM SCOUR REPAIR

KASKASKIA RIVER

RANDOLPH COUNTY, ILLINOIS

SPECIFICATIONS

SOLICITATION NUMBER: W912P9-18-X-0XXX

MAY 2018

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 08 00 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 30 ENVIRONMENTAL PROTECTION

01 13 20 PROJECT SCHEDULE

01 14 40 CONTRACTOR QUALITY CONTROL

01 15 00 TEMPORARY CONSTRUCTION FACILITIES

01 22 00 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 71 23.00 13 CONTRACTOR SURVEYS

DIVISION 03 - CONCRETE

03 20 00.00 10 CONCRETE REINFORCING

03 35 10 TREMIE CONCRETE

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 31 - EARTHWORK

31 23 20 UNDERWATER EXCAVATION

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 22 15 CONTRACT DIVING OPERATIONS

35 37 00 WATER BASED STONE PROTECTION

-- End of Project Table of Contents --

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 08 00

SPECI AL CONTRACT REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCE DRAWI NGS

1. 2 PAY REQUESTS

1. 3 PHYSI CAL DATA ( APR 1984) FAR 52. 236- 4

1. 4 PUBLI C UTI LI TI ES AND PRI VATE I MPROVEMENTS

1. 5 PARTI AL PAYMENT

1. 6 CERTI FI CATES OF COMPLI ANCE

1. 7 PURCHASE ORDERS

1. 8 SAFETY AND HEALTH REQUI REMENTS MANUAL EM 385- 1- 1

1. 9 ACCI DENT I NVESTI GATI ONS AND REPORTI NG

1. 10 ACCI DENT PREVENTI ON PROGRAM

1. 11 DAI LY I NSPECTI ONS

1. 12 ENVI RONMENTAL LI TI GATI ON

1. 13 SUBCONTRACTS

1. 14 REQUI RED I NSURANCE

1. 15 PROTECTI ON OF MATERI AL AND WORK

1. 16 CONTAMI NATI ON OF WATER

1. 17 ORDER AND COORDI NATI ON OF WORK

1. 18 SUBMI TTALS

1. 19 AS- BUI LT DRAWI NGS

1. 20 MEANS OF ESCAPE FOR PERSONNEL QUARTERED OR WORKI NG ON FLOATI NG

PLANT

1. 21 EMERGENCY ALARMS AND SI GNALS

1. 22 USE OF MECHANI ZED EQUI PMENT ON FLOATI NG PLANT

1. 23 OBSTRUCTI ON OF NAVI GABLE WATERWAYS ( DEC 1991) DFARS 252. 236- 7002

1. 24 SI GNAL LI GHTS

1. 25 I NSPECTI ON FACI LI TI ES

1. 26 STONE SOURCES

1. 27 PARTNERI NG

1. 28 CONTRACTOR PERFORMANCE EVALUATI ONS

1. 29 SECURI TY REQUI REMENTS

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 08 00 Page 1

SECTI ON 00 08 00

SPECI AL CONTRACT REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCE DRAWI NGS

a. One set of t he r ef er ence dr awi ngs l i s t ed on Sheet G- 001 whi ch cover det ai l s of t he exi st i ng st r uct ur e, wi l l be i ncl uded i n each set of t he cont r act dr awi ngs f ur ni shed t he Cont r act or wi t hout char ge, i n accor dance wi t h Cont r act Cl ause DFARS 252. 236- 7001. Dr awi ngs showi ng addi t i onal det ai l s ar e avai l abl e f or exami nat i on at t he Dept . of t he Ar my, St . Loui s Di st r i ct , Cor ps of Engi neer s, St . Loui s, Mi ssour i .

Addi t i onal pr i nt s of r ef er ence dr awi ngs wi l l be f ur ni shed t o t he Cont r act or on r equest at t he cost of r epr oduct i on.

b. The st at i oni ng and di mensi ons shown on t he cont r act and r ef er ence dr awi ngs f or t he exi st i ng st r uct ur e have been t aken f r om t he or i gi nal cont r act dr awi ngs and t he shop dr awi ngs f or t he or i gi nal const r uct i on. The Cont r act or shal l ver i f y al l t he above st at i oni ng and di mensi ons and shal l be r esponsi bl e f or maki ng t he new mat er i al and wor k f i t t he exi st i ng condi t i ons.

1. 2 PAY REQUESTS

Pay r equest s aut hor i zed i n t he Cont r act Cl ause ent i t l ed " Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s" , wi l l be pai d pur suant t o t he c l ause ent i t l ed " Pr ompt Payment f or Const r uct i on Cont r act s" . Pay r equest s shal l be submi t t ed on ENG For m 93 and 93a, " Payment Est i mat e- Cont r act Per f or mance" and " Cont i nuat i on" , r espect i vel y. Al l i nf or mat i on and subst ant i at i on r equi r ed by t he i dent i f i ed cont r act c l auses shal l be submi t t ed wi t h t he ENG For m 93, and t he r equi r ed cer t i f i cat i on shal l be i ncl uded on t he l ast page of t he ENG For m 93a, s i gned by an aut hor i zed of f i c i al of t he Cont r act or and dat ed when si gned. The desi gnat ed bi l l i ng of f i ce i s t he Of f i ce of t he Ar ea Engi neer .

1. 3 PHYSI CAL DATA ( APR 1984) FAR 52. 236- 4

Dat a and i nf or mat i on f ur ni shed or r ef er r ed t o bel ow i s f ur ni shed f or t he Cont r act or ' s i nf or mat i on. The Gover nment shal l not be r esponsi bl e f or any i nt er pr et at i on of or concl usi on dr awn f r om t he dat a or i nf or mat i on by t he Contractor.

a. Physi cal Condi t i ons. The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons by sur veys.

b. Weat her Condi t i ons. I nf or mat i on wi t h r espect t o t emper at ur es and pr eci pi t at i on may be obt ai ned f r om t he Nat i onal Weat her Ser vi ce.

c. Tr anspor t at i on Faci l i t i es. Rai l r oads and hi ghways ser ve t he gener al ar ea of t he wor k. Wat er t r anspor t at i on i s avai l abl e t o t he s i t e of t he wor k.

d. Condi t i on of Ri ver Channel . Dat a r el at i ng t o r i ver st ages, soundi ngs and f l ow may be obt ai ned by cal l i ng t he St . Loui s Di st r i ct Cor ps of Engi neer s Wat er Cont r ol Management Of f i ce at ei t her

DOCUMENT 00 08 00 Page 2

314- 331- 8342 or 800- 432- 1208, or by v i s i t i ng t he St . Loui s Di st r i ct Cor ps of Engi neer s Wat er Cont r ol websi t e at http://mvs-wc.mvs.usace.army.mil .

e. Channel Tr af f i c . Out si de of t he l ock c l osur e per i od, t her e i s moder at e commer ci al and pl easur e t r af f i c oper at i ng i n t he Kaskaski a Ri ver adj acent t o t he s i t e. The passage of l ar ge cr af t may del ay oper at i ons i n t he channel .

