APPENDIX C-1
Schedule of Services
1. The Cleaning Schedule chart is included in this appendix. The Contractor shall perform all work between the hours of 7:00 a.m. and 3:30 p.m., Monday through Friday. No work shall be performed on weekends or holidays.
Work to be performed that falls on a Government holiday shall be performed by the Contractor during the week of that holiday on a schedule that has been agreed to by the Contracting Officer or his/her representative and the
Contractor.
NOTE: Government Holidays: New Year’s Day, Martin Luther King’s Birthday, All Presidents’ Day, Memorial
Day, Fourth of July, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
Services shall be performed as follows during the months scheduled.
A – Services performed on the FIRST TUESDAY.
B – Services performed on the SECOND TUESDAY.
C – Services performed on the SECOND WEDNESDAY.
D – Services performed on the SECOND THURDAY.
E – Services performed on the THIRD MONDAY.
F – Services performed on the THIRD TUESDAY.
G – Services performed on the THIRD THURSDAY.
H – Services performed on FRIDAY.
I – Services performed on MONDAY, WEDNESDAY, AND FRIDAY.
Schedule of Services Appendix C-1
Ja nu ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
First Floor Once Per Month
1.1.5. Waste Recepticals/Trash Barrels
1.1.6. Light Fixtures
1.1.7. Stairways, Handrails, and Landings
1.1.8. Interior Floor Gutters/Drains
Once Per Week
1.1.1.1. Floors
Second Floor Once Per Month
1.1.5. Waste Recepticals/Trash Barrels
1.1.6. Stairways, Handrails, and Landings
1.1.7. Interior Floor Gutters/Drains
Once Per Week
1.1.1.1. Floors
Third Floor Once Per Month
1.1.1.1. Maintenance Shop Floors
1.1.6. Stairways, Handrails, and Landings
1.1.7. Interior Floor Gutters and Drains
Once Per Week
1.1.1.1. Generator Floors
Three Times Per Week
1.1.1.1. Control Room Floors
1.1.2.1. Carpeted Floors
1.1.3. Restrooms
1.1.4. Kitchen/Lunchroom
1.1.5. Waste Recepticals/Trash Barrels
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
1.1. Clarence Cannon Power Plant & Main Dam
H H
A AAAAA
H H
H
AAAAAA
H H H H H
AAA
H HH
H H H H H
B B B B BB B B B B
H H H H H
I I
H H H H H H
I I I I II I I I I
AAAA
H
B B
H H H H H H
AAAAA
Schedule of Services Appendix C-2 ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
Fourth Floor Once Per Month
1.1.7. Stairways, Handrails, and Landings
1.1.8. Interior Floor Gutters and Drains
1.1.9. Kaplan and Francis Units
1.1.11. Elevator
1.1.13. Diesel Storage/ Conduit Room
Once Per Week
1.1.1.1. Floors
1.1.5. Waste Recepticals/Trash Barrels
1.1.10. Transformer Deck
Fifth Floor Once Per Month
1.1.2.1. Carpeted Floors
1.1.5. Waste Recepticals/Trash Barrels
1.1.8. Interior Floor Gutters and Drains
Sixth Floor Once Per Month
1.1.1.1. Floors
Seventh Floor Once Per Month
1.1.1.1. Floors
1.1.5. Waste Recepticals/Trash Barrels
Eighth Floor Once Per Month
1.1.1.1. Floors
1.1.7. Stairways, Handrails, and Landings
1.1.8. Interior Floor Gutters and Drains
Once Per Week
1.1.3. Restrooms
1.1.5. Waste Recepticals/Trash Barrels
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
H H H
E E E E E E
H H H H H H H H H
E E E E E E
CC C C C C CC C C C C
C C
C C C C C C C C C C C C
C C C C CC C C C C
G G G G GG G G G G G
1.1. Clarence Cannon Power Plant & Main Dam
H H HH H H H H H H H H
G
Schedule of Services Appendix C-3 ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
South Abutment Once Per Month
1.1.1.1. Floors
1.1.5. Waste Recepticals/Trash Barrels
1.1.7. Stairways, Handrails, and Landings
Intake Gates and HPB #9 Once Per Month
1.1.1.1. Floors
1.1.7. Stairways, Handrails, and Landings
1.1.12. Ventilation Grills and Ducts
Dog Houses and Catwalk Area Once Per Month
1.1.1.1. Floors
1.1.7. Staiways, Handrails, and Landings
1.1.14. Dog Houses
Pier Nose Area Once Per Month
1.1.15 Pier Nose Area
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
1.1. Clarence Cannon Power Plant & Main Dam
D D D D DD D D D D D D
D D D D D D DD D D D D
F F FF F F F F F F
F F F F F F F F F F F F
F F
Schedule of Services Appendix C-4 ar y
Fe br ua ry
M ar ch
A pr il
M ay
Ju ne
Ju ly
A ug us t
Se pt em be r
O ct ob er
N ov em be r
D ec em be r
Re-Regulation Dam Once Per Month
1.2.1. Gate House
1.2.2. Control Room
1.2.3. Stairway/Handrails/Landings
1.2.4. Generator Room/Bottom Floor
1.2.5. Top of Dam
A - Services performed on First Tuesday B - Services performed on Second Tuesday C - Services performed on Second Wednesday D - Services performed on Second Thursday E - Services performed on Third Monday F - Services performed on Third Tuesday G - Services performed on Third Thursday H - Services Performed on Firday I - Services Performed on Monday, Wednesday, and Friday
1.2. Re-Regulation Dam
A A A A A A AA A A A A
Schedule of Services Appendix C-5
| Power Plant 1 |
| Power Plant 2 |
| Main Dam |
| Re-Regulation Dam |