About this file

This document is an Abstract of Offers for a federal contract solicitation (W912P825BA021) for the Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H Degrading and Dike Construction project in Cameron Parish, Louisiana. The government estimate is $14,860,000.00, with eight contractors submitting bids ranging from $9,850,825.00 to $20,319,504.70. The project involves multiple line items including mobilization and demobilization, excavation, dike construction, spill box relocation, clearing and grubbing, ditching and draining, separator geotextile installation, and bird nesting prevention measures.

The bidding contractors include Maverick Constructors (Louisiana), Precision Construction (Louisiana), Justin J. Reeves (Louisiana), RLB Contracting (Texas), Onshore Materials (Louisiana), Curranco LLC (Louisiana), Venergy Group (Florida), and Genesis 360 LLC (Louisiana). The solicitation was issued by the US Army Engineer District in New Orleans, with bid security requirements of 20% for most contractors. The project involves significant earthwork, with 520,000 cubic yards of excavation and 360,000 cubic yards of dike construction planned. The bid opening and contract dates are in July and August 2025, indicating a near-future procurement timeline.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
W912P825BA021.pdf PDF
Attachment 0002 - 250611 CDF-H Plans.pdf PDF
Attachment 0001 - Specs CDF-H.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Maverick Constructors, LLC $9,850,000.00 6. Curranco LLC $17,457,050.00 3091 Hwy 104 2126 Peters Rd.

Opelousas, LA 70570 Harvey, LA

2. Precision Construction, LLC $10,580,256.74 7. Venergy Group LLC $17,681,748.80 401 Sonnier Road 3130 Seminole Road Carenco, LA 70520 Fort Pierce, FL 34951

3. Justin J. Reeves, LLC $10,652,418.01 8. Genesis 360 LLC $19,604,350.00 7836 Park Ave 8352 Bluebonnet Blvd Houma, LA Baton Rouge, LA 70810

4. RLB Contracting, Inc $13,384,750.00 PO Box 1739 Port Lavaca, TX 77979

5. Onshore Materials, LLC $13,765,000.00 127 Lincoln Lane Thibodaux, LA 70301

IGE Amount: $14,860,000.00

Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H Degrading and Dike Construction, Cameron Parish, LA

Solicitation Number: W912P825BA021

2. DATE ISSUED 3. DATE OPENED

15-Jul-25

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Mobilization and Demobilization

1 JOB $ 1,062,835.00 $ 1,062,835.00 $ 1,000,000.00 $ 1,000,000.00 $ 919,523.94 $ 919,523.94 $ 375,899.01 $ 375,899.01

0002 Excavation 520,000 CY $ 16.65 $ 8,658,000.00 $ 5.90 $ 3,068,000.00 $ 7.09 $ 3,686,800.00 $ 9.92 $ 5,158,400.00

0003 Dike Construction 360,000 CY $ 6.00 $ 2,160,000.00 $ 9.45 $ 3,402,000.00 $ 10.62 $ 3,823,200.00 $ 10.69 $ 3,848,400.00

0004 Spill Box Relocation 1 JOB $ 1,650,000.00 $ 1,650,000.00 $ 681,465.00 $ 681,465.00 $ 701,907.00 $ 701,907.00 $ 467,981.23 $ 467,981.23

0005 Clearing and Grubbing 32.3 AC $ 15,600.00 $ 503,880.00 $ 2,750.00 $ 88,825.00 $ 7,356.00 $ 237,598.80 $ 6,289.00 $ 203,134.70

0006 Ditching and Draining 1 JOB $ 117,000.00 $ 117,000.00 $ 1,160,460.00 $ 1,160,460.00 $ 787,552.00 $ 787,552.00 $ 268,205.00 $ 268,205.00

0007 Separator Geotextile 82,500 SY $ 5.93 $ 489,225.00 $ 4.85 $ 400,125.00 $ 4.59 $ 378,675.00 $ 3.76 $ 310,200.00

Bird Nesting Prevention and

Avoidance Measures –

OW

90 DAYS $ 2,434.00 $ 219,060.00 $ 555.00 $ 49,950.00 $ 500.00 $ 45,000.00 $ 224.10 $ 20,169.00

$ 14,860,000.00 $ 9,850,825.00 $ 10,580,256.74 $ 10,652,388.94

NOTE: Estimated Amount Fields highlighted in yellow are corrected tabulations based on Quantity and Unit Price proposed.

14-Aug-25

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

6. NUMBER OF AMENDMENTS ISSUED

7400 Leake Avenue

New Orleans, LA 70118

A. HIRED LABOR A. OFFEROR: MAVERICK CONSTRUCTORS, LLC B. OFFEROR: PRECISION CONSTRUCTION, LLC

Taylor Brandon

Contract Specialist

Karen Hargrave

Contracting Officer

TOTAL:

Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H

Degrading and Dike Construction, Cameron Parish, LA

7B. DESCRIPTION OF

OFFERED ITEM

B. BID SECURITY (Type and amount): 20%

C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount): 20%

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1

ABSTRACT OF OFFERS

1. SOLICITATION NUMBER W912P825BA021

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

SIGNATURE

4. ISSUING OFFICE

US ARMY ENGINEER DISTRICT, NOD

B. OFFEROR: JUSTIN J. REEVES, LLC

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

14-AUG-2025

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Mobilization and Demobilization

1 JOB $ 1,062,835.00 $ 1,062,835.00 $ 1,800,000.00 $ 1,800,000.00 $ 1,310,000.00 $ 1,310,000.00 $ 3,200,000.00 $ 3,200,000.00

0002 Excavation 520,000 CY $ 16.65 $ 8,658,000.00 $ 11.00 $ 5,720,000.00 $ 10.50 $ 5,460,000.00 $ 13.00 $ 6,760,000.00

0003 Dike Construction 360,000 CY $ 6.00 $ 2,160,000.00 $ 7.50 $ 2,700,000.00 $ 12.00 $ 4,320,000.00 $ 14.50 $ 5,220,000.00

Spill Box

Relocation 1 JOB $ 1,650,000.00 $ 1,650,000.00 $ 750,000.00 $ 750,000.00 $ 900,000.00 $ 900,000.00 $ 300,000.00 $ 300,000.00

Clearing and

Grubbing

32.3 AC $ 15,600.00 $ 503,880.00 $ 2,500.00 $ 80,750.00 $ 25,000.00 $ 807,500.00 $ 26,000.00 $ 839,800.00

Ditching and

Draining 1 JOB $ 117,000.00 $ 117,000.00 $ 1,800,000.00 $ 1,800,000.00 $ 300,000.00 $ 300,000.00 $ 550,000.00 $ 550,000.00

Separator Geotextile

82,500 SY $ 5.93 $ 489,225.00 $ 3.20 $ 264,000.00 $ 7.00 $ 577,500.00 $ 4.50 $ 371,250.00

Bird Nesting Prevention and

Avoidance Measures – OW

90 DAYS $ 2,434.00 $ 219,060.00 $ 3,000.00 $ 270,000.00 $ 1,000.00 $ 90,000.00 $ 2,400.00 $ 216,000.00

$ 14,860,000.00 $ 13,384,750.00 $ 13,765,000.00 $ 17,457,050.00

7B. DESCRIPTION

OF OFFERED ITEM

TOTAL:

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1

B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount) 5%

(Without Profit)

6. NUMBER OF AMENDMENTS

ISSUED

C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES

(Including Profit)

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Calcasieu River and Pass, Dredged Material

Management Plan (DMMP), CDF-H Degrading and Dike

Construction, Cameron Parish, LA

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR A. OFFEROR: RLB CONTRACTING, INC B. OFFEROR: ONSHORE MATERIALS, LLC B. OFFEROR: CURRANCO LLC

B. REASONABLE CONTRACT

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Mobilization and Demobilization

1 JOB $ 1,062,835.00 $ 1,062,835.00 $ 1,512,695.00 $ 1,512,695.00 $ 2,240,582.00 $ 2,240,582.00

0002 Excavation 520,000 CY $ 16.65 $ 8,658,000.00 $ 15.78 $ 8,205,600.00 $ 22.50 $ 11,700,000.00

0003 Dike Construction 360,000 CY $ 6.00 $ 2,160,000.00 $ 15.10 $ 5,436,000.00 $ 11.00 $ 3,960,000.00

Spill Box

Relocation 1 JOB $ 1,650,000.00 $ 1,650,000.00 $ 324,000.00 $ 324,000.00 $ 445,500.00 $ 445,500.00

Clearing and

Grubbing

32.3 AC $ 15,600.00 $ 503,880.00 $ 23,471.48 $ 758,128.80 $ 13,849.00 $ 447,322.70

Ditching and

Draining 1 JOB $ 117,000.00 $ 117,000.00 $ 1,080,000.00 $ 1,080,000.00 $ 330,000.00 $ 330,000.00

Separator Geotextile

82,500 SY $ 5.93 $ 489,225.00 $ 3.25 $ 268,125.00 $ 4.68 $ 386,100.00

Bird Nesting Prevention and

Avoidance Measures – OW

90 DAYS $ 2,434.00 $ 219,060.00 $ 1,080.00 $ 97,200.00 $ 9,000.00 $ 810,000.00

$ 14,860,000.00 $ 17,681,748.80 $ 20,319,504.70

NOTE: Estimated Amount Fields highlighted in yellow are corrected tabulations based on Quantity and Unit Price proposed.

7B. DESCRIPTION OF

OFFERED ITEM

TOTAL:

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1

6. NUMBER OF AMENDMENTS

ISSUED

C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED:

(Including Profit)

A. HIRED LABOR A. OFFEROR: VENERGY GROUP LLC B. OFFEROR: GENESIS 360 LLC B. OFFEROR:

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount)

(Without Profit)

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Calcasieu River and Pass, Dredged Material

Management Plan (DMMP), CDF-H Degrading and Dike

Construction, Cameron Parish, LA

(Check A, B or C and complete D, E, and F) NO. 7 NO. 8 NO. 9

2025-08-14T14:33:55-0500
HARGRAVE.KAREN.DENISE.1019731959

File details come from the government source that posted it. Updated .