Attachment 1 Bid List

View the file

Other files for this federal contract opportunity

Other files attached to Geotechnical Exploration-Drilling Services, newest first.
File Type Posted
Questions_ _Anwsers_21-22.pdf PDF
Questions_ _Anwsers_18-20.pdf PDF
Section_B_FY16_Line_Items_Excel_Sheet.xlsx XLSX spreadsheet
Questions_ _Anwsers_10-17.pdf PDF
WD_15.pdf PDF
Amendment_2.pdf PDF
Revised_Attachment_1_-_Bid_Lists.pdf PDF
QA_1-9.pdf PDF
Amendment_1.pdf PDF
Drilling_Services-RFP.pdf PDF
Appendix_1_PPQ_Form.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B

SCHEDULE OF LINE ITEMS

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

0001 Mobilization and Demobilization 0001A Land-Based 0-400 MILES 20 EA 0001B Overwater 0-400 MILES 2 EA 0001C Swamp/Marsh Buggy 0-400 MILES 2 EA 0001D Jack up Boat/Barge 0-400 MILES 2 EA

0002 Standby Time 16 HR

0003 Drilling 0003A Drilling Day ︵8 hrs/day ︶ 240 DA 0003B Drilling Overtime 50 HR 0003C Swamp/Marsh Buggy drilling 2 DA 0003D Jack Up Boat/Barge drilling 2 DA 0004 Support

0004A Overwater Drilling Support ︵Barge, Tugboat ︶ 2 DA 0004B Helper Boat 2 DA

0005 Personnel 0005A Boat Operator 40 HR 0005B Boat Operator Overtime 40 HR 0005C Driller 40 HR 0005D Driller Overtime 40 HR 0005C Laborer 100 HR 0005D Laborer Overtime 100 HR 0005E Geologist 100 HR 0005F Geologist Overtime 100 HR 0005G Railroad Flagman 10 HR 0005H Railroad Flagman, Overtime 10 HR

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

Supplies & Equipment

0006 Piezometer Materials, General 0006A At-grade manhole covers 35 EA 0006B Bentonite 20 BG 0006C Filter Sand 20 BG 0006D Portland Cement ︵94 lb bag ︶ 20 BG 000EB Concrete ︵80 lb bag ︶ 50 BG 0006F Concrete 15 CY 0006G Piezometer Tips, Porous Stone 10 EA

0006H Threaded Galvanized Caps ︵2-inch ︶ or PVC slip caps 20 EA

0006I 4-inch Bollards ︵Sch 40 Steel pipe 4-inch by 6-foot ︶ 40 EA

0006J 6-inch Bollards ︵Sch 40 Steel pipe 6-inch by 6-foot ︶ 40 EA

0007 Screen and Riser Materials 0007A 21-ft length pieces, 2-inch diameter, galvanized 40 EA 0007B Couplings/Reducers/Caps ︵2 inch, galvanized ︶ 40 EA 0007C Piezometer Tips, Stainless steel, wire wrap 35 EA 0007D 8-inch, Sch 40 stainless riser 5 FT 0007E 10-inch, sch 40 stainless riser 5 FT 0007F 30-slot, 8-inch diameter, stainless steel wire wrap 20 FT 0007G 40-slot, 8-inch diameter, stainless steel wire wrap 20 FT

0007H 30-slot, 10-inch diameter, stainless steel wire wrap 20 FT

0007I 40-slot, 10-inch diameter, stainless steel wire wrap 20 FT

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

0008 Specialty Equipment 0008A Telehandler ︵Lull type ︶ 5 DA 0008B Portable Core Drill ︵hand carry ︶ 5 DA 0008C Jon Boat 5 DA 0008D Skid Steer 5 DA 0008E Skid Steer Auger Attachment ︵10 ft ︶ 5 DA 0008F Air Knife 5 DA 0008G Light Plant 5 DA

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

0009 Wood Core Boxes, w/ core preservation materials NQ, HQ, PQ or 4 x 5-1/2; ︵10-ft capacity ︶ 20 EA

0010 Plastic Cylinder Molds w/Caps ︵6-in x 12-in ︶ 5 DZ 0011 Buckets, 5-gallon, plastic w/sealable lids 50 EA 0012 Sample Jars ︵Pint w/ 3" mouth ︶ 120 DZ 0013 5-Inch x 36-Inch Thin Walled Tube 20 EA 0014 3-Inch x 30-Inch Thin Walled Tube 50 EA 0015 Transportation of Testing Samples 3 TP 0016 Clearing 10 HR 0017 Cribbing or Drill Pad 10 HR 0018 Sheilding of Overhead Lines/Guardrail Removal 700 FT

Railroad Indemnity Requirements and Traffic Control Equipment 1 EA

0020 Level C PPE Equipment 5 DA 0021 Level C Disposal of Drilling Cuttings 20 EA 0022 Well Cleanout per well w/GFE ︵max 6 hrs/well ︶ 10 EA 0023 Non-Special Waste Disposal 10 DR 0024 Special Waste Disposal 10 DR

Special Waste Assessment of Carbon -TCLP Semi- Volatiles 20 EA

Special Waste Assessment of Carbon -TCLP Volatiles and Semi-Volatiles 20 EA

0027 Special Waste Assessment of Carbon-Full TCLP 20 EA 0028 Water Testing SVOC's 10 EA 0290 Water Testing -Low-level PAH's 10 EA

Soils Laboratory Testing 0030 Atterberg Limits Tests ︵3-point ︶ 300 EA

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

0031 Natural Water Content 400 EA 0032 Grain Size Analysis ︵C136 ︶ 400 EA 0033 Wet Seive Analysis ︵C117 & C136 ︶ 300 EA 0034 % Passing #200 or #230 Sieve ︵D1140 ︶ 300 EA 0035 Hydrometer Analysis 50 EA 0036 Standard Compaction 10 EA 0037 Modified Compaction 2 EA 0038 Maximum & Minimum Index 10 EA 0039 California Bearing Ratio ︵CBR ︶ 2 EA 0040 Unconfined Compressive Strength 50 EA 0041 Q Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA 0042 R Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA 0043 S Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA 0044 Direct Shear Tests ︵3 POINTS ︶ 40 EA 0045 One-Dimensional Consolidation ︵3 POINT ︶ 10 EA

Hazardous Waste Soil Classifications 0046 Haz Waste Atterberg Limits ︵3 POINTS ︶ 2 EA 0047 Haz Waste Natural Water Content 2 EA 0048 Haz Waste Grain Size Analysis 2 EA 0049 Haz Waste Wet Sieve Analysis 2 EA 0050 Disposal of Soils Testing Material, Haz/Spec Waste 20 EA

Rock Laboratory Testing 0051 Bulk Density 5 EA 0052 Petrographic Examination 5 EA 0053 Elasticity & Poisson's Ratio 5 EA 0054 Triaxial Compressive Strength 5 EA 0055 Direct Tensile Strength 25 EA

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

0056 Unconfined Compressive Strength 25 EA 0057 Direct Shear Strength ︵3-points ︶ 50 EA

In Situ Testing 0058 Falling Head Tests 20 DA 0059 Pumping Tests 20 DA 0060 Electronic Piezcone Penetrometer 2 DA 0061 Vane Shear Testing 1 DA 0062 Geophysical Logging 1 DA 0063 Hydrocone/Geocone Sampling 1 DA 0064 Flat-Plate Dilatometer Testing ︵w/GFE ︶ 20 DA 0065 Optical Televiewer 5 DA 0066 Prebored Pressuremeter 5 DA

0067A Test Pits ︵No shoring ︶ 5 DA 0067B Test Pits ︵With shoring ︶ 5 DA 0068A Downhole Video Inspection ︵No pumping ︶ 2 DA 0068B Downhole Video Inspection ︵With pumping ︶ 2 DA

Total for Base Year

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE YEAR

EA =Each HR =Hour DA =Day FT =Feet DZ =Dozen BG =Bag CY =Cubic Yard DR =Drum w/lid ︵55 Gallon ︶ TP =Trip

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year One

1001 Mobilization and Demobilization 1001A Land-Based 0-400 MILES 20 EA -$ -$ 1001B Overwater 0-400 MILES 2 EA -$ -$ 1001C Swamp/Marsh Buggy 0-400 MILES 2 EA -$ -$ 1001D Jack up Boat/Barge 0-400 MILES 2 EA -$ -$

1002 Standby Time 16 HR -$ -$

1003 Drilling 1003A Drilling Day ︵8 hrs/day ︶ 240 DA -$ -$ 1003B Drilling Overtime 50 HR -$ -$ 1003C Swamp/Marsh Buggy drilling 2 DA -$ -$ 1003D Jack Up Boat/Barge drilling 2 DA -$ -$ 1004 Support -$

1004A Overwater Drilling Support ︵Barge, Tugboat ︶ 2 DA -$ -$ 1004B Helper Boat 2 DA -$ -$

1005 Personnel 1005A Boat Operator 40 HR -$ -$ 1005B Boat Operator Overtime 40 HR -$ -$ 1005C Driller 40 HR -$ -$ 1005D Driller Overtime 40 HR -$ -$ 1005E Laborer 100 HR -$ -$ 1005F Laborer Overtime 100 HR -$ -$ 1005G Geologist 100 HR -$ -$ 1005H Geologist Overtime 100 HR -$ -$ 1005I Railroad Flagman 20 HR -$ -$ 1005J Railroad Flagman, Overtime 20 HR -$ -$

Supplies & Equipment

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year One

1006 Piezometer Materials, General 1006A At-grade manhole covers 35 EA -$ -$ 1006B Bentonite 20 BG -$ -$ 1006C Filter Sand 20 BG -$ -$ 1006D Portland Cement ︵94 lb bag ︶ 20 BG -$ -$ 1006E Concrete ︵80 lb bag ︶ 50 BG -$ -$ 1006F Concrete 15 CY -$ -$ 1006G Piezometer Tips, Porous Stone 20 EA -$ -$

