This is Amendment 0001 to Solicitation W912P826BA023 for maintenance dredging services in the Calcasieu River and Pass, Louisiana. The amendment, effective September 2, 2026, is issued by the U.S. Army Corps of Engineers New Orleans District (W07D Endist) and modifies the bidding schedule and technical specifications. The contracting officer is Evan Woitha (evan.g.woitha@usace.army.mil, 504-862-1214).
The project involves dredging and marsh creation activities from River Mile 5.0 to Mile 17.0 within the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) Sabine Cycle 6 program in Calcasieu and Cameron Parishes, Louisiana. The base work includes dredging from Mile 6.0 to 17.0 with disposal to marsh creation sites 7A and 7B, dike construction for both sites, staging area development, aerial photography documentation, and mobilization/demobilization (estimated 2,740,000 cubic yards for the first tranche and 482,000 cubic yards above that threshold). Optional Work 1 includes an alternative marsh site (Alt. 4) with dredging, dike construction, dike degrading, and bird nesting prevention measures. Optional Work 2 includes Devil's Elbow dredging (700,000 and 200,000 cubic yard tranches), additional dike construction and mobilization, and ditching/draining work across multiple confined disposal facilities. Award will be made as a single lump sum to one bidder; all optional items must be bid. If Optional Work 1 is exercised, it will be performed concurrently within the original 300-calendar-day base work period. If Optional Work 2 is exercised, the contract duration will be extended by 170 additional calendar days. The amendment clarifies that survey soundings and contours represent June/July 2026 conditions and revises selected bidding schedule quantities and drawing sheets (G-03 and C-16 through C-28).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION 00 10 00
Pages 00010-3, 4, 5, 6, and 7. Delete these pages in their entirety and substitute with the attached revised pages 00010-3, 4, 5, 6, and 7 therefore.
SECTION 35 20 23.00 12
Page 3, paragraph 1.2.1. Revise the 2nd sentence to read as follows: “The soundings and contours shown on the contract drawings are representative of conditions that existed in June/July 2026 and do not necessarily represent existing conditions”.
DRAWINGS
SHEET IDENTIFICATION Nos. G-03, C-16 to C-23, and C-25 to C-28. Delete these drawings in their entirety and substitute with the attached revised drawings SHEET IDENTIFICATION Nos. G-03, C-16 to C-23, and C-25 to C-28.
SECTION 00 10 00 – BIDDING SCHEDULE
Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Including Beneficial Use within CWPPRA Sabine Cycle 6 Marsh Creation Areas, Calcasieu and Cameron Parishes, LA
00 10 00 - 3 ED 23-024
Item
Description Estimated
Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002 Aerial Photography Documentation 1 JOB
Dredging (Mile 6.0 to 17.0) – Sabine Cycle 6 (Sites 7A & 7B) Disposal
*0003A First 2,740,000 CY 2,740,000 CY
*0003B All Over 2,740,000 CY 482,000 CY
0004 Dike Construction – Sabine Site 7A 16,500 LF
0005 Dike Construction – Sabine Site 7B 17,700 LF
0006 Sabine Cycle 6 Staging Areas 1 JOB
TOTAL BASE WORK: $
OPTIONAL WORK 1 (OW1)
Dredging (Mile 6.0 to 17.0) – Sabine Cycle 6 (Site ALT 4) Disposal - OW1
0007A First 13,600 CY 13,600 CY
0007B All Over 13,600 CY 2,400 CY
0008 Dike Construction – Sabine Site
ALT 4 - OW1 13,400 LF
0009 Dike Degrading – Sabine Sites 7A
& 7B - OW1 34,200 LF
0010 Dike Degrading – Sabine Site ALT
4 - OW1 13,400 LF
0011 Bird Nesting Prevention and Avoidance Measures - OW1 90 DAYS
TOTAL OW1: $
TOTAL BASE WORK + OW1: $
00 10 00-4 ED 23-024
OPTIONAL WORK 2 (OW2)
0012 Dredging - Devil’s Elbow - OW2
