A22_17-R-0007_Amendment_2.pdf

PDF 99 KB Posted

Attached to
Mowing Services Wapp Lake
Solicitation number
W912P9-17-R-0007
Issued by

About this file

Amendment 2 Mowing Service Wapp Lake

View the file

Other files

File Type Posted
17-R-0007_Amend_3.pdf PDF
A02_Appendix_B_Area_Maps.pdf PDF
A02_Contractor_Information_Sheet.pdf PDF
A22_17-R-0007_Amend_1.pdf PDF
Appendices_Mowing_Svc_Wapp_Lake.pdf PDF
W912P9-17-R-0007_Mowing_Services_Wapp_Lake.pdf PDF
Appendix_B_Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

1. Revise Table of Contents

2. Revise Appendix B Maps.

3. Add Section 5.18 Insurance Requirement.

There are no other changes, all other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-17-R-0007

X 9B. DATED (SEE ITEM 11)

16-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Dec-2016

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P9-17-R-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

SCOPE OF WORK

PERFORMANCE WORK STATEMENT

GROUNDS MAINTENANCE SERVICES

Wappapello Lake

Table of Contents

1. Description of Services

1.1. Improved Grounds Maintenance

1.2. Unimproved Grounds Maintenance

1.3. Turf Renovation

1.4 Leaf Mulching

2. Service Delivery Summary (SDS)

2.1. Quality Control

2.2. Quality Assurance

2.3. Performance Assessment

3. Government-Furnished Property and Services

3.1. Keys

3.2. Seed

3.3. Fertilizer

4. Contractor-Furnished Property and Services

4.1. Herbicide

4.2. Mulch

5. General Information

5.1. Background

5.2. Environmental Requirements

5.3. Pesticide Reports

5.4. Inspections

5.5. Hazardous Materials

5.6. Hazardous Materials Management

5.7. Permits, Licenses and Certifications

5.8. Hours of Operation

5.9. Security Requirements

5.10. Contractor Vehicles

5.11. Special Qualifications

5.12. Interfaces

5.13. Contracting Officer and Contracting Officer Representative (Quality Assurance Personnel)

5.14. Safety Requirements and Reports

5.15. Changes in Work

5.16. Period of Performance

5.17. Manpower Reporting

5.18. Required Insurance

6. Appendices Appendix A: Grounds Description/Workload estimates Appendix B: Area Maps Appendix C: Data Requirements Appendix D: Definitions Appendix E: Contractor Vehicle Sign Appendix F: Pesticide Reports Appendix G: Accident Prevention Plan Appendix H: Ground Maintenance Master Work Plan

PERFORMANCE WORK STATEMENT FOR GROUNDS MAINTENANCE SERVICES

1. Description of Services. The Contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Wappapello Lake, Missouri, in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor’s performance will be based on the Contracting Officer’s (CO), Contracting Officer’s Representative (COR), and Quality Assurance Personnel evaluations of the results required by the Service Delivery Summary and not the frequency or method of performance. It is at the Contractor’s discretion to determine the levels of frequencies to attain the level of service at the best value. The evaluation of results will be based on COR performance assessment, quality assurance results, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, and local laws and commercial standards as outlined by the Professional Grounds Management Society (PGMS). When mowing, vegetation control, mulching, and renovation services are required, the Contractor shall contact the COR one business day prior to starting services. Services shall be completed in a continuous clockwise or counter clockwise movement around the project, and shall follow the same path, every cycle, as outlined in the Contractors Grounds Maintenance Master Work Plan (GMMWP). The GMMWP will describe how the Contractor plans to meet the contract requirements and the equipment and manpower to be utilized.

1.1. Improved Grounds Maintenance. Improved grounds are identified in Appendix B. Improved grounds are areas that require more frequent maintenance such as campgrounds, day-use areas, boat ramps, and road sides, average frequencies are found in Appendix A. Exact mowing limits will follow existing mowing limits; any questions regarding widths, areas, or inclusions will be defined in the field.

1.1.1. Mowing. The Contractor shall mow all improved grounds to look well-manicured with a neat and professional appearance at all times. The Contractor shall maintain grass height between three (3) and six (6) inches, uniform in appearance, free of skips, gaps, rutting, or scalping. When a mowing cycle occurs, the grass shall be mowed to a height of three (3) inches. The CO or COR may allow deviation from the three (3) inch mowing height, if environmental conditions exist where a deviation is required to maintain turf health.

The Contractor shall be required to pick up debris, natural and manmade, prior to mowing any area. Natural debris such as tree limbs, branches, rocks, and other debris not suitable for mowers to pass over without damage to the mower or potential danger of discharged debris shall be removed out of the mowing limits by the Contractor. The Contractor shall remove or mulch grass clippings when wind-rowed after mowing, before leaving work area.

1.1.2 Clippings and Discharge. The Contractor shall direct all grass clippings away from sidewalks, picnic shelters, campsites, roadways, parking lots, buildings and other improvements adjacent to the mowed areas.

Clippings shall be removed completely from the above improvements if discharged on them. The Contracting Officer’s Representative will designate where grass clippings may be disposed of on Government property.

All natural debris such as tree limbs, branches, rocks, and other debris not suitable for mowers to pass over without damage to the mower or potential danger of discharged debris shall be removed out of the mowing limits by the Contractor.

1.1.2. Edging. Edging shall be accomplished along sidewalks and concrete slabs in order to keep all vegetation off of these structure and includes removal of vegetation from expansion joints and cracks in sidewalks, driveways, curbs and other hard surfaces.

1.1.3. Trimming. The Contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds. Trimming height shall match surrounding area grass height. The Contractor shall remove, or mulch, grass clippings when wind-rowed after trimming, before leaving work area. The Contractor shall trim all areas concurrent with mowing.

1.1.4. Vegetation Control. The Contractor shall provide all management, licenses, tools, supplies, equipment, transportation and labor to develop and implement an Integrated Pest Management (IPM) plan in the areas covered by the Contractors Grounds Maintenance Master Work Plan (GMMWP). The IPM shall be submitted to the CO for approval prior to the commencement of work. The Contractor shall use only herbicides approved by the CO or COR. Herbicides on the current, Missouri Restricted-Use Pesticide List and any types of soil sterilants shall not be used. The Contractor shall comply with current federal, state, local, regulations, plans, and policies. The Contractor shall comply with all applicable parts of ER 1130-2- 540, Pest Control Program for Civil Works Projects, Protection of Environment, Pesticide Program, and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. The Contractor shall ensure that all workers have current state certification for the herbicide control services being performed, and that the CO has a copy of each applicator’s certification. The Contractor shall be permitted to use approved herbicides to control vegetation and reduce the amount of trimming work. Herbicide application shall be permitted around perimeter rocks/timbers, guardrails, buildings, shelters, signs, carsonite posts, other inanimate objects and those approved by the Government. Contractor shall not apply herbicide any further than 8’’ from the object.

Herbicide use will not be permitted around such items as culverts, campsites and their associated facilities (breaker boxes, water/sewer hookups), hillsides, ditches and other areas were erosion will occur due to lack of vegetation which shall be determined by the Government. The use of herbicides is intended to reduce, but not eliminate the amount of trimming. Careless or negligent use of herbicides resulting in unsightly or unsafe conditions will terminate the Contractors privilege to use them and vegetation in these respective areas will then be controlled by trimming. The Contractor shall control vegetation through execution of a vegetation control program appropriate for the area. The Contractor must submit a list of herbicides to be used for approval by the Contracting Officers Representative prior to each application, see Appendix F. Mixing of chemicals, filling of containers, applications, and disposal shall be in accordance with all manufacturers’ label instructions and Federal and state laws. Mixing or disposal of chemicals or filling of containers shall not occur on government lands.

1.1.5. Lawn Renovation. If lawn areas are damaged due to Contractor action, the Contractor shall renovate at no additional cost to the government.

1.2. Unimproved Grounds Maintenance. Unimproved grounds are identified in Appendix B, and average frequencies are found in Appendix A. The Contractor shall maintain grass and woody vegetation, up to one and a half (1.5) inch caliper, in un-improved grounds to prevent woody encroachment. Any existing wooded areas contained within un-improved area shall not be the responsibility of the Contractor to maintain. The Contractor shall mow un-improved grounds a minimum of once per year and a maximum of three times per year, at appropriate dates determined by CO or COR based upon weather forecasts, special events, and ground conditions. Grass height shall be mowed between four (4) and six (6) inches. Exact mowing limits will follow existing mowing limits; any questions regarding widths, areas, or inclusions will be defined in the field.

1.2.1. Trimming. The Contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on unimproved grounds. The Contractor shall match trimming height to surrounding area grass height. The Contractor shall trim all areas concurrent with mowing.

1.2.2. Lawn Renovation. If lawn areas are damaged due to Contractor action, the Contractor shall renovate at no additional cost to the government.

1.3 Turf Renovation. The Contractor shall renovate turf in areas using a process including; mowing (as needed), seed bed preparation, fertilization, seeding/incorporation of seed, and mulching. Fertilization rates shall be determined by the CO or COR, based upon soil testing. Seeding rates shall be adjusted from nine (9) to fifteen

(15) pounds per 1000 square feet as determined by the CO or COR and agreed upon by the Contractor, and shall be uniform across the entire area. Seed bed preparation shall include soil disturbance that loosens the soil surface to accommodate over-seeding and seed incorporation. Turf renovations shall be completed on areas damaged by the Contractor.

1.4 Leaf Mulching. The Contractor will be required to mulch all leaves in the Redman Creek Campgrounds, Redman Picnic and Redman Creek Recreation Area. Eagle Point, Peoples Creek Campgrounds and the Greenville Campground and Recreation Area. During the months of October –March the Contractor is required to mulch leaves to prevent damage to existing turf. Prior to mulching, leaves on roadways, parking lots and parking spurs, and picnic/campground impact sites shall be removed. Mulched leaves shall be dispersed so as not to accumulate over one half (1/2) inch thick in any area.

2. Service Delivery Summary (SDS). The contract service requirements are summarized in performance objectives that relate directly to requirements. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SDS and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success.

PERFORMANCE

OBJECTIVE

PWS

PARA.

PERFORMANCE

THRESHOLD REMEDY METHOD OF

ASSESSMENT

SDS-1

Maintain Improved Grounds Para. 1.1 inclusive

No more than five (5) valid defects per month

Re-performance within 8 hours of notification, or a mutually acceptable timeframe to CO, COR and Contractor

Periodic Validation

SDS-2

Maintain Unimproved Grounds

Para. 1.2 inclusive

No more than 2 (2) defects per month

Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor

Periodic Validation

SDS-3

Turf Renovation Paras.

1.3 inclusive

No more than zero (0) defects per month

Re-performance within one day or a mutually acceptable timeframe to CO, COR and Contractor

Periodic Validation

SDS-4

Leaf Mulching

Paras.

1.4 inclusive

No more than 2 (2) defects per month

Re-performance within one day or a mutually acceptable

Periodic Validation timeframe to CO, COR and Contractor

SDS-5

Quality Control

a. Contractor’s quality control plan (incorporated into contract after award)

Para. 2.1 100% compliance to Contractors plan

Contractor shall complete a written corrective action report

Periodic Validation

2.1 Quality Control. The Contractor shall provide a written description of the quality control system to include identification of the commercial practices and procedures to be used, such as those of the Professional Grounds Management Society (PGMS), the American National Standards Institute (ANSI), Occupational Safety and Health Administration (OSHA), and local Extension Offices of the Federal Cooperative Extension Service. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-performance and continual repeat of defective service does not occur. The Contractor shall submit a written quality control plan and master work plan, Appendix I, to the contracting officer for approval. The Contractor shall submit the plan no later than the pre-performance conference. The plan shall specifically address the Contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.

2.2. Quality Assurance. The government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The CO or COR or Quality Assurance personnel (QA) shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in the Contractors GMMWP. When a performance threshold has not been met or Contractor performance has not been accomplished, the QA will initiate and provide the Contracting Officer notification of a Contractor deficiency. The Contractor shall respond to the deficiency notice in accordance with instructions provided and return it to the Contracting Officer within 1 calendar days of receipt.

2.3. Performance Assessment.

2.3.1. Periodic Validations. This method requires the QA to employ a “spot check” style of evaluation.

Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the CO or COR. Failing to meet the performance threshold as outlined in the SDS for any of these performance objectives in any one calendar month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SDS of these performance objectives in any combination for any two or more months during a contract period shall constitute an immediate progress meeting with the Multi- Functional Team.

3. Government-Furnished Property and Services

3.1. Keys. The Government will furnish the necessary keys for access to recreation areas. NOTE: Duplication of Government-furnished keys is not permitted. The Contractor shall immediately report the loss of any keys to the Contracting Officer. In the event that a Government-furnished key is lost, the Contractor is responsible for reimbursement of all costs incurred by the Government for replacement of entire lock systems throughout the lake project which are affected by the lost key. Contractor costs shall include Government labor, replacement lock costs, replacement key costs, tumbler reworking and all contracted-labor costs required to replace lock systems. The Government will determine the specific replacement lock system.

3.2. Reserved.

3.3. Reserved.

4. Contractor-Furnished Property and Services

4.1 Herbicide. The Contractor shall furnish only approved herbicides in accordance with Environmental Protection Agency guidelines, ER 1130-2-540, Pest Control Program for Civil Works Projects, and the Contracting Officer, or his authorized representative. Herbicides on the current, Missouri Restricted-Use Pesticide List shall not be used. Herbicides shall be of the type required and selectively suitable for the work at hand. The Contractor must submit a list of herbicides to be used for approval by the Contracting Officers Representative prior to each application.

4.2 Mulch. Mulch shall be fresh threshed straw, from a cereal grain such as oats, wheat, or barley, free of mold, mildew, and objectionable weed seeds.

5. General Information.

5.1. Background. All contract areas are located at Wappapello Lake, Wappapello MO. Butler and Wayne Counties, Missouri. Areas to be serviced include administrative, service, recreation, and public use areas.

Locations of contract areas, contract limits, and drawings are shown in Appendix B contained herein. The Contracting Officer will establish exact contract limits and locations in the field.

5.2. Environmental Requirements. In addition to all applicable Federal, State and Local environmental codes and regulations, the following specific guidance is provided.

5.3. Pesticide Reports. The Contractor shall submit a pre-use report to the CO, or their representative 3 working days prior to the initial pesticide application; pre-use forms are accepted for 1 calendar year without any changes.

Each category and chemical mixture shall warrant individual pre-use forms. Include pesticide name, use concentration, amount applied, date, and detailed location of use. Following a pesticide application, a post-use pesticide form shall be submitted to the CO, or their representative, for the day and for each individual recreational area. Soil sterilants shall not be permitted.

5.4. Inspections. The Contractor is subject to inspection by DOD certified applicators/inspectors as well as State Department of Agriculture Pesticides Division or equivalent agency.

5.5. Hazardous Materials Inventory. The Contractor shall maintain an up-to-date hazardous material inventory with copies of SDS(s), Safety Data Sheets, for all materials used on the job site.

5.6. Hazardous Materials Management. The Contractor shall remove all hazardous materials by the end of each workday. No storing or mixing of chemicals will be allowed on within the project boundaries.

5.7. Permits, Licenses and Certifications. Unless otherwise specified in this contract, Contractor employees shall obtain all necessary permits, licenses, and certifications; give all required notices; and comply with applicable Federal, State, County, and Local laws, codes, and regulations in performance of the requirements of this contract. The Contractor shall maintain all records of such requirements and make the documentation available to the government for review. All pesticide application will be made by State certified applicator as prescribed in DoDI 4150.07.

5.8. Hours of Operation. No work will be permitted on Saturdays, Sundays, or holidays unless this restriction is specifically waived by the CO or COR. If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. Grounds work shall not commence before sunrise or continue past sunset without prior approval from the CO or COR. NOTE: Mowing within campsites (campgrounds) shall not be permitted between the hours of 5 p.m. and 8 a.m. local times.

Federal holidays are as follows:

New Year’s Day - 1 January Labor Day - 1st Monday in September Martin Luther King Day - 3rd Monday in January

Columbus Day - 2nd Monday in October

Washington’s Birthday - 3rd Monday in February

Veteran’s Day - 11 November

Memorial Day - last Monday in May Thanksgiving Day - 4th Thursday in November

Independence Day - 4 July Christmas Day - 25 December

5.9. Security Requirements. The contractor and all associated sub-contractors shall receive a brief/training (provided by the COR) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training. Pre-screen employees using E-Verify Program. "The Contractor must pre-screen Employees using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Employee has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Employees must be provided to the COR no later than 3 business days after the initial contract award.

5.10. Contractor Vehicles. The Contractor shall provide all vehicles necessary to perform all services under this contract. The Contractor shall keep all vehicles clean and in safe operating condition. Vehicles shall be clearly marked with an identification sign showing, in 1-1/2 inch or larger letters, the Contractor’s name, type of business and address as set for in Appendix E.

5.11. Special Qualifications. The Contractor shall provide the name and telephone number of the Contractor’s on-site contract manager and alternate responsible for all requirements in the GMMWP.

5.12. Interfaces. The Contractor shall not unduly interfere with regularly scheduled government operational activities in the performance of contract requirements. In the event a government supervisor so requests, the Contractor shall temporarily cease work in the area and report the instructions, to include name of the government person involved, to the CO immediately by the most expedient means. The Contractor shall notify the CO verbally of disputes with customers or other Contractors and follow-up in writing.

5.13. Contracting Officer and Contracting Officer Representative. The Contracting Officer will appoint an alternate representative for management of the day to day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the Contractor after contract award.

5.14. Safety Requirements and Reports. This paragraph applies to contracts and purchase orders that require the Contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions). EM 385-1-1 and its changes are available at http://www.hq.usace.army.mil (at the homepage, select Safety and Occupational Health and then select Changes to EM). The Contractor shall be responsible for complying with the current edition and all changes posted on the web as set forth in this solicitation. The Government may inspect all equipment and materials. Any equipment or material found not in conformity with the requirements of this contract shall be removed from Government property immediately. The Contractor shall develop and submit an Accident Prevention Program using the forms located in Appendix G prior to commencing work.

5.15. Changes in Work. During the contract period, it may be necessary to change the frequency of services due to construction, maintenance repairs, and variations in public visitation, flooding of areas, complete or partial http://www.hq.usace.army.mil/ closure of recreation areas, or other circumstances. In the event changes occur, the CO or COR will notify the Contractor by telephone a minimum of 24 hours prior to the changes, followed by written confirmation.

5.15.1 Recreation Area Upgrades and Additions. The Government reserves the right to make modifications and/or add landscape structures within the existing mowing limits during the contract period.

This may include plantings of landscape trees, landscape shrubs, native grass areas, split-rail fence, facility improvements, and posts. It is the intent of the Government to plant/replace approximately 50-100 landscape trees every year of the contract period. No payment or considerations shall be due to the Contractor for such additions or physical upgrades to recreation areas.

5.16 Period of Performance. The period of performance for this contract shall be for five (5) years commencing from the date of award.

5.17. Manpower Reporting. The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the period of performance on each invoice.

5.18. Required Insurance. As required by the Contract Clause entitled “Insurance-Work on a Government Installation”, the Contractor shall furnish to the Contracting Officer, prior to the commencement of work, a certificate or written statement as evidence of the minimum insurance listed below. The Contractor shall procure and maintain such types and amounts of insurance during the entire period of his/her performance under this contract. The Contractor shall assure that the certificate or written statement is in aforementioned Contract Clause.

(1) Workmen’s Compensation – Amounts required by applicable jurisdictional statutes.

(2) Employer’s Liability Insurance - $100,000

(3) Comprehensive General Liability Insurance – (No property damage liability insurance is required).

Bodily Injury - $500,000 per occurrence

(4) Comprehensive Automobile Insurance Bodily Injury - $200,000 each person $500,000 each accident Property Damage - $20,000 each accident

Certificates of insurance should be submitted to the following address along with submitted bid packages:

Department of the Army St. Louis District, Corps of Engineers Wappapello Lake Management Office 10992 Hwy T Wappapello Mo. 63966-9603

(End of Summary of Changes)

2.1 Quality Control. The Contractor shall provide a written description of the quality control system to include identification of the commercial practices and procedures to be used, such as those of the Professional Grounds Management Society (PGMS)...
3. Government-Furnished Property and Services
4. Contractor-Furnished Property and Services