1006H Threaded Galvanized Caps ︵2-inch ︶ or PVC slip caps 20 EA -$ -$

1006I 4-inch Bollards ︵Sch 40 Steel pipe 4-inch by 6-foot ︶ 40 EA -$ -$

1006J 6-inch Bollards ︵Sch 40 Steel pipe 6-inch by 6-foot ︶ 40 EA -$ -$

1007 Screen and Riser Materials 1007A 21-ft length pieces, 2-inch diameter, galvanized 40 EA -$ -$ 1007B Couplings/Reducers/Caps ︵2 inch, galvanized 40 EA -$ -$ 1007C Piezometer Tips, Stainless steel, wire wrap 35 EA -$ -$ 1007D 8-inch, Sch 40 stainless riser 5 FT -$ -$ 1007E 10-inch, sch 40 stainless riser 5 FT -$ -$ 1007F 30-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$ 1007G 40-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$

1007H 30-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

1007I 40-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

1008 Specialty Equipment 1008A Telehandler ︵Lull type ︶ 5 DA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year One

1008B Portable Core Drill ︵hand carry ︶ 5 DA -$ -$ 1008C Jon Boat 5 DA -$ -$ 1008D Skid Steer 5 DA -$ -$ 1008E Skid Steer Auger Attachment ︵10 ft ︶ 5 DA -$ -$ 1008F Air Knife 5 DA -$ -$ 1008G Light Plant 5 DA -$ -$

1009 Wood Core Boxes, w/ core preservation materials NQ, HQ, PQ or 4 x 5-1/2; ︵10-ft capacity ︶ 20 EA -$ -$

1010 Plastic Cylinder Molds w/Caps ︵6-in x 12-in ︶ 5 DZ -$ -$ 1011 Buckets, 5-gallon, plastic w/sealable lids 50 EA -$ -$ 1012 Sample Jars ︵Pint w/ 3" mouth ︶ 120 DZ -$ -$ 1013 5-Inch x 36-Inch Thin Walled Tube 20 EA -$ -$ 1014 3-Inch x 30-Inch Thin Walled Tube 50 EA -$ -$ 1015 Transportation of Testing Samples 3 TP -$ -$ 1016 Clearing 10 HR -$ -$ 1017 Cribbing or Drill Pad 10 HR -$ -$ 1018 Sheilding of Overhead Lines/Guardrail Removal 700 FT -$ -$

Railroad Indemnity Requirements and Traffic Control Equipment 1 EA -$ -$

1020 Level C PPE Equipment 5 DA -$ -$ 1021 Level C Disposal of Drilling Cuttings 20 EA -$ -$ 1022 Well Cleanout per well w/GFE ︵max 6 hrs/well ︶ 10 EA -$ -$ 1023 Non-Special Waste Disposal 10 DR -$ -$ 1024 Special Waste Disposal 10 DR -$ -$

Special Waste Assessment of Carbon -TCLP Semi- Volatiles 20 EA -$ -$

Special Waste Assessment of Carbon -TCLP Volatiles and Semi-Volatiles 20 EA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year One

1027 Special Waste Assessment of Carbon-Full TCLP 20 EA -$ -$ 1028 Water Testing SVOC's 10 EA -$ -$ 1029 Water Testing -Low-level PAH's 10 EA -$ -$

Soils Laboratory Testing 1030 Atterberg Limits Tests ︵3-point ︶ 300 EA -$ -$ 1031 Natural Water Content 400 EA -$ -$ 1032 Grain Size Analysis ︵C136 ︶ 400 EA -$ -$ 1033 Wet Seive Analysis ︵C117 & C136 ︶ 300 EA -$ -$ 1034 % Passing #200 or #230 Sieve ︵D1140 ︶ 300 EA -$ -$ 1035 Hydrometer Analysis 50 EA -$ -$ 1036 Standard Compaction 10 EA -$ -$ 1037 Modified Compaction 2 EA -$ -$ 1038 Maximum & Minimum Index 10 EA -$ -$ 1039 California Bearing Ratio ︵CBR ︶ 2 EA -$ -$ 1040 Unconfined Compressive Strength 50 EA -$ -$ 1041 Q Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 1042 R Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 1043 S Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 1044 Direct Shear Tests ︵3 POINTS ︶ 40 EA -$ -$ 1045 One-Dimensional Consolidation ︵3 POINT ︶ 10 EA -$ -$

Hazardous Waste Soil Classifications 1046 Haz Waste Atterberg Limits ︵3 POINTS ︶ 2 EA -$ -$ 1047 Haz Waste Natural Water Content 2 EA -$ -$ 1048 Haz Waste Grain Size Analysis 2 EA -$ -$ 1049 Haz Waste Wet Sieve Analysis 2 EA -$ -$ 1050 Disposal of Soils Testing Material, Haz/Spec Waste 20 EA -$ -$

Rock Laboratory Testing 1051 Bulk Density 5 EA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year One

1052 Petrographic Examination 5 EA -$ -$ 1053 Elasticity & Poisson's Ratio 5 EA -$ -$ 1054 Triaxial Compressive Strength 5 EA -$ -$ 1055 Direct Tensile Strength 25 EA -$ -$ 1056 Unconfined Compressive Strength 25 EA -$ -$ 1057 Direct Shear Strength ︵3-points ︶ 50 EA -$ -$

In Situ Testing 1058 Falling Head Tests 20 DA -$ -$ 1059 Pumping Tests 20 DA -$ -$ 1060 Electronic Piezcone Penetrometer 2 DA -$ -$ 1061 Vane Shear Testing 1 DA -$ -$ 1062 Geophysical Logging 1 DA -$ -$ 1063 Hydrocone/Geocone Sampling 1 DA -$ -$ 1064 Flat-Plate Dilatometer Testing ︵w/GFE ︶ 20 DA -$ -$ 1065 Optical Televiewer 5 DA -$ -$ 1066 Prebored Pressuremeter 5 DA -$ -$

1067A Test Pits ︵No shoring ︶ 5 DA -$ -$ 1067B Test Pits ︵With shoring ︶ 5 DA -$ -$ 1068A Downhole Video Inspection ︵No pumping ︶ 2 DA -$ -$ 1068B Downhole Video Inspection ︵With pumping ︶ 2 DA -$ -$

Total for Option Year One -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Two

2001 Mobilization and Demobilization 2001A Land-Based 0-400 MILES 20 EA -$ -$ 2001B Overwater 0-400 MILES 2 EA -$ -$ 2001C Swamp/Marsh Buggy 0-400 MILES 2 EA -$ -$ 2001D Jack up Boat/Barge 0-400 MILES 2 EA -$ -$

2002 Standby Time 16 HR -$ -$

2003 Drilling 2003A Drilling Day ︵8 hrs/day ︶ 240 DA -$ -$ 2003B Drilling Overtime 50 HR -$ -$ 2003C Swamp/Marsh Buggy drilling 2 DA -$ -$ 2003D Jack Up Boat/Barge drilling 2 DA -$ -$ 2004 Support

2004A Overwater Drilling Support ︵Barge, Tugboat ︶ 2 DA -$ -$ 2004B Helper Boat 2 DA -$ -$

2005 Personnel 2005A Boat Operator 40 HR -$ -$ 2005B Boat Operator Overtime 40 HR -$ -$ 2005C Driller 40 HR -$ -$ 2005D Driller Overtime 40 HR -$ -$ 2005E Laborer 100 HR -$ -$ 2005F Laborer Overtime 100 HR -$ -$ 2005G Geologist 100 HR -$ -$ 2005H Geologist Overtime 100 HR -$ -$ 2005I Railroad Flagman 10 HR -$ -$ 2005J Railroad Flagman, Overtime 10 HR -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Two

2006 Piezometer Materials, General 2006A At-grade manhole covers 35 EA -$ -$ 2006B Bentonite 20 BG -$ -$ 2006C Filter Sand 20 BG -$ -$ 2006D Portland Cement ︵94 lb bag ︶ 20 BG -$ -$ 2006E Concrete ︵80 lb bag ︶ 50 BG -$ -$ 2006F Concrete 15 CY -$ -$ 2006G Piezometer Tips, Porous Stone 10 EA -$ -$

2006H Threaded Galvanized Caps ︵2-inch ︶ or PVC slip caps 20 EA -$ -$

2006I 4-inch Bollards ︵Sch 40 Steel pipe 4-inch by 6-foot ︶ 40 EA -$ -$

2006J 6-inch Bollards ︵Sch 40 Steel pipe 6-inch by 6-foot ︶ 40 EA -$ -$

2007 Screen and Riser Materials 2007A 21-ft length pieces, 2-inch diameter, galvanized 40 EA -$ -$ 2007B Couplings/Reducers/Caps ︵2 inch, galvanized 40 EA -$ -$ 2007C Piezometer Tips, Stainless steel, wire wrap 35 EA -$ -$ 2007D 8-inch, Sch 40 stainless riser 5 FT -$ -$ 2007E 10-inch, sch 40 stainless riser 5 FT -$ -$ 2007F 30-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$ 2007G 40-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$

2007H 30-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

2007I 40-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

2008 Specialty Equipment 2008A Telehandler ︵Lull type ︶ 5 DA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Two

2008B Portable Core Drill ︵hand carry ︶ 5 DA -$ -$ 2008C Jon Boat 5 DA -$ -$ 2008D Skid Steer 5 DA -$ -$ 2008E Skid Steer Auger Attachment ︵10 ft ︶ 5 DA -$ -$ 2008F Air Knife 5 DA -$ -$ 2008G Light Plant 5 DA -$ -$

2009 Wood Core Boxes, w/ core preservation materials NQ, HQ, PQ or 4 x 5-1/2; ︵10-ft capacity ︶ 20 EA -$ -$

2010 Plastic Cylinder Molds w/Caps ︵6-in x 12-in ︶ 5 DZ -$ -$ 2011 Buckets, 5-gallon, plastic w/sealable lids 50 EA -$ -$ 2012 Sample Jars ︵Pint w/ 3" mouth ︶ 120 DZ -$ -$ 2013 5-Inch x 36-Inch Thin Walled Tube 20 EA -$ -$ 2014 3-Inch x 30-Inch Thin Walled Tube 50 EA -$ -$ 2015 Transportation of Testing Samples 3 TP -$ -$ 2016 Clearing 10 HR -$ -$ 2017 Cribbing or Drill Pad 10 HR -$ -$ 2018 Sheilding of Overhead Lines/Guardrail Removal 700 FT -$ -$