f . Obst r uct i on of Channel . Most wor k under t hi s cont r act shal l t ake pl ace dur i ng a l ock c l osur e. The Cont r act or shal l not be concer ned wi t h navi gat i on dur i ng t he cl osur e per i od. The Gover nment wi l l not under t ake t o keep t he channel f r ee f r om vessel s or ot her obst r uct i ons, except t o t he ext ent of such r egul at i ons, i f any, as may be pr escr i bed by t he Secr et ar y of t he Ar my, i n accor dance wi t h t he pr ovi s i ons of Sect i on 7 of t he Ri ver and Har bor Act appr oved 8 August 1917. The Cont r act or wi l l be r equi r ed t o conduct t he wor k i n such manner as t o obst r uct navi gat i on as l i t t l e as possi bl e, and i n case t he Cont r act or ' s pl ant so obst r uct s t he channel as t o make di f f i cul t or endanger t he passage of vessel s, sai d pl ant shal l be pr ompt l y moved on t he appr oach of any vessel t o such an ext ent as may be necessar y t o af f or d a pr act i cabl e passage. Upon compl et i on of t he wor k under t hi s cont r act , al l pl ant i ncl udi ng r anges, buoys, pi l es, and ot her mar ks pl aced i n navi gabl e wat er s or on shor e by t he Cont r act or , shal l be pr ompt l y r emoved.

1. 4 PUBLI C UTI LI TI ES AND PRI VATE I MPROVEMENTS

a. Unl ess ot her wi se speci f i ed, shown on t he dr awi ngs, or st at ed i n wr i t i ng by t he Cont r act i ng Of f i cer , t he Cont r act or shal l not move or di st ur b any publ i c ut i l i t i es or pr i vat e i mpr ovement s. Such r emoval s, al t er at i ons, and/ or r el ocat i ons, wher e necessar y, wi l l be made by ot her s. The l ocat i ons shown on t he dr awi ngs f or under gr ound ut i l i t i es ar e appr oxi mat e onl y. The exact l ocat i ons of such ut i l i t i es shal l be det er mi ned by t he Cont r act or i n t he f i el d pr i or t o commenci ng const r uct i on oper at i ons i n t hei r v i c i ni t y.

b. The at t ent i on of t he Cont r act or i s di r ect ed t o t he possi bi l i t y t hat publ i c ut i l i t i es or pr i vat e i mpr ovement s may be encount er ed wi t hi n t he const r uct i on l i mi t s, some of whi ch may be bur i ed, and t he exi st ence of whi ch i s pr esent l y not known. Shoul d any such ut i l i t i es or i mpr ovement s be encount er ed, t he Cont r act or shal l i mmedi at el y not i f y t he Cont r act i ng Of f i cer so t hat a det er mi nat i on may be made as t o whet her t hey shal l be r emoved, r el ocat ed, or al t er ed. Af t er such det er mi nat i on i s made, t he Cont r act or shal l , i f so di r ect ed by t he Cont r act i ng Of f i cer , r emove, r el ocat e, or al t er t hem as r equi r ed and an equi t abl e adj ust ment wi l l be made. I n t he event t he Cont r act i ng Of f i cer ar r anges f or such r emoval s, al t er at i ons, or r el ocat i ons t o be per f or med by ot her s, t he Cont r act or shal l cooper at e wi t h such ot her s dur i ng t he l at t er s ' r emoval , al t er at i on, or r el ocat i on oper at i ons.

1. 5 PARTI AL PAYMENT

At t he di scr et i on of t he Cont r act i ng Of f i cer , par t i al payment wi l l be made f or equi pment del i ver ed and st or ed on si t e or of f s i t e pr ovi di ng such st or age i s i n accor dance wi t h t he pr ovi s i ons of t hese speci f i cat i ons and t he Cont r act or f ur ni shes sat i sf act or y evi dence t hat t i t l e t o such equi pment has been acqui r ed and t hat i t wi l l be ut i l i zed on t he wor k cover ed by t hese speci f i cat i ons. Par t i al payment i s def i ned as t he

DOCUMENT 00 08 00 Page 3 i nvoi ce amount pl us shi ppi ng cost s. I f t he equi pment i s st or ed of f s i t e, t he Gover nment shal l have t he r i ght t o i nspect t he equi pment .

1. 6 CERTI FI CATES OF COMPLI ANCE

Any cer t i f i cat es r equi r ed f or demonst r at i ng pr oof of compl i ance of mat er i al s wi t h speci f i cat i on r equi r ement s shal l be execut ed i n 3 copi es.

Each cer t i f i cat e shal l i ncl ude t he si gnat ur e and t i t l e of an of f i c i al aut hor i zed t o cer t i f y i n behal f of t he manuf act ur i ng company and shal l cont ai n t he name and addr ess of t he Cont r act or , t he pr oj ect name and l ocat i on, and t he quant i t y and dat e or dat es of shi pment or del i ver y t o whi ch t he cer t i f i cat es appl y. Copi es of l abor at or y t est r epor t s submi t t ed wi t h cer t i f i cat es shal l cont ai n t he name and addr ess of t he t est i ng l abor at or y and t he dat e or dat es of t he t est s t o whi ch t he r epor t appl i es. Cer t i f i cat i on shal l not be const r ued as r el i evi ng t he Cont r act or f r om r esponsi bi l i t y f or f ur ni shi ng sat i sf act or y mat er i al i f , af t er t est s ar e per f or med on sel ect ed sampl es, t he mat er i al i s f ound not t o meet t he speci f i c r equi r ement s.

1. 7 PURCHASE ORDERS

Two copi es of al l pur chase or der s f or ot her t han st ock mat er i al s showi ng t he f i r m names and addr esses and l i s t of mat er i al shal l be f ur ni shed t o t he Cont r act i ng Of f i cer or an aut hor i zed r epr esent at i ve as soon as i ssued.

1. 8 SAFETY AND HEALTH REQUI REMENTS MANUAL EM 385- 1- 1

The Saf et y and Heal t h Requi r ement s Manual EM 385- 1- 1 f or ms a par t of t hese speci f i cat i ons. EM 385- 1- 1 and i t s changes ar e avai l abl e at http://www.publications.usace.army.mil/USACEPublications/Engineer-Manuals/ .

Cont r act or shal l be r esponsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s solicitation.

1. 9 ACCI DENT I NVESTI GATI ONS AND REPORTI NG

Ref er t o EM 385- 1- 1, Par agr aph 01. D. Acci dent s, i nvol v i ng cont r act or and/ or subcont r act or empl oyees per f or mi ng any wor k or r el at ed wor k on a USACE pr oj ect , shal l be i nvest i gat ed and r epor t ed i mmedi at el y t o t he Cont r act i ng Of f i cer or aut hor i zed Cont r act i ng Of f i cer ' s r epr esent at i ve.

Thi s r epor t i ng r equi r ement appl i es t o on- si t e or of f - s i t e acci dent s. Upon r ecei pt of t he i ni t i al acci dent r epor t not i f i cat i on, t he Cont r act i ng Of f i cer shal l i ssue addi t i onal gui dance concer ni ng cont i nui ng pr oj ect oper at i ons whi ch may i ncl ude a " cease wor k" di r ect i ve. I f a cease wor k di r ect i ve i s i ssued, t he Cont r act or wi l l not be al l owed t o r esume wor k r el at ed t o t he acci dent unt i l al l condi t i ons of t he " cease wor k" di r ect i ve ar e met . Af t er t he i ni t i al not i f i cat i on, t he Cont r act or shal l ensur e a f or mal i nvest i gat i on i s conduct ed and r epor t s ar e compl et ed by t he i mmedi at e super vi sor of t he empl oyee( s) i nvol ved and r epor t ed t o t he Cont r act i ng Of f i cer or an aut hor i zed r epr esent at i ve wi t hi n one wor ki ng day af t er t he acci dent occur s. The acci dent I nvest i gat i on r epor t shal l be made on ENG For m 3394.

