A02_RvsdAppendix_C2-C5_Amend-2.pdf

PDF 56 KB Posted

Attached to
JANITORIAL SVCS - CLARENCE CANNON DAM
Solicitation number
W912P916R0015
Issued by

About this file

Revised Appendix C - Amendment 2

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ja nu ar y

Fe br ua ry

M ar ch

A pr il

M ay

Ju ne

Ju ly

A ug us t

Se pt em be r

O ct ob er

N ov em be r

D ec em be r

First Floor Once Per Month

1.1.5.

1.1.6.

1.1.7.

1.1.8.

Waste Receptacles/Trash Barrels Light Fixtures Stairways, Handrails, and Landings Interior Floor Gutters/Drains

Once Per Week

1.1.1.1. Floors

Second Floor Once Per Month

1.1.5.

1.1.6.

1.1.7.

Waste Receptacles/Trash Barrels Stairways, Handrails, and Landings Interior Floor Gutters/Drains

Once Per Week

1.1.1.1. Floors

Third Floor Once Per Month

1.1.1.1. Maintenance Shop Floors

1.1.6. Stairways, Handrails, and Landings

1.1.7. Interior Floor Gutters and Drains

Once Per Week

1.1.1.1. Generator Floors

Three Times Per Week 1.1.1.1.

1.1.2.1.

1.1.3.

1.1.4.

1.1.5.

Control Room Floors Carpeted Floors Restrooms Kitchen/Lunchroom Waste Receptacles/Trash Barrels

A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday

1.1. Clarence Cannon Power Plant & Main Dam

H H

A AAAAA

H H

H

AAAAAA

H H H H H

AAA

H HH

H H H H H

B B B B BB B B B B

H H H H H

I I

H H H H H H

I I I I II I I I I

AAAA

H

B B

H H H H H H

AAAAA

ar y

Fe br ua ry

M ar ch

A pr il

M ay

Ju ne

Ju ly

A ug us t

Se pt em be r

O ct ob er

N ov em be r

D ec em be r

Fourth Floor Once Per Month

1.1.7. Stairways, Handrails, and Landings

1.1.8. Interior Floor Gutters and Drains

1.1.9. Kaplan and Francis Units

1.1.11. Elevator

1.1.13. Diesel Storage/ Conduit Room

Once Per Week 1.1.1.1.

1.1.5.

1.1.10.

Floors Waste Receptacles/Trash Barrels Transformer Deck

Fifth Floor Once Per Month

1.1.2.1.

1.1.5.

1.1.8.

Carpeted Floors Waste Receptacles/Trash Barrels Interior Floor Gutters and Drains

Sixth Floor Once Per Month

1.1.1.1. Floors

Seventh Floor Once Per Month

1.1.1.1.

1.1.5.

Floors Waste Receptacles/Trash Barrels

Eighth Floor Once Per Month

1.1.1.1. Floors

1.1.7. Stairways, Handrails, and Landings

1.1.8. Interior Floor Gutters and Drains

Once Per Week 1.1.3.

1.1.5.

Restrooms Waste Receptacles/Trash Barrels

A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday

H H H

E E E E E E

H H H H H H H H H

E E E E E E

CC C C C C CC C C C C

C C

C C C C C C C C C C C C

C C C C CC C C C C

G G G G GG G G G G G

1.1. Clarence Cannon Power Plant & Main Dam

H H HH H H H H H H H H

G ar y

Fe br ua ry

M ar ch

A pr il

M ay

Ju ne

Ju ly

A ug us t

Se pt em be r

O ct ob er

N ov em be r

D ec em be r

South Abutment Once Per Month

1.1.1.1.

1.1.5.

1.1.7.

Floors Waste Receptacles/Trash Barrels Stairways, Handrails, and Landings

Intake Gates and HPB #9 Once Per Month

1.1.1.1. Floors

1.1.7. Stairways, Handrails, and Landings

1.1.12. Ventilation Grills and Ducts

Dog Houses and Catwalk Area Once Per Month

1.1.1.1. Floors

1.1.7. Staiways, Handrails, and Landings

1.1.14. Dog Houses

Pier Nose Area Once Per Month

1.1.15 Pier Nose Area

A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday

1.1. Clarence Cannon Power Plant & Main Dam

D D D D DD D D D D D D

D D D D D D DD D D D D

F F FF F F F F F F

F F F F F F F F F F F F

F F ar y

Fe br ua ry

M ar ch

A pr il

M ay

Ju ne

Ju ly

A ug us t

Se pt em be r

O ct ob er

N ov em be r

D ec em be r

Re-Regulation Dam Once Per Month

1.2.1. Gate House

1.2.2. Control Room

1.2.3. Stairway/Handrails/Landings

1.2.4. Generator Room/Bottom Floor

1.2.5. Top of Dam

A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday

1.2. Re-Regulation Dam

A A A A A A AA A A A A

Power Plant 1
Power Plant 2
Main Dam
Re-Regulation Dam

File details come from the government source that posted it. Updated .