Solicitation W912P826BA061.pdf
PDF 9 MB Posted
- Attached to
- GIWW Gulf Intracoastal Waterway, Algiers Lock, New Maintenance Building, Orleans Parish, Louisiana
- Solicitation number
- W912P826BA061
About this file
This is a Solicitation for construction services at the Gulf Intracoastal Waterway Algiers Lock facility in Orleans Parish, Louisiana, issued by the Department of the Army Corps of Engineers Engineering District New Orleans. The project involves selective demolition and construction of a new metal maintenance building with cast-in-place concrete foundation, including electrical, plumbing, and mechanical systems. Additional work includes structural excavation and fill, prestressed concrete pile driving, asphaltic concrete pavement removal and replacement with subbase and base courses, site landscaping (fertilizing, seeding, and mulching), ductile iron waterline installation, sanitary sewer work, and other related incidental activities. The project magnitude is between $1,000,000 and $5,000,000.
Bids are due Thursday, 27 August 2026 at 10:00 AM local time, with bid opening scheduled for the same day at 11:00 AM local time. A mandatory pre-bid site visit was held on 25 June 2026 at 10:00 AM CST at the Algiers Lock facility located at 3500 Blythe Road, New Orleans, Louisiana 70131. The solicitation includes six amendments addressing design drawings, site visit documentation, bid due date changes, option clauses (52.217-8 and 52.217-9), and responses to contractor questions. A Microstation file with geo-referenced information in .dgn format is available upon email request, as this format is not supported by SAM.gov. No further questions will be accepted beyond those addressed in Amendment 0006.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 22-048
US Army Corps of Engineers
New Orleans District
GIWW - Gulf Intracoastal Waterway
Algiers Lock New Maintenance Building
Orleans Parish, Louisiana
Construction Solicitation and Specifications
March 2026
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LA 70118-3651
ED 22-048
May 18, 2026
SOLICITATION: W912P826BA061
FOR: GIWW – Gulf Intracoastal Waterway, Algiers Lock, New Maintenance Building, Orleans Parish, Louisiana
TO OPEN:
Prospective contractors must register in the System for Award Management (SAM). See FAR Clause
52.204-7 for required information. The website for SAM is https://www.sam.gov. As of April 4, 2022, the Federal
Government has stopped using the DUNS Number as a unique identifier for entities and switched to a Unique Entity
ID generated by SAM.gov. In addition, entities with DUNS Numbers but no SAM.gov registration have been able to get Unique Entity IDs without registering in SAM.gov since October 2021. NOTE: The DUNS Number is no longer used in SAM.gov, eSRS, FSRS, FPDS, CPARS, or FAPIIS.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of selective demolition, construction of a new metal maintenance building with cast-in-place concrete foundation, electrical, plumbing and mechanical systems;
structural excavation and fill; driving prestressed concrete piles; removal and replacement of asphaltic concrete pavement including subbase course and base course; fertilizing, seeding and mulching; ductile iron waterline;
sanitary sewer; and other related incidental work.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED 15 MARCH 2024.
ATTENTION: Contractors must complete, and submit with their bid, the provisions located in Section 00 45 00. A bidder may also submit, in lieu of the completed Section 00 45 00, a complete copy of their Online Representations and Certifications from SAM.gov with an expiration date on or after the date of award.
