A22-17-R-0019-0002.pdf
PDF 21 KB Posted
- Attached to
- GRAND TOWER PL 84-99 Federal contract opportunity
- Solicitation number
- W912P917R0019
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17-R-0019-0004-3.pdf | ||
| 17-R-0019-0004-1.pdf | ||
| A22-17-R-0019-0004.pdf | ||
| 17-R-0019-0004-2.pdf | ||
| A22-17-R-0019-0003.pdf | ||
| A22-17-R-0019-0003-Attachment-1.pdf | ||
| A22-17-R-0019-0002-Attachment-1.pdf | ||
| A22-17-R-0019-0002-Attachment-2.pdf | ||
| A22-17-R-0019-0001-Site_Visit_Map.pdf | ||
| A22-17-R-0019-0001.pdf | ||
| A22-17-R-0019-Solicitation-GrandTower.pdf | ||
| A02-17-R-0019-Grand_Tower_PL8499_Adv_Specs.pdf | ||
| H01-17-R-0019-Grand_Tower_Plans_Advertised_2017_02_16.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE PAGE TWO.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-17-R-0019
X 9B. DATED (SEE ITEM 11)
21-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Mar-2017
CODE
CONTRACTING DIVISION
USARMY ENGR DIST ST LOUIS
1222 SPRUCE ST RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P9-17-R-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0002
The purpose for this amendment is listed below:
1.) Add Sign-In Sheet from the Site Visit. ( See Attachment-1)
2.) "Delete the original Section 31 21 10.99 15 and replace it with the like-numbered section which includes changes to paragraph 3.1.2." (See Attachment-2)
3.) Please note all questions will be cut off on 03/16/17 for this requirement.
4.) Questions and Answers for Grand Tower:
a. Page 1 of the solicitation states that “An offer guarantee is not required, however page 53 states “If the offeror intends to use and ILC in lieu of a bid bond, or to secure other types of bonds such as performance and payment bonds, the letter of credit and letter of confirmation formats in paragraphs (e) and (f) of this clause shall be used.” Is a Bid Bond required for this submission?
ANSWER: PLEASE NOTE AN OFFER GUARANTEE IS NOT REQUIRED. ON PAGE 53 THE
FOLLOWING IS DELETED, “If the offeror intends to use and ILC in lieu of a bid bond, or to secure other types of bonds such as performance and payment bonds, the letter of credit and letter of confirmation formats in paragraphs (e) and (f) of this clause shall be used”.
b. Based on knowledge gained from attending the site visit and an increased understanding of the complexity of the scope of work, we would like to request a 2 week extension in order to provide a more complete response to the scope of work and a detailed work plan, mitigating risks for the USACE in selecting the right vendor for this project.
ANSWER: THE RESPONSE DATE WILL REMAIN THE SAME.
c. In the solicitation it states that PPQ forms (adjective rating sheet) must be submitted with all projects that are provided in the past performance section. Sometimes these are difficult to receive back especially during the busy time of the year. Based on that, would the government accept CPAR reports for projects that are provided in the past performance section instead of the PPQ form?
ANSWER: THE GOVERNMENT WILL ACCEPT CPAR REPORTS FOR PROJECTS THAT ARE
PROVIDED IN THE PAST PERFORMANCE SECTION INSTEAD OF THE PPQ FORM.
W912P9-17-R-0019
d. In Section 31 21 10.99 15, page 2, 3.1.2 Contractors Work Area Stripping. It states that there is to be no more than two inches stripped off of this area. However, this is the area that will be used to dry the material with the use of lime. I am afraid that what will be left behind will be very difficult to grow any vegetation even with the 2 inches of material that is stripped. Is there any way this can be changed to 4 or 6 inches to be stripped, so that there is more material to create an optimal seed bed?
ANSWER: PLEASE SEE ATTACHMENT-2 OF THIS AMENDMENT.
(End of Summary of Changes)