A22-17-R-0019-0002-Attachment-2.pdf
PDF 14 KB Posted
- Attached to
- GRAND TOWER PL 84-99 Federal contract opportunity
- Solicitation number
- W912P917R0019
About this file
Spec Change Attachment-2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A22-17-R-0019-0004.pdf | ||
| 17-R-0019-0004-3.pdf | ||
| 17-R-0019-0004-1.pdf | ||
| 17-R-0019-0004-2.pdf | ||
| A22-17-R-0019-0003.pdf | ||
| A22-17-R-0019-0003-Attachment-1.pdf | ||
| A22-17-R-0019-0002.pdf | ||
| A22-17-R-0019-0002-Attachment-1.pdf | ||
| A22-17-R-0019-0001.pdf | ||
| A22-17-R-0019-0001-Site_Visit_Map.pdf | ||
| A22-17-R-0019-Solicitation-GrandTower.pdf | ||
| A02-17-R-0019-Grand_Tower_PL8499_Adv_Specs.pdf | ||
| H01-17-R-0019-Grand_Tower_Plans_Advertised_2017_02_16.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amend 0002
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 21 10.99 15
STRIPPING (PL84-99)
PART 1 GENERAL
1.1 SCOPE
1.2 QUALITY CONTROL
1.2.1 General
1.2.2 Reporting
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 STRIPPING
3.1.1 Topsoil Removal (Stripping of Repair Areas)
3.1.2 Contractor's Work Area Stripping
3.2 USE OF STRIPPED MATERIAL
-- End of Section Table of Contents --
SECTION 31 21 10.99 15 Page 1
SECTION 31 21 10.99 15
STRIPPING (PL84-99)
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all plant, labor, equipment, and materials, and performing all operations necessary for stripping the areas specified herein or indicated on the drawings, and for the removal and disposal of all stripped materials.
1.2 QUALITY CONTROL
1.2.1 General
The Contractor shall establish and maintain quality control for clearing and grubbing operations to assure compliance with contract requirements, and maintain records of quality control for all construction operations including but not limited to the following:
(1) Stripping. Limits, depth of stripping, percentage of area complete; type of material.
1.2.2 Reporting
A copy of these records of inspections and tests, as well as the records of corrective action taken, shall be furnished to the Government as specified in Section 01 14 40, paragraph DOCUMENTATION.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 STRIPPING
3.1.1 Topsoil Removal (Stripping of Repair Areas)
Repair areas shall be defined as the existing levee and within the new levee footprint that is to be constructed. Stripping shall consist of the removal of materials down to bare earth and without removing more earth than is necessary and no more than 8 inches.
3.1.2 Contractor's Work Area Stripping
In contractor's work area, materials shall be removed down to bare earth and without removing more earth than is necessary and no more than 6 inches. The area stripped within the Contractor's work area shall be no more than what is necessary for purposes of drying on-site excavated material that is to be utilized in the construction of the levee cross-section.
SECTION 31 21 10.99 15 Page 2
3.2 USE OF STRIPPED MATERIAL
All stripped material from the levee footprint, Contractor's work area and borrow areas shall be stockpiled separately and used for top dressing on the respective areas.
-- End of Section --
SECTION 31 21 10.99 15 Page 3