*0012A First 700,000 CY 700,000 CY
*0012B All Over 700,000 CY 200,000 CY
0013 Dike Construction - CDF 12B -
OW2 01 JOB
0014 Dike Construction - CDF 13 - OW2 01 JOB
0015 Additional Mobilization and Demobilization - OW2 01 JOB
0016 Ditching/Draining CDF 1 - OW2 7,060 LF
0017 Ditching/Draining CDF 3 - OW2 12,370 LF
0018 Ditching/Draining CDF 7 - OW2 19,000 LF
0019 Ditching/Draining CDF 8 - OW2 20,100 LF
0020 Ditching/Draining CDF 9 - OW2 19,250 LF
0021 Ditching/Draining CDF 10 - OW2 13,770 LF
0022 Ditching/Draining CDF 11 - OW2 15,340 LF
0023 Ditching/Draining CDF 12B - OW2 24,400 LF
0024 Ditching/Draining CDF 13 - OW2 28,820 LF
0025 Ditching/Draining CDF 15 - OW2 16,340 LF
0026 Ditching/Draining CDF 17 - OW2 17,870 LF
0027 Ditching/Draining CDF 22 - OW2 13,440 LF
TOTAL OW2: $
TOTAL BASE WORK + OW2: $
TOTAL BASE WORK + OW1 + OW2: $
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
* Denotes a change from previous Bidding Schedule
00 10 00-5 ED 23-024
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE
UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY
ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE
INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See RFO 14.306-3, Rejection of Individual Bids).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices states in the schedule. The Contracting Officer may exercise the OPTIONAL WORK items by written notice to the Contractor at any time up to 90 calendar days before completion of base work. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). **If an option is to be exercised at the time of contract award FAR 17.208 shall be used in place of FAR 52.217-5.
NOTE 7: OPTIONAL WORK Item 0011 “Bird Nesting Prevention and Avoidance Measures” will occur concurrently with contract work. The successful bidder is advised that the contract time required for Bird Nesting Prevention and Avoidance Measures is included in the performance period allowed for completion of the base work and will not be adjusted for Bird Nesting Prevention and Avoidance Measures work.
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00 10 00-6 ED 23-024
NOTE 8: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL
WORK. In the event that OPTIONAL WORK 1 (OW1) items are exercised under the terms of the contract, the time required for completion of the contract will not be adjusted but shall be performed concurrent with the original contract duration of 300 calendar days established for the BASE WORK items specified in the Contract Provision in Section 00 73 00 SUPPLEMENTARY CONDITIONS entitled COMMENCEMENT, PROSECUTION, and COMPLETION OF WORK. In the event that OPTIONAL WORK 2 (OW2) items are exercised under the terms of the contract, the time required for completion of the contract will be increased by 170 calendar days beyond the original duration of 300 calendar days established for the BASE WORK items specified in the Contract Provision in Section 00 73 00 SUPPLEMENTARY CONDITIONS entitles
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
00 10 00-7 ED 23-024
EVALUATION OF SUBLINE ITEMS
Item No. 0003, 0007 and 0012 are subdivided into two or more estimated quantities and is to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS
This variation in estimated quantities clause is applicable only to item No. 0003, 0007 and 0012.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item No. 0003, 0007 and 0012 are less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause VARIATION IN ESTIMATED
QUANTITY.
(c) If the actual quantity of work performed under item No. 0003, 0007 and 0012 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with VARIATION IN ESTIMATED QUANTITY.
