A02_RvsdAppendix_C2-C5_Amend-2.pdf
PDF 56 KB Posted
- Attached to
- JANITORIAL SVCS - CLARENCE CANNON DAM
- Solicitation number
- W912P916R0015
About this file
Revised Appendix C - Amendment 2
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ja nu ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
First Floor Once Per Month
1.1.5.
1.1.6.
1.1.7.
1.1.8.
Waste Receptacles/Trash Barrels Light Fixtures Stairways, Handrails, and Landings Interior Floor Gutters/Drains
Once Per Week
1.1.1.1. Floors
Second Floor Once Per Month
1.1.5.
1.1.6.
1.1.7.
Waste Receptacles/Trash Barrels Stairways, Handrails, and Landings Interior Floor Gutters/Drains
Once Per Week
1.1.1.1. Floors
Third Floor Once Per Month
1.1.1.1. Maintenance Shop Floors
1.1.6. Stairways, Handrails, and Landings
1.1.7. Interior Floor Gutters and Drains
Once Per Week
1.1.1.1. Generator Floors
Three Times Per Week 1.1.1.1.
1.1.2.1.
1.1.3.
1.1.4.
1.1.5.
Control Room Floors Carpeted Floors Restrooms Kitchen/Lunchroom Waste Receptacles/Trash Barrels
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
1.1. Clarence Cannon Power Plant & Main Dam
H H
A AAAAA
H H
H
AAAAAA
H H H H H
AAA
H HH
H H H H H
B B B B BB B B B B
H H H H H
I I
H H H H H H
I I I I II I I I I
AAAA
H
B B
H H H H H H
AAAAA
ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
Fourth Floor Once Per Month
1.1.7. Stairways, Handrails, and Landings
1.1.8. Interior Floor Gutters and Drains
1.1.9. Kaplan and Francis Units
1.1.11. Elevator
1.1.13. Diesel Storage/ Conduit Room
Once Per Week 1.1.1.1.
1.1.5.
1.1.10.
Floors Waste Receptacles/Trash Barrels Transformer Deck
Fifth Floor Once Per Month
1.1.2.1.
1.1.5.
1.1.8.
Carpeted Floors Waste Receptacles/Trash Barrels Interior Floor Gutters and Drains
Sixth Floor Once Per Month
1.1.1.1. Floors
Seventh Floor Once Per Month
1.1.1.1.
1.1.5.
Floors Waste Receptacles/Trash Barrels
Eighth Floor Once Per Month
1.1.1.1. Floors
1.1.7. Stairways, Handrails, and Landings
1.1.8. Interior Floor Gutters and Drains
Once Per Week 1.1.3.
1.1.5.
Restrooms Waste Receptacles/Trash Barrels
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
H H H
E E E E E E
H H H H H H H H H
E E E E E E
CC C C C C CC C C C C
C C
C C C C C C C C C C C C
C C C C CC C C C C
G G G G GG G G G G G
1.1. Clarence Cannon Power Plant & Main Dam
H H HH H H H H H H H H
G ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
South Abutment Once Per Month
1.1.1.1.
1.1.5.
1.1.7.
Floors Waste Receptacles/Trash Barrels Stairways, Handrails, and Landings
Intake Gates and HPB #9 Once Per Month
1.1.1.1. Floors
1.1.7. Stairways, Handrails, and Landings
1.1.12. Ventilation Grills and Ducts
Dog Houses and Catwalk Area Once Per Month
1.1.1.1. Floors
1.1.7. Staiways, Handrails, and Landings
1.1.14. Dog Houses
Pier Nose Area Once Per Month
1.1.15 Pier Nose Area
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
1.1. Clarence Cannon Power Plant & Main Dam
D D D D DD D D D D D D
D D D D D D DD D D D D
F F FF F F F F F F
F F F F F F F F F F F F
F F ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
Re-Regulation Dam Once Per Month
1.2.1. Gate House
1.2.2. Control Room
1.2.3. Stairway/Handrails/Landings
1.2.4. Generator Room/Bottom Floor
1.2.5. Top of Dam
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
1.2. Re-Regulation Dam
A A A A A A AA A A A A
| Power Plant 1 |
| Power Plant 2 |
| Main Dam |
| Re-Regulation Dam |
File details come from the government source that posted it. Updated .