Railroad Indemnity Requirements and Traffic Control Equipment 1 EA -$ -$

2020 Level C PPE Equipment 5 DA -$ -$ 2021 Level C Disposal of Drilling Cuttings 20 EA -$ -$ 2022 Well Cleanout per well w/GFE ︵max 6 hrs/well ︶ 10 EA -$ -$ 2023 Non-Special Waste Disposal 10 DR -$ -$ 2024 Special Waste Disposal 10 DR -$ -$

Special Waste Assessment of Carbon -TCLP Semi- Volatiles 20 EA -$ -$

Special Waste Assessment of Carbon -TCLP

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Two

2027 Special Waste Assessment of Carbon-Full TCLP 20 EA -$ -$ 2028 Water Testing SVOC's 10 EA -$ -$ 2029 Water Testing -Low-level PAH's 10 EA -$ -$

Soils Laboratory Testing 2030 Atterberg Limits Tests ︵3-point ︶ 300 EA -$ -$ 2031 Natural Water Content 400 EA -$ -$ 2032 Grain Size Analysis ︵C136 ︶ 400 EA -$ -$ 2033 Wet Seive Analysis ︵C117 & C136 ︶ 300 EA -$ -$ 2034 % Passing #200 or #230 Sieve ︵D1140 ︶ 300 EA -$ -$ 2035 Hydrometer Analysis 50 EA -$ -$ 2036 Standard Compaction 10 EA -$ -$ 2037 Modified Compaction 2 EA -$ -$ 2038 Maximum & Minimum Index 10 EA -$ -$ 2039 California Bearing Ratio ︵CBR ︶ 2 EA -$ -$ 2040 Unconfined Compressive Strength 50 EA -$ -$ 2041 Q Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 2042 R Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 2043 S Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 2044 Direct Shear Tests ︵3 POINTS ︶ 40 EA -$ -$ 2045 One-Dimensional Consolidation ︵3 POINT ︶ 10 EA -$ -$

Hazardous Waste Soil Classifications 2046 Haz Waste Atterberg Limits ︵3 POINTS ︶ 2 EA -$ -$ 2047 Haz Waste Natural Water Content 2 EA -$ -$ 2048 Haz Waste Grain Size Analysis 2 EA -$ -$ 2049 Haz Waste Wet Sieve Analysis 2 EA -$ -$ 2050 Disposal of Soils Testing Material, Haz/Spec Waste 20 EA -$ -$

Rock Laboratory Testing 2051 Bulk Density 5 EA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Two

2052 Petrographic Examination 5 EA -$ -$ 2053 Elasticity & Poisson's Ratio 5 EA -$ -$ 2054 Triaxial Compressive Strength 5 EA -$ -$ 2055 Direct Tensile Strength 25 EA -$ -$ 2056 Unconfined Compressive Strength 25 EA -$ -$ 2057 Direct Shear Strength ︵3-points ︶ 50 EA -$ -$

In Situ Testing 2058 Falling Head Tests 20 DA -$ -$ 2059 Pumping Tests 20 DA -$ -$ 2060 Electronic Piezcone Penetrometer 2 DA -$ -$ 2061 Vane Shear Testing 1 DA -$ -$ 2062 Geophysical Logging 1 DA -$ -$ 2063 Hydrocone/Geocone Sampling 1 DA -$ -$ 2064 Flat-Plate Dilatometer Testing ︵w/GFE ︶ 20 DA -$ -$ 2065 Optical Televiewer 5 DA -$ -$ 2066 Prebored Pressuremeter 5 DA -$ -$

2067A Test Pits ︵No shoring ︶ 5 DA -$ -$ 2067B Test Pits ︵With shoring ︶ 5 DA -$ -$ 2068A Downhole Video Inspection ︵No pumping ︶ 2 DA -$ -$ 2068B Downhole Video Inspection ︵With pumping ︶ 2 DA -$ -$

Total for Option Year Two -$

EA =Each HR =Hour DA =Day FT =Feet DZ =Dozen BG =Bag CY =Cubic Yard

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Two

DR =Drum w/lid ︵55 Gallon ︶

TP =Trip

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Three

3001 Mobilization and Demobilization 3001A Land-Based 0-400 MILES 20 EA -$ -$ 3001B Overwater 0-400 MILES 2 EA -$ -$ 3001C Swamp/Marsh Buggy 0-400 MILES 2 EA -$ -$ 3001D Jack up Boat/Barge 0-400 MILES 2 EA -$ -$

3002 Standby Time 16 HR -$ -$

3003 Drilling 3003A Drilling Day ︵8 hrs/day ︶ 240 DA -$ -$ 3003B Drilling Overtime 50 HR -$ -$ 3003C Swamp/Marsh Buggy drilling 2 DA -$ -$ 3003D Jack Up Boat/Barge drilling 2 DA -$ -$ 3004 Support

3004A Overwater Drilling Support ︵Barge, Tugboat ︶ 2 DA -$ -$ 3004B Helper Boat 2 DA -$ -$

3005 Personnel 3005A Boat Operator 40 HR -$ -$ 3005B Boat Operator Overtime 40 HR -$ -$ 3005C Driller 40 HR -$ -$ 3005D Driller Overtime 40 HR -$ -$ 3005E Laborer 100 HR -$ -$ 3005F Laborer Overtime 100 HR -$ -$ 3005G Geologist 100 HR -$ -$ 3005H Geologist Overtime 100 HR -$ -$ 3005I Railroad Flagman 10 HR -$ -$ 3005J Railroad Flagman, Overtime 10 HR -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Three

3006 Piezometer Materials, General 3006A At-grade manhole covers 35 EA -$ -$ 3006B Bentonite 20 BG -$ -$ 3006C Filter Sand 20 BG -$ -$ 3006D Portland Cement ︵94 lb bag ︶ 20 BG -$ -$ 3006E Concrete ︵80 lb bag ︶ 50 BG -$ -$ 3006F Concrete 15 CY -$ -$ 3006G Piezometer Tips, Porous Stone 10 EA -$ -$

3006H Threaded Galvanized Caps ︵2-inch ︶ or PVC slip caps 20 EA -$ -$

3006I 4-inch Bollards ︵Sch 40 Steel pipe 4-inch by 6-foot ︶ 40 EA -$ -$

3006J 6-inch Bollards ︵Sch 40 Steel pipe 6-inch by 6-foot ︶ 40 EA -$ -$

30017 Screen and Riser Materials 3007A 21-ft length pieces, 2-inch diameter, galvanized 40 EA -$ -$ 3007B Couplings/Reducers/Caps ︵2 inch, galvanized 40 EA -$ -$ 3007C Piezometer Tips, Stainless steel, wire wrap 35 EA -$ -$ 3007D 8-inch, Sch 40 stainless riser 5 FT -$ -$ 3007E 10-inch, sch 40 stainless riser 5 FT -$ -$ 3007F 30-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$ 3007G 40-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$

3007H 30-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

3007I 40-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

3008 Specialty Equipment 3008A Telehandler ︵Lull type ︶ 5 DA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Three

3008B Portable Core Drill ︵hand carry ︶ 5 DA -$ -$ 3008C Jon Boat 5 DA -$ -$ 3008D Skid Steer 5 DA -$ -$ 3008E Skid Steer Auger Attachment ︵10 ft ︶ 5 DA -$ -$ 3008F Air Knife 5 DA -$ -$ 3008G Light Plant 5 DA -$ -$

3009 Wood Core Boxes, w/ core preservation materials NQ, HQ, PQ or 4 x 5-1/2; ︵10-ft capacity ︶ 20 EA -$ -$

3010 Plastic Cylinder Molds w/Caps ︵6-in x 12-in ︶ 5 DZ -$ -$ 3011 Buckets, 5-gallon, plastic w/sealable lids 50 EA -$ -$ 3012 Sample Jars ︵Pint w/ 3" mouth ︶ 120 DZ -$ -$ 3013 5-Inch x 36-Inch Thin Walled Tube 20 EA -$ -$ 3014 3-Inch x 30-Inch Thin Walled Tube 50 EA -$ -$ 3015 Transportation of Testing Samples 3 TP -$ -$ 3016 Clearing 10 HR -$ -$ 3017 Cribbing or Drill Pad 10 HR -$ -$ 3018 Sheilding of Overhead Lines/Guardrail Removal 700 FT -$ -$

Railroad Indemnity Requirements and Traffic Control Equipment 1 EA -$ -$

3020 Level C PPE Equipment 5 DA -$ -$ 3021 Level C Disposal of Drilling Cuttings 20 EA -$ -$ 3022 Well Cleanout per well w/GFE ︵max 6 hrs/well ︶ 10 EA -$ -$ 3023 Non-Special Waste Disposal 10 DR -$ -$ 3024 Special Waste Disposal 10 DR -$ -$

Special Waste Assessment of Carbon -TCLP Semi- Volatiles 20 EA -$ -$

Special Waste Assessment of Carbon -TCLP

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Three

3027 Special Waste Assessment of Carbon-Full TCLP 20 EA -$ -$ 3028 Water Testing SVOC's 10 EA -$ -$ 3029 Water Testing -Low-level PAH's 10 EA -$ -$

Soils Laboratory Testing 3030 Atterberg Limits Tests ︵3-point ︶ 300 EA -$ -$ 3031 Natural Water Content 400 EA -$ -$ 3032 Grain Size Analysis ︵C136 ︶ 400 EA -$ -$ 3033 Wet Seive Analysis ︵C117 & C136 ︶ 300 EA -$ -$ 3034 % Passing #200 or #230 Sieve ︵D1140 ︶ 300 EA -$ -$ 3035 Hydrometer Analysis 50 EA -$ -$ 3036 Standard Compaction 10 EA -$ -$ 3037 Modified Compaction 2 EA -$ -$ 3038 Maximum & Minimum Index 10 EA -$ -$ 3039 California Bearing Ratio ︵CBR ︶ 2 EA -$ -$ 3040 Unconfined Compressive Strength 50 EA -$ -$ 3041 Q Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 3042 R Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 3043 S Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 3044 Direct Shear Tests ︵3 POINTS ︶ 40 EA -$ -$ 3045 One-Dimensional Consolidation ︵3 POINT ︶ 10 EA -$ -$

Hazardous Waste Soil Classifications 3046 Haz Waste Atterberg Limits ︵3 POINTS ︶ 2 EA -$ -$ 3047 Haz Waste Natural Water Content 2 EA -$ -$ 3048 Haz Waste Grain Size Analysis 2 EA -$ -$ 3049 Haz Waste Wet Sieve Analysis 2 EA -$ -$ 3050 Disposal of Soils Testing Material, Haz/Spec Waste 20 EA -$ -$

Rock Laboratory Testing 3051 Bulk Density 5 EA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Three

3052 Petrographic Examination 5 EA -$ -$ 3053 Elasticity & Poisson's Ratio 5 EA -$ -$ 3054 Triaxial Compressive Strength 5 EA -$ -$ 3055 Direct Tensile Strength 25 EA -$ -$ 3056 Unconfined Compressive Strength 25 EA -$ -$ 3057 Direct Shear Strength ︵3-points ︶ 50 EA -$ -$

In Situ Testing 3058 Falling Head Tests 20 DA -$ -$ 3059 Pumping Tests 20 DA -$ -$ 3060 Electronic Piezcone Penetrometer 2 DA -$ -$ 3061 Vane Shear Testing 1 DA -$ -$ 3062 Geophysical Logging 1 DA -$ -$ 3063 Hydrocone/Geocone Sampling 1 DA -$ -$ 3064 Flat-Plate Dilatometer Testing ︵w/GFE ︶ 20 DA -$ -$ 3065 Optical Televiewer 5 DA -$ -$ 3066 Prebored Pressuremeter 5 DA -$ -$

3067A Test Pits ︵No shoring ︶ 5 DA -$ -$ 3067B Test Pits ︵With shoring ︶ 5 DA -$ -$ 3068A Downhole Video Inspection ︵No pumping ︶ 2 DA -$ -$ 3068B Downhole Video Inspection ︵With pumping ︶ 2 DA -$ -$

Total for Option Year Three -$

"FOR OFFICIAL USE ONLY"

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Four 4001 Mobilization and Demobilization

4001A Land-Based 0-400 MILES 20 EA -$ -$ 4001B Overwater 0-400 MILES 2 EA -$ -$ 4001C Swamp/Marsh Buggy 0-400 MILES 2 EA -$ -$ 4001D Jack up Boat/Barge 0-400 MILES 2 EA -$ -$

4002 Standby Time 16 HR -$ -$

4003 Drilling 4003A Drilling Day ︵8 hrs/day ︶ 240 DA -$ -$ 4003B Drilling Overtime 50 HR -$ -$ 4003C Swamp/Marsh Buggy drilling 2 DA -$ -$ 4003D Jack Up Boat/Barge drilling 2 DA -$ -$ 4004 Support

4004A Overwater Drilling Support ︵Barge, Tugboat ︶ 2 DA -$ -$ 4004B Helper Boat 2 DA -$ -$

4005 Personnel 4005A Boat Operator 40 HR -$ -$ 4005B Boat Operator Overtime 40 HR -$ -$ 4005C Driller 40 HR -$ -$ 4005D Driller Overtime 40 HR -$ -$ 4005E Laborer 100 HR -$ -$ 4005F Laborer Overtime 100 HR -$ -$ 4005G Geologist 100 HR -$ -$ 4005H Geologist Overtime 100 HR -$ -$ 4005I Railroad Flagman 10 HR -$ -$ 4005J Railroad Flagman, Overtime 10 HR -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Four

Supplies & Equipment

4006 Piezometer Materials, General 4006A At-grade manhole covers 35 EA -$ -$ 4006B Bentonite 20 BG -$ -$ 4006C Filter Sand 20 BG -$ -$ 4006D Portland Cement ︵94 lb bag ︶ 20 BG -$ -$ 4006E Concrete ︵80 lb bag ︶ 50 BG -$ -$ 4006F Concrete 15 CY -$ -$ 4006G Piezometer Tips, Porous Stone 10 EA -$ -$

40006H Threaded Galvanized Caps ︵2-inch ︶ or PVC slip caps 20 EA -$ -$

4006I 4-inch Bollards ︵Sch 40 Steel pipe 4-inch by 6-foot ︶ 40 EA -$ -$

4006J 6-inch Bollards ︵Sch 40 Steel pipe 6-inch by 6-foot ︶ 40 EA -$ -$

4007 Screen and Riser Materials 4007A 21-ft length pieces, 2-inch diameter, galvanized 40 EA -$ -$ 4007B Couplings/Reducers/Caps ︵2 inch, galvanized 40 EA -$ -$ 4007C Piezometer Tips, Stainless steel, wire wrap 35 EA -$ -$ 4007D 8-inch, Sch 40 stainless riser 5 FT -$ -$ 4007E 10-inch, sch 40 stainless riser 5 FT -$ -$ 4007F 30-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$ 4007G 40-slot, 8-inch diameter, stainless steel wire wrap 20 FT -$ -$

4007H 30-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

4007I 40-slot, 10-inch diameter, stainless steel wire wrap 20 FT -$ -$

4008 Specialty Equipment

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Four

4008A Telehandler ︵Lull type ︶ 5 DA -$ -$ 4008B Portable Core Drill ︵hand carry ︶ 5 DA -$ -$ 4008C Jon Boat 5 DA -$ -$ 4008D Skid Steer 5 DA -$ -$ 4008E Skid Steer Auger Attachment ︵10 ft ︶ 5 DA -$ -$ 4008F Air Knife 5 DA -$ -$ 4008G Light Plant 5 DA -$ -$

4009 Wood Core Boxes, w/ core preservation materials NQ, HQ, PQ or 4 x 5-1/2; ︵10-ft capacity ︶ 20 EA -$ -$

4010 Plastic Cylinder Molds w/Caps ︵6-in x 12-in ︶ 5 DZ -$ -$ 4011 Buckets, 5-gallon, plastic w/sealable lids 50 EA -$ -$ 4012 Sample Jars ︵Pint w/ 3" mouth ︶ 120 DZ -$ -$ 4013 5-Inch x 36-Inch Thin Walled Tube 20 EA -$ -$ 4014 3-Inch x 30-Inch Thin Walled Tube 50 EA -$ -$ 4015 Transportation of Testing Samples 3 TP -$ -$ 4016 Clearing 10 HR -$ -$ 4017 Cribbing or Drill Pad 10 HR -$ -$ 4018 Sheilding of Overhead Lines/Guardrail Removal 700 FT -$ -$

Railroad Indemnity Requirements and Traffic Control Equipment 1 EA -$ -$

4020 Level C PPE Equipment 5 DA -$ -$ 4021 Level C Disposal of Drilling Cuttings 20 EA -$ -$ 4022 Well Cleanout per well w/GFE ︵max 6 hrs/well ︶ 10 EA -$ -$ 4023 Non-Special Waste Disposal 10 DR -$ -$ 4024 Special Waste Disposal 10 DR -$ -$

Special Waste Assessment of Carbon -TCLP Semi- Volatiles 20 EA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Four

Special Waste Assessment of Carbon -TCLP Volatiles and Semi-Volatiles 20 EA -$ -$

4027 Special Waste Assessment of Carbon-Full TCLP 20 EA -$ -$ 4028 Water Testing SVOC's 10 EA -$ -$ 4029 Water Testing -Low-level PAH's 10 EA -$ -$

Soils Laboratory Testing 4030 Atterberg Limits Tests ︵3-point ︶ 300 EA -$ -$ 4031 Natural Water Content 400 EA -$ -$ 4032 Grain Size Analysis ︵C136 ︶ 400 EA -$ -$ 4033 Wet Seive Analysis ︵C117 & C136 ︶ 300 EA -$ -$ 4034 % Passing #200 or #230 Sieve ︵D1140 ︶ 300 EA -$ -$ 4035 Hydrometer Analysis 50 EA -$ -$ 4036 Standard Compaction 10 EA -$ -$ 4037 Modified Compaction 2 EA -$ -$ 4038 Maximum & Minimum Index 10 EA -$ -$ 4039 California Bearing Ratio ︵CBR ︶ 2 EA -$ -$ 4040 Unconfined Compressive Strength 50 EA -$ -$ 4041 Q Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 4042 R Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 4043 S Triaxial Compressive Strength ︵3 POINTS ︶ 10 EA -$ -$ 4044 Direct Shear Tests ︵3 POINTS ︶ 40 EA -$ -$ 4045 One-Dimensional Consolidation ︵3 POINT ︶ 10 EA -$ -$

Hazardous Waste Soil Classifications 4046 Haz Waste Atterberg Limits ︵3 POINTS ︶ 2 EA -$ -$ 4047 Haz Waste Natural Water Content 2 EA -$ -$ 4048 Haz Waste Grain Size Analysis 2 EA -$ -$ 4049 Haz Waste Wet Sieve Analysis 2 EA -$ -$ 4050 Disposal of Soils Testing Material, Haz/Spec Waste 20 EA -$ -$

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Four

Rock Laboratory Testing 4051 Bulk Density 5 EA -$ -$ 4052 Petrographic Examination 5 EA -$ -$ 4053 Elasticity & Poisson's Ratio 5 EA -$ -$ 4054 Triaxial Compressive Strength 5 EA -$ -$ 4055 Direct Tensile Strength 25 EA -$ -$ 4056 Unconfined Compressive Strength 25 EA -$ -$ 4057 Direct Shear Strength ︵3-points ︶ 50 EA -$ -$

In Situ Testing 4058 Falling Head Tests 20 DA -$ -$ 4059 Pumping Tests 20 DA -$ -$ 4060 Electronic Piezcone Penetrometer 2 DA -$ -$ 4061 Vane Shear Testing 1 DA -$ -$ 4062 Geophysical Logging 1 DA -$ -$ 4063 Hydrocone/Geocone Sampling 1 DA -$ -$ 4064 Flat-Plate Dilatometer Testing ︵w/GFE ︶ 20 DA -$ -$ 4065 Optical Televiewer 5 DA -$ -$ 4066 Prebored Pressuremeter 5 DA -$ -$

4067A Test Pits ︵No shoring ︶ 5 DA -$ -$ 4067B Test Pits ︵With shoring ︶ 5 DA -$ -$ 4068A Downhole Video Inspection ︵No pumping ︶ 2 DA -$ -$ 4068B Downhole Video Inspection ︵With pumping ︶ 2 DA -$ -$

Total for Option Year Four -$

EA =Each HR =Hour DA =Day FT =Feet DZ =Dozen

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

Option Year Four

BG =Bag CY =Cubic Yard DR =Drum w/lid ︵55 Gallon ︶

TP =Trip

"FOR OFFICIAL USE ONLY"