(End of Clause)
G-03
GENERAL NOTES:
:1
G -0
G e n e ra l N o te s L e g e n d a n d
A b rv
G A
G E
S A
N D
G E
N E
R A
L N
O T
E S
L E
G E
N D
A
B B
R E
V
IA
T
IO
N S
DESCRIPTION
TABULATION OF BENCHMARKS
ELEVATIONMARKBENCH
15-095C-9
EL. +1.879 NAVD88 (2009.55)
EASTERN: 2631892.439
NORTHERN: 522566.739
LONG: 093° 22' 55.12644"
LAT: 29° 55' 15.62290"C109
EL. +0.997 NAVD88 (2009.55)
EASTERN: 2632041.616
NORTHERN: 522602.418
LONG: 093° 22' 53.43867"
LAT: 29° 55' 16.00244"
15-095C-10
EL. +6.433 NAVD88 (2009.55)
EASTERN: 2650089.080
NORTHERN: 492227.380
LONG: 093° 19' 22.38019"
LAT: 29° 50' 18.49966"
CANAL, APPROXIMATELY 150 FEET WEST OF A BOAT RAMP.
SET 5/8" REBAR WITH PINK CAP, 20 FEET NORTH OF THE NORTH TOP BANK OF THE
AS DESCRIBED.
MARK. THE MARK IS A USACE ALUMINUM CAP SET ON A 5/8" X 24" IRON ROD. FOUND
THE GRAVEL PARKING LOT AND PROCEED TO THE NORTHWEST CORNER AND THE
TO THE PARKING LOT FOR THE NORTH LINE RECREATION AREA, TURN RIGHT INTO
FROM HACKBERRY, LA PROCEED SOUTH ON HWY 27 FOR APPROXIMATELY 5 MILES
GUARD RAIL. FOUND AS DESCRIBED.
37.9 FT NORTH OF A LAMP/POWER POLE, 174.3 FT WEST OF THE WEST END OF A
MARK IS AT THE TOE OF THE LEVEE 26 FT NORTH OF THE CL OF THE LEVEE RD,
ALUMINUM CAP ON A 5/8" STEEL ROD 24" IN LENGTH SET FLUSH WITH THE GROUND.
PROCEED FOR 1.08 MILES TO THE MARK ON THE LEFT. THE MARK IS A C.O.E.
TO THE INTERSECTION WITH THE LEVEE RD, TURN RIGHT ON THE LEVEE RD AND
WAKEFIELD RD, TURN RIGHT ONTO WAKEFIELD RD AND PROCEED FOR 2.08 MILES
LA PROCEED WEST ON HWY 27 FOR 1.21 MILES TO THE INTERSECTION WITH
TO REACH MARK FROM THE INTERSECTION OF HWY 27 AND AMACO RD IN CAMERON,
PMB LOST
EL. +2.25 NAVD88 (2009.55)
EASTERN: 2618225.770
NORTHERN: 523630.650
LONG: 093° 25' 30.632878"
LAT: 29° 55' 23.709116"
ISLAND.
AND EASTERLY FOR APPROXIMATELY 5 MILES TO MONUMENT LOCATED ON A SMALL
NATURE TRAIL AT SABINE REFUGE, BY BOAT, PROCEED NORTHEASTERLY, NORTHLY
FROM THE HUMPBACK BRIDGE AT STARKS CENTRAL CANAL NEAR THE CREOLE
AND BELOW HWY 27 BRIDGE. SEE SHEETS C-40 AND C-41 FOR MORE DETAILS.
THROUGH THE HOG ISLAND GULLY CANAL, AROUND THE HOG GULLY ISLAND CONTROL STRUCTURE
UNDER CWPPRA PROJECT CS-28-2 (SABINE CYCLE 2). CONTRACTOR MAY ALTERNATIVELY ROUTE
11) PRIMARY PIPELINE ROUTING SHALL USE THE PERMANENT DREDGE PIPELINE CONSTRUCTED
AWARD CONTAINING THE DISPOSAL AREA XY COORDINATES.
10) GENERAL NOTES: A COPY OF THE RIGHT-OF-WAY PLAN WILL BE PROVIDED UPON CONTRACT
CHART 11339, CALCASIEU RIVER AND APPROACHES, DATA PULLED ON MAY 2023.
9) NAVIGATION AIDS: ALL NAVIGATION AIDS SHOWN ARE IDENTIFIED REFERENCING NOAA
8) AERIAL IMAGES: ALL AERIAL IMAGES SHOWN WERE FLOWN 2024.
ACTUALLY USED.
REQUIREMENTS FOR ALL AREAS PROPOSED TO BE USED, AS WELL AS ALL DISPOSAL AREAS
RIVER SHIP CHANNEL. REFER TO THE CONTRACT SPECIFICATIONS FOR FULL DETAILS AND
DIKE SURVEYS. ALL EFFLUENT DRAINAGE OF THE CDFS SHALL BE RETURNED TO THE CALCASIEU
REPAIR/CONSTRUCTION/MAINTENANCE/FORTIFICATION OF RETENTION DIKES AND PRE-DISPOSAL
ELBOW (OPTION WORK 2). AREAS FOR DISPOSAL TO BE USED BY THE CONTRACTOR REQUIRE
AVAILABLE FOR PLACEMENT OF DREDGE MATERIAL DISPOSAL ONLY FOR THE DREDGING OF DEVILS
(MCA(S)), AS WELL AS CONFINED DISPOSAL FACILITIES 12B AND 13 (CDF-12B AND CDF-13) ARE
7) DISPOSAL AREAS: ONLY THE HATCHED DISPOSAL AREAS, IDENTIFIED AS MARSH CREATION AREAS
STATE PLANE SOUTH.
SOUTH EXPRESSED IN SURVEY FOOT. ALL XY COORDINATES SHOWN ARE LOUISIANA
HORIZONTAL DATUM - THE HORIZONTAL DATUM IS NAD 1983 STATE PLANE LOUISIANA
FEET.
VERTICAL DATUM - THE VERTICAL DATUM IS NAVD88 (2009.55) GEOID 12B AND ARE IN
FOLLOWS:
SURVEYS ARE PROVIDED ON THIS SHEET. THE VERTICAL AND HORIZONTAL DATUMS ARE AS
OBTAINED FROM MVN SURVEY SECTION (504-862-2995). GAGES AND BENCHMARKS USED DURING
CROSS SECTIONS OF THE MARCH CREATION AREAS ARE BASED ON SURVEY DATA FROM APRIL 2021,
6) SABINE CYCLE 6 SURVEYS: EXISTING GROUND ELEVATIONS SHOWN ON SHEETS C-46 TO C-48
STATE PLANE SOUTH.
SOUTH EXPRESSED IN SURVEY FOOT. ALL XY COORDINATES SHOWN ARE LOUISIANA
HORIZONTAL DATUM - THE HORIZONTAL DATUM IS NAD 1983 STATE PLANE LOUISIANA
FEET.
VERTICAL DATUM - THE VERTICAL DATUM IS MEAN LOWER LOW WATER (MLLW) AND ARE IN
VERTICAL AND HORIZONTAL DATUMS ARE AS FOLLOWS:
MVN OPERATIONS DIVISION. GAGES USED DURING SURVEYS ARE PROVIDED ON THIS SHEET. THE
CALCASIEU SHIP CHANNEL ARE BASED ON SURVEY DATA DATED JUNE/JULY 2026, OBTAINED FROM
5) CSC SURVEYS: EXISTING GROUND ELEVATIONS SHOWN ON ALL CROSS SECTIONS OF THE
4) AZIMUTHS: ALL AZIMUTHS ARE GEODETIC AND ARE SHOWN IN THE SOUTHERN DIRECTION.
3) RIVER MILES: RIVER MILES SHOWN ARE APPROXIMATE AND ARE FOR REFERENCE ONLY.
FOR DREDGING LIMITS REQUIRED FOR THIS CONTRACT.
COORDINATES AND CURVE DATA", AND THE RESPECTIVE PLAN VIEW SHEETS (C-01 THROUGH C-15)
ALIGNMENT COORDINATES ARE SHOWN ON SHEET G-04, "TABULATIONS, CHANNEL CENTERLINE
CENTERLINE, STARTING FROM P.O.B. STA. 0+00. THE ENTIRE CALCASIEU SHIP CHANNEL
2) STATIONING: ALL STATION VALUES ARE ALONG, AND PERPENDICULAR, TO THE CHANNEL
CDF-10, CDF-11, CDF-12B, CDF-13, CDF-15, CDF-17, AND CDF-22
DITCHING AND DRAINING: CDF-1, CDF-3, CDF-7, CDF-8, CDF-9,
DITCHING & DRAINING OF CONFINED DISPOSAL FACILITIES (CDF) SITES
DIKE CONSTRUCTION - CDF-12B AND CDF-13
SHIP CHANNEL TO STATION 130+00
DREDGING LIMIT IS FROM THE INTERSECTION WITH CALCASIEU
DEVIL'S ELBOW DREDGING
OPTIONAL WORK 2 -
DEGRADED FOLLOWING CONSTRUCTION OF MARSH SITES
DIKE DEGRADING - SABINE SITES 7A, 7B, AND ALT. 4 RETENTION DIKES SHALL BE
ON THE PERIMETERS OF ALT. 4 MARSH SITE
DIKE CONSTRUCTION - FULLY-CONFINED DIKES SHALL BE CONSTRUCTED
DIKE CONSTRUCTION - ALTERNATIVE 4 (ALT. 4) MARSH CREATION SITE
LOWER DREDGING LIMIT - STATION 315+00 (APPROX. RIVER MILE 6.0)
UPPER DREDGING LIMIT - STATION 893+60 (APPROX. RIVER MILE 17.0)
DREDGING MILE 6.0 TO MILE 17.0:
OPTIONAL WORK 1 -
ON THE PERIMETERS OF MARSH SITES 7A AND 7B.
DIKE CONSTRUCTION - FULLY-CONFINED DIKES SHALL BE CONSTRUCTED
DIKE CONSTRUCTION - MARSH CREATION SITES 7A AND 7B
LOWER DREDGING LIMIT - STATION 315+00 (APPROX. RIVER MILE 6.0)
UPPER DREDGING LIMIT - STATION 893+60 (APPROX. RIVER MILE 17.0)
DREDGING MILE 6.0 TO MILE 17.0:
BASEWORK:
THE UPPER AND LOWER LIMITS OF DREDGING ARE AS FOLLOWS:
OPTIONAL WORK: CDF-12B AND CDF-13.
AND ASSOCIATED DISPOSAL AREAS; BASEWORK: SABINE CYCLE 6 MARSH CREATION, AND
1) LIMITS OF WORK: CALCASIEU SHIP CHANNEL (CSC), C/L STATION 1805+00 TO C/L STATION 200+00
(73350)
LAKE CHARLES
(73595)
GAS PLANT (RB #86)
(73600)
HACKBERRY
STAFF GAGE ON CALCASIEU RIVER AT MILE 33.3
STAFF GAGE ON CALCASIEU RIVER AT MILE 29.7
STAFF GAGE ON CALCASIEU RIVER AT MILE 25.0.
STAFF GAGE ON ON DEVIL'S ELBOW NEAR MILE 22.7
STAFF GAGE ON CALCASIEU RIVER MILE 19.4
GAGE DESCRIPTION EL.
TABULATION OF GAGES
(RB #114)(73565)
ROSE BLUFF CUTOFF
(RANGE E)(73575)
MOSS LAKE
(RANGE D)(73585)
DEVIL'S ELBOW
LONG: -93° 18' 19.3", LAT: 30° 11' 03.8" (SHEET C-03)
LONG: -93° 15' 25.04", LAT: 30° 12' 47.1" (SHEET C-01)
LONG: -93° 19' 44.5", LAT: 30° 07' 36.8" (SHEET C-05)
LONG: -93° 19' 40.5", LAT: 30° 02' 53.4" (SHEET C-08)
LONG: -93° 20' 01.9", LAT: 30° 00' 20.4" (SHEET C-09)
LONG: -93° 19' 28.1", LAT: 30° 05' 46.0" (SHEET C-06)
(73615)
LONG POINT (DM 72)
STAFF GAGE ON DAY MARKER 72 AT MILE 11.2
HACKBERRY, LA NEAR MILE 16.5.
AUTOMATIC GAGE ON CALCASIEU RIVER AT
LONG: -93° 20' 18.8", LAT: 29° 55' 45.6" (SHEET C-12)
= +1.6' M.L.G
0.0' NAVD88 = +0.6' M.L.L.W.
= +1.6' M.L.G
0.0' NAVD88 = +0.6' M.L.L.W.
= +1.8' M.L.G.
0.0' NAVD88 = +0.8' M.L.L.W.
= +1.8' M.L.G.
0.0' NAVD88 = +0.8' M.L.L.W.
= +1.9' M.L.G.
0.0' NAVD88 = +0.9' M.L.L.W.
= +2.0' M.L.G.
0.0' NAVD88 = +1.0' M.L.L.W.
= +2.1' M.L.G.
0.0' NAVD88 = +1.1' M.L.L.W.
(73625)
ST JOHN ISLAND (DM 57)
STAFF GAGE ON DAY MARKER 57
LONG: -93.3496889, LAT: 29.8306917 (SHEET C-15)
= +2.2' M.L.G.
0.0' NAVD88 = +1.2' M.L.L.W.
USED FOR MVN SURVEY REACH MILES 36 TO 31.25
USED FOR MVN SURVEY REACH MILES 31.25 TO 27
USED FOR MVN SURVEY REACH MILES 27 TO 23
AND DEVIL'S ELBOW.
USED FOR MVN SURVEY REACH MILES 23 TO 21.7,
USED FOR MVN SURVEY REACH MILES 17.7 TO 13.6
USED FOR MVN SURVEY REACH MILES 13.6 TO 8.5
USED FOR MVN SURVEY REACH MILES 21.7 TO 17.7
USED FOR MVN SURVEY REACH MILES 8.5 TO 3
(73650)
CAMERON AUTOMATIC GAGE ON CALCASIEU RIVER PILOTS DOCK,
2 MILES SW OF CAMERON, LA.
LONG: -93.3478778, LAT: 29.7760361
STAFF GAGE ON DAY MARKER 86
(73595)
DAY MARKER 86 (DM 86)
LONG: -93.3279167, LAT: 30.0481556
=2.3' M.L.G.
0.0' NAVD88=+1.3 M.L.L.W.
=1.9' M.L.G.
0.0' NAVD88=+0.9 M.L.L.W.
ABBREVIATIONS
MAX
MIN.
TYP
MAXIMUM
MINIMUM
MISCELLANEOUS
TYPICAL
APPROXIMATE
VERTICAL
STATION
DRAWINGDWG
EL.
FT
MISC
GENERAL LEGEND
ELEVATION
EXIST EXISTING
V
HIGC HOG ISLAND GULLY CANAL
P.I. POINT OF INFLECTION
STA.
FEET
N.T.S. NOT TO SCALE
FT
P.I.
EXISTING GROUND
C/L CENTERLINE
BASELINEB/L
SF SQUARE FEET
(+/-) APPROXIMATE
AC ACRE
UNDISTURBED BORING
TOP EDGE OF CUT
TOB TOP OF BANK
APPROX.
LF LINEAR FEET
RIVER MILE#
THEO. THEORETICAL
T.E.C.
BORROW TOP EDGE OF CUTB.T.E.C
SURVEY MONUMENT / BENCHMARK
ACCESS ROADWAYS
DREDGE PIPELINE AND ACCESS CORRIDORS
C.R.A.P. CALCASIEU RIVER AND PASS
ALTERNATIVE ALT.
CONSTRUCTED MARSH FILLCMF
CY CUBIC YARDS
ECD EARTHEN CONTAINMENT DIKE
MCA MARSH CREATION AREA
MEAN LOW WATER MLW
VERIFIED PIPELINE VP
SOIL BORINGSB
CSC CALCASIEU SHIP CHANNEL
RIVER MILERM
PERMANENT PIPELINE (CS-28-2) PP
WEST COVE CANALWCC
SABINE NATIONAL WILDLIFE REFUGE SNWR
RIGHT OF ENTRYROE
RIGHT OF WAYROW
MARSH NOURISHMENTMN
CONSTRUCTION RIGHT OF ENTRY (ROE) LIMIT
STAGING AREAS
SABINE NATIONAL WILDLIFE REFUGE BOUNDARY LIMIT
AND EXISTING ROW BOUNDARY
PERMANENT PIPELINE (CS-28-2) ALIGNMENT
* UNLESS OTHERWISE NOTED ON EACH SHEET
CHANNEL CENTERLINE
BOTTOM EDGE OF CUT (B.E.C.)
TANGENT LINE
PROPOSED PIPELINE
EXISTING PIPELINE
GAGE
OVERHEAD POWER LINE AND TRANSMISSION TOWER
P.I., P.C., AND P.T. LOCATION IDENTIFIER
GREEN BEACON/MARKER
RED BEACON/MARKER
NAVIGATION LIGHT
CDF AREAS AVAILABLE FOR DISPOSAL (OW2)
MARSH CREATION AREAS (BASEWORK) AND
MARSH NOURISHMENT AREAS (OW1)
(BASEWORK)
BENEFICAL USE BORROW AREA (CSC RM 5-17)
EXISTING STONE FORESHORE PROTECTION
MHW MEAN HIGH WATER
N.A.R. NATURAL ANGLE OF REPOSE
* UNLESS OTHERWISE NOTED ON EACH SHEET
H HORIZONTAL
DISPOSAL AREA SURVEY TRANSECT
R E
V
IS
E S
U R
V E
Y D
A T
E
A
U G
M .M
.G
C H
A N
G E
C D
F -1
A
T O
C D
F -1
B
M .M
.G
A U
G
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
A N
S I
D
M .M
.G
E D
-2 -0
A L
IC
E
P
K E
R L
A .P
.K
M .J
.T
W P
B
A
A U
G
A U
G U
S T
W
P
C A
X X
X
H -1
-4
C A
L C
A S
IE
U
A N
D C
A M
E R
O N
P A
R
IS
H E
S L
A
S A
B
IN
E C
Y C
L E
M
A R
S H
C R
E A
T
IO
N A
R E
A S
IN
C
L U
D
IN
G B
E N
E F
IC
IA
L U
S E
W
IT
H
IN
C W
P P
R A
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G F
Y M
IL
E
S
.0 T
O
.0
C A
L C
A S
IE
U
R
IV
E R
A N
D P
A S
S L
A
| IDCode: J |
| Page: 1 |
| Pages: 20 |
| AmendNo: 0001 |
| EffDate: 02 SEP 2026 |
| ReqNo: |
| ProjNo: ED-23-024 |
| IssCode: W912P8 |
| AdmCode: |
| IssuedBy: W07V ENDIST N ORLEANS |
KO CONTRACTING DIVISION, 7400 LEAKE AVE
NEW ORLEANS, LA 70118-3651
UNITED STATES
EVAN WOITHA, EMAIL: EVAN.G.WOITHA@USACE.ARMY.MIL TELEPHONE: (504) 862-1214
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912P826BA023 |
| SolDate: 17 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The solicitation has been amended as followed: |
1. Incorporate the following changes to the bid schedule, plans, specs, and drawings.
NOTE: Please be sure to acknowledge all amendments on the SF1442 form as part of your bid submission.
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .