A22_18B0011_Solicitation.pdf
PDF 657 KB Posted
- Attached to
- Grounds Maintenance
- Solicitation number
- W912P918B0011
About this file
Solicitation
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 27 Feb 2018
A X B
C D
EX
X G F 43 - 47
X H
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 48
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P9 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
4th Floor, Room No. 4.207 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 17
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 20 M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
21 - 31
PART II - CONTRACT CLAUSES
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
314 331-8746FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
32 - 42
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
29 Jan 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912P918B0011
Section B - Supplies or Services and Prices
BID SCHEDULE
Section B Grounds Maintenance
Schedule A (Indefinite Quantity Items)
NOTE: All Indefinite Quantity (IDQ) items are estimated and are to be used for bid evaluations purposes only. The guaranteed minimum amount is $2500.00 for the base year and and $1300.00 for the option years. The maximum capacity is $750,000.00. Information concerning indefinite quantity contracts as well as minimum and maximum task order amounts are referenced in Contract Clauses, Section I. Line items with an asterisk (*) may be ordered by fractions of an acre and prices will be prorated accordingly.
ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
LAWN MAINTENANCE
0001 Administration Building 18 EA ___________ ___________ and Visitor Center Area
TYPE A MOWING
0002 Dam East and Spillway 12 EA ___________ ___________
0003 Dam West 12 EA ___________ ___________
0004 Main Dam 12 EA ___________ ___________
0005 Lithia Springs 12 EA ___________ ___________
0006 Opossum Creek 5 EA ___________ ___________
0007 Coon Creek 12 EA ___________ ___________
0008 Lone Point 5 EA ___________ ___________
0009 Sullivan Beach 12 EA ___________ ___________
0010 Okaw Bluff 12 EA ___________ ___________
0011 Bo Wood 12 EA ___________ ___________
0012 Camp Camfield 12 EA ___________ ___________
0013 Wilborn Creek 12 EA ___________ ___________
0014 Signs 7 EA ___________ ___________
0015 Wood’s Lake 12 EA ___________ ___________
0016 Whitley Creek 12 EA ___________ ___________
0017 Lithia Springs Land 7 EA ___________ ___________ Treatment
0018 Opossum Creek Land 7 EA ___________ ___________
0019 Type A Mowing* 30 AC ___________ ___________
TYPE B MOWING
0020 Lithia Springs Chautauqua “B” 2 EA ___________ ___________
0021 Camp Camfield “B” 5 EA ___________ ___________
0022 Lithia Springs “B” 5 EA ___________ ___________
0023 Dam East and Spillway “B” 5 EA ___________ ___________
0024 Dam West “B” 5 EA ___________ ___________
0025 Opossum Creek “B” 5 EA ___________ ___________
0026 Coon Creek “B” 5 EA ___________ ___________
0027 Whitley Creek “B” 5 EA ___________ ___________
0028 Whitley Creek Land 5 EA ___________ ___________ Treatment “B”
0029 Woods Lake “B” 5 EA ___________ ___________
0030 Bo Wood “B” 5 EA ___________ ___________
0031 Type B Mowing * 40 AC ___________ ___________
TURF MANAGEMENT
0032 Turf Fertilization* 5 AC ___________ ___________
0033 Overseeding* 5 AC ___________ ___________
0034 Aeration* 5 AC ___________ ___________
0035 Turf Renovation with 5 TN ___________ ___________ Topsoil Placement
0036 Turf Renovation without 500 SF ___________ ___________ Topsoil Placement
0037 Turf Renovation without 5 AC ___________ ___________ Topsoil Placement*
CHEMICAL APPLICATION
0038 Poison Ivy Control* 3 AC ___________ ___________
0039 Broadleaf Control* 40 AC ___________ ___________
0040 Level 1 Vegetation Control* 3 AC ___________ ___________
0041 Chemical Application for 10 AC ___________ ___________ Turf Growth Regulator
BEACH SAND MAINTENANCE
0042 Dam West Beach 6 EA ___________ ___________
0043 Sullivan Beach 6 EA ___________ ___________
0044 Wilborn Creek Beach 6 EA ___________ ___________
0045 Lithia Springs Beach 6 EA ___________ ___________
0046 Coon Creek Beach 6 EA ___________ ___________
BED MAINTENANCE/SUPPLY MULCH
0047 Supply Mulch 6 EA ___________ ___________
0048 Bed Maintenance 12 EA ___________ ___________
TREE/SHRUB PLANTING
0049 B & B Tree/Shrub Planting 6 EA ___________ ___________
Base Year Total ___________
ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
LAWN MAINTENANCE
1001 Administration Building 18 EA ___________ ___________ and Visitor Center Area
TYPE A MOWING
1002 Dam East and Spillway 12 EA ___________ ___________
1003 Dam West 12 EA ___________ ___________
1004 Main Dam 12 EA ___________ ___________
1005 Lithia Springs 12 EA ___________ ___________
1006 Opossum Creek 5 EA ___________ ___________
1007 Coon Creek 12 EA ___________ ___________
1008 Lone Point 5 EA ___________ ___________
1009 Sullivan Beach 12 EA ___________ ___________
1010 Okaw Bluff 12 EA ___________ ___________
1011 Bo Wood 12 EA ___________ ___________
1012 Camp Camfield 12 EA ___________ ___________
1013 Wilborn Creek 12 EA ___________ ___________
1014 Signs 7 EA ___________ ___________
1015 Wood’s Lake 12 EA ___________ ___________
1016 Whitley Creek 12 EA ___________ ___________
1017 Lithia Springs Land 7 EA ___________ ___________ Treatment
1018 Opossum Creek Land 7 EA ___________ ___________
1019 Type A Mowing* 30 AC ___________ ___________
1020 Lithia Springs Chautauqua “B” 2 EA ___________ ___________
1021 Camp Camfield “B” 5 EA ___________ ___________
1022 Lithia Springs “B” 5 EA ___________ ___________
1023 Dam East and Spillway “B” 5 EA ___________ ___________
1024 Dam West “B” 5 EA ___________ ___________
1025 Opossum Creek “B” 5 EA ___________ ___________
1026 Coon Creek “B” 5 EA ___________ ___________
1027 Whitley Creek “B” 5 EA ___________ ___________
1028 Whitley Creek Land 5 EA ___________ ___________ Treatment “B”
1029 Woods Lake “B” 5 EA ___________ ___________
1030 Bo Wood “B” 5 EA ___________ ___________
1031 Type B Mowing * 40 AC ___________ ___________
1032 Turf Fertilization* 5 AC ___________ ___________
1033 Overseeding* 5 AC ___________ ___________
1034 Aeration* 5 AC ___________ ___________
1035 Turf Renovation with 5 TN ___________ ___________ Topsoil Placement
1036 Turf Renovation without 500 SF ___________ ___________ Topsoil Placement
1037 Turf Renovation without 5 AC ___________ ___________ Topsoil Placement*
CHEMICAL APPLICATION
1038 Poison Ivy Control* 3 AC ___________ ___________
1039 Broadleaf Control* 40 AC ___________ ___________
1040 Level 1 Vegetation Control* 3 AC ___________ ___________
1041 Chemical Application for 10 AC ___________ ___________
1042 Dam West Beach 6 EA ___________ ___________
1043 Sullivan Beach 6 EA ___________ ___________
1044 Wilborn Creek Beach 6 EA ___________ ___________
1045 Lithia Springs Beach 6 EA ___________ ___________
1046 Coon Creek Beach 6 EA ___________ ___________
1047 Supply Mulch 6 EA ___________ ___________
1048 Bed Maintenance 12 EA ___________ ___________
1049 B & B Tree/Shrub Planting 6 EA ___________ ___________
Optional Year 1 Total ___________
2001 Administration Building 18 EA ___________ ___________ and Visitor Center Area
TYPE A MOWING
2002 Dam East and Spillway 12 EA ___________ ___________
2003 Dam West 12 EA ___________ ___________
2004 Main Dam 12 EA ___________ ___________
2005 Lithia Springs 12 EA ___________ ___________
2006 Opossum Creek 5 EA ___________ ___________
2007 Coon Creek 12 EA ___________ ___________
2008 Lone Point 5 EA ___________ ___________
2009 Sullivan Beach 12 EA ___________ ___________
2010 Okaw Bluff 12 EA ___________ ___________
2011 Bo Wood 12 EA ___________ ___________
2012 Camp Camfield 12 EA ___________ ___________
2013 Wilborn Creek 12 EA ___________ ___________
2014 Signs 7 EA ___________ ___________
2015 Wood’s Lake 12 EA ___________ ___________
2016 Whitley Creek 12 EA ___________ ___________
2017 Lithia Springs Land 7 EA ___________ ___________ Treatment
2018 Opossum Creek Land 7 EA ___________ ___________
2019 Type A Mowing* 30 AC ___________ ___________
2020 Lithia Springs Chautauqua “B” 2 EA ___________ ___________
2021 Camp Camfield “B” 5 EA ___________ ___________
2022 Lithia Springs “B” 5 EA ___________ ___________
2023 Dam East and Spillway “B” 5 EA ___________ ___________
2024 Dam West “B” 5 EA ___________ ___________
2025 Opossum Creek “B” 5 EA ___________ ___________
2026 Coon Creek “B” 5 EA ___________ ___________
2027 Whitley Creek “B” 5 EA ___________ ___________
2028 Whitley Creek Land 5 EA ___________ ___________ Treatment “B”
2029 Woods Lake “B” 5 EA ___________ ___________
2030 Bo Wood “B” 5 EA ___________ ___________
2031 Type B Mowing * 40 AC ___________ ___________
2032 Turf Fertilization* 5 AC ___________ ___________
2033 Overseeding* 5 AC ___________ ___________
2034 Aeration* 5 AC ___________ ___________
2035 Turf Renovation with 5 TN ___________ ___________ Topsoil Placement
2036 Turf Renovation without 500 SF ___________ ___________ Topsoil Placement
2037 Turf Renovation without 5 AC ___________ ___________ Topsoil Placement*
CHEMICAL APPLICATION
2038 Poison Ivy Control* 3 AC ___________ ___________
2039 Broadleaf Control* 40 AC ___________ ___________
2040 Level 1 Vegetation Control* 3 AC ___________ ___________
2041 Chemical Application for 10 AC ___________ ___________
2042 Dam West Beach 6 EA ___________ ___________
2043 Sullivan Beach 6 EA ___________ ___________
2044 Wilborn Creek Beach 6 EA ___________ ___________
2045 Lithia Springs Beach 6 EA ___________ ___________
2046 Coon Creek Beach 6 EA ___________ ___________
2047 Supply Mulch 6 EA ___________ ___________
2048 Bed Maintenance 12 EA ___________ ___________
2049 B & B Tree/Shrub Planting 6 EA ___________ ___________
Optional Year 2 Total ___________
3001 Administration Building 18 EA ___________ ___________ and Visitor Center Area
TYPE A MOWING
3002 Dam East and Spillway 12 EA ___________ ___________
3003 Dam West 12 EA ___________ ___________
3004 Main Dam 12 EA ___________ ___________
3005 Lithia Springs 12 EA ___________ ___________
3006 Opossum Creek 5 EA ___________ ___________
3007 Coon Creek 12 EA ___________ ___________
3008 Lone Point 5 EA ___________ ___________
3009 Sullivan Beach 12 EA ___________ ___________
3010 Okaw Bluff 12 EA ___________ ___________
3011 Bo Wood 12 EA ___________ ___________
3012 Camp Camfield 12 EA ___________ ___________
3013 Wilborn Creek 12 EA ___________ ___________
3014 Signs 7 EA ___________ ___________
3015 Wood’s Lake 12 EA ___________ ___________
3016 Whitley Creek 12 EA ___________ ___________
3017 Lithia Springs Land 7 EA ___________ ___________ Treatment
3018 Opossum Creek Land 7 EA ___________ ___________
3019 Type A Mowing* 30 AC ___________ ___________
3020 Lithia Springs Chautauqua “B” 2 EA ___________ ___________
3021 Camp Camfield “B” 5 EA ___________ ___________
3022 Lithia Springs “B” 5 EA ___________ ___________
3023 Dam East and Spillway “B” 5 EA ___________ ___________
3024 Dam West “B” 5 EA ___________ ___________
3025 Opossum Creek “B” 5 EA ___________ ___________
3026 Coon Creek “B” 5 EA ___________ ___________
3027 Whitley Creek “B” 5 EA ___________ ___________
3028 Whitley Creek Land 5 EA ___________ ___________ Treatment “B”
3029 Woods Lake “B” 5 EA ___________ ___________
3030 Bo Wood “B” 5 EA ___________ ___________
3031 Type B Mowing * 40 AC ___________ ___________
TURF MANAGEMENT
3032 Turf Fertilization* 5 AC ___________ ___________
3033 Overseeding* 5 AC ___________ ___________
3034 Aeration* 5 AC ___________ ___________
3035 Turf Renovation with 5 TN ___________ ___________ Topsoil Placement
3036 Turf Renovation without 500 SF ___________ ___________ Topsoil Placement
3037 Turf Renovation without 5 AC ___________ ___________ Topsoil Placement*
CHEMICAL APPLICATION
3038 Poison Ivy Control* 3 AC ___________ ___________
3039 Broadleaf Control* 40 AC ___________ ___________
3040 Level 1 Vegetation Control* 3 AC ___________ ___________
3041 Chemical Application for 10 AC ___________ ___________
3042 Dam West Beach 6 EA ___________ ___________
3043 Sullivan Beach 6 EA ___________ ___________
3044 Wilborn Creek Beach 6 EA ___________ ___________
3045 Lithia Springs Beach 6 EA ___________ ___________
3046 Coon Creek Beach 6 EA ___________ ___________
3047 Supply Mulch 6 EA ___________ ___________
3048 Bed Maintenance 12 EA ___________ ___________
3049 B & B Tree/Shrub Planting 6 EA ___________ ___________
Optional Year 3 Total ___________
4001 Administration Building 18 EA ___________ ___________ and Visitor Center Area
TYPE A MOWING
4002 Dam East and Spillway 12 EA ___________ ___________
4003 Dam West 12 EA ___________ ___________
4004 Main Dam 12 EA ___________ ___________
4005 Lithia Springs 12 EA ___________ ___________
4006 Opossum Creek 5 EA ___________ ___________
4007 Coon Creek 12 EA ___________ ___________
4008 Lone Point 5 EA ___________ ___________
4009 Sullivan Beach 12 EA ___________ ___________
4010 Okaw Bluff 12 EA ___________ ___________
4011 Bo Wood 12 EA ___________ ___________
4012 Camp Camfield 12 EA ___________ ___________
4013 Wilborn Creek 12 EA ___________ ___________
4014 Signs 7 EA ___________ ___________
4015 Wood’s Lake 12 EA ___________ ___________
4016 Whitley Creek 12 EA ___________ ___________
4017 Lithia Springs Land 7 EA ___________ ___________ Treatment
4018 Opossum Creek Land 7 EA ___________ ___________
4019 Type A Mowing* 30 AC ___________ ___________
4020 Lithia Springs Chautauqua “B” 2 EA ___________ ___________
4021 Camp Camfield “B” 5 EA ___________ ___________
4022 Lithia Springs “B” 5 EA ___________ ___________
4023 Dam East and Spillway “B” 5 EA ___________ ___________
4024 Dam West “B” 5 EA ___________ ___________
4025 Opossum Creek “B” 5 EA ___________ ___________
4026 Coon Creek “B” 5 EA ___________ ___________
4027 Whitley Creek “B” 5 EA ___________ ___________
4028 Whitley Creek Land 5 EA ___________ ___________ Treatment “B”
4029 Woods Lake “B” 5 EA ___________ ___________
4030 Bo Wood “B” 5 EA ___________ ___________
4031 Type B Mowing * 40 AC ___________ ___________
4032 Turf Fertilization* 5 AC ___________ ___________
4033 Overseeding* 5 AC ___________ ___________
4034 Aeration* 5 AC ___________ ___________
4035 Turf Renovation with 5 TN ___________ ___________ Topsoil Placement
4036 Turf Renovation without 500 SF ___________ ___________ Topsoil Placement
4037 Turf Renovation without 5 AC ___________ ___________ Topsoil Placement*
CHEMICAL APPLICATION
4038 Poison Ivy Control* 3 AC ___________ ___________
4039 Broadleaf Control* 40 AC ___________ ___________
4040 Level 1 Vegetation Control* 3 AC ___________ ___________
4041 Chemical Application for 10 AC ___________ ___________
4042 Dam West Beach 6 EA ___________ ___________
4043 Sullivan Beach 6 EA ___________ ___________
4044 Wilborn Creek Beach 6 EA ___________ ___________
4045 Lithia Springs Beach 6 EA ___________ ___________
4046 Coon Creek Beach 6 EA ___________ ___________
4047 Supply Mulch 6 EA ___________ ___________
4048 Bed Maintenance 12 EA ___________ ___________
4049 B & B Tree/Shrub Planting 6 EA ___________ ___________
Optional Year 4 Total ___________
Grand Total ___________ (Base Year + Optional Years)
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job Base Year- Mowing and Ground
FFP
Maintenance at Lake Shelbyville, Shelbyville Illinois FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 1 Job OPTION Option Year One (1) Mowing and Ground
FFP
UNIT UNIT PRICE MAX AMOUNT
2001 1 Job OPTION Option Year Two (2)- Mowing and Ground
FFP
UNIT UNIT PRICE MAX AMOUNT
3001 1 Job OPTION Option Year Three (3) Mowing and Ground
FFP
UNIT UNIT PRICE MAX AMOUNT
4001 1 Job OPTION Option Year Four (4) Mowing and Ground
FFP
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 1001 N/A N/A N/A Government 2001 N/A N/A N/A Government 3001 N/A N/A N/A Government 4001 N/A N/A N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-15 Certificate of Conformance APR 1984
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 15-MAR-2018 TO
14-MAR-2019
N/A LAKE SHELBYVILLE PROJECT OFC
ANNA E. HICKMAN
US ARMY ENGR DIST ST LOUIS
1989 STATE HIGHWAY 16
SHELBYVILLE IL 62565-4631
217-774-3867 X 7007
965116
1001 POP 15-MAR-2019 TO
14-MAR-2020
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 15-MAR-2020 TO
14-MAR-2021
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 15-MAR-2021 TO
14-MAR-2022
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 15-MAR-2022 TO
14-JAN-2023
N/A (SAME AS PREVIOUS LOCATION)
52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
Section H - Special Contract Requirements
52.000-4000 52.000-4000 REQUIRED INSURANCE JAN 2000
Section I - Contract Clauses
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
SEP 2007
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2016 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.214-29 Order Of Precedence--Sealed Bidding JAN 1986 52.216-22 Indefinite Quantity OCT 1995 52.217-8 Option To Extend Services NOV 1999 52.217-9 Option To Extend The Term Of The Contract MAR 2000 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.222-41 Service Contract Labor Standards MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
MAY 2014
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001
52.223-16 Acquisition of EPEAT (R) - Registered Personal Computer Products
OCT 2015
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.226-1 Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-11 Extras APR 1984 52.232-15 Progress Payments Not Included APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items NOV 2017 52.246-25 Limitation Of Liability--Services FEB 1997 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.250-1 Indemnification Under Public Law 85-804 APR 1984 52.252-6 Authorized Deviations In Clauses APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.223-7004 Drug Free Work Force SEP 1988 252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Dec 2017)
DEC 2017
252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.239-7001 Information Assurance Contractor Training and Certification JAN 2008 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 2500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of 750,000.00
(2) Any order for a combination of items in excess of 750,000.00; or
(3) A series of orders from the same ordering office within five (5) days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within seven (7)days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN--
CERTIFICATION (AUG 2009)
(a) Definitions. As used in this provision--
Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.
Marginalized populations of Sudan means--
(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and
(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate--
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education; or
(6) Have been voluntarily suspended.
(b) Certification. By submission of its offer, the offeror certifies that the offeror does not conduct any restricted business operations in Sudan.
(End of provision)
52.248-1 VALUE ENGINEERING (OCT 2010)
(a) General. The Contractor is encouraged to develop, prepare, and submit value engineering change proposals (VECP's) voluntarily. The Contractor shall share in any net acquisition savings realized from accepted VECP's, in accordance with the incentive sharing rates in paragraph (f) below.
(b) Definitions. "Acquisition savings,'' as used in this clause, means savings resulting from the application of a VECP to contracts awarded by the same contracting office or its successor for essentially the same unit. Acquisition savings include--
(1) Instant contract savings, which are the net cost reductions on this, the instant contract, and which are equal to the instant unit cost reduction multiplied by the number of instant contract units affected by the VECP, less the Contractor's allowable development and implementation costs;
(2) Concurrent contract savings, which are net reductions in the prices of other contracts that are definitized and ongoing at the time the VECP is accepted; and
(3) Future contract savings, which are the product of the future unit cost reduction multiplied by the number of future contract units in the sharing base. On an instant contract, future contract savings include savings on increases in quantities after VECP acceptance that are due to contract modifications, exercise of options, additional orders, and funding of subsequent year requirements on a multiyear contract.
"Collateral costs," as used in this clause, means agency cost of operation, maintenance, logistic support, or Government-furnished property.
"Collateral savings," as used in this clause, means those measurable net reductions resulting from a VECP in the agency's overall projected collateral costs, exclusive of acquisition savings, whether or not the acquisition cost changes.
"Contracting office" includes any contracting office that the acquisition is transferred to, such as another branch of the agency or another agency's office that is performing a joint acquisition action.
"Contractor's development and implementation costs," as used in this clause, means those costs the Contractor incurs on a VECP specifically in developing, testing, preparing, and submitting the VECP, as well as those costs the Contractor incurs to make the contractual changes required by Government acceptance of a VECP.
"Future unit cost reduction," as used in this clause, means the instant unit cost reduction adjusted as the Contracting Officer considers necessary for projected learning or changes in quantity during the sharing period. It is calculated at the time the VECP is accepted and applies either (1) throughout the sharing period, unless the Contracting Officer decides that recalculation is necessary because conditions are significantly different from those previously anticipated or (2) to the calculation of a lump-sum payment, which cannot later be revised.
"Government costs," as used in this clause, means those agency costs that result directly from developing and implementing the VECP, such as any net increases in the cost of testing, operations, maintenance, and logistics support. The term does not include the normal administrative costs of processing the VECP or any increase in this contract's cost or price resulting from negative instant contract savings.
"Instant contract," as used in this clause, means this contract, under which the VECP is submitted. It does not include increases in quantities after acceptance of the VECP that are due to contract modifications, exercise of options, or additional orders. If this is a multiyear contract, the term does not include quantities funded after VECP acceptance. If this contract is a fixed-price contract with prospective price redetermination, the term refers to the period for which firm prices have been established.
"Instant unit cost reduction" means the amount of the decrease in unit cost of performance (without deducting any Contractor's development or implementation costs) resulting from using the VECP on this, the instant contract. If this is a service contract, the instant unit cost reduction is normally equal to the number of hours per line-item task saved by using the VECP on this contract, multiplied by the appropriate contract labor rate.
"Negative instant contract savings" means the increase in the cost or price of this contract when the acceptance of a VECP results in an excess of the Contractor's allowable development and implementation costs over the product of the instant unit cost reduction multiplied by the number of instant contract units affected.
"Net acquisition savings" means total acquisition savings, including instant, concurrent, and future contract savings, less Government costs.
"Sharing base," as used in this clause, means the number of affected end items on contracts of the contracting office accepting the VECP.
Sharing period, as used in this clause, means the period beginning with acceptance of the first unit incorporating the VECP and ending at a calendar date or event determined by the contracting officer for each VECP.
"Unit," as used in this clause, means the item or task to which the Contracting Officer and the Contractor agree the VECP applies.
"Value engineering change proposal (VECP)" means a proposal that--
(1) Requires a change to this, the instant contract, to implement; and
(2) Results in reducing the overall projected cost to the agency without impairing essential functions or characteristics; provided, that it does not involve a change--
(i) In deliverable end item quantities only;
(ii) In research and development (R&D) end items or R&D test quantities that is due solely to results of previous testing under this contract; or
(iii) To the contract type only.
(c) VECP preparation. As a minimum, the Contractor shall include in each VECP the information described in subparagraphs (1) through (8) below. If the proposed change is affected by contractually required configuration management or similar procedures, the instructions in those procedures relating to format, identification, and priority assignment shall govern VECP preparation. The VECP shall include the following:
(1) A description of the difference between the existing contract requirement and the proposed requirement, the comparative advantages and disadvantages of each, a justification when an item's function or characteristics are being altered, the effect of the change on the end item's performance, and any pertinent objective test data.
(2) A list and analysis of the contract requirements that must be changed if the VECP is accepted, including any suggested specification revisions.
(3) Identification of the unit to which the VECP applies.
(4) A separate, detailed cost estimate for (i) the affected portions of the existing contract requirement and (ii) the VECP. The cost reduction associated with the VECP shall take into account the Contractor's allowable development and implementation costs, including any amount attributable to subcontracts under the Subcontracts paragraph of this clause, below.
(5) A description and estimate of costs the Government may incur in implementing the VECP, such as test and evaluation and operating and support costs.
(6) A prediction of any effects the proposed change would have on collateral costs to the agency.
(7) A statement of the time by which a contract modification accepting the VECP must be issued in order to achieve the maximum cost reduction, noting any effect on the contract completion time or delivery schedule.
(8) Identification of any previous submissions of the VECP, including the dates submitted, the agencies and contract numbers involved, and previous Government actions, if known.
(d) Submission. The Contractor shall submit VECP's to the Contracting Officer, unless this contract states otherwise.
If this contract is administered by other than the contracting office, the Contractor shall submit a copy of the VECP simultaneously to the Contracting Officer and to the Administrative Contracting Officer.
(e) Government action. (1) The Contracting Officer will notify the Contractor of the status of the VECP within 45 calendar days after the contracting office receives it. If additional time is required, the Contracting Officer will notify the Contractor within the 45-day period and provide the reason for the delay and the expected date of the decision. The Government will process VECP's expeditiously; however, it shall not be liable for any delay in acting upon a VECP.
(2) If the VECP is not accepted, the Contracting Officer will notify the Contractor in writing, explaining the reasons for rejection. The Contractor may withdraw any VECP, in whole or in part, at any time before it is accepted by the Government. The Contracting Officer may require that the Contractor provide written notification before undertaking significant expenditures for VECP effort.
(3) Any VECP may be accepted, in whole or in part, by the Contracting Officer's award of a modification to this contract citing this clause and made either before or within a reasonable time after contract performance is completed. Until such a contract modification applies a VECP to this contract, the Contractor shall perform in accordance with the existing contract. The decision to accept or reject all or part of any VECP is a unilateral decision made solely at the discretion of the Contracting Officer.
(f) Sharing rates. If a VECP is accepted, the Contractor shall share in net acquisition savings according to the percentages shown in the table below. The percentage paid the Contractor depends upon (1) this contract's type (fixed-price, incentive, or cost-reimbursement), (2) the sharing arrangement specified in paragraph (a) above (incentive, program requirement, or a combination as delineated in the Schedule), and (3) the source of the savings (the instant contract, or concurrent and future contracts), as follows:
CONTRACTOR'S SHARE OF NET ACQUISITION SAVINGS
(Figures in percent)
Contract Type Incentive (Voluntary) Program Requirement
(Mandatory) Instant Contract
Rate Concurrent and Future Contract
Rate
Instant Contract Rate
Concurrent and Future Contract
Rate Fixed-price
(includes fixed-price-award-fee;
excludes other fixed-price incentive contracts)
(1) 50 (1) 50 (1) 25 25
Incentive (fixed-price or cost) (other than award fee)
(2) (1) 50 (2) 25
Cost-reimbursement (includes cost-plus-award-fee;
excludes other cost-type incentive
Contracts)
(3) 25 (3) 25 15 15
(1) The Contracting Officer may increase the Contractor's sharing rate to as high as 75 percent for each VECP.
(2) Same sharing arrangement as the contract's profit or fee adjustment formula.
(3) The Contracting Officer may increase the Contractor's sharing rate to as high as 50 percent for each VECP.
(g) Calculating net acquisition savings.
(1) Acquisition savings are realized when (i) the cost or price is reduced on the instant contract, (ii) reductions are negotiated in concurrent contracts, (iii) future contracts are awarded, or (iv) agreement is reached on a lump-sum payment for future contract savings (see subparagraph (i)(4) below). Net acquisition savings are first realized, and the Contractor shall be paid a share, when Government costs and any negative instant contract savings have been fully offset against acquisition savings.
(2) Except in incentive contracts, Government costs and any price or cost increases resulting from negative instant contract savings shall be offset against acquisition savings each time such savings are realized until they are fully offset. Then, the Contractor's share is calculated by multiplying net acquisition savings by the appropriate Contractor's percentage sharing rate (see paragraph (f) above). Additional Contractor shares of net acquisition savings shall be paid to the Contractor at the time realized.
(3) If this is an incentive contract, recovery of Government costs on the instant contract shall be deferred and offset against concurrent and future contract savings. The Contractor shall share through the contract incentive structure in savings on the instant contract items affected. Any negative instant contract savings shall be added to the target cost or to the target price and ceiling price, and the amount shall be offset against concurrent and future contract savings.
(4) If the Government does not receive and accept all items on which it paid the Contractor's share, the Contractor shall reimburse the Government for the proportionate share of these payments.
(h) Contract adjustment. The modification accepting the VECP (or a subsequent modification issued as soon as possible after any negotiations are completed) shall--
(1) Reduce the contract price or estimated cost by the amount of instant contract savings, unless this is an incentive contract;
(2) When the amount of instant contract savings is negative, increase the contract price, target price and ceiling price, target cost, or estimated cost by that amount;
(3) Specify the Contractor's dollar share per unit on future contracts, or provide the lump-sum payment;
(4) Specify the amount of any Government costs or negative instant contract savings to be offset in determining net acquisition savings realized from concurrent or future contract savings; and
(5) Provide the Contractor's share of any net acquisition savings under the instant contract in accordance with the following:
(i) Fixed-price contracts--add to contract price.
(ii) Cost-reimbursement contracts--add to contract fee.
(i) Concurrent and future contract savings.
(1) Payments of the Contractor's share of concurrent and future contract savings shall be made by a modification to the instant contract in accordance with subparagraph (h)(5) above. For incentive contracts, shares shall be added as a separate firm-fixed-price line item on the instant contract. The Contractor shall maintain records adequate to identify the first delivered unit for 3 years after final payment under this contract.
(2) The Contracting Officer shall calculate the Contractor's share of concurrent contract savings by (i) subtracting from the reduction in price negotiated on the concurrent contract any Government costs or negative instant contract savings not yet offset and (ii) multiplying the result by the Contractor's sharing rate.
(3) The Contracting Officer shall calculate the Contractor's share of future contract savings by (i) multiplying the future unit cost reduction by the number of future contract units scheduled for delivery during the sharing period, (ii) subtracting any Government costs or negative instant contract savings not yet offset, and (iii) multiplying the result by the Contractor's sharing rate.
(4) When the Government wishes and the Contractor agrees, the Contractor's share of future contract savings may be paid in a single lump sum rather than in a series of payments over time as future contracts are awarded. Under this alternate procedure, the future contract savings may be calculated when the VECP is accepted, on the basis of the Contracting Officer's forecast of the number of units that will be delivered during the sharing period. The Contractor's share shall be included in a modification to this contract (see subparagraph (h)(3) above) and shall not be subject to subsequent adjustment.
(5) Alternate no-cost settlement method. When, in accordance with subsection 48.104-4 of the Federal Acquisition Regulation, the Government and the Contractor mutually agree to use the no-cost settlement method, the following applies:
(i) The Contractor will keep all the savings on the instant contract and on its concurrent contracts only.
(ii) The Government will keep all the savings resulting from concurrent contracts placed on other sources, savings from all future contracts, and all collateral savings.
(j) Collateral savings. If a VECP is accepted, the Contracting Officer will increase the instant contract amount, as specified in paragraph (h)(5) of this clause, by a rate from 20 to 100 percent, as determined by the Contracting Officer, of any projected collateral savings determined to be realized in a typical year of use after subtracting any Government costs not previously offset. However, the Contractor's share of collateral savings will not exceed the contract's firm-fixed-price, target price, target cost, or estimated cost, at the time the VECP is accepted, or $100,000, whichever is greater. The Contracting Officer will be the sole determiner of the amount of collateral savings.
(k) Relationship to other incentives. Only those benefits of an accepted VECP not rewardable under performance, design-to-cost (production unit cost, operating and support costs, reliability and maintainability), or similar incentives shall be rewarded under this clause. However, the targets of such incentives affected by the VECP shall not be adjusted because of VECP acceptance. If this contract specifies targets but provides no incentive to surpass them, the value engineering sharing shall apply only to the amount of achievement better than target.
(l) Subcontracts. The Contractor shall include an appropriate value engineering clause in any subcontract of $150,000 or more and may include one in subcontracts of lesser value. In calculating any adjustment in this contract's price for instant contract savings (or negative instant contract savings), the Contractor's allowable development and implementation costs shall include any subcontractor's allowable development and implementation costs, and any value engineering incentive payments to a subcontractor, clearly resulting from a VECP accepted by the Government under this contract. The Contractor may choose any arrangement for subcontractor value engineering incentive payments; provided, that the payments shall not reduce the Government's share of concurrent or future contract savings or collateral savings.
(m) Data. The Contractor may restrict the Government's right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:
"These data, furnished under the Value Engineering clause of contract . . . . . . . . . . , shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause. This restriction does not limit the Government's right to use information contained in these data if it has been obtained or is otherwise available from the Contractor or from another source without limitations."
If a VECP is accepted, the Contractor hereby grants the Government unlimited rights in the VECP and supporting data, except that, with respect to data qualifying and submitted as limited rights technical data, the Government shall have the rights specified in the contract modification implementing the VECP and shall appropriately mark the data.
(The terms "unlimited rights" and "limited rights" are defined in Part 27 of the Federal Acquisition Regulation.)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far www.acq.osdsd.mil/dp/dars
252.216-7006 ORDERING (MAY 2011)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from one
(1) year from the date of award for the base year and for each option year.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c)(1) If issued electronically, the order is considered ``issued'' when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.
(2) If mailed or transmitted by facsimile, a delivery order or task order is considered ``issued'' when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.
(3) Orders may be issued orally only if authorized in the schedule.
(End of Clause)
FAR 14.407-2 APPARENT CLERICAL
14.407-2 Apparent clerical mistakes.
(a) Any clerical mistake, apparent on its face in the bid, may be corrected by the contracting officer before award. The contracting officer first shall obtain from the bidder a verification of the bid intended. Examples of apparent mistakes are -
(1) Obvious misplacement of a decimal point;
(2) Obviously incorrect discounts (for example, 1 percent 10 days, 2 percent 20 days, 5 percent 30 days);
(3) Obvious reversal of the price f.o.b. destination and price f.o.b. origin; and
(4) Obvious mistake in designation of unit.
(b) Correction of the bid shall be effected by attaching the verification to the original bid and a copy of the verification to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.