1. 10 ACCI DENT PREVENTI ON PROGRAM

Ref er t o Cont r act Cl ause FAR 52. 236- 13 ent i t l ed, " Acci dent Pr event i on" .

Wi t hi n 15 days af t er r ecei pt of Not i ce of Awar d of t he cont r act , and at l east 7 days pr i or t o t he pr ewor k conf er ence, t he or i gi nal and one copy of t he Acci dent Pr event i on Pr ogr am shal l be submi t t ed t o t he Cont r act i ng

DOCUMENT 00 08 00 Page 4

Of f i cer f or r evi ew. See EM 385- 1- 1 Appendi x A ( 2014 Edi t i on) and checkl i st i ncl uded at t he end of t hi s sect i on f or gui dance i n cr eat i ng t he Acci dent Pr event i on Pl an.

The pr ogr am shal l al so i ncl ude a copy of company pol i cy st at ement of acci dent pr event i on and any ot her gui dance st at ement s nor mal l y pr ovi ded new empl oyees. Each company empl oyee shal l be r equi r ed t o s i gn t he company pol i cy st at ement of acci dent pr event i on t o ver i f y t hat al l empl oyees have been i nf or med of t he saf et y pr ogr am, and such si gned st at ement s shal l be mai nt ai ned at t he pr oj ect s i t e.

When mar i ne pl ant and equi pment ar e i n use under t hi s cont r act , t he r equi r ement s of EM 385- 1- 1, Sect i on 19 shal l be met .

The Cont r act or shal l not commence physi cal wor k at t he s i t e unt i l t he pr ogr am has been r evi ewed and f ound accept abl e by t he Cont r act i ng Of f i cer , or an aut hor i zed r epr esent at i ve. The Cont r act or shal l submi t f or appr oval t he Act i v i t y Hazar d Anal ysi s f or each phase of const r uct i on pr i or t o t he begi nni ng of wor k i n each phase. Al so r ef er t o Sect i on 1 of EM 385- 1- 1.

1. 11 DAI LY I NSPECTI ONS

The Cont r act or shal l per f or m dai l y saf et y i nspect i ons and r ecor d t hem i n RMS. Repor t s of dai l y i nspect i ons shal l be mai nt ai ned at t he j ob s i t e.

The r epor t s shal l be r ecor ds of t he dai l y i nspect i ons and r esul t i ng act i ons. Each r epor t shal l i ncl ude, as a mi ni mum, t he f ol l owi ng:

a. Phase( s) of const r uct i on under way dur i ng t he i nspect i on.

b. Locat i ons of ar eas i nspect i ons wer e made.

c. Resul t s of i nspect i on, i ncl udi ng nat ur e of def i c i enci es obser ved and cor r ect i ve act i ons t aken, or t o be t aken, dat e, and si gnat ur e of t he per son r esponsi bl e f or i t s cont ent s.

1. 12 ENVI RONMENTAL LI TI GATI ON

a. I f t he per f or mance of al l or any par t of t he wor k i s or der ed by a cour t of compet ent j ur i sdi ct i on t o be suspended, del ayed, or i nt er r upt ed as a r esul t of envi r onment al l i t i gat i on, as def i ned bel ow, t he Cont r act i ng Of f i cer , at t he r equest of t he Cont r act or , shal l det er mi ne whet her t he or der i s due i n any par t t o t he act s or omi ssi ons of t he Cont r act or or a Subcont r act or at any t i er not r equi r ed by t he t er ms of t hi s cont r act . I f i t i s det er mi ned t hat t he or der i s not due i n any par t t o act s or omi ssi ons of t he Cont r act or or a Subcont r act or at any t i er ot her t han as r equi r ed by t he t er ms of t hi s cont r act , such suspensi on, del ay, or i nt er r upt i on shal l be consi der ed as i f or der ed by t he Cont r act i ng Of f i cer i n t he admi ni st r at i on of t hi s cont r act under t he t er ms of t he Cont r act Cl ause ent i t l ed " Suspensi on of Wor k" .

b. The t er m " envi r onment al l i t i gat i on" , as used her ei n, means a l awsui t al l egi ng t hat t he wor k wi l l have an adver se ef f ect on t he envi r onment or t hat t he Gover nment has not dul y consi der ed, ei t her subst ant i vel y or pr ocedur al l y, t he ef f ect of t he wor k on t he environment.

DOCUMENT 00 08 00 Page 5

1. 13 SUBCONTRACTS

I n accor dance wi t h t he Cont r act Cl ause ent i t l ed " Subcont r act s" , t he Cont r act or shal l , wi t hi n seven days af t er t he awar d of any subcont r act by t he Cont r act or or a Subcont r act or , del i ver t o t he Cont r act i ng Of f i cer t wo copi es of a compl et ed St andar d For m 1413. Bot h copi es must cont ai n t he or i gi nal s i gnat ur es of bot h par t i es.

1. 14 REQUI RED I NSURANCE

a. As r equi r ed by t he Cont r act Cl ause ent i t l ed " I nsur ance- Wor k on a Gover nment I nst al l at i on" , t he Cont r act or shal l wi t hi n 7 days af t er r ecei pt of Not i ce of Awar d and pr i or t o t he commencement of wor k, f ur ni sh t o t he Cont r act i ng Of f i cer , a wr i t t en st at ement of r equi r ed i nsur ance as evi dence of t he f ol l owi ng mi ni mum i nsur ance:

( 1) Wor kmen' s Compensat i on. Amount s r equi r ed by appl i cabl e j ur i sdi ct i onal st at ut es.

( 2) Empl oyer ' s Li abi l i t y I nsur ance. $100, 000

( 3) Compr ehensi ve Gener al Li abi l i t y I nsur ance.

Bodi l y I nj ur y - $500, 000 per occur r ence

( 4) Compr ehensi ve Aut omobi l e I nsur ance.

Bodi l y I nj ur y - $200, 000 each per son $500, 000 each acci dent Pr oper t y Damage - $ 20, 000 each acci dent

b. St at ement s of r equi r ed i nsur ance shal l be submi t t ed t o t he f ol l owi ng addr ess:

Depar t ment of t he Ar my St . Loui s Di st r i ct , Cor ps of Engi neer s Sout her n Ar ea Of f i ce, CEMVS- EC- CS 113 West Mai n St r eet , Sui t e 3 Jackson, Mi ssour i 63755

1. 15 PROTECTI ON OF MATERI AL AND WORK

The Cont r act or shal l at al l t i mes pr ot ect and pr eser ve al l mat er i al s, suppl i es, and equi pment of ever y descr i pt i on ( i ncl udi ng pr oper t y whi ch may be Gover nment - f ur ni shed or owned) and al l wor k per f or med. Al l r easonabl e r equest s of t he Cont r act i ng Of f i cer t o encl ose or speci al l y pr ot ect such pr oper t y shal l be compl i ed wi t h. I f , as det er mi ned by t he Cont r act i ng Of f i cer , mat er i al , equi pment , suppl i es, and wor k per f or med ar e not adequat el y pr ot ect ed by t he Cont r act or , such pr oper t y may be pr ot ect ed by t he Gover nment and t he cost t her eof may be char ged t o t he Cont r act or or deduct ed f r om any payment s due t o t he Cont r act or .

1. 16 CONTAMI NATI ON OF WATER

I n addi t i on t o t he r equi r ement s set f or t h i n SECTI ON 01 11 30, par agr aph Pr ot ect i on of Wat er Resour ces, t he Cont r act or shal l t ake posi t i ve pr ot ect i ve measur es t o pr event spi l l age of pot ent i al pol l ut ant mat er i al s such as f uel , emul si on mat er i al s, chemi cal s et c. , f r om st or age cont ai ner s or equi pment , i nt o l akes or t r i but ar y wat er s. Such posi t i ve pr ot ect i ve

DOCUMENT 00 08 00 Page 6 measur es may i ncl ude, but ar e not l i mi t ed t o, t he f ol l owi ng:

( 1) A ber m encl osur e of suf f i c i ent capaci t y t o cont ai n such mat er i al s.

( 2) Secur i t y measur es t o pr event act s of vandal i sm whi ch coul d r esul t i n spi l l age of such mat er i al s ( f ences, guar ds, et c. ) .

( 3) St or age of such mat er i al s i n an ar ea wher e t he t er r ai n woul d pr ecl ude l eakage i nt o l ake or t r i but ar y wat er s.

( 4) Ut i l i zat i on of secur e Gover nment st or age ar eas i f t he Cont r act i ng Of f i cer i ndi cat es such space i s avai l abl e. No st or age past i mmedi at e needs ( 2 days) wi t hout t he consent of t he Cont r act i ng Of f i cer .

The Cont r act or shal l submi t i t s pr oposal s f or i mpl ement i ng t he above pr ovi s i ons i n accor dance wi t h SECTI ON 01 11 30, par agr aph Envi r onment al Pr ot ect i on Pl an.

1. 17 ORDER AND COORDI NATI ON OF WORK

The Cont r act or may st ar t and compl et e t he wor k i n such or der and sequence as desi r ed subj ect t o compl i ance wi t h t he f ol l owi ng par agr aphs:

A. SPECI AL CONSI DERATI ONS. The Cont r act or may st ar t and compl et e t he wor k i n such or der and sequence as desi r ed subj ect t o compl i ance wi t h t he f ol l owi ng par agr aphs.

( 1) ( 1) The Cont r act or shoul d be awar e t hat t he or der of wor k wi l l be hi ghl y dependent on t he f l ow r at es of t he r i ver . The Cont r act or shal l moni t or dai l y t he r i ver l evel s, f l ow condi t i ons, and f l ow f or ecast s so t hat wor k schedul es can be adj ust ed accor di ngl y. The Cont r act or shal l mai nt ai n c l ose communi cat i on wi t h t he Gover nment t o i dent i f y an accept abl e wi ndow f or i ni t i at i on of t he wor k. Thi s i nf or mat i on wi l l be di scussed i n det ai l pr i or t o const r uct i on. The Cont r act or shal l not be al l owed t o begi n wor k i n t he r i ver unt i l f l ow condi t i ons and f l ow f or ecast s ar e i ndi cat i ng a pr ol onged condi t i on f avor abl e t o wor ki ng upst r eam of t he dam. For t hi s pr oj ect , f avor abl e f l ow condi t i ons ar e consi der ed t o be 1, 000 cf s at t he Venedy St at i on gage and f al l i ng wi t h mi ni mal r ai nf al l f or ecast ed.

( 2) Upon r ecei pt of Ful l Not i ce t o Pr oceed, t he Cont r act or shal l be r equi r ed t o mobi l i ze and ar r i ve onsi t e i n t he mont hs of August t hr ough Oct ober of 2018. I f condi t i ons do not per mi t , i ssuance of Ful l Not i ce t o Pr oceed and mobi l i zat i on may be r equi r ed t o be r eschedul ed t o August t hr ough Oct ober 2019. The Cont r act or shal l not be al l owed t o begi n wor k i n t he r i ver unt i l f l ow condi t i ons and f l ow f or ecast s ar e i ndi cat i ng a pr ol onged condi t i on f avor abl e t o wor ki ng upst r eam of t he dam. For t hi s pr oj ect , f avor abl e f l ow condi t i ons ar e consi der ed t o be 1, 000 cf s at t he Venedy St at i on gage and f al l i ng.

( 3) Upon r ecei pt of Ful l Not i ce t o Pr oceed t he per i od of per f or mance f or mobi l i zat i on t o t he s i t e and compl et i on of al l under wat er const r uct i on i ncl udi ng ver i f i cat i on sur veys shal l be 21 days. Once t he Cont r act or i s mobi l i zed onsi t e he shal l wor k seven days a week, 24 hour s per day as per mi t t ed usi ng mul t i pl e shi f t s and mul t i pl e cr ew oper at i ons i n or der t o compl et e t he wor k dur i ng schedul ed cl osur es.

DOCUMENT 00 08 00 Page 7

( 4) I t i s ant i c i pat ed t hat al l under wat er const r uct i on wi l l r equi r e f l oat i ng pl ant s.

( 5) I t i s ant i c i pat ed t hat t o per f or m scour r epai r s at t he scour l ocat i ons, bot h l ock c l osur es and cl osur e of t he t ai nt er gat es of t he dam wi l l be necessar y t o pr ovi de condi t i ons wi t h mi ni mal r i ver vel oci t i es t o compl et e t he wor k. The Gover nment wi l l c l ose t he l ock dur i ng t he ent i r e 21 day per i od of per f or mance st at ed above;

however , t he Gover nment wi l l per mi t l ockages by t he Cont r act or as r equi r ed f or t r anspor t at i on of mat er i al s and equi pment . The Cont r act or shal l pr ovi de a wor k schedul e c l ear l y i ndi cat i ng t he sequence and dur at i on of al l act i v i t i es, i ncl udi ng t he ant i c i pat ed number of dam cl osur es needed, wor k t o be accompl i shed wi t hi n each cl osur e and t hei r ant i c i pat ed l engt h at l east 5 days bef or e t he pr e- const r uct i on meet i ng. Al l i mpact s t o navi gat i on or pool r egul at i on, i ncl udi ng but not l i mi t ed t o t he schedul ed cl osur e per i ods shal l be coor di nat ed wi t h and appr oved by t he Cont r act i ng Of f i cer . The Cont r act or i s r equi r ed t o obt ai n and coor di nat e t he necessar y r esour ces t o per f or m t he desi gnat ed wor k i n t he al l ot t ed c l osur e per i ods. The maxi mum dam cl osur e per i od cur r ent l y ant i c i pat ed i s 24 hour s, whi ch may be ext ended l onger based on i nf l ows and l ock oper at i ons. I t i s ant i c i pat ed t hat t her e wi l l be a mi ni mum of 12 hour s but up t o a maxi mum of 24 hour s r equi r ed bet ween adj acent dam cl osur es, t o r el ease f l ows based on i nf l ows.

Ti me when r el eases ar e made t hr ough t he dam i n- bet ween 24- hour dam cl osur es shal l be consi der ed i nci dent al t o per f or mance of wor k and shal l not be consi der ed st and- by t i me, al l cost i mpact s associ at ed wi t h t hese dur at i ons shal l be consi der ed i nci dent al t o t he per j ob l i ne i t em t o whi ch i t r el at es. The speci f i ed dur at i on of t he c l osur e per i ods shal l be l engt hened at t he Cont r act i ng Of f i cer ' s di scr et i on as f l ow condi t i ons and r i ver st ages per mi t .

( 6) Any const r uct i on oper at i ons whi ch i mpede l ock or dam oper at i ons out si de any schedul ed cl osur es shal l not be al l owed unl ess coor di nat ed wi t h and appr oved by t he Cont r act i ng Of f i cer .

Upon i dent i f i cat i on of any r equi r ed i mpact s t o navi gat i on or dam r egul at i on or changes i n any pr evi ousl y schedul ed i mpact s t o navi gat i on or dam r egul at i on, t he Cont r act or shal l i nf or m and coor di nat e wi t h t he Cont r act i ng Of f i cer as soon as possi bl e, but no l at er t han 7 days pr i or t o t he schedul ed i mpact . The Gover nment shal l be gi ven suf f i c i ent t i me t o r evi ew and appr ove any changes. When wor k has pr oceeded such t hat t he Cont r act or det er mi nes a c l osur e i s no l onger needed, t he Cont r act or shal l i nf or m t he Gover nment i n a t i mel y manner .

( 7) St andby Cost s - I nt er i m Demobi l i zat i on - Re- mobi l i zat i on.

I f f l ows i ncr ease or ar e f or ecast ed t o i ncr ease t he Gover nment may det er mi ne t hat t he dam gat es need t o be opened t o pass f l ows f or ext ended dur at i ons dur i ng t he 21 day per i od of per f or mance above and beyond t he ant i c i pat ed mi ni mum 12 hour s and maxi mum 24 hour s r equi r ed f or f l ow r el eases bet ween adj acent dam cl osur es. At t hi s t i me t he Cont r act i ng Of f i cer wi l l not i f y t he Cont r act or wi t h as much advance not i ce as possi bl e i f f l ows ar e f or ecast ed t o i ncr ease, but t he Cont r act or shal l be awar e t hat t hi s not i ce may be as l i t t l e as 24 hour s and shal l depend upon t he l ocat i on and dur at i on of t he hydr ol ogi c event whi ch wi l l cause t he f l ows t o i ncr ease. Upon not i f i cat i on by t he Cont r act i ng Of f i cer t he Cont r act or shal l i mmedi at el y begi n t o r emove per sonnel and

DOCUMENT 00 08 00 Page 8 mat er i al t hat woul d be ef f ect ed by dam gat e oper at i ons. The Cont r act i ng Of f i cer shal l di r ect t he Cont r act or t o ei t her l eave equi pment wi t h mi ni mum per sonnel r equi r ed onsi t e on st andby or t o demobi l i ze and r e- mobi l i ze at a f ut ur e dat e t o compl et e r emai ni ng wor k ef f or t s. Such cost associ at ed wi t h st andby, demobi l i zat i on or r e- mobi l i zat i on shal l be pai d under t he appl i cabl e l i ne i t em t o whi ch i t r el at es f or ei t her " St andby Cost " , " I nt er i m Demobi l i zat i on" , or " Re- mobi l i zat i on" . St andby t i me shal l not be per mi t t ed t o be char ged f or ant i c i pat ed f l ow r el eases up t o 24 hour s bet ween adj acent dam cl osur es nor downt i me schedul ed by t he Cont r act or as a r esul t of t hei r sequence of oper at i on. I n addi t i on, t he Cont r act i ng Of f i cer wi l l det er mi ne t he ext ent of t he del ay t o t he wor k due t o f l ow condi t i ons and f l ow f or ecast s, and t he t i me f i xed f or compl et i on or r emai ni ng wor k wi l l be ext ended f or t he per i od of t he t i me del ay, i n accor dance wi t h Sect i on 00700, Cont r act Cl ause ent i t l ed, " Def aul t " .

( 8) The Cont r act or i s advi sed t hat ot her wor k i n t he ar ea may be ongoi ng dur i ng t he l i f e of t hi s cont r act , and shal l coor di nat e i t s wor k so as not t o i nt er f er e wi t h t he ot her wor k. The Cont r act or shal l r epor t dai l y t he wor k schedul e f or t hat day t o t he Jer r y F.

Cost el l o Lock and Dam l ockmast er . The Cont r act or shal l coor di nat e al l oper at i ons such t hat i nt er r upt i ons t o t he f unct i ons of t he Gover nment per sonnel and use of t he l ock by r i ver t r af f i c i s r educe by schedul i ng needed cl osur es as out l i ned wi t hi n, dur i ng wor k out si de t he 21 day per i od of per f or mance f or t he under wat er const r uct i on. The Cont r act or shal l r ecei ve pr i or i t y l ockage one ( 1) t i me per 24- hour per i od out si de t he 21 day per i od of per f or mance. The Cont r act or shal l not i f y t he Gover nment 12 hour s i n advance of pr i or i t y l ockages. Ot her l ockages shal l be schedul ed al ong wi t h al l ot her demands f or t he l ock.

( 9) Si t e Access. The l ock wal l s, gui de wal l s and mi t er gat e wal kways shal l be used by t he Cont r act or onl y wi t h t he per mi ssi on of t he Cont r act i ng Of f i cer . The l ock wal l s, gui de wal l s, and mi t er gat e wal kways shal l be kept open at al l t i mes f or t r avel by Gover nment per sonnel . The Cont r act or shal l keep t he l ock wal l s, gui de wal l s and mi t er gat e wal kways cl ear of al l mat er i al s, debr i s and equi pment at al l t i mes. The Cont r act or shal l coor di nat e al l oper at i ons such t hat t he f unct i ons of t he Gover nment per sonnel and t he use of t he l ock by r i ver t r af f i c ar e not i nt er r upt ed, except dur i ng schedul ed l ock c l osur es. Access t o t he dam ser vi ce br i dge shal l not be per mi t t ed wi t hout appr oval f r om t he Cont r act i ng Of f i cer and Lockmast er . The Cont r act or shal l not be al l owed access t o t he Lock and Dam Cont r ol House ot her t han f or coor di nat i on pur poses.

( 10) Pot abl e wat er i s avai l abl e t o t he Cont r act or at t he spi got i n t he st agi ng ar ea and t he hydr ant and dr i nki ng f ount ai n near t he r ecr eat i on ar ea r est r oom.

( 11) Cont r act or per sonnel shal l not use t he t oi l et f aci l i t i es at t he l ock ( ei t her i n t he Cont r ol House or Mai nt enance Bui l di ng) .

The publ i c r est r oom at t he r ecr eat i on ar ea can be used by t he Cont r act or . Tempor ar y t oi l et f aci l i t i es shal l conf or m t o t he Cor ps of Engi neer s Saf et y Manual EM 385- 1- 1.

( 12) Secur i ng Fl oat i ng Pl ant s. Al l f l oat i ng pl ant s and suppor t equi pment shal l not ut i l i ze any t ype of anchor i ng or st abi l i z i ng

DOCUMENT 00 08 00 Page 9 suppor t t hat anchor s i nt o t he r i ver channel bot t om. The bot t om of t he r i ver channel and bot h bank sl opes ar e l i ned wi t h a f i ve f oot t hi ck c l ay bl anket upst r eam of t he dam. The Cont r act or may ut i l i ze t i e of f poi nt s cur r ent l y l ocat ed on t he upst r eam por t i ons of t he dam pi er s.

( 13) Tempor ar y moor i ng ar eas f or f l oat i ng pl ant wi l l be avai l abl e as shown on t he dr awi ngs and t hei r l ocat i ons shal l be coor di nat ed wi t h t he Cont r act i ng Of f i cer ' s Repr esent at i ve and t he Lockmaster.

( 14) ( 14) At al l t i mes when Cont r act or ' s f l oat i ng pl ant i s moor ed or t i ed of f near t he l ock or t he dam, t he Cont r act or shal l be compl et el y r esponsi bl e f or moni t or i ng and adj ust i ng t i e of f l i nes. The Cont r act or shal l devel op a f l oat i ng pl ant pl an t o enabl e 24 hour s a day, 7 days a week moni t or i ng of hi s f l oat i ng pl ant . At l east 3 days pr i or t o mobi l i zat i on, t he Cont r act or ' s pl an shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval .

I n t he event of sever e hi gh wat er condi t i ons, at t he Gover nment s di scr et i on, t he Cont r act or may be r equi r ed t o r emove al l f l oat i ng pl ant f r om t he pr oj ect ar ea unt i l t he wat er has r eceded.

( 15) The Cont r act or may al so be r equi r ed t o t empor ar i l y move al l f l oat i ng pl ant at t he Gover nment ' s di scr et i on t o f aci l i t at e ongoi ng sur veys and moni t or i ng of t he r i ver at t he l ock dur i ng t he dur at i on of t he cont r act . Thi s shal l be at no cost t o t he Government.

( 16) Boat Ramp, Par ki ng l ot , Haul r oads i n t he v i c i ni t y of t he Lock and Dam. The Cont r act or shal l v i deo r ecor d t he exi st i ng condi t i on of al l paved ar eas appr oved f or st agi ng and st or age act i v i t i es as wel l as any necessar y haul r oads i ncl udi ng t he boat r amp t o be used. The Cont r act i ng Of f i cer ' s Repr esent at i ve shal l be pr esent dur i ng al l v i deo r ecor di ng. Two copi es of t he const r uct i on ar ea vi deo shal l be pr ovi ded t o t he Cont r act i ng Of f i cer . Al l paved ar eas used by t he Cont r act or f or st agi ng, st or age, boat r amp and haul r oads shal l be r et ur ned t o t hei r pr e- const r uct i on condi t i ons at no expense t o t he Gover nment . The Cont r act or ' s per sonnel shal l be r equi r ed t o par k vehi c l es i n t he par ki ng ar eas as shown on t he pl ans. Al l t ur f ed ar eas t hat ar e di st ur bed by t he Cont r act or such as st agi ng ar eas or r i ver access f or t he di sposal s i t e shal l be gr aded smoot h and pr epar ed f or seedi ng. Seedi ng wi l l be done by ot her s.

( 17) I t i s ant i c i pat ed t hat di ver s wi l l be necessar y t o compl et e t he out l i ned wor k. For di ve oper at i ons, t he Cont r act or shal l f ol l ow t he l at est edi t i on of EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual , par t i cul ar l y Sect i on 30 and Appendi x G f or cont r act di ve oper at i ons.

B. SEQUENCE OF WORK.

( 1) Cont r act or shal l per f or m ver i f i cat i on sur vey pr i or t o commencement of const r uct i on. Thi s shal l ser ve as t he exi st i ng condi t i on t o compar e al l subsequent ver i f i cat i on sur veys.

( 2) The Cont r act or shal l excavat e t he exi st i ng st one pr ot ect i on and cl ay l ayer as shown on dr awi ngs, r emove debr i s f r om t he scour hol e and t hen per f or m t he Foundat i on Sur vey. Ef f or t s shal l be

DOCUMENT 00 08 00 Page 10 made by t he Cont r act or t o l i mi t t he number of c l osur es needed f or excavation.

( 3) The Cont r act or shal l pl ace new r i pr ap ar ound t he per i met er of t he pl anned concr et e l i f t s as shown on dr awi ngs pr i or t o r ebar pl acement f or concr et e pour t o EL. 335 f t . Wi t hi n 24- hour s pr i or t o r ebar pl acement t he cont r act or shal l r emove any debr i s i ncl udi ng new r i pr ap t hat i s l ocat ed wi t hi n t he scour hol e. The Cont r act or shal l t hen compl et e a ver i f i cat i on sur vey dur i ng an i dent i f i ed c l osur e per i od.

( 4) I nst al l at i on of t he r ebar cage i n t he scour hol e f or t he concr et e pour t o EL. 335 f t shal l f ol l ow as per t he dr awi ngs.

( 5) The concr et e pour t o EL. 335 wi l l be pl aced accor di ng t o t he dr awi ngs and ver i f i cat i on sur vey per f or med af t er compl et i on dur i ng an i dent i f i ed c l osur e per i od.

( 6) Cont r act or desi gned pr ecast concr et e bl ocks wi l l be pl aced and anchor ed accor di ng t o t he dr awi ngs af t er t he EL. 335 pour has r eached t he r equi r ed 12 hour st r engt h of 1500 psi as out l i ned i n Sect i on 03 35 10 Par agr aph 2. 2. 1. 1.

( 7) The concr et e pour t o EL. 337 wi l l f ol l ow pl acement of pr ecast concr et e bl ocks and r ebar cage. The pour wi l l be compl et ed accor di ng t o t he dr awi ngs and ver i f i cat i on sur vey per f or med af t er compl et i on dur i ng an i dent i f i ed c l osur e per i od.

( 8) Pr ecast concr et e bl ocks wi l l be pl aced and anchor ed accor di ng t o t he dr awi ngs af t er t he EL. 337 pour has r eached t he r equi r ed 12 hour st r engt h of 1500 psi as out l i ned i n Sect i on 03 35 10 Par agr aph 2. 2. 1. 1.

( 9) Ri pr ap pl acement upst r eam of t he EL. 339 pour wi l l be f i ni shed as per t he dr awi ngs

( 10) The concr et e pour t o EL. 339 wi l l f ol l ow pl acement of pr ecast concr et e bl ocks, r ebar cage and r i pr ap. The pour wi l l be compl et ed accor di ng t o t he dr awi ngs and ver i f i cat i on sur vey per f or med af t er compl et i on dur i ng an i dent i f i ed c l osur e per i od.

( 11) Concr et e pl acement ar ound t he f l oat i ng upst r eam gui de wal l pi er wi l l occur i n a manner as t o mi ni mi ze conf l i c t s wi t h t he l ock c l osur e schedul e. The Cont r act or shal l coor di nat e l ock c l osur e per i od r equest s wi t h t he Gover nment f or t hi s wor k i n conj unct i on wi t h t he const r uct i on schedul e and ot her r equi r ed l ock c l osur es.

Ver i f i cat i on sur veys shal l be per f or med af t er compl et i on.

1. 18 SUBMI TTALS

Addi t i onal submi t t al s f or t hi s cont r act t hat ar e not l i s t ed wi t hi n i ndi v i dual t echni cal pr ovi s i ons ar e l i s t ed bel ow. Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on; submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 - SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

DOCUMENT 00 08 00 Page 11

Acci dent Pr event i on Pr ogr am; G St at ement s of Requi r ed I nsur ance; G Fl oat i ng Pl ant Pl an; G Const r uct i on Ar ea Vi deo; G

1. 19 AS- BUI LT DRAWI NGS

a. " As- Bui l t " Cont r act Dr awi ngs. The Cont r act or shal l mai nt ai n a separ at e set of f ul l - s i ze cont r act dr awi ngs, mar ked up i n r ed, t o i ndi cat e as- bui l t condi t i ons. Each as- bui l t cont r act dr awi ng shal l i ncl ude t he Cont r act Number ( W912P9- XX- C- XXXX) associ at ed wi t h t he cont r act . These dr awi ngs shal l be mai nt ai ned i n a cur r ent condi t i on at al l t i mes unt i l compl et i on of t he wor k and shal l be avai l abl e f or r evi ew by Gover nment per sonnel at al l t i mes. Al l var i at i ons f r om t he cont r act dr awi ngs, f or what ever r eason, i ncl udi ng t hose occasi oned by modi f i cat i ons, opt i onal mat er i al s, and t he r equi r ed coor di nat i on bet ween t r ades, shal l be i ndi cat ed. These var i at i ons shal l be shown i n t he same gener al det ai l ut i l i zed i n t he cont r act dr awi ngs. One set of mar ked- up har d copy dr awi ngs and one el ect r oni c copy of t he mar ked- up dr awi ngs i n pdf f or mat shal l be f ur ni shed t o t he Cont r act i ng Of f i cer pr i or t o accept ance of t he wor k. The Gover nment wi l l wi t hhol d t wo per cent of t he t ot al bi d pr i ce of t he i t ems f or whi ch as- bui l t cont r act dr awi ngs have not been submi t t ed.

b. " As- Bui l t " Shop Dr awi ngs. Upon compl et i on of i t ems of wor k, t he Cont r act or shal l r evi se t he shop dr awi ngs t o show " as- bui l t " condi t i ons. The not at i on " Revi sed t o show ' as- bui l t ' condi t i ons" shal l be pl aced i n r ed i n t he l ower r i ght cor ner of each dr awi ng al ong wi t h t he i ni t i al s of a r esponsi bl e company r epr esent at i ve. Each as- bui l t shop dr awi ng or cat al og cut shal l be i dent i f i ed by t he Cont r act Number ( W912P9- XX- C- XXXX) associ at ed wi t h t he cont r act , and cor r espondi ng t r ansmi t t al number f r om ENG For m 4025. " As- bui l t " shop dr awi ngs of each Cont r act or - pr epar ed const r uct i on dr awi ng shoul d be pr epar ed as soon as possi bl e af t er t he const r uct i on det ai l ed on a gi ven dr awi ng has been compl et ed. Af t er t he " as- bui l t " shop dr awi ngs have been pr epar ed as descr i bed above and wi t hi n 15 days af t er t he cont r act compl et i on dat e, t he Cont r act or shal l submi t one har d copy and one el ect r oni c copy i n pdf f or mat of as- bui l t shop dr awi ngs, i ncl udi ng cat al og cut s, t o t he Cont r act i ng Of f i cer . The Gover nment wi l l wi t hhol d t wo per cent of t he t ot al bi d pr i ce of t he i t em f or whi ch as- bui l t shop dr awi ngs have not been submi t t ed.

1. 20 MEANS OF ESCAPE FOR PERSONNEL QUARTERED OR WORKI NG ON FLOATI NG PLANT

Two means of escape shal l be pr ovi ded f or assembl y, s l eepi ng, and messi ng ar eas on f l oat i ng pl ant s. For ar eas i nvol v i ng 10 or mor e per sons, bot h means of egr ess shal l be t hr ough st andar d s i ze door s openi ng t o di f f er ent exi t r out es. Wher e 9 or f ewer per sons ar e i nvol ved, one of t he means of escape may be a wi ndow ( mi ni mum di mensi ons 24- i nch by 36- i nch) whi ch l eads t o a di f f er ent exi t r out e. Ref er t o Sect i on 19 of EM 385- 1- 1.

1. 21 EMERGENCY ALARMS AND SI GNALS

a. Al ar ms. Emer gency al ar ms shal l be i nst al l ed and mai nt ai ned on al l f l oat i ng pl ant r equi r i ng a cr ew wher e i t i s possi bl e f or ei t her a passenger or cr ewman t o be out of s i ght or hear i ng f r om any ot her per son. The al ar m syst em shal l be oper at ed f r om t he pr i mar y el ect r i cal syst em wi t h st andby bat t er i es on t r i ckl e char ge t hat wi l l

DOCUMENT 00 08 00 Page 12 aut omat i cal l y f ur ni sh t he r equi r ed ener gy dur i ng an el ect r i cal - syst em f ai l ur e. A suf f i c i ent number of s i gnal i ng devi ces shal l be pl aced on each deck so t hat t he sound can be hear d di st i nct l y at any poi nt above t he usual backgr ound noi se. Al l s i gnal i ng devi ces shal l be so i nt er connect ed t hat act uat i on can occur f r om at l east one st r at egi c poi nt on each deck.

b. Si gnal s.

( 1) Fi r e Al ar m Si gnal s. The gener al f i r e al ar m si gnal shal l be i n accor dance wi t h par a 97. 13- 15b of t he Coast Guar d Rul es and Regul at i ons f or Car go and Mi scel l aneous Vessel s, Subchapt er I , 1 Sep 77 ( CG 257) .

( 2) Abandon Shi p Si gnal s. The si gnal f or abandon shi p shal l be i n accor dance wi t h par agr aph 97. 13- 15c of r ef er ence ci t ed i n ( 1) above.

( 3) Man- Over boar d Si gnal . Hai l and pass t he wor d t o t he br i dge.

Al l per sonnel and vessel s capabl e of r ender i ng assi st ance shal l respond.

c. Moor i ng Li nes. Eye l oops on moor i ng l i nes wi l l be equi pped wi t h becket s or handl i ng r opes t o pr ot ect t he hands of deckhands.

1. 22 USE OF MECHANI ZED EQUI PMENT ON FLOATI NG PLANT

When mechani zed equi pment i s oper at ed on f l oat i ng pl ant t he Cont r act or shal l pr ovi de posi t i ve and accept abl e means of pr event i ng t hi s equi pment f r om movi ng or f al l i ng i nt o t he wat er . The t ype of equi pment addr essed by t hi s c l ause i ncl udes f r ont - end l oader s, bul l dozer s, t r ucks ( bot h on- and of f - r oad) , backhoes, t r ack hoes, and si mi l ar equi pment . I f t he Cont r act or pl ans t o use such equi pment on f l oat i ng pl ant , an Act i v i t y Hazar dous Anal ysi s must be devel oped f or t hi s f eat ur e of wor k. The pl an must i ncl ude a det ai l ed expl anat i on of t he t ype or t ypes of physi cal bar r i er s, cur bs, st r uct ur es, et c. , whi ch wi l l be i ncor por at ed t o pr ot ect t he oper at or and pr event t he equi pment f r om ent er i ng t he wat er . Nonst r uct ur al war ni ng devi ces may be consi der ed f or s i t uat i ons wher e t he use of st r uct ur al bar r i er s i s det er mi ned t o be i mpr act i cabl e. The Act i v i t y Hazar d Anal ysi s must t hor oughl y addr ess t he pr ocedur e and shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or r evi ew and accept ance pr i or t o st ar t of t hi s f eat ur e of wor k.

1. 23 OBSTRUCTI ON OF NAVI GABLE WATERWAYS ( DEC 1991) DFARS 252. 236- 7002

a. The Cont r act or shal l - -

( 1) Pr ompt l y r ecover and r emove any mat er i al , pl ant , machi ner y, or appl i ance whi ch t he cont r act or l oses, dumps, t hr ows over boar d, s i nks, or mi spl aces, and whi ch, i n t he opi ni on of t he Cont r act i ng Of f i cer , may be danger ous t o or obst r uct navi gat i on;

( 2) Gi ve i mmedi at e not i ce, wi t h descr i pt i on and l ocat i ons of any such obst r uct i ons, t o t he Cont r act i ng Of f i cer , and

( 3) When r equi r ed by t he Cont r act i ng Of f i cer , mar k or buoy such obst r uct i ons unt i l t he same ar e r emoved.

b. The Cont r act i ng Of f i cer may- -

DOCUMENT 00 08 00 Page 13

( 1) Remove t he obst r uct i ons by cont r act or ot her wi se shoul d t he Cont r act or r ef use, negl ect , or del ay compl i ance wi t h par agr aph ( a) of t hi s c l ause; and

( 2) Deduct t he cost of r emoval f r om any moni es due or t o become due t o t he Cont r act or , or

( 3) Recover t he cost of r emoval under t he Cont r act or ' s bond.

c. The Cont r act or ' s l i abi l i t y f or t he r emoval of a vessel wr ecked or sunk wi t hout f aul t or negl i gence i s l i mi t ed t o t hat pr ovi ded i n Sect i ons 15, 19, and 20 of t he Ri ver and Har bor Act of Mar ch 3, 1899 ( 33 U. S. C. 410 et . seq. ) .

1. 24 SI GNAL LI GHTS

The Cont r act or shal l di spl ay s i gnal l i ght s and conduct i t s oper at i ons i n accor dance wi t h t he Gener al Regul at i ons of t he Depar t ment of t he Ar my and of t he Coast Guar d gover ni ng l i ght s and day si gnal s t o be di spl ayed by t owi ng vessel s wi t h t ows on whi ch no si gnal s can be di spl ayed, vessel s wor ki ng on wr ecks, dr edges, and vessel s engaged i n l ayi ng cabl es or pi pe i n submar i ne or bank pr ot ect i on oper at i ons, l i ght s t o be di spl ayed on dr edge pi pe l i nes, and day si gnal s t o be di spl ayed by vessel s of mor e t han 65 f eet i n l engt h moor ed or anchor ed i n a f ai r way or channel , and t he passi ng by ot her vessel s of f l oat i ng pl ant wor ki ng i n navi gabl e channel s, as set f or t h i n Commandant U. S. Coast Guar d I nst r uct i on M16672. 2, Navi gat i on Rul es: I nt er nat i onal - I nl and ( Comdt i nst M16672. 2) or 33 CFR 81 Appendi x A ( I nt er nat i onal ) and 33 CFR 84 t hr ough 33 CFR 89 ( I nl and) as applicable.

1. 25 I NSPECTI ON FACI LI TI ES

a. I n or der t o f aci l i t at e i nspect i on, t he Cont r act or wi l l be r equi r ed, wi t hout addi t i onal cost t o t he Gover nment :

( 1) To f ur ni sh, on t he r equest of t he Cont r act i ng Of f i cer or any i nspect or , t he use of such boat s, boat men, l abor er s, and mat er i al f or mi ng a par t of t he or di nar y and usual equi pment and cr ew of t he pl ant as may be r easonabl y necessar y i n i nspect i ng t he wor k.

( 2) To f ur ni sh, on t he r equest of t he Cont r act i ng Of f i cer or any i nspect or , sui t abl e t r anspor t at i on f r om al l poi nt s on shor e desi gnat ed by t he Cont r act i ng Of f i cer t o and f r om t he var i ous pi eces of pl ant .

b. Shoul d t he Cont r act or r ef use, negl ect , or del ay compl i ance wi t h t hese r equi r ement s, t he speci f i c f aci l i t i es may be f ur ni shed and mai nt ai ned by t he Cont r act i ng Of f i cer , and t he cost t her eof wi l l be deduct ed f r om any amount s due or t o become due t he Cont r act or .

1. 26 STONE SOURCES

a. On t he basi s of i nf or mat i on and dat a avai l abl e t o t he Cont r act i ng Of f i cer , st one meet i ng t he qual i t y r equi r ement s of t hese speci f i cat i ons has been pr oduced f r om t he sour ces l i s t ed at t he end of t hese Speci al Cl auses.

b. St one may be f ur ni shed f r om any of t he cur r ent l y l i s t ed sour ces

DOCUMENT 00 08 00 Page 14 or , at t he opt i on of t he Cont r act or , may be f ur ni shed f r om any ot her sour ce desi gnat ed by t he Cont r act or and accept ed by t he Cont r act i ng Of f i cer , subj ect t o t he condi t i ons her ei naf t er st at ed.

c. I t i s t he Cont r act or ' s r esponsi bi l i t y t o det er mi ne t hat t he st one sour ce or combi nat i on of sour ces sel ect ed ar e capabl e of suppl y i ng t he quant i t i es and gr adat i on needed and at t he r at e needed t o mai nt ai n t he schedul ed pr ogr ess of t he wor k.

d. Af t er t he awar d of t he cont r act , t he Cont r act or shal l desi gnat e i n wr i t i ng onl y one sour ce or one combi nat i on of sour ces f r om whi ch st one wi l l be f ur ni shed. I f t he Cont r act or pr oposes t o f ur ni sh st one f r om a sour ce not cur r ent l y l i s t ed, onl y a s i ngl e addi t i onal sour ce f or st one may be desi gnat ed. Sampl es f or accept ance t est i ng shal l be pr ovi ded as r equi r ed by SECTI ON 35 37 00. I f a sour ce f or st one so desi gnat ed by t he Cont r act or i s not accept ed f or use by t he Cont r act i ng Of f i cer , t he Cont r act or may not pr opose ot her sour ces but shal l f ur ni sh t he st one f r om a sour ce l i s t ed at no addi t i onal cost t o t he Gover nment .

e. Accept ance of a sour ce of st one i s not t o be const r ued as accept ance of al l mat er i al f r om t hat sour ce. The r i ght i s r eser ved t o r ej ect mat er i al s f r om cer t ai n l ocal i zed ar eas, zones, st r at a, or channel s when such mat er i al s ar e unsui t abl e f or st one as det er mi ned by t he Cont r act i ng…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.