PTC-i ED 22-048
PROJECT TABLE OF CONTENTS
Division 00 – PROCUREMENT AND CONTRACTING
Solicitation, Offer And Award SF-1442 00 10 00 Bidding Schedule 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions 00 45 00 Representations And Certifications 00 70 00 Conditions Of The Contract 00 72 00 General Conditions
Division 01 - GENERAL REQUIREMENTS
01 00 00 General Provisions 01 11 00 Summary Of Work 01 32 01.00 10 Project Schedule 01 33 00 Submittal Procedures 01 35 26 Governmental Safety Requirements 01 42 00 Sources For Reference Publications 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) 01 45 04.00 10 Contractor Quality Control 01 45 35 Special Inspections 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Plan 01 57 23.01 12 Truck Wash-Down Rack 01 78 02.00 10 Closeout Submittals 01 78 23 Operation And Maintenance Data
DIVISION 02 - EXISTING CONDITIONS
02 41 00 Selective Demolition
DIVISION 03 - CONCRETE
03 11 14.00 12 Formwork For Concrete 03 21 00.00 12 Reinforcing Steel 03 31 00.00 12 Cast-In-Place Structural Concrete
DIVISION 04 - MASONRY
04 20 00 Unit Masonry
PTC-ii ED 22-048
DIVISION 05 - METALS
05 05 23.16 Structural Welding 05 12 00 Structural Steel 05 21 00 Steel Joist Framing 05 30 00 Steel Decks 05 40 00 Cold-Formed Metal Framing 05 50 13 Miscellaneous Metal Fabrications 05 51 00 Metal Stairs 05 51 33 Metal Ladders 05 52 00 Metal Railings
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets 06 61 16 Solid Surfacing Fabrications
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 21 16 Mineral Fiber Blanket Insulation 07 60 00 Flashing And Sheet Metal 07 61 14.00 20 Steel Standing Seam Structural Roofing 07 92 00 Joint Sealants
DIVISION 08 – OPENINGS
08 11 13 Steel Doors And Frames 08 31 00 Access Doors And Panels 08 33 23 Overhead Coiling Doors 08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 81 00 Glazing 08 91 00 Metal Wall Louvers
DIVISION 09 – FINISHES
09 06 00 Schedules For Finishes 09 22 00 Supports For Plaster And Gypsum Board 09 29 00 Gypsum Board 09 51 00 Acoustical Ceilings 09 65 00 Resilient Flooring 09 90 00 Paints And Coatings
PTC-iii ED 22-048
DIVISION 10 – SPECIALTIES
10 14 00.20 Interior Signage 10 21 13 Toilet Compartments 10 28 13 Toilet Accessories 10 44 16 Fire Extinguishers 10 51 13 Metal Lockers
DIVISION 11 – EQUIPMENT
11 31 13 Electric Kitchen Equipment
DIVISION 12 – FURNISHINGS
12 21 00 Window Blinds
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
DIVISION 22 – PLUMBING
22 00 00 Plumbing, General Purpose 22 07 19.00 40 Plumbing Piping Insulation
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 HVAC System Cleaning 23 03 00.00 20 Basic Mechanical Materials And Methods 23 05 93 Testing, Adjusting, And Balancing For HVAC 23 07 00 Thermal Insulation For Mechanical Systems 23 08 00 Commissioning Of Mechanical And Plumbing Systems 23 23 00 Refrigerant Piping 23 30 00 HVAC Air Distribution 23 31 13.00 40 Metal Ducts 23 34 23.00 40 HVAC Power Ventilators 23 37 13.00 40 Diffusers, Registers, And Grilles 23 81 00 Decentralized Unitary HVAC Equipment
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11.00 28 Cybersecurity
PTC-iv ED 22-048
DIVISION 26 – ELECTRICAL
26 05 00.00 40 Common Work Results For Electrical 26 20 00 Interior Distribution System 26 28 01.00 10 Coordinated Power System Protection 26 41 00 Lightning Protection System 26 51 00 Interior Lighting
DIVISION 27 – COMMUNICATIONS
27 10 00 Building Telecommunications Cabling System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 60 Interior Fire Alarm System, Non-Addressable
DIVISION 31 - EARTHWORK
31 00 00 Earthwork 31 05 19 Geotextile 31 23 16.16 12 Structural Excavation And Fill 31 62 13.20 12 Prestressed Concrete Piles
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 Subbase 32 11 23 Aggregate Base Course 32 12 16.00 12 Asphaltic Pavement 32 17 23 Pavement Markings 32 92 19.00 12 Fertilizing, Seeding, And Mulching
DIVISION 33 - UTILITIES
33 11 00 Water Utility Distribution Piping 33 30 00 Sanitary Sewerage 33 71 02 Underground Electrical Distribution
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.13 10 Overhead Bridge Crane
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
00 10 00-3 Ed 22-048
SECTION 00 10 00 – BIDDING SCHEDULE
GIWW – Gulf Intracoastal Waterway Algiers Lock
New Maintenance Building Orleans Parish, Louisiana
Item Description Estimated Quantity
Unit Unit Price
Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
Video and Photographic Documentation
1 JOB
0003 Truck Wash-Down Rack 1 EA
0004 Selective Demolition 1 JOB
Cast-in-Place Building Foundation
1 JOB
0006 Maintenance Building 1 JOB
0007 Plumbing System 1 JOB
0008 Mechanical System 1 JOB
0009 Electrical System 1 JOB
0010 Excavation and Embankment 1 JOB
0011 Geotextile Fabric - Pavement 4,500 SY
0012 Structural Excavation 165 CY
0013 Granular Fill 185 CY
Furnish and Drive Prestressed Concrete Piles (14”x14”)
4,600 LF
0015 Subbase 600 CY
0016 Base Course 480 CY
0017 Asphaltic Pavement 460 TON
0018 Permanent Pavement Markings 1 JOB
Fertilizing, Seeding and Mulching
1 AC
6-Inch Diameter Ductile Iron Waterline
240 LF
2-1/2-Inch Diameter PE Waterline
50 LF
0022 4-Inch Diameter Sanitary Sewer 60 LF
00 10 00-4 Ed 22-048
0023 S&WB Sewer Manhole 1 EA
TOTAL BASE WORK: $
OPTIONAL WORK 1 (OW1)
0024 Overhead Crane – OW1 1 JOB
TOTAL OW1 $
TOTAL BASE + OW1 $
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00 10 00-5 Ed 22-048 of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see EVALUATION OF OPTIONS FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. Upon exercising the Optional Work, the Contractor shall immediately begin the work and prosecute the work continuously simultaneously with any other Base Work until the Optional Work is completed. Bidders shall bid on all items including optional items (see “EVALUATION OF OPTIONS” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5.
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that OPTIONAL WORK item is exercised under the terms of the contract, the time required for completion of the contract will not be adjusted but shall be performed concurrent with days established for the BASE WORK items specified in contract provision entitled ”COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK ”.
Section 00 00 00 - Procurement and Contracting Requirements
Algiers Lock New Maintenance BuildingInstrument Name:
The work consists of selective demolition, construction of a new metal maintenance building with cast-in-place concrete foundation, electrical, plumbing and mechanical systems; structural excavation and fill; driving prestressed concrete piles; removal and replacement of asphaltic concrete pavement including subbase course and base course; fertilizing, seeding and mulching;
ductile iron waterline; sanitary sewer; and other related incidental work. Magnitude of this project:
Between $1,000,000 and $5,000,000.
W912P826BA061
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
Section 00 21 00 - Instructions
FAR Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.204-7 System for Award Management- Registration. (Deviation 2026- O0038)
2026-02
52.214-3 Amendments to Invitations for Bids. (Deviation 2026-O0038)
2026-02
52.214-4 False Statements in Bids. 1984-04
52.214-5 Submission of Bids. (Deviation 2026-O0038)
2026-02
52.214-6 Explanation to Prospective Bidders.
1984-04
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids.
(Deviation 2026-O0038)
2026-02
52.214-12 Preparation of Bids. 1984-04
52.214-34 Submission of Offers in the English Language.
1991-04
52.214-35 Submission of Offers in U.S.
Currency.
1991-04
52.215-22 Limitations on Pass-Through Charges-Identification of Subcontract Effort. (Deviation 2026-O0038)
2026-02
52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (Deviation 2026- O0038)
2026-02
52.225-10 Notice of Buy American Requirement-Construction Materials.
2014-05
52.232-14 Notice of Availability of Progress Payments Exclusively for Small Business Concerns.
1984-04
52.233-2 Service of Protest. (Deviation 2026-O0038)
2026-02
DFARS Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.204-7024 Notice on the Use of the Supplier Performance Risk System.
2023-03
252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.
2023-01
FAR Provisions Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.216-1 Type of Contract. (Deviation 2026-02
Type of Contract (Feb 2026) (Deviation 2026-O0038)
The Government contemplates award of a Firm Fixed Price[Contracting Officer insert specific type of contract] contract resulting from this solicitation.
(End of provision)
52.228-1 Bid Guarantee. 1996-09
Bid Guarantee (Sept 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
52.252-1 Solicitation Provisions Incorporated by Reference.
1998-02
Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov________[Insert one or more Internet addresses]
52.252-3 Alterations in Solicitation. 1984-04
Alterations in Solicitation (Apr 1984)
Portions of this solicitation are altered as follows:
52.252-5 Authorized Deviations in Provisions.
2020-11
Authorized Deviations in Provisions (Nov 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS[insert regulation name](48 CFR Chapter2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 21 13 - Instructions to Bidders
SOLICITATION NUMBER: W912P825BA0061
NOTE: BIDDERS MAY SUBMIT BIDS BY ONLY ONE METHOD: A) ELECTRONIC COMMERCE
(EMAIL) OR BY 2) ELECTRONIC COMMERCE (PIEE). BIDDERS SHALL LIMIT THE BID
SUBMITTAL TO ONE OPTION OR THE OTHER, NOT BOTH.
Electronic Submission of Bids/Proposals (Email):
The New Orleans District utilizes electronic commerce (Email) for receipt of electronic bids under this IFB solicitation. To submit an electronic commerce (Email) bid please follow these steps:
1. Send an email containing your name, email address and bid/proposal to the following emails associated with the IFB (MUST include all emails):
- LEANN.R.THORNTON@USACE.ARMY.MIL
- KATHERINE.B.YOUNTS@USACE.ARMY.MIL
2. ALL BIDS SUBMITTED BY EMAIL MUST CONTAIN THE SOLICITATION NUMBER IN THE
SUBJECT LINE.
3. Once the agency receives your bid/proposal at the above email addresses, you will then receive a confirmation email stating your bid/proposal was received. If a bidder does not receive a reply acknowledging receipt electronically from the New Orleans District, it is incumbent upon the bidder to seek confirmation from the issuing Contracting office by phone.
Note: The size limit for incoming emails is 35MB. Any bid/proposal over this size may not be accepted by the server and will constitute the bid not being received timely. Please note that embedded links, URLs, and other html language included may interfere with the USACE server security, which may cause emails to be removed prior to being received by the contracting office.
Bidders are advised to refrain from including external links, embedded links, URLs, and other html language not germane to the bid/proposal. Please note it is a bidder's responsibility, when transmitting its bid electronically, to ensure the receipt of its bid to the proper designee at the proper time. See FAR 14.304(b)(1)(i) regarding untimely electronic bids. Please note, MVN's computer system firewall may cause a delay in receipt of emails, so be sure to allow ample time for possible delay. If your email would exceed 35MB you can use one of the following methods as a work-around:
Use .zip files as attachments. Combine multiple files into a .zip file to compress file size prior to adding as an email attachment.
Send multiple emails. Label each email with same subject line and indicate number of emails. For example: Smith Construction W912P825BXXXX (1 of 2) Smith Construction W912P825BXXXX (2 of 2).
Electronic Submission of Bids/Proposals (PIEE):
THE ONLY AUTHORIZED TRANSMISSION METHODS FOR SUBMITTING BID/PROPOSALS IN
RESPONSE TO THIS SOLICITATION IS THROUGH THE PIEE SOLICITATION MODULE
WEBSITE AT: AND/OR SUBMISSION THROUGH E-MAIL TO THE https://piee.eb.mil
CONTRACT SPECIALIST. NO OTHER TRANSMISSION METHODS (FACSIMILE, REGULAR
MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
Bid/Proposal submissions shall be uploaded to the PIEE Solicitation Module website AND/OR e-mailed to the Contract Specialist by the identified date and time.
Solicitation Number: W912P826BA061
BIDDERS ARE STRONGLY ENCOURAGED TO READ THE PIEE SOLICITATION MODULE
WEBSITE INSTRUCTIONS.
Electronic File Submission Organization:
Bidders shall submit their bid/proposal in response to this IFB via the PIEE Solicitation Module AND /OR via E-Mail to the Contract Specialist in ONE (1) transmission to the identified USACE receivers in "PIEE Solicitation Module Website and Submission Receiver Information" below. It shall be the offeror's responsibility to check the websites for any amendments. The bidder shall submit in the bid/proposal all requested information specified in this solicitation.
Ensure files are compatible and viewable in Microsoft Office 2013, or later, format. Self-extracting exe files are not acceptable. Zip files are not recommended. DO NOT USE Cloud storage providers, google docs, web-based drop boxes, OneNote/OneDrive, URLs, web-based format, or any other virtual/web-based memory services are NOT acceptable methods of submitting a bid /proposal.
PIEE Solicitation Module Website and Submission Receiver Information:
PIEE Solicitation Module: https://piee.eb.mil/
Email addresses to enter as 'Receivers' in PIEE Solicitation Module, Contract Specialist Leann.R.
and Contracting Officer Thornton@usace.army.mil Katherine.B.Younts@usace.army.mil
Bid Opening: This bid opening is currently scheduled for Tuesday, 14 July 2026, at 1:00 PM CT.
The Contracting Officer and Contract Specialist will begin downloading bids at 12:00 PM CT, which is the bid submission receipt cutoff time. All bids received after 12:00 PM CT on Tuesday, 14 July 2026, will be considered late.
Audio Teleconference Bid Opening Information:
The bid opening will be held electronically and can be accessed via:
Microsoft Teams Need help?
Join the meeting now https://dod.teams.microsoft.us/l/meetup-join/19%3adod% 3ameeting_ea41d5914631450a88e6503cca365377%40thread.v2/0?context=%7b%22Tid%22% 3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%228a67120f-42c6- 43ab-a5b7-f22f00689463%22%7d
Meeting ID: 993 192 881 131
Passcode: 3ci2kh2Z
OR
Dial in by phone
+1 503-207-9433,,327732539# United States, Beaverton
Find a local number
Phone conference ID: 327 732 539#
Following the conclusion of the bid opening, in accordance with FAR 14.403(b), abstracts of offers for unclassified acquisitions shall be available for public inspection via SAM.GOV.
Instructions to Bidders
QUESTION AND ANSWER VIA PROJNET
ALL SUBMITTED QUESTIONS FOR THIS PROJECT AND THE ANSWERS PROVIDED SHALL
BE VIEWED IN BIDDER INQUIRY IN PROJNET AT
( )https://www.projnet.org
Technical inquiries and/or questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) Wednesday, July 8, 2026, 10:
An additional question period will be set when the bid opening date is 00 AM Local Time.
established. To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. Emailed inquiries and/or questions will not be accepted. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.
The Bidder Inquiry Key is: 99STIT-MHVE7Y
Specific Instructions for First Time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
*** END OF NARRATIVE ***
Section 00 22 00 - Supplementary Instructions
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.217-5 Evaluation of Options. (Deviation
"General Decision Number: LA20260041 01/30/2026
Superseded General Decision Number: LA20250041
State: Louisiana
Construction Type: Building
County: Orleans County in Louisiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/02/2026
1 01/30/2026
ASBE0053-001 09/02/2024
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 32.66 9.86
* ELEC0130-010 12/01/2025
ELECTRICIAN (Including
Communication Technician and
Low Voltage Wiring)..............$ 36.00 16.66
ELEV0016-001 01/01/2025
ELEVATOR MECHANIC................$ 51.11 38.435+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATION: Employer contributes 8% of basic hourly rate for
5 years or more of service; 6% of basic hourly rate for under 5 years of service as vacation pay credit.
ENGI0406-002 07/01/2014
POWER EQUIPMENT OPERATOR
(Crane)..........................$ 23.46 8.35
CRANE PREMIUMS:
50-150 Tons $1.75
Over 150 Tons $2.25
IRON0623-021 07/01/2024
IRONWORKER (REINFORCING AND
STRUCTURAL)......................$ 34.75 13.86
PAIN1244-006 09/01/2024
GLAZIER..........................$ 25.44 12.20
PAIN1244-013 12/01/2021
PAINTER: Spray Only (Excludes
Drywall Finishing/Taping)........$ 18.83 9.48
PLAS0567-001 08/01/2022
CEMENT MASON/CONCRETE FINISHER...$ 30.47 7.97
PLUM0060-009 06/02/2025
PIPEFITTER (Including HVAC
Pipe and Unit Installation;
Excluding Installation of
HVAC Temperature Controls).......$ 34.87 17.79
PLUMBER (Installation of HVAC
Temperature Controls;
Excluding HVAC Pipe and Unit
Installation)....................$ 33.30 14.98
SHEE0214-010 09/01/2013
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 26.71 11.93
SULA2012-026 09/22/2014
BRICKLAYER.......................$ 18.66 0.00
CARPENTER (Form Work Only).......$ 15.00 0.00
CARPENTER, Excludes Drywall
Hanging and Metal Stud
Installation, and Form Work......$ 19.37 2.46
DRYWALL FINISHER/TAPER...........$ 16.55 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 18.21 4.90
LABORER: Common or General......$ 13.09 0.00
LABORER: Mason Tender - Brick...$ 12.38 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 22.92 0.00
PAINTER (BRUSH AND ROLLER),
Excludes Drywall
Finishing/Taping.................$ 17.25 0.00
ROOFER...........................$ 16.77 5.66
SPRINKLER FITTER (Fire
Sprinklers)......................$ 21.08 5.79
TILE SETTER......................$ 20.00 0.00
TRUCK DRIVER: Dump Truck........$ 15.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between
January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive
Order 13658 does not apply to contracts subject only to the
Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
Washington, DC 20210.
END OF GENERAL DECISION"
Section 00 45 00 - Representations and Certifications
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
2024-09
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements- Representation.
2017-01
52.223-1 Biobased Product Certification.
(Deviation 2026-O0038)
2026-02
52.223-4 Recovered Material Certification. 2008-05
52.229-12 Tax on Certain Foreign Procurements.
2021-02
DFARS Provisions Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials.
2022-09
252.204-7008 Compliance with Safeguarding Covered Defense Information
2016-10
Controls.
252.225-7055 Representation Regarding Business Operations with the Maduro Regime.
2022-05
252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region- Representation.
2023-06
FAR Provisions Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.203-2 Certificate of Independent Price Determination.
1985-04
Certificate of Independent Price Determination (Apr 1985)
(a) The offeror certifies that-
(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to-
(i) Those prices;
(ii) The intention to submit an offer; or
(iii) The methods or factors used to calculate the prices offered.
(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.
(b) Each signature on the offer is considered to be a certification by the signatory that the signatory-
(1) Is the person in the offeror's organization responsible for determining the prices being offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to paragraphs (a)(1) through (a)(3) of this provision; or
(2)
(i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to paragraphs (a)(1) through (a)(3) of this provision ____[insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization];
(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) of this provision have not participated, and will not participate, in any action contrary to paragraphs (a)
(1) through (a)(3) of this provision; and
(iii) As an agent, has not personally participated, and will not participate, in any action contrary to paragraphs (a)(1) through (a)(3) of this provision.
(c) If the offeror deletes or modifies subparagraph (a)(2) above, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
52.209-7 Information Regarding Responsibility Matters.
(Deviation 2026-O0038)
Information Regarding Responsibility Matters (Feb 2026) (Deviation 2026-O0038)
(a) Definitions. As used in this provision-
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means-
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;
head of a division or business segment; and similar positions).
(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in-
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
52.209-13 Violation of Arms Control Treaties or Agreements- Certification. (Deviation 2026- O0038)
2026-02
Violation of Arms Control Treaties or Agreements-Certification (Feb 2026) (Deviation 2026- O0038)
(a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services as defined in Federal Acquisition Regulation 2.101.
(b) Certification. [Offeror shall check either (1) or (2).]
[ ] (1) The Offeror certifies that-
(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C.
2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; and
(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; or
[ ] (2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.
(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.
(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there.
Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .