Bid Abstract W912P825BA021.pdf
PDF 727 KB Posted
- Solicitation number
- W912P825BA021
About this file
This document is an Abstract of Offers for a federal contract solicitation (W912P825BA021) for the Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H Degrading and Dike Construction project in Cameron Parish, Louisiana. The government estimate is $14,860,000.00, with eight contractors submitting bids ranging from $9,850,825.00 to $20,319,504.70. The project involves multiple line items including mobilization and demobilization, excavation, dike construction, spill box relocation, clearing and grubbing, ditching and draining, separator geotextile installation, and bird nesting prevention measures.
The bidding contractors include Maverick Constructors (Louisiana), Precision Construction (Louisiana), Justin J. Reeves (Louisiana), RLB Contracting (Texas), Onshore Materials (Louisiana), Curranco LLC (Louisiana), Venergy Group (Florida), and Genesis 360 LLC (Louisiana). The solicitation was issued by the US Army Engineer District in New Orleans, with bid security requirements of 20% for most contractors. The project involves significant earthwork, with 520,000 cubic yards of excavation and 360,000 cubic yards of dike construction planned. The bid opening and contract dates are in July and August 2025, indicating a near-future procurement timeline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| W912P825BA021.pdf | ||
| Attachment 0002 - 250611 CDF-H Plans.pdf | ||
| Attachment 0001 - Specs CDF-H.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Maverick Constructors, LLC $9,850,000.00 6. Curranco LLC $17,457,050.00 3091 Hwy 104 2126 Peters Rd.
Opelousas, LA 70570 Harvey, LA
2. Precision Construction, LLC $10,580,256.74 7. Venergy Group LLC $17,681,748.80 401 Sonnier Road 3130 Seminole Road Carenco, LA 70520 Fort Pierce, FL 34951
3. Justin J. Reeves, LLC $10,652,418.01 8. Genesis 360 LLC $19,604,350.00 7836 Park Ave 8352 Bluebonnet Blvd Houma, LA Baton Rouge, LA 70810
4. RLB Contracting, Inc $13,384,750.00 PO Box 1739 Port Lavaca, TX 77979
5. Onshore Materials, LLC $13,765,000.00 127 Lincoln Lane Thibodaux, LA 70301
IGE Amount: $14,860,000.00
Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H Degrading and Dike Construction, Cameron Parish, LA
Solicitation Number: W912P825BA021
2. DATE ISSUED 3. DATE OPENED
15-Jul-25
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,062,835.00 $ 1,062,835.00 $ 1,000,000.00 $ 1,000,000.00 $ 919,523.94 $ 919,523.94 $ 375,899.01 $ 375,899.01
0002 Excavation 520,000 CY $ 16.65 $ 8,658,000.00 $ 5.90 $ 3,068,000.00 $ 7.09 $ 3,686,800.00 $ 9.92 $ 5,158,400.00
0003 Dike Construction 360,000 CY $ 6.00 $ 2,160,000.00 $ 9.45 $ 3,402,000.00 $ 10.62 $ 3,823,200.00 $ 10.69 $ 3,848,400.00
0004 Spill Box Relocation 1 JOB $ 1,650,000.00 $ 1,650,000.00 $ 681,465.00 $ 681,465.00 $ 701,907.00 $ 701,907.00 $ 467,981.23 $ 467,981.23
0005 Clearing and Grubbing 32.3 AC $ 15,600.00 $ 503,880.00 $ 2,750.00 $ 88,825.00 $ 7,356.00 $ 237,598.80 $ 6,289.00 $ 203,134.70
0006 Ditching and Draining 1 JOB $ 117,000.00 $ 117,000.00 $ 1,160,460.00 $ 1,160,460.00 $ 787,552.00 $ 787,552.00 $ 268,205.00 $ 268,205.00
0007 Separator Geotextile 82,500 SY $ 5.93 $ 489,225.00 $ 4.85 $ 400,125.00 $ 4.59 $ 378,675.00 $ 3.76 $ 310,200.00
Bird Nesting Prevention and
Avoidance Measures –
OW
90 DAYS $ 2,434.00 $ 219,060.00 $ 555.00 $ 49,950.00 $ 500.00 $ 45,000.00 $ 224.10 $ 20,169.00
$ 14,860,000.00 $ 9,850,825.00 $ 10,580,256.74 $ 10,652,388.94
NOTE: Estimated Amount Fields highlighted in yellow are corrected tabulations based on Quantity and Unit Price proposed.
14-Aug-25
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR: MAVERICK CONSTRUCTORS, LLC B. OFFEROR: PRECISION CONSTRUCTION, LLC
Taylor Brandon
Contract Specialist
Karen Hargrave
Contracting Officer
TOTAL:
Calcasieu River and Pass, Dredged Material Management Plan (DMMP), CDF-H
Degrading and Dike Construction, Cameron Parish, LA
7B. DESCRIPTION OF
OFFERED ITEM
B. BID SECURITY (Type and amount): 20%
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount): 20%
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
ABSTRACT OF OFFERS
1. SOLICITATION NUMBER W912P825BA021
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
B. OFFEROR: JUSTIN J. REEVES, LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
14-AUG-2025
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,062,835.00 $ 1,062,835.00 $ 1,800,000.00 $ 1,800,000.00 $ 1,310,000.00 $ 1,310,000.00 $ 3,200,000.00 $ 3,200,000.00
0002 Excavation 520,000 CY $ 16.65 $ 8,658,000.00 $ 11.00 $ 5,720,000.00 $ 10.50 $ 5,460,000.00 $ 13.00 $ 6,760,000.00
0003 Dike Construction 360,000 CY $ 6.00 $ 2,160,000.00 $ 7.50 $ 2,700,000.00 $ 12.00 $ 4,320,000.00 $ 14.50 $ 5,220,000.00
Spill Box
Relocation 1 JOB $ 1,650,000.00 $ 1,650,000.00 $ 750,000.00 $ 750,000.00 $ 900,000.00 $ 900,000.00 $ 300,000.00 $ 300,000.00
Clearing and
Grubbing
32.3 AC $ 15,600.00 $ 503,880.00 $ 2,500.00 $ 80,750.00 $ 25,000.00 $ 807,500.00 $ 26,000.00 $ 839,800.00
Ditching and
Draining 1 JOB $ 117,000.00 $ 117,000.00 $ 1,800,000.00 $ 1,800,000.00 $ 300,000.00 $ 300,000.00 $ 550,000.00 $ 550,000.00
Separator Geotextile
82,500 SY $ 5.93 $ 489,225.00 $ 3.20 $ 264,000.00 $ 7.00 $ 577,500.00 $ 4.50 $ 371,250.00
Bird Nesting Prevention and
Avoidance Measures – OW
90 DAYS $ 2,434.00 $ 219,060.00 $ 3,000.00 $ 270,000.00 $ 1,000.00 $ 90,000.00 $ 2,400.00 $ 216,000.00
$ 14,860,000.00 $ 13,384,750.00 $ 13,765,000.00 $ 17,457,050.00
7B. DESCRIPTION
OF OFFERED ITEM
TOTAL:
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount) 5%
(Without Profit)
6. NUMBER OF AMENDMENTS
ISSUED
C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES
(Including Profit)
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calcasieu River and Pass, Dredged Material
Management Plan (DMMP), CDF-H Degrading and Dike
Construction, Cameron Parish, LA
(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6
A. HIRED LABOR A. OFFEROR: RLB CONTRACTING, INC B. OFFEROR: ONSHORE MATERIALS, LLC B. OFFEROR: CURRANCO LLC
B. REASONABLE CONTRACT
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,062,835.00 $ 1,062,835.00 $ 1,512,695.00 $ 1,512,695.00 $ 2,240,582.00 $ 2,240,582.00
0002 Excavation 520,000 CY $ 16.65 $ 8,658,000.00 $ 15.78 $ 8,205,600.00 $ 22.50 $ 11,700,000.00
0003 Dike Construction 360,000 CY $ 6.00 $ 2,160,000.00 $ 15.10 $ 5,436,000.00 $ 11.00 $ 3,960,000.00
Spill Box
Relocation 1 JOB $ 1,650,000.00 $ 1,650,000.00 $ 324,000.00 $ 324,000.00 $ 445,500.00 $ 445,500.00
Clearing and
Grubbing
32.3 AC $ 15,600.00 $ 503,880.00 $ 23,471.48 $ 758,128.80 $ 13,849.00 $ 447,322.70
Ditching and
Draining 1 JOB $ 117,000.00 $ 117,000.00 $ 1,080,000.00 $ 1,080,000.00 $ 330,000.00 $ 330,000.00
Separator Geotextile
82,500 SY $ 5.93 $ 489,225.00 $ 3.25 $ 268,125.00 $ 4.68 $ 386,100.00
Bird Nesting Prevention and
Avoidance Measures – OW
90 DAYS $ 2,434.00 $ 219,060.00 $ 1,080.00 $ 97,200.00 $ 9,000.00 $ 810,000.00
$ 14,860,000.00 $ 17,681,748.80 $ 20,319,504.70
NOTE: Estimated Amount Fields highlighted in yellow are corrected tabulations based on Quantity and Unit Price proposed.
7B. DESCRIPTION OF
OFFERED ITEM
TOTAL:
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
6. NUMBER OF AMENDMENTS
ISSUED
C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED:
(Including Profit)
A. HIRED LABOR A. OFFEROR: VENERGY GROUP LLC B. OFFEROR: GENESIS 360 LLC B. OFFEROR:
B. REASONABLE CONTRACT B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount): 20% B. BID SECURITY (Type and amount)
(Without Profit)
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calcasieu River and Pass, Dredged Material
Management Plan (DMMP), CDF-H Degrading and Dike
Construction, Cameron Parish, LA
(Check A, B or C and complete D, E, and F) NO. 7 NO. 8 NO. 9
| 2025-08-14T14:33:55-0500 | |
| HARGRAVE.KAREN.DENISE.1019731959 |