This document is an Invitation for Bid (IFB) for the U.S. Army Corps of Engineers New Orleans District, soliciting bids for the Calcasieu River and Pass Dredged Material Management Plan (DMMP) CDF-H Degrading and Dike Construction project in Cameron Parish, Louisiana. The small business set-aside contract (NAICS code 237990) has an estimated construction value between $10-25 million and involves rehabilitating an upland confined disposal facility (CDF-H) along the Calcasieu Ship Channel, including site ditching, excavation, and constructing earthen retention dikes.
Key procurement details include a bid opening date of 14 August 2025, with bidders required to register in the System for Award Management (SAM). The project's base work includes seven line items such as mobilization, excavation, dike construction, spill box relocation, clearing, ditching, and geotextile installation. An optional line item for bird nesting prevention is also included. Bidders must provide unit prices for all items, and the contract will be awarded as a whole to a single bidder. Performance and payment bonds are required, and physical work cannot commence until submittals like the Accident Prevention Program and Contractor Quality Control Plan are approved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract W912P825BA021.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 0001 - Specs CDF-H.pdf | ||
| Attachment 0002 - 250611 CDF-H Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 23-022
IFB NO. W912P825BA021
US Army Corps of Engineers New Orleans District
Calcasieu River and Pass Dredged Material Management Plan (DMMP)
CDF-H Degrading and Dike Construction
Cameron Parish, LA
Construction Solicitation And Specifications
15 July 2025 r:'l"l':'I
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LA 70118-3651
ED 23-022
15 July 2025
REPLY TO
ATTENTION OF
SOLICITATION: W912P825BA021
FOR: Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H Degrading and Dike Construction, Cameron Parish, LA
TO OPEN: 14 August 2025
Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. As of April 4, 2022, the Federal Government has stopped using the DUNS Number as a unique identifier for entities and switched to a Unique Entity ID generated by SAM.gov. In addition, entities with DUNS Numbers but no SAM.gov registration have been able to get Unique Entity IDs without registering in SAM.gov since October 2021.
NOTE: The DUNS Number is no longer used in SAM.gov, eSRS, FSRS, FPDS, CPARS, or FAPIIS.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of rehabilitation of selected upland confined disposal facility H (CDF-H) along the Calcasieu Ship Channel which entails: ditching of the site, excavation of the disposal area to the required grade and placement of material for the construction of earthen retention dikes to the required DMMP standards; all as shown on the drawings. The work also includes surveying and all operations incidental thereto.
CAUTION TO BIDDERS: In delivery of hand-carried bids, bidders are cautioned to allow sufficient time for delays which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid opening for various lengths of time and for visitor background checks by MVN security when entering the installation at place of bid opening. Such delays DO NOT permit acceptance or consideration of late bids.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED 15 MARCH 2024.
ATTENTION: Contractors must complete, and submit with their bid, the provisions located in Section 00 45 00. A bidder may also submit, in lieu of the completed Section 00 45 00, a complete copy of their Online Representations and Certifications from SAM.gov with an expiration date on or after the date of award.
ALL INQUIRIES REGARDING THIS SOLICITATION
SHOULD BE MADE TO THE FOLLOWING:
TAYLOR BRANDON
CONTRACT SPECIALIST
U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
E-MAIL: TAYLOR.H.BRANDON@USACE.ARMY.MIL
PHONE: (504) 862-1009
COLLECT CALLS NOT ACCEPTED
NOTE: FOR THE MOST PROMPT RESPONSE, PLEASE SEND ALL QUESTIONS VIA E-MAIL.
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
Created On:
10 Jul 2025, 07:12 AM Central Daylight Time
I
I
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
I
► I □ □ I
Section 00 01 15 - List of Drawing Sheets
Identifier Attachment Name Attachment Description Reference
Identifier Date Line Item
# Of Pages
Provided Under Separate Cover
0001 Specification 12 Jun
0002 Plans 12 Jun
W912P825BA021
Attachment 0001 - Specs CDF-H.pdf
Attachment 0002 -
250611 CDF-H
Plans.pdf
SECTION 00010 – BIDDING SCHEDULE
Dredged Material Management Plan (DMMP), CDF-H Degrading and Dike Construction Cameron Parish, LA (ED-23-022)
00010-3 ED 23-022
Award will be made as a whole to one bidder.
NOTE 1: The unit “Job” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.
NOTE 2: Bidders shall furnish unit prices for all items listed on schedule of bid items, which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE
EXTENDED ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, HIS BID WILL BE DECLARED
NON-RESPONSIVE.
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF
Item
Description
Estimated Quantity
Unit
Unit Price
Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 01 JOB
0002 Excavation 520,000 CY
0003 Dike Construction 360,000 CY
0004 Spill Box Relocation 01 JOB
0005 Clearing and Grubbing 32.3 AC
0006 Ditching and Draining 01 JOB
0007 Separator Geotextile 82,500 SY
OPTION WORK
Bird Nesting Prevention and Avoidance Measures – OW
90 DAYS
TOTAL BASE WORK:
TOTAL OPTION WORK $
TOTAL WORK: $
I
SECTION 00010 – BIDDING SCHEDULE
Dredged Material Management Plan (DMMP)
CDF-H Degrading and Dike Construction Cameron Parish, LA (ED-23-022)
00010-4 ED 23-022
1442 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within 24 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2).
NOTE 5: OPTIONAL WORK Item 0008 “Bird Nesting Prevention and Avoidance Measures - OW” will occur concurrently with contract work, if Item 0008 is awarded. The successful bidder is advised that the contract time required for Bird Nesting Prevention and Avoidance Measures is included in the performance period allowed for completion of the BASE WORK and any awarded OPTIONAL WORK and will not be adjusted for exercise of Bird Nesting Prevention and Avoidance Measures.
NOTE 6: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
(End of Clause)
Bid Bond Date Bond Executed (Must Not Be Later 0MB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027
Principal (Legal Name And Business Address) Type Of Organization ("X" One) D Individual D Partnership □Joint Venture
D Corporation D Other (Specify)
State Of Incorporation
Surety(ies) (Name And Business Address)
Penal Sum Of Bond Bid Identification Percent Amount Not To Exceed Bid Date Invitation Number Of Bid Million(s) Thousand(s) Hundred(s) Cents Price For (Construction, Supplies Or Services)
B Obligation:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
Conditions:
The Principal has submitted the bid identified above.
Therefore:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
Authorized For Local Reproduction Previous Edition Is Not Usable
STANDARD FORM 24 (REV. 10/2023)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
Witness:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
Principal
1. 2. 3.
Signature(s) (Seal) (Seal) (Seal) Corporate
Name(s) 1. 2. 3. Seal And Title(s) (Typed)
Individual Surety(ies)
Signature(s) 1. (Seal) 2• (Seal)
Name(s) 1. 2.
(Typed)
Corporate Surety(ies)
Name And State Of Incorporation Liability Limit ($)
Address
~ Signature(s) 1. 2. Corporate e 3eal ::::, Name(s) 1. 2.
t/J
And Title( s) (Typed)
Name And State Of Incorporation Liability Limit ($) m Address
~ Signature(s) 1. 2. Corporate e :eal ::::, Name(s) 1. 2.
t/J
And Title( s) (Typed)
Name And State Of Incorporation Liability Limit ($)
Address f Signature(s) 1. 2. Corporate 8eal
::::, Name(s) 1. 2.
t/J
And Title( s) (Typed)
Name And State Of Incorporation Liability Limit ($)
C Address f Signature(s) 1. 2. Corporate
1. 2. 8eal ::::, Name(s) t/J
And Title( s) (Typed)
STANDARD FORM 24 (REV. 10/2023) PAGE 2
Name And State Of Incorporation Liability Limit ($) w Address
~ Signature(s) 1. 2. Corporate ! Seal j Name(s) 1. 2.
ti)
And Title( s) (Typed)
Name And State Of Incorporation Liability Limit ($)
LL
Address
~ Signature(s) 1. 2. Corporate ! Seal j Name(s) 1. 2.
ti)
And Title( s) (Typed)
Name And State Of Incorporation Liability Limit ($)
C) Address
~ Signature(s) 1. 2. Corporate ! Seal j Name(s) 1. 2.
ti) And Title( s) (Typed)
Instructions
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability
Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
STANDARD FORM 24 (REV. 10/2023) PAGE 3
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated
"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New
Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and
"offeror."
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §
3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (0MB) control number. The 0MB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General
Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street, NW, Washington, DC
20405.
STANDARD FORM 24 (REV. 10/2023) PAGE 4
Section 00 21 00 - Instructions
FAR Clauses Incorporated by Reference
Number
52.204-7 52.204-16 52.204-22 52.214-3 52.214-4 52.214-5 52.214-6 52.214-7 52.214-12 52.214-34 52.214-35 52.222-5 52.225-12
Title
System for Award Management.
Commercial and Government Entity Code Reporting.
Alternative Line Item Proposal.
Amendments to Invitations for Bids.
False Statements in Bids.
Submission of Bids.
Explanation to Prospective Bidders.
Late Submissions, Modifications, and Withdrawals of Bids.
Preparation of Bids.
Submission of Offers in the English Language.
Submission of Offers in U.S. Currency.
Construction Wage Rate Requirements-Secondary Site of the Work.
Notice of Buy American Requirement-Construction Materials Under Trade Agreements.
DFARS Clauses Incorporated by Reference
Number Title
252.204-7019 Notice ofNlST SP 800-171 DoD Assessment Requirements.
252.204-7024 Notice on the Use of the Supplier Performance Risk System.
252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.
FAR Clauses Incorporated by Full Text
52.216-1 Type of Contract.
Type of Contract (Apr 1984)
Effective Date
Nov2024 Aug2020 Jan2017 Dec2016 Apr 1984 Dec2016 Apr 1984 Nov 1999 Apr 1984 Apr 1991 Apr 1991 May 2014 May2014
Effective Date
Nov2023 Mar2023 Jan 2023
Alternate/ Deviation
Alternate/ Deviation
(Apr 1984)
The Government contemplates award of a firm-fixed-price contract resulting from this solicitation.(End of provision)
52.228-1 Bid Guarantee. (Sep 1996)
Bid Guarantee (Sept 1996)
Variation Effective Date
Variation Effective Date
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form ofa firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be twenty (20%) percent of the bid price or $3,000,000.00, whichever is less.
( d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
( e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
52.233-2 Service of Protest. (Sep 2006)
Service of Protest (Sept 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Christopher Nuccio, Contracting Officer, U.S. Army Corps of Engineers, ATTN: CEMVN-CTW, 7400 Leake Avenue, New Orleans, LA 70118-3651.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 Site Visit (Construction). (Feb 1995)
Site Visit (Construction) (Feb 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: TBA
Address: TBA
Telephone: TBA
(End of Provision)
52.252-1 Solicitation Provisions Incorporated by Reference.
Solicitation Provisions Incorporated by Reference (Feb 1998)
(Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https:/ /www.acguisition.gov/
(End of provision)
52.252-3 Alterations in Solicitation. (Apr 1984)
Alterations in Solicitation (Apr 1984)
Portions of this solicitation are altered as follows:
(End of clause)
52.252-5 Authorized Deviations in Provisions. (Nov2020)
Authorized Deviations in Provisions (Nov 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation ( 48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation ( 48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
DFARS Clauses Incorporated by Full Text
252.215-7008 Only One Offer. (Dec 2022)
ONLY ONE OFFER (DEC 2022)
(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to-
(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable (10 U.S.C. 3705) or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 3702 and FAR 15.403-3); and
(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1 (b )(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph ( c) of DF ARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.
(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DF ARS 225.870-4( c ), the Canadian Commercial Corporation shall obtain and provide the following:
(1) Profit rate or fee (as applicable).
(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price ( comparable to the analysis required at FAR 15 .404-1 ).
(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable. Such data may include the identical types of data as certified cost or pricing data, consistent with Table 15-2 of 15.408, but without the certification.
(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.
(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph ( c ), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
7/10/25, 7:27 AM SAM.gov
"General Decision Number: LA20250007 02/07/2025
State: Louisiana
Construction Type: Heavy Dredging
Counties: Louisiana Statewide.
DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE
MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(l).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022:
♦ Executive Order 14026 generally applies to the contract.
♦ The contractor must pay all covered workers at least $17.75 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.
I I I I
I I I I I I I I
-------------- ______________ I If the contract was awarded on ♦ Executive Order 13658 I or between January 1, 2015 and generally applies to the I January 29, 2022, and the contract. I contract is not renewed or ♦ The contractor must pay alll extended on or after January covered workers at least I 30, 2022: $13. 30 per hour ( or the I applicable wage rate listed!
on this wage determination, I if it is higher) for all I hours performing on that I contract in 2025. I
-------------- ______________ I
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number
Publication Date 02/07/2025
SULA1994-001 04/01/1994
https://sam.gov/wage-determination/LA20250007 /0 1/5
The following rates were revised pursuant to 29 CFR 1.6(c)(l) on 02/07/2025.
Rates Fringes
Derrick Operator ................. $ 16.85 **
Dozer Operator ................... $ 16.85 **
Dredge 16"" and Over Deckhand .................... $ 16.85 ** Dredge tender operator ...... $ 16.85 ** Fireman ..................... $ 16.85 ** First assistant engineer .... $ 16.85 ** Leverman .................... $ 16.85 ** Oiler ....................... $ 16.85 ** Second assistant engineer ... $ 16.85 ** Shoreman .................... $ 16.85 ** Third assistant engineer .... $ 16.85 ** Truck driver ................ $ 16.85 ** Welder ...................... $ 16.85 **
Dredge Under 16"" Deckhand .................... $ 16.85 ** Dredge tender operator ...... $ 16.85 ** Leverman .................... $ 16.85 ** Oiler ....................... $ 16.85 ** Welder ...................... $ 16.85 **
Hydraulic Dredging First cook .................. $ 16.85 ** Handyman .................... $ 16.85 ** Janitor, cabin person ....... $ 16.85 ** Second cook ................. $ 16.85 **
Marsh Buggy Dragline, Oiler ...... $ 16.85 **
Marsh Buggy Dragline, Operator ... $ 16.85 **
Self-Propelled Hopper Dredge, Drag Tender ...................... $ 22.55 8.02+a
FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
https://sam.gov/wage-determination/L.A20250007 /0 2/5
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than '"'SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 https://sam.gov/wage-determination/LA20250007 /0 3/5 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(l).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division https://sam.gov/wage-determination/L.A20250007 /0 4/5
7/10/25, 7:27 AM
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
SAM.gov
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requester considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION"
https://sam.gov/wage-determination/LA20250007 /0 5/5
Section 00 22 00 - Supplementary Instructions
Number Title
52.217-5 Evaluation of Options.
Effective Date
Jul 1990
Alternate/ Deviation
Variation Effective Date
Section 00 45 00 - Representations and Certifications
Number
52.204-24
52.209-7 52.209-13 52.229-12 52.236-28
Title
Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
Information Regarding Responsibility Matters.
Violation of Arms Control Treaties or Agreements-Certification.
Tax on Certain Foreign Procurements.
Preparation of Proposals-Construction.
DFARS Clauses Incorporated by Reference
Number
252.203-7005 252.204-7008
252.204-7017
252.225-7055
252.225-7057
Title
Representation Relating to Compensation of Former DoD Officials.
Compliance with Safeguarding Covered Defense Information Controls.
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation.
Representation Regarding Business Operations with the Maduro Regime.
Preaward Disclosure of Employment oflndividuals Who Work in the People's Republic of China.
252_225_ 7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region Representation.
FAR Clauses Incorporated by Full Text
Effective Date
Nov2021
Oct 2018 Nov2021 Feb 2021 Oct 1997
Effective Date
Sep 2022 Oct 2016
May2021
May2022
Aug2022
Jun2023
Alternate/ Deviation
Alternate/ Deviation
52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures. (Dec 2023)
Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (Dec 2023)
Variation Effective Date
Variation Effective Date
(a) Definitions. As used in this provision, Covered article, FASCSA order, Intelligence community, National security system, Reasonable inquiry, Sensitive compartmented information, Sensitive compartmented information system, and Source have the meaning provided in the clause 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition.
(b) Prohibition. Contractors are prohibited from providing or using as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the prohibition is set out in an applicable Federal Acquisition Supply Chain Security Act (F ASCSA) order, as described in paragraph (b)(l) of FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition.
( c) Procedures.
(1) The Offeror shall search for the phrase "FASCSA order" in the System for Award Management (SAM)( https://www.sam.gov) for any covered article, or any products or services produced or provided by a source, if there is an applicable F ASCSA order described in paragraph (b )(1) of FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition.
(2) The Offeror shall review the solicitation for any F ASCSA orders that are not in SAM, but are effective and do apply to the solicitation and resultant contract (see FAR 4.2303(c)(2)).
(3) F ASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
(d) Representation. By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and that the offeror does not propose to provide or use in response to this solicitation any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable F ASCSA order in effect on the date the solicitation was issued, except as waived by the solicitation, or as disclosed in paragraph ( e ).
( e) Disclosures. The purpose for this disclosure is so the Government may decide whether to issue a waiver. For any covered article, or any products or services produced or provided by a source, if the covered article or the source is subject to an applicable F ASCSA order, and the Offeror is unable to represent compliance, then the Offeror shall provide the following information as part of the offer:
(1) Name of the product or service provided to the Government;
(2) Name of the covered article or source subject to a FASCSA order;
(3) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied the covered article or the product or service to the Offeror;
(4) Brand;
(5) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);
(6) Item description;
(7) Reason why the applicable covered article or the product or service is being provided or used;
(f) Executive agency review of disclosures. The contracting officer will review disclosures provided in paragraph ( e) to determine if any waiver may be sought. A contracting officer may choose not to pursue a waiver for covered articles or sources otherwise subject to a F ASCSA order and may instead make an award to an offeror that does not require a waiver.
(End of provision)
DFARS Clauses Incorporated by Full Text
252.204-7007 Alternate A, Annual Representations and Certifications. (Oct 2024) Alternate A (Oct 2024)
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)
Substitute the following paragraphs (b), (d), and (e) for paragraphs (b) and (d) of the provision at FAR 52.204-8:
(b)(l) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (e) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation. and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph ( e) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph ( e) applies.
[ ] (ii) Paragraph ( e) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.
(d)(l) The following representations or certifications in the SAM database are applicable to this solicitation as indicated:
(i) 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation. Applies to all solicitations.
(ii) 252.216-7008, Economic Price Adjustment-Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.
(iii) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.
(iv) 252.225-7049, Prohibition on Acquisition of Certain Foreign Commercial Satellite Services-Representations. Applies to solicitations for the acquisition of commercial satellite services.
(v) 252.225-7050, Disclosure of Ownership or Control by the Government ofa Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.
(vi) 252.229-7012, Tax Exemptions (Italy)-Representation. Applies to solicitations and contracts when contract performance will be in Italy.
(vii) 252.229-7013, Tax Exemptions (Spain)-Representation. Applies to solicitations and contracts when contract performance will be in Spain.
(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.]
[ ](i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.
[ ](ii) 252.225-7000, Buy American-Balance of Payments Program Certificate.
[ ](iii) 252.225-7020, Trade Agreements Certificate.
[ ] Use with Alternate I.
[ ](iv) 252.225-7031, Secondary Arab Boycott of Israel.
[ ](v) 252.225-7035, Buy American-Free Trade Agreements-Balance of Payments Program Certificate.
[ ] Use with Alternate I.
[ ] Use with Alternate II.
[ ] Use with Alternate III.
[ ] Use with Alternate IV.
[ ] Use with Alternate V.
[ ](vi) 252.226-7002, Representation for Demonstration Project for Contractors Employing Persons with Disabilities.
[ ](vii) 252.232-7015, Performance-Based Payments-Representation.
( e) The Offeror has completed the annual representations and certifications electronically via the SAM website at https://www.sam.gov. After reviewing the SAM database information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8( c) and paragraph ( d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [Offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
F AR/DF ARS Provision# Title Date Change
Any changes provided by the Offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.
Section 00 70 00 - Conditions of the Contract
Number
52.214-27
52.214-28
52.222-3 52.222-7 52.232-27 52.232-39 52.233-1 52.233-3 52.233-4 52.236-2 52.236-3 52.236-5 52.236-6 52.236-7 52.236-8
52.236-9
52.236-10 52.236-11 52.236-12 52.236-13 52.236-15 52.236-16 52.236-17 52.236-21
52.240-1
52.242-13 52.242-14 52.243-4 52.249-2 52.249-10
Title
Price Reduction for Defective Certified Cost or Pricing Data -- Modifications - Sealed Bidding (DEVIATION 2022-00001) Subcontractor Certified Cost or Pricing Data -- Modifications -- Sealed Bidding
(DEVIATION 2022-00001)
Convict Labor.
Withholding of Funds.
Prompt Payment for Construction Contracts.
Unenforceability of Unauthorized Obligations.
Disputes.
Protest after Award.
Applicable Law for Breach of Contract Claim.
Differing Site Conditions.
Site Investigation and Conditions Affecting the Work.
Material and Workmanship.
Superintendence by the Contractor.
Permits and Responsibilities.
Other Contracts.
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
Operations and Storage Areas.
Use and Possession Prior to Completion.
Cleaning Up.
Accident Prevention.
Schedules for Construction Contracts.
Quantity Surveys. (Alternate I) Layout of Work.
Specifications and Drawings for Construction.
Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.
Bankruptcy.
Suspension of Work.
Changes.
Termination for Convenience of the Government (Fixed-Price).
Default (Fixed-Price Construction).
DFARS Clauses Incorporated by Reference
Number Title
252.232-7004 DoD Progress Payment Rates (DEVIATION 2020-00010)
FAR Clauses Incorporated by Full Text
Effective Date
Jun2020
Jun2020
Jun2003 May 2014 Jan 2017 Jun 2013 May 2014 Aug 1996 Oct2004 Apr1984 Apr1984 Apr1984 Apr1984 Nov 1991 Apr1984
Apr1984
Apr1984 Apr1984 Apr1984 Nov 1991 Apr1984 Apr1984 Apr1984 Feb 1997
Nov2024
Jul 1995 Apr1984 Jun2007 Apr2012 Apr1984
Effective Date
Oct 2014
Alternate/ Deviation
Variation Effective Date
Deviation 2022-00001 Oct 2021
Deviation 2022-00001 Oct 2021
Alternate I
Alternate/ Deviation
Deviation 2020-00010
Apr1984
Variation Effective Date Mar2020
52.204-8 Annual Representations and Certifications. (DEVIATION 2025-00003 and 2025-00004) (Jan 2025) Deviation 2025-00004 (Mar…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .