This file contains detailed engineering plans and technical drawings for the Comite River Diversion Project in East Baton Rouge Parish, Louisiana, prepared by the U.S. Army Corps of Engineers New Orleans District. The project involves excavating a diversion channel, reshaping the existing Comite River, constructing a north tributary with riprap and bedding material, installing reinforced concrete pipe headwalls, and building access roads. The project scope includes extensive earthwork, with cross-section drawings showing excavation and fill requirements, side slope specifications ranging from 1V:3H to 1V:4H, and precise elevation details.

The project's federal contract opportunity indicates a construction budget between $25 million and $100 million, with the solicitation (W912P825B0037) available exclusively on the System of Award Management (SAM) website. Contractors must be registered in SAM to download the solicitation and bid. Key technical elements include constructing concrete diversion structures, driving steel H-piles, semi-compacted fill placement, drainage ditch excavation, asphaltic pavement installation, and site grading. The project area spans multiple parcels east and west of Highway 67, with temporary construction easements and specific utility relocation considerations, including interactions with existing electrical transmission lines, pipelines, and telecommunications infrastructure.

View the file

Other files

File Type Posted
COMITE RIVER DIVERSION PROJECT BID Abstract.pdf PDF
Amendment 0007.pdf PDF
Am0006_Comite River Diversion Structure_Revised and New-Drawings.pdf.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 .pdf PDF
Admendment 0002.pdf PDF
Amendment 0001.pdf PDF
Comite River Diversion Structure plans 44-102.pdf PDF
A21-W912P825B0037.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S T A 3 1 0 + 1 6 . 5 5 T H R U 3 0 9 + 1 7 . 4 9

1 5 F T B O T T O MS I D E S L O P E S 1 V : 3 H , T O 1 V : 3 . 2 5 H

T R A N S I T I O N

E A

S E

M E

N T

C O

N S

T R

U C

T

IO

N

L

IM

IT

O

F W

O R

K

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

STA 24+91 T

HRU 23+9115 FT BOTTOM SIDE SLOPES 1V:3.2

5H TO 1V:4H

TRANSITION

C

O N

C R E T E P

IP

E

'-0 " R

E

IN

F O

R C E

D

Y

.0

X

0.

P I S

TA

. 5

+1 3.

Y

.3

X

2.

S

TA

. 0

+0

Y

.6

X

9.

S

TA

. 5

+6 2.

SLOPES 1V:3H

SLOPES 1V:3H

Y

.6

X

9.

S

TA

. 5

+6 2.

S

TA

. 1

5+ .7

D

IV

E R S

IO

N C

H A N

N E L

Y

.6

X

4.

CONCRETE HEADWALL

PIPE CULVERT &

DIVERSION CHANNEL

C/L COMITE

SEE NOTE 1

EXISTING ACCESS ROAD

E-4

E-5

E-3

OE-5

SEE NOTE 1

SEE NOTE 2

SEE NOTE 2

SEE NOTE 2

V :3 .2

H

V :3 .2

H

V :3 .2

H

V :3 .2

H

BM

GUILLORY

CONSTRUCTION EASEMENT

C O

N S

T R

U C

T

IO

N E

A S

E M

E N

T

CONSTRUCTION EASEMENT

EXISTING

START OF WORK

5+13.01

STA PO

T

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

1S

T A

S T

A

SITE PLAN - LATERAL DITCH

SCALE: 1" = 60"

C O

N S

T R

U C

T

IO

N E

A S

E M

E N

T

CONSTRUCTION EASEMENT

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N E

A S

E M

E N

T

C /L H

W Y

60' 120'0

NORTH

PLAN

W O

R K T

O B

E P

E R F O

R M

E D B

Y O

T H E R S

NOTES:

2. FILL EXISTING DITCH EVEN WITH THE SURROUNDING SOIL.

CROSSING THROUGHOUT THE DURATION OF THIS PROJECT.

RESPONSIBLE FOR MAINTAINING THE ACCESS ROAD AND

PEMANENT ACCESS. THE CONTRACTOR SHALL BE

PROJECT, THESE ITEMS SHALL REMAIN IN PLACE AS

UPON COMPLETION OF THE COMITER RIVER DIVERSION

CONTRACT, AND REMAIN IN PLACE FOR THIS PROJECT.

CULVERTS WILL BE INSTALLED AS PART OF A SEPARATE

1. THE EXISTING ACCESS ROAD CROSSING AND PIPE

C-106

S

IT

E P

L A

N

L A

T E

R A

L D

IT

C

H

C

-1 .d g n

LAT.DITCH

6+

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L

A M

IT

E

R

IV

E R

A N

D T

R

IB

U T

A R

IE

S

L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D

L A

S T

E R

E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

T

EXISTING GROUND

EXISTING GROUND

EL. 73.75'

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

1V:3H 7-0'

1V:

3H

7-0'

1V:3H 1V:

3H7-0'

EL. 72.48'

1V:3H 1V:

3H

1V:

3H

C/L

LATERAL DITCH

1V:3H

EL. 72.37'

0+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

0+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

0+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

EL. 73.64'

EXISTING GROUND

EL. 73.53'

EXISTING GROUND

EL. 73.41'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

0+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

0+80

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

1+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

LATERAL DITCH CROSS SECTIONS - STA. 0+00 - 1+00

SCALE: 1" = 8'

C-330

L A

T E

R A

L D

IT

C

H C

R O

S S

S E

C T

IO

N

S

S T

A

H -4

C -3

.d g n

0 16'

FILL: 55.0 SQ. FT.

EXCAVATION: 85.0 SQ. FT.

EXCAVATION: 65.32 SQ. FT.

EXCAVATION: 68.55 SQ. FT.

EXCAVATION: 74.69 SQ. FT.

FILL: 5.20 SQ. FT.

EXCAVATION: 86.44 SQ. FT.

FILL: 4.31 SQ. FT.

EXCAVATION: 85.99 SQ. FT.

NOTES:

BE HAULED OFF-SITE BY CONTRACTOR.

SEMI-COMPACTED. EXCESS EXCAVATED MATERIAL SHALL

EXCAVATED MATERIAL USED AS FILL SHALL BE

2. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

1. FILL EXISTING DITCH.

FILL

SEMI-COMPACTED

EXCAVATION

LAT.DITCH

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

EL. 73.86'

EL. 73.19'

EXISTING GROUND

EL. 73.07'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

1+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

1+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

1+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

EL. 72.96'

EXISTING GROUND

EL. 72.84'

EXISTING GROUND

EL. 72.73'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

1+80

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

2+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

2+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

LATERAL DITCH CROSS SECTIONS - STA. 1+20 - 2+20

SCALE: 1" = 8'

C-331

L A

T E

R A

L D

IT

C

H C

R O

S S

S E

C T

IO

N

S

S T

A

H -4

C -3

.d g n

0 16'

FILL: 2.84 SQ. FT.

EXCAVATION: 83.01 SQ. FT.

FILL: 11.83 SQ. FT.

EXCAVATION: 62.15SQ. FT.

FILL: 33.28 SQ. FT.

EXCAVATION: 112.78 SQ. FT.

FILL: 35.57 SQ. FT.

EXCAVATION: 111.37 SQ. FT.

FILL: 4.93 SQ. FT.

EXCAVATION: 83.28 SQ. FT.

EXCAVATION: 146.76 SQ. FT.

NOTES:

BE HAULED OFF-SITE BY CONTRACTOR.

SEMI-COMPACTED. EXCESS EXCAVATED MATERIAL SHALL

EXCAVATED MATERIAL USED AS FILL SHALL BE

2. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

1. FILL EXISTING DITCH.

FILL

SEMI-COMPACTED

EXCAVATION

LAT.DITCH

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

EL. 72.62'

EL. 72.50'

EXISTING GROUND

EL. 72.39'

EXISTING GROUNDC/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

2+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

2+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

2+80

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

EL. 72.27'

EXISTING GROUND

EL. 72.16'

EXISTING GROUND

EL. 72.05'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

3+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

3+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

3+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

LATERAL DITCH CROSS SECTIONS - STA. 2+40 - 3+40

SCALE: 1" = 8'

C-332

L A

T E

R A

L D

IT

C

H C

R O

S S

S E

C T

IO

N

S

S T

A

H -4

C -3

.d g n

0 16'

EXCAVATION: 134.99 SQ. FT.

FILL: 1.60 SQ. FT.

EXCAVATION: 83.31 SQ. FT.

FILL: 21.13 SQ. FT.

EXCAVATION: 137.88 SQ. FT.

FILL: 38.83 SQ. FT.

EXCAVATION: 152.26 SQ. FT.

FILL: 18.21 SQ. FT.

EXCAVATION: 85.02 SQ. FT.

FILL: 19.79 SQ. FT.

EXCAVATION: 207.23 SQ. FT.

NOTES:

BE HAULED OFF-SITE BY CONTRACTOR.

SEMI-COMPACTED. EXCESS EXCAVATED MATERIAL SHALL

EXCAVATED MATERIAL USED AS FILL SHALL BE

2. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

1. FILL EXISTING DITCH.

FILL

SEMI-COMPACTED

EXCAVATION

LAT.DITCH

EXIST. GROUND

EXTEND 8-FT TO

SEE NOTE 3

EL. 71.93'

EXISTING GROUND

EL. 71.82'

EXISTING GROUND

EL. 71.70'

EXISTING GROUNDC/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

3+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

3+80

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

4+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

EL. 71.59'

EXISTING GROUND

EL. 71.48'

EXISTING GROUND

EL. 71.36'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

4+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

4+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

4+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

LATERAL DITCH CROSS SECTIONS - STA. 3+60 - 4+60

SCALE: 1" = 8'

C-333

L A

T E

R A

L D

IT

C

H C

R O

S S

S E

C T

IO

N

S

S T

A

H -4

C -3

.d g n

0 16'

FILL: 29.81 SQ. FT.

EXCAVATION: 208.36 SQ. FT.

FILL: 36.66 SQ. FT.

EXCAVATION: 239.50 SQ. FT.

FILL: 35.09 SQ. FT.

EXCAVATION: 258.09 SQ. FT.

FILL: 101.0 SQ. FT.

EXCAVATION: 258.27 SQ. FT.

FILL: 45.0 SQ. FT.

EXCAVATION: 251.35 SQ. FT.

FILL: 50.11 SQ. FT.

EXCAVATION: 252.03 SQ. FT.

NOTES:

15-FT TO THE LEFT OF OFFSET -50, TO EXISTING GROUND.

3. THE SLOPE OF THE SEMI-COMPACTED FILL SHALL EXTEND

BE HAULED OFF-SITE BY CONTRACTOR.

SEMI-COMPACTED. EXCESS EXCAVATED MATERIAL SHALL

EXCAVATED MATERIAL USED AS FILL SHALL BE

2. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

1. FILL EXISTING DITCH.

FILL

SEMI-COMPACTED

16'-0"

SEE NOTE 3

SEE NOTE 3

SEE NOTE 3

SEE NOTE 3

EL. 71.25'

EXISTING GROUND

EXISTING GROUND

EXISTING GROUNDC/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

7-0' 1V:

3H1V:3H

EL. 69.63'

EL. 69.52'

4+80

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

5+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

5+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

EXISTING GROUND

EL. 70.79'

EXISTING GROUND

EL. 70.68'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCH

7-0' 1V:

3H1V:3H

FINISHED GRADE

FINISHED GRADE

1V:4 H

1V:4H

1V:4 H1V:4H

EL. 69.41'

5+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

5+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

5+80

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

LATERAL DITCH CROSS SECTIONS - STA. 4+80 - 5+80

SCALE: 1" = 8'

C-334

L A

T E

R A

L D

IT

C

H C

R O

S S

S E

C T

IO

N

S

S T

A

H -4

C -3

.d g n

0 16'

FILL: 64.0 SQ. FT.

EXCAVATION: 260.43 SQ. FT.

EXCAVATION: 250.56 SQ. FT.

FILL: 74.37 SQ. FT.

EXCAVATION: 210.29 SQ. FT.

FILL: 30.0 SQ. FT

EXCAVATION: 109.49 SQ. FT.

FILL: 237.0 SQ.FT.

EXCAVATION: 190.71 SQ. FT.

FILL: 264.06 SQ. FT.

EXCAVATION: 210.62 SQ. FT.

NOTES:

8-FT TO THE LEFT OF OFFSET -50, TO EXISTING GROUND.

3. THE SLOPE OF THE SEMI-COMPACTED FILL SHALL EXTEND

BE HAULED OFF-SITE BY CONTRACTOR.

SEMI-COMPACTED. EXCESS EXCAVATED MATERIAL SHALL

EXCAVATED MATERIAL USED AS FILL SHALL BE

2. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

1. FILL EXISTING DITCH.

FILL

SEMI-COMPACTED

16'-0"

16'-0"

EL. 70.56'

EXISTING GROUND

EL. 70.45'

EXISTING GROUND

EL. 70.34'

EXISTING GROUND

C/L

LATERAL DITCH

C/L

LATERAL DITCH

C/L

LATERAL DITCHFINISHED GRADE

FINISHED GRADE

FINISHED GRADE

1V:4H 1V:4

H

1V:4H 1V:4 H

1V:4H 1V:4 H

6+00

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

6+20

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

6+40

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

EL. 70.22'

EXISTING GROUND

C/L

LATERAL DITCH

FINISHED GRADE

1V:4H 1V:4

H

6+60

-50 -40 -30 -20 -10 0 10 20 30 40 50

70 70

80 80

90 90

LATERAL DITCH CROSS SECTIONS - STA. 6+00 - 6+60

SCALE: 1" = 8'

C-335

L A

T E

R A

L D

IT

C

H C

R O

S S

S E

C T

IO

N

S

S T

A

H -4

C -3

.d g n

0 16'

FILL: 276.79 SQ. FT.

EXCAVATION: 216.49 SQ. FT.

FILL: 284.89 SQ. FT.

EXCAVATION: 185.45 SQ. FT.

FILL: 241.04 SQ. FT.

EXCAVATION: 224.99 SQ. FT.

FILL: 11.4 SQ. FT.

EXCAVATION: 461.58 SQ. FT.

BE HAULED OFF-SITE BY CONTRACTOR.

SEMI-COMPACTED. EXCESS EXCAVATED MATERIAL SHALL

EXCAVATED MATERIAL USED AS FILL SHALL BE

2. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

1. FILL EXISTING DITCH.

NOTES:

1'-7" 1'-7"

16'-0" 16'-0"26'-0"

58'-0"

.2 3°

4'- 0"

JOINT

CONSTRUCTION

CONCRETE PIPE (TYP.)

JOINT

CONSTRUCTION

FOR CLARITY

NOT SHOWN

FLAP GATES

JOINT

CONSTRUCTION

16'-0"26'-0"16'-0"

1'-4 1/4 "

1'-4 1/4 "

20'-9 1/16 "

9'-9"

3'-8"

8"

3'-4"

3'-7 1/2 "

5' -7

1' -3

4'-11 3/16 "

CONSTRUCTION JOINT

BASE SLAB

WALL

CONCRETE PIPE

TOP OF RIPRAP

BOTTOM OF KEY

BOTTOM OF SLAB

CONSTRUCTION JOINT

CONCRETE BUTTRESS

WALLWALL

TOP OF SLAB

C/L PIPE C/L PIPE C/L PIPE

EL. 70.15

EL. 68.48

EL. 66.98

13'-0"

0.5V:1H

C/L PIPE C/L PIPEC/L PIPE

0.5 V:

1H

LIMITS OF GROUTED RIPRAP = 40'-0"

WALL 1

(ABOVE AND BELOW THE PIPE CULVERTS)

WALL 2 WALL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

C-401

L A

T E

R A

L D

IT

C

H H

E A

D W

A L

L P

L A

N A

N D

E L

E V

A T

IO

N

H -4

C -4

.d g n

SCALE: 1/2" = 1'-0"

LATERAL DITCH HEADWALL - PLAN

SCALE: 1/2" = 1'-0"

LATERAL DITCH HEADWALL - ELEVATION

GENERAL NOTES

2. CONCRETE BUTTRESS ARE NOT REQUIRED FOR WALL 2.

CONCRETE.

WITH SPEC SECTION 03 31 00.00 12, CAST-IN-PLACE STRUCTURAL

CONCRETE IS PLACED, PREPARE THE SURFACE IN ACCORDANCE

SURFACE SHALL BE CLEANED. IMMEDIATELY BEFORE NEW

1. ALL CONSTRUCTION JOINTS SHOWN ARE OPTIONAL. HARDENED

1'-8"

1'-8"

12" O.C., E.F.

#8 BARS @

12" O.C., E.F.

#8 BAR @

#6 BARS

8"

B

A R

S

O

.C

#8 BARS @ 12" O.C.

(TYP.)

BUTTRESS

CONCRETE

PIPE (TYP.)

3"

8'-0"

T&B, E.F.

#8 BARS @ 12" O.C.

EQUALLY

#8 BARS SPACED

8'-0"

3"

3"

1'-7"

#6 STIRRUPS @ 12" O.C. T&B, E.F.

#6 BARS,

EQUALLY

#8 BARS SPACED

BARS

#8 BENT

1/2" JOINT1'-8"

#8 BAR

T&B, E.F.

#8 BARS @ 12" O.C.

#6 BARS

T&B, E.F.

#8 BARS, @ 12" O.C.

#6 STIRRUPS @ 12" O.C.

T&B, E.F.

#6 BARS,

T&B, E.F.

#8 BARS, @ 12" O.C.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

WALL 1 - HEADWALL REINFORCEMENT DETAIL

C-402

L A

T E

R A

L D

IT

C

H H

E A

D W

A L

L R

E

IN

F O

R C

E M

E N

T

D E

T A

IL

S

H -4

C -4

.d g n

SCALE: 3/4" = 1'

A

SCALE: 3/4" = 1'

SECTION

A

B

B

SCALE: 3/4" = 1'

SECTION

(WALL 3 REINFORCEMENT IS SIMILAR)

WALL 2 - HEADWALL REINFORCEMENT DETAIL

SCALE: 3/4" = 1'

WALL 1

WALL 2

C/L PIPE C/L PIPE

SCALE: N.T.S.

REINFORCEMENT CLEARANCE - DETAIL

T Y

P

TYP.

LAT.DITCH

BOTTOM OF KEY, EL. 66.98

BOTTOM OF SLAB, EL. 68.48

TOP OF SLAB, EL. 70.15

BOTTOM OF KEY, EL. 66.98

BOTTOM OF SLAB, EL. 68.48

TOP OF SLAB, EL. 70.15

TOP OF WALL, EL. 77.65

TOP OF WALL, EL. 77.65

1V:

3H

EXISTING GROUND EL. 81.0EXISTING GROUND EL. 81.0

SEMI-COMPACTED FILL

CONCRETE PIPE (RCP)

SEPARATOR GEOTEXTILE

GRANULAR SAND FILL

(TYP.)

1V:3H

6" MINIMUM BEDDING MATERIAL

L/2L/2LL

(TERMINATE AT TOP OF PIPE)

SEPARATOR GEOTEXTILE

1V:3H

13'-6", GROUTED RIPRAP

TOP OF BANK EL. 81.0

PIPE CULVERT INVERT, EL. 70.56

TOP OF WALL, EL. 77.65

C/L PIPE & FLAP GATE

RIPRAP EL. 68.27

EL. 60.45

STA 15+45.61

EL. 70.75

(BOTTOM EL. OF RCP)

PIPE INV.

START OF CULVERTS

STA. 5+62

TOP OF RCP EL. 75.00

STA. 6+68=CHANNEL C/L 15+56.70

INV. EL. 70.56

32" R-1500

12"R-90

6" BEDDING STONE

SEPARATOR GEOTEXTILE

SEPARATOR FABRIC

WITH GEOTEXTILE

10'X1' R 90 RIPRAP

EXISTING GROUND EL. 81.0

-0.57%

DITCH INV.

START OF DITCH

STA. 0+00

INV. EL. 73.98

A

106 LF @ -0.57%

C/L DIVERSION CHANNEL

EXISTING GROUND EL. 81.0

SEE SHEET C-502 FOR

FLAP GATE DETAILS

TOP OF BANK

1V:3H

32" R-1500

12"R-90

6" BEDDING STONE

SEPARATOR GEOTEXTILE

REINFORCED CONCRETE HEADWALL

G R

O U

IM

IT

S

GROUTED RIPRAP.

SEE C-401 FOR GROUT LIMITS.

6" BEDDING STONE

1V:3H

EL. 71.17

PIPE INV.

EL. 70.15

BOTTOM EL. OF RCP 1V:3H

RIPRAP TO BE PLACED ALONG DITCH SLOPES

AND AROUND PIPE CULVERTS (REFER TO

PLAN SHEET C-204 FOR RIPRAP LIMITS)

5-FT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

1'-7"

20'-0"

REINFORCED CONCRETE PIPE HEADWALL DETAIL

SCALE: 1/4" = 1'

C-501

L A

T E

R A

L D

IT

C

H S

E C

T

IO

N A

N D

D E

T A

IL

S

H -4

C -5

.d g n

SCALE: 1/16" = 1'-0"

REINFORCED CONCRETE PIPE PROFILE @ STA. 15+50.70

REINFORCED CONCRETE PIPE TYPICAL SECTION

SCALE: 1" = 4'

A

LAT.DITCH

NOTE:

2. KTR TO FIELD FIT RIPRAP AS NECESSARY.

APPROVAL BY USACE.

DIMENSIONS SHALL BE SUBMITTED FOR REVIEW AND

STANDARD MANUFACTURED PIPE LENGTH. THE L AND L/2

1. THE "L" DESIGNATION FOR THE PIPE CULVERT EQUALS THE

C/L PIPE CULVERT

1'-8"

8'-0"

(S E

E N

O T

E

(SEE NOTE 4)

EMBEDMENT (TYP.)

ROD, 6-3/4" LONG WITH 4-1/2"

OF THE FLAP GATE FLANGE

CONCRETE WALL AND PERIMETER

BE INSTALLED BETWEEN THE

1/2" X 1'-6" RUBBER NEOPRENE TO

M

IN

M

IN

(S E

E N

O T

E

C/L PIPE & FLAP GATE

1'-8"

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

SCALE: N.T.S.

ELEVATION VIEW

LIFTING EYE

FLAP GATE

SCALE: N.T.S.

FRONT VIEW

(SEE NOTE 4)

EMBEDMENT (TYP.)

ROD, 6-3/4" LONG WITH 4-1/2"

FLAP GATE LINKAGE

SECTION VIEW FLAP GATE (HEAD WALL MOUNTING)

SCALE: 1" = 1'

(PI

VOT R

ADIU

S)

"D

FLAP GATE (DIA.)

FLANGE

FLANGE

FLAP GATE

"A"

B

C

NEOPRENE PAD

1/2" RUBBER

LAT.DITCH

F L

A P

G A

T E

D E

T A

IL

S

H -4

C -5

.d g n

NOTES

THROUGH WALL FACE.

6. FLAP GATE FRAME DIMENIONS INCLUDES SKEW ANGLE OF PIPE

CONCRETE PIPE.

DISTANCE AROUND THE PERIMETER OF THE REINFORCED

5. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 6" EDGE

AND METAL FRAME TO THE CONCRETE HEADWALL.

ANCHORS (OR APPROVED EQUAL), TO INSTALL THE FLAP GATE

4. THE CONTRACTOR SHALL USE HILTI HIT-HY 200 ADHESIVE

3. GATE ASSEMBLY SHOWN ONLY.

BE VERIFIED WITH THE FLAP GATE MANUFACTURER.

AND NEOPRENE SEATS. MATERIALS CONFIGURATION SHOULD

AND COVER, AS WELL AS STAINLESS STEEL LINKS AND BOLTS,

2. 48" FLAP GATE SHALL BE PROVIDED WITH AN ALUMINUM FRAME

MAXIMUM SEATING HEAD.

1. FLAP GATE SHOULD BE SUITABLE FOR OPERATION ON 15'-0"

DIMENSIONS

DIA.

48" I.D. PIPE

A

60.0" 30.0"

B

36.125"

C-502

29'-.22"R

78'-7.68"R

'-5 .1

R .1

R

E-1

OE-5

NORTH TRIBUTARY

S T A 3 1 0 + 1 6 . 5 5 T H R U 3 0 9 + 1 7 . 4 9

1 5 F T B O T T O M S I D E S L O P E S 1 V : 3 H , T O 1 V : 3 . 2 5 H

T R A N S I T I O N

CR-12

CONSTRUCTION EASEMENT

C O

N S

T R

U C

T

IO

N E

A S

E M

E N

T

C O

M

IT

E

R

IV

E R

C O

M

IT

E R

IV

E R

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

STA 24+91 THRU 23+91

15 FT BOTTOM SIDE SLOPES 1V:3.25H TO 1V:4H

TRANSITION

R

'-4 .6

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00

0+0

1+0

SITE PLAN - NORTH TRIBUTARY

SCALE: 1" = 60"

60' 120'0

NORTH

PLAN

N.TRIB.

N O

R T

H T

R

IB

U T

A R

Y S

IT

E

P L

A N

H C

-1 .d g n

CONSTRUCTION EASEMENT

C-107

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L

A M

IT

E

R

IV

E R

A N

D T

R

IB

U T

A R

IE

S

L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D

L A

S T

E R

E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

0+001+602+65 1+002+00

EL. 57.0

EL. 58.5

EL. 57.0

AS PART OF COMITE RIVER

EXCAVATION AND RIPRAP WORK TO BE COMPLETED

EXCAVATION AND RIPRAP WORK

BEGIN NORTH TRIBUTARY

AS PART OF NORTH TRIBUTARY

EXCAVATION AND RIPRAP WORK TO BE COMPLETED

FOR DETAILS)

SECTION (SEE PLAN SHEET C-508

RIPRAP KEY IN / TRANSITION

42", RIPRAP, R-3500

12", RIPRAP, R-90 6", BEDDING MATERIAL

12", BEDDING MATERIAL

24", RIPRAP, R-200

RIPRAP R-200

COMITE RIVER

C/L

EXISTING TOB OF BANK VARIES BETWEEN 78.0 ~ 79.4

TIE-IN IS THE SAME.

NORTH TRIBUTARY AND THE COMITE RIVER

RIPRAP DESIGN AND THICKNESS FOR THE

P R

O F

IL

E

N O

R T

H T

R

IB

U T

A R

Y

C-108

H C

-1 .d g n

60.0

70.0

80.0

50.0

(VIEW LOOKING NORTH)

NORTH TRIBUTARY PROFILE

60.0

70.0

80.0

50.0

SCALE: N.T.S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H L

O U

IS

IA

N A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

2+654+00 3+004+60

EL. 58.5

EL. 60.0

AS PART OF NORTH TRIBUTARY

EXCAVATION AND RIPRAP WORK TO BE COMPLETED

NORTH TRIBUTARY (NO RIPRAP OR BEDDING)

REQUIRED EXCAVATION / RESHAPING OF

AND SNAGGING ONLY)

(CLEARING, GRUBBING,

EXISTING NORTH TRIBUTARY

EXISTING TOB OF BANK VARIES BETWEEN 78.0 ~ 79.4

FOR DETAILS)

SECTION (SEE PLAN SHEET C-508

RIPRAP KEY IN / TRANSITION

12", BEDDING MATERIAL

RIPRAP R-200

EXISTING TOB OF BANK VARIES BETWEEN 78.0 ~ 79.4

EXCAVATION LIMITS

C/L

EL. 54.0

T.O.B. EL. 78.0

EXCAVATION LIMITS

1V:3H

1V :3H

T.O.B. EL. 78.0

1V:3H 1V:3H

1+60

EL. 52.0

T.O.B. EL. 78.0 T.O.B. EL. 78.0

C/L 1V:3H

1+00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

T.O.B. EL. 78.0

EL. 52.0

C/L

T.O.B. EL. 78.0

EXCAVATION LIMITS

1V:3H

1+20

C/L

T.O.B. EL. 78.0

EL. 52.0

T.O.B. EL. 78.0

EXCAVATION LIMITS

1V:3H

1V:3H

1+40

N.TRIB

N O

R T

H T

R

IB

U T

A R

Y T

Y P

IC

A

L S

E C

T

IO

N S

H

-4

C -4

.d g n

NORTH TRIBUTARY TYPICAL CROSS SECTIONS - STA. 1+00, 1+40 & 1+80

10' 20'0 C-411

FILL: 1040.47 SQ. FT.

EXCAVATION: 638.32 SQ. FT.

FILL: 716.71 SQ. FT.

EXCAVATION: 694.86 SQ. FT.

FILL: 498.63 SQ. FT.

EXCAVATION: 957.91 SQ. FT.

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

RIPRAP

42" R3500

RIPRAP

12" R90

STONE

6" BEDDING

GEOTEXTILE

SEPARATOR

FILL: 461.37 SQ. FT.

EXCAVATION: 786.51 SQ. FT.

1 1

DETAIL - TYP.

EXCAVATION LIMITSEL. 52.0

T.O.B. EL. 78.0 T.O.B. EL. 78.0

C/L 1V:3H

1+00

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

T.O.B. EL. 78.0

EL. 52.0

C/L

T.O.B. EL. 78.0

EXCAVATION LIMITS

1V:3H

1+20

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

40 40

50 50

60 60

70 70

80 80

90 90

C/L

T.O.B. EL. 78.0

EL. 52.0

T.O.B. EL. 78.0

EXCAVATION LIMITS

1V:3H

1V:3H

1+40

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

50 50

60 60

70 70

80 80

90 90

N.TRIB

N O

R T

H T

R

IB

U T

A R

Y T

Y P

IC

A

L S

E C

T

IO

N S

H -4

C -4

.d g n

NORTH TRIBUTARY TYPICAL CROSS SECTIONS - STA. 1+00, 1+40 & 1+80

10' 20'0 C-412

FILL: 1040.47 SQ. FT.

EXCAVATION: 638.32 SQ. FT.

FILL: 716.71 SQ. FT.

EXCAVATION: 694.86 SQ. FT.

FILL: 498.63 SQ. FT.

EXCAVATION: 957.91 SQ. FT.

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

24" R200

STONE

BEDDING

12"

DETAIL - TYP.

GEOTEXTILE

SEPARATOR

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

C/L

EL. 60.0

VARIE

S

VARIES

T.O.B. EL. 78.77

T.O.B. EL. 77.85

VARIES

C/L

VARIE

S

EL. 60.0

T.O.B. EL. 79.38T.O.B. EL. 79.38

50 50

60 60

70 70

80 80

90 90

N.TRIB

N O

R T

H T

R

IB

U T

A R

Y T

Y P

IC

A

L S

E C

T

IO

N S

H -4

C -4

.d g n

NORTH TRIBUTARY TYPICAL CROSS SECTIONS - STA. 3+25 & 4+00

10' 20'0

C-413

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

3+25

EXISTING GRADE

EXISTING GRADE

30' 30'-0"

30'-0"

30'-0"

30'

30'

EL. 52.0

T.O.B. EL. 78.0 T.O.B. EL. 78.0

C/L

1V:3H

1+00

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

T.O.B. EL. 78.0

EL. 52.0

C/L

T.O.B. EL. 78.0

EXISTING GRADE

EXCAVATION LIMITS

1V:3H

1+20

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

40 40

50 50

60 60

70 70

80 80

90 90

C/L

T.O.B. EL. 78.0

EL. 52.0

T.O.B. EL. 78.0

EXISTING GRADE

EXCAVATION LIMITS

1V:3H

1V:3H

1+40

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

50 50

60 60

70 70

80 80

90 90

N.TRIB

S T

A

N O

R T

H T

R

IB

U T

A R

Y C

R O

S S

S E

C T

IO

N

S

H -4

C -4

.d g n

NORTH TRIBUTARY CROSS SECTIONS - STA. 1+00 - 1+40

10' 20'0 C-414

FILL: 986.06 SQ. FT.

EXCAVATION: 653.32 SQ. FT.

FILL: 863.15 SQ. FT.

EXCAVATION: 736.86 SQ. FT.

FILL: 629.37 SQ. FT.

EXCAVATION: 961.81 SQ. FT.

NOTES

CONDITION DETAIL.

2. SEE SHEET C-415 FOR TYPICAL END

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

1. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

C-415

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

30'-0"

30'-0"

30'-0"

30'-0" 30'-0"

30'-0"

30'

C/L

EL. 54.0

T.O.B. EL. 78.0

1V:3H 1V:3H

T.O.B. EL. 78.0

1V:3H

1+60

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

T.O.B. EL. 78.0

C/L

EL. 54.29

T.O.B. EL. 78.0EXISTING GRADE

EXCAVATION LIMITS

1V:3H

1V:3H

1+80

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120

50 50

60 60

70 70

80 80

90 90

C/L

EL. 54.57

EXISTING GRADE

EXCAVATION LIMITS

T.O.B. EL. 78.0

EXISTING GRADE

T.O.B. EL. 78.0

1V:3H1V:3H

2+00

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120

50 50

60 60

70 70

80 80

90 90

1V:3H

1V:

3H

T.O.B. EL. 78.0

N.TRIB.

S T

A

N O

R T

H T

R

IB

U T

A R

Y C

R O

S S

S E

C T

IO

N

S

H -4

C -4

.d g n

NORTH TRIBUTARY CROSS SECTIONS - STA. 1+60 - 2+00

10' 20'0 C-415

FILL: 469.84 SQ. FT.

EXCAVATION: 787.32 SQ. FT.

FILL: 456.77 SQ. FT.

EXCAVATION: 620.22 SQ. FT.

FILL: 127.88 SQ. FT.

EXCAVATION: 916.70 SQ. FT.

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

TYPICAL END CONDITION DETAIL

SCALE: 1" = 6'

FINISHED GRADE

30'

30'

30'-0"

30'-0"

30'-0"

30'-0"

C/L

EL. 54.86

1V:

3HT.O.B. EL. 78.00

1V:

3H

T.O.B. EL. 78.0

2+20

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

C/L

EL. 55.14

T.O.B. EL. 78.0

T.O.B. EL. 78.0

EXISTING GRADE

EXCAVATION LIMITS

1V:

3H

1V:

3H

2+40

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

T.O.B. EL. 78.0

C/L

EL. 55.43

EXISTING GRADE

EXCAVATION LIMITS

VARIES

1V:

3H

T.O.B. EL. 78.0

1V:3H

2+60

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110

50 50

60 60

70 70

80 80

90 90

N.TRIB.

S T

A

N O

R T

H T

R

IB

U T

A R

Y C

R O

S S

S E

C T

IO

N

S

H -4

C -4

.d g n

NORTH TRIBUTARY CROSS SECTIONS - STA. 2+20 - 2+60

10' 20'0 C-416

FILL: 232.51 SQ. FT.

EXCAVATION: 698.61 SQ. FT.

FILL: 124.68 SQ. FT.

EXCAVATION: 749.69 SQ. FT.

EXCAVATION: 669.69 SQ. FT.

NOTES

END CONDITION.

2. SEE DETAIL 1, SHEET C-415 FOR TYPICAL

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

1. EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

OF -100

FILL SHALL EXTEND 20-FT TO THE LEFT

THE SLOPE OF THE SEMI-COMPACTED

OF -100

FILL SHALL EXTEND 20-FT TO THE LEFT

THE SLOPE OF THE SEMI-COMPACTED

EXCAVATION LIMIT

C/L

VARIES

VARIE

S

2+80

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

C/L

EL. 60.0

EXISTING GRADE

VARIES

VARIE

S

EXCAVATION LIMITS

EXISTING GRADE

3+00

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

C/L

EXISTING GRADE

VARIES

VARIE

S

EXCAVATION LIMITS

EXISTING GRADE

EL. 60.0

3+20

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

N.TRIB.

S T

A

N O

R T

H T

R

IB

U T

A R

Y C

R O

S S

S E

C T

IO

N

S

H -4

C -4

.d g n

NORTH TRIBUTARY CROSS SECTIONS - STA. 2+80 - 3+20

10' 20'0 C-417

EXCAVATION: 276.68 SQ. FT.

EXCAVATION: 290.93 SQ. FT.

EXCAVATION: 256.04 SQ. FT.

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

APPROX.

TOB 79.25

APPROX.

TOB 79.75

APPROX.

TOB 79.90

APPROX.

TOB 79.50

APPROX.

TOB 79.95

APPROX.

TOB 81.0

EXCAVATION LIMIT

C/L

EL. 60.0

VARIES

VARIE

S

3+40

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

C/L

EXISTING GRADE

VARIES

VARIE

S

EXCAVATION LIMITS

EL. 60.0

3+60

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

C/L

EL. 60.0

EXISTING GRADE

VARIES

VARIE

S

EXCAVATION LIMITS

3+80

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

N.TRIB.

S T

A

N O

R T

H T

R

IB

U T

A R

Y C

R O

S S

S E

C T

IO

N

S

H -4

C -4

.d g n

NORTH TRIBUTARY CROSS SECTIONS - STA. 3+40 - 3+80

10' 20'0 C-418

EXCAVATION: 352.46 SQ. FT.

EXCAVATION: 164.64 SQ. FT.

EXCAVATION: 227.93 SQ. FT.

APPROX.

TOB 79.60

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

APPROX.

TOB 79.6

APPROX.

TOB 78.75

APPROX.

TOB 79.25

APPROX.

TOB 79.75

TOB 78.75

C/L

4+00

-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100

50 50

60 60

70 70

80 80

90 90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

N.TRIB.

S T

A

N O

R T

H T

R

IB

U T

A R

Y C

R O

S S

S E

C T

IO

N

S

H -4

C -4

.d g n

NORTH TRIBUTARY CROSS SECTIONS - STA. 4+00

10' 20'0 C-419

EXCAVATION: 629.32 SQ. FT.

APPROX.

TOB 78.90

NOTES

OFF-SITE BY CONTRACTOR.

COMPACTED. EXCESS MATERIAL SHALL BE HAULED

EXCAVATED MATERIAL USED AS FILL SHALL BE SEMI-

EXCAVATED MATERIAL MAY BE USED AS FILL. ALL

LEGEND

EXCAVATION

SEMI-COMPACTED FILL

TOB 78.45

C-503

S T

P

A U

L

M

IN

N E

S O

T A

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S T

P

A U

L D

IS

T

R

IC

-4 -4

C

-5

.d g

STEEL T-POSTS

7' LONG X 3 1/2" WIDE OR

ROUND WOODEN POSTS

SILT FENCE FABRIC

SILT FENCE FABRIC

MATERIAL

SURFACING

MATERIAL

SURFACING

EXCAVATION

AND DRAINAGE

MAT PLACEMENT

EXCAVATION

AND DRAINAGE

MAT PLACEMENT

TO FORM A 4' WIDE PANEL)

TIMBERS BOLTED TOGETHER

TOP TIMBER MAT (1' X 1' X 20'

TO FORM A 4' WIDE PANEL)

TIMBERS BOLTED TOGETHER

BASE TIMBER MAT (1' X 1' X 12'

EXISTING GRADE

BACKFILL TRENCH TO

E1

DETAIL-SILT FENCE

SCALE: NOT TO SCALE

A1

SCALE: NOT TO SCALE

DETAIL-TRUCK WASHDOWN RACK

S

IT

E D

E T

A

IL

S

E7

SCALE: NOT TO SCALE

DETAIL-TIMBER BRIDGE REQUIRED AT EACH PIPELINE CROSSING

(1 O

F

E9 SCALE: NOT TO SCALE

SETTLEMENT MEASUREMENT GAGE - PROFILE

E8 SCALE: NOT TO SCALE

SETTLEMENT MEASUREMENT GAGE - PLAN

M A

X

M

IN

MAT

TIMBER

BASE

MAT

TIMBER

BASE

MAT

TIMBER

BASE

MAT

TIMBER

TOP

MAT

TIMBER

TOP

MAT

TIMBER

TOP

5. TRUCK WASHDOWN PLAN AND PROFILE ARE SAMPLE DESIGNS.

4. TRUCK WASH DOWN RACK SHALL BE PLACED AT EVERY PROPOSED EGRESS.

OF THE TRUCK WASHDOWN RACK.

3. THE CONTRACTOR SHALL PROVIDE SURFACING MATERIAL FOR INGRESS AND EGRESS

FOR DRAINAGE SHALL NOT EXCEED 16 INCHES.

2. THE DEPTH OF EXCAVATION FOR THE PLACEMENT OF THE BASE TIMBER MATS AND

1. THE TIMBER MATS SHALL BE SLOPED TO ALLOW FOR DRAINAGE.

PROFILE - TRUCK WASHDOWN RACK

10'

(1-REQUIRED)

12" x 4'-0" x 30'-0"

TIMBER MAT

(1-REQUIRED)

12" x 4'-0" x 30'-0"

TIMBER MAT

12" x 4'-0" x 10'-0"

TIMBER MAT

12" x 4'-0" x 30'-0"

TIMBER MAT

BURIED PIPELINE

EXISTING

24" C/L

BURIED PIPELINE

EXISTING

10'

12" x 4'-0" x 30'-0"

TIMBER MAT

(TYP.)

5'

(TYP.)

5'

(TYP.)

5'

(TYP.)

5'

COMPACTED FILL RAMP

1V ON 20H (+/-)COMPACTED FILL RAMP

1V ON 20H (+/-)

1V ON 20H (+/-)1V ON 20H (+/-)

PROFILE - TIMBER BRIDGE

CONTRACT SPECIFICATIONS.

11. THE GAGE LOCATIONS ARE IDENTIFIED ON THE DESIGN SECTION AND IN THE

CONTRACTING OFFICER.

EMBANKMENT SECTION AT THE CONTRACTOR'S OPTION WITH APPROVAL OF THE

10. THE GAGE LOCATIONS MAY BE MOVED HORIZONTALLY ON THE EXISTING

SHALL BE HALF THE DISTANCE BETWEEN THE GAGES.

PLACED LESS THAN 100 FEET APART. THE SETTLEMENT MEASUREMENT RANGE

9. THE EXCEPTION TO NOTE NUMBER 8 ABOVE, SHALL BE WHERE THE GAGES ARE

CENTERLINE OF THE EMBANKMENT SECTION.

EACH DIRECTION FROM EACH GAGE, AND SHALL BE MEASURED ALONG THE

8. THE SETTLEMENT MEASUREMENT RANGE FOR EACH GAGE SHALL BE 150 FEET IN

SETTLEMENT GAGES.

7. THE CONTRACTOR MUST FURNISH AND INSTALL STEEL PLATES TO BE USED AS

SETTLEMENT DURING CONSTRUCTION;

***TO RECEIVE PAYMENT FOR PLACEMENT OF ADDITIONAL FILL FROM FOUNDATION

SETTLEMENT PLATE NOTES:

ENTRANCES.

CONSTRUCTION, AND MAINTENANCE OF NEW ACCESS ROAD AND ASPHALT

ARE SAMPLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN,

6. NEW ACCESS ROAD AND ASPHALT ENTRANCE DETAILS AND PLANS

NOTES:

20'

4'1'

A-1

SCALE: NOT TO SCALE

DETAIL - SILT FENCE TRENCH

PLAN - TRUCK WASHDOWN RACK

20'

4'1'

A-1 3

10' O.C.

4"

TIMBER BRIDGE - PLAN

4'-0"

1/4"

4'-0"

/4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

E9

SEPARATOR GEOTEXTILE

SEPARATOR GEOTEXTILE

BEDDING

R-90 RIPRAP

R-1500 RIPRAP

AT CONCRETE DIVERSION STRUCTURE

TERMINATE SEPARATOR GEOTEXTILE

2'-0"

2'X2'

TRENCH

MATERIAL (COMPACTED)

EXCAVATED CLAY

RIPRAP

BEDDING MATERIAL

TRENCH BOX

FABRIC IN 2'X2'

TRENCH SEPARATOR

C-504

T

P

A U

L

M

IN

N E

S O

T A

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S T

P

A U

L D

IS

T

R

IC

-4

C

-5

.d g n

S

IT

E D

E T

A

IL

S

EDGE OF SHOULDER

ASPHALT

(2 O

F

RADIUS

30 FT

-2

-2

32'-0"

VARIES

EXISTING GROUND

SURFACING MATERIAL

12" AGGREGATE DRIVEWAY

GEOTEXTILE FABRIC SEPARATOR

(WEARING COURSE)

1V ON 4H SLOPE

2' TRANSITION OR

(WEARING COURSE)

1V ON 4H SLOPE

2' TRANSITION OR

(COMPACTED)

3" CRUSHED STONE BASE COURSE

2" ASPHALT BINDING COURSE

4" ASPHALT WEARING COURSE

EXISTING GROUND

36 FT. LENGTH

CONCRETE PIPE,

60'-0"

36 FT. LENGTH

SEE SHEET C-502 FOR DETAILS

FARM STYLE GATE

92'-0"

DOWN THE SLOPE WITH NO OVERLAPS, GAPS OR BREAKS IN RUN.

3. THE SEPARATOR GEOTEXTILE SHALL BE ONE CONTINUOUS PIECE FROM TRENCH

REQUIREMENTS

2. REFER TO SPECIFICATION SECTION 32 15 0001 12, SURFACING FOR ASPHALT PAVING

THROUGHOUT THE DURATION OF THE PROJECT.

MAINTENANCE OF THE TEMPORARY ACCESS ROAD AND NEW ASPHALT ENTRANCES

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND

1. THE TEMPORARY ACCESS ROAD AND NEW ASPHALT ENTRANCE DETAILS ARE SAMPLES.

LA HWY 67 (PLANK ROAD)

ROAD

ACCESS

NEW

C/L

SLOPE TO DRAIN SLOPE TO DRAIN

ACCESS ROAD VARIES

ROAD

ACCESS

C/L

VARIES

SLOPE TO DRAIN

30 FT RADIUS

(WEARING COURSE)

1V ON 4H SLOPE

2' TRANSITION OR

GEOTEXTILE FABRIC

SEPARATOR

A

DETAIL - NEW ASPHALT ENTRANCE

A

B

VARIES

EXISTING HWY. 67 NEW ASPHALT ENTRANCE AND DRIVEWAY

B

SECTION - NEW ASPHALT ENTRANCE

SECTION - NEW ASPHALT ENTRANCE

NTS

NTS

NTS

NTS

NOTES:

DETAIL - CONSTRUCTION ACCESS ROAD SURFACING

SEPARATOR GEOTEXTILE DETAIL @ STA. 17+12

SIMILAR AT STA. 22+66 AND 3+30, SHEET C-105

C-201

NATURAL REPOSE

SIDE SLOPES

C-332

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

S T

A

DIVERSION CHANNELDIVERSION STRUCTURE

FILTER FABRIC

GEOTEXTILE SEPARATOR

SCALE: N.T.S.

KEY TRENCH DETAIL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

D A

T E

C-505

H -4

-4

C -5

.d g n

A N

D G

A T

E D

E T

A

IL

S F

A R

M S

T Y

L E

F E

N C

IN

G

NOTES:

U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

2' x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx xx xx xx xx x x x x

END OR CORNER PANEL

x xxx

PULL POST BRACE PANEL DETAIL

DAP DETAIL

NO SCALE

NO SCALE

NO SCALE

TYPICAL LAYOUT-3 STRAND BARBED-WIRE FENCE

x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx xx xx xx xx x x x x

NO SCALE

TYPICAL PANEL GATE DETAIL

END OR CORNER BRACE PANEL NOTE:

ALL BARBED-WIRE STRANDS SHALL BE WRAPPED TWICE

AROUND PULL POST AND STAPLED AT LEAST 4 TIMES.

1. THE SPACING OF END OR CORNER PANEL AND BRACE PANEL OF 10' AND 9' IS

MAXIMUM. WHEN CORNER OR END PANEL CONFLICTS WITH GATE OR CATTLE

GUARD BRACE PANELS, OR TWO CORNER PANELS CONFLICT, BRACING AND

SPACING OF POSTS SHALL BE ALTERED TO PROVIDE ADEQUATE BRACING AS

REQUIRED.

2. THE GATE SHOWN IS TYPICAL. ANY STANDARD COMMERCIAL GATE THAT VARIES ONLY

IN NON-ESSENTIAL DETAILS SHALL BE ACCEPTABLE, SUBJECT TO APPROVAL.

3. LATCH AND PIN FOR PANEL GATE IS REQUIRED, BUT NOT SHOWN.

4. ANY CUTS IN POSTS OR BRACING AFTER PRESERVATIVE TREATMENT SHALL BE

RECOATED WITH PRESERVATIVE AS RECOMMENDED BY TREATMENT FACILITY.

5. THE PERMANENT FARM STYLE GATES SHALL BE INSTALLED AT THE CONSTRUCTION

ACCESS LOCATIONS SHOWN ON PLAN SHEET C-101 & C-102 AT THE END OF THE

PROJECT.

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx xx xx xx xx x

DAP

DAP

8"DIA. (TOP) X7'-6" LONG

END OR CORNER POST-WOOD

8"DIA. (TOP) X7'-6" LONG

END OR CORNER POST-WOOD

6" DIA. (TOP) X7'-0" LONG

TERMINIAL LINE POST-WOOD

BARBED-WIRE

BRACE

4"X4" WOOD

DAP

"2

TWISTED TO TIGHTEN

LOOP OF 7-GAGE WIRE

GRADE

4"X4" WOOD BRACE

TWISTED TO TIGHTEN

LOOP OF 7-GAGE WIRE

9'-0"

LINE POST

TERMINAL

4"X4" WOOD BRACE

LONG

8" DIA. (TOP) X7'-6"

WOOD PULL POST

LINE POST

TERMINAL

4"X4" WOOD BRACE

TO TIGHTEN

WIRE TWISTED

LOOP OF 7-GAGE

6-5/8" O.D. SCH 40 PIPE

STANDARD HINGE

1-1/2" NOMINAL DIA. TUBULAR STEEL

CHAIN AND PADLOCK

ROAD SURFACE

CONCRETE CAP

WIRE TO PREVENT REMOVAL

MINIMUM 3 HOG RINGS AROUND TWISTED

THEN TWISTED A ND TIGHTENED.

WRAPPED AROUND TENSION BAND AND

ALL BARBED-WIRE STRANDS SHALL BE

2'

24" DIA. MIN.

CONCRETE

1" MIN.

4"X4" WOOD BRACE

SIDE OF BRACE

NAILS EACH

2-16 D GALV.

4"X4" WOOD BRACE

10'-0"

BRACE PANELEND PANEL

32' GATE OPENING

2"

9' 9'

OF CONCRETE SLAB

MINIMUM OF 3" FROM EDGE

TERMINATE WATERSTOP A

CONTROL JOINT

SEE DETAIL 1

WATERSTOP

SCALE: 1'' = 1' - 0''

9''

1/4'' R

1/4'' R

1-1/2'' Ø 1'' Ø

/8

3/4'' Ø

3"

TOP OF CONCRETE SLAB

BOTTOM OF CONCRETE SLAB

TOP OF CONCRETE SLAB

BOTTOM OF CONCRETE SLAB

4-1/2"

THREE-BULB WATERSTOP-DETAIL

SCALE: N.T.S.

THREE-BULB WATERSTOP DETAILS

PROFILE VIEW

SECTION VIEW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

DIV.CH.

O

F

W A

T E

R S

T O

P S

P L

IC

E

D E

T A

IL

S

H -4

C -5

.d g

C-506

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

L O

O D

C O

N T

R O

L A

M

IT

E R

IV

E

R A

N D

T R

IB

U

T A

R

IE

S L

A

C O

M

IT

E R

IV

E

R B

A S

IN

C

O M

IT

E

R

IV

E R

D

IV

E R

S

IO

N P

R O

J E

C T

C O

M

IT

E R

IV

E

R D

IV

E

R S

IO

N

S T

R U

C T

U R

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W

P

-2

-B -0

A P

R

IL

A N

S I

D

J L

B R

A D

L E

Y P

.E

JD

L

/L K

D /S

D B

J E

R E

M Y

D L

A S

T E

R E

.I

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

E A

S T

B A

T O

N R

O U

G E

P A

R

IS

H

L O

U

IS

IA

N

A

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

DIV.CH.

O

F

W A

T E

R S

T O

P S

P L

IC

E

D E

T A

IL

S

H -4

C -5

.d g

C-507

C-508

-4

C

-5

.d g n

N O

R T

H T

R

IB

U T

A R

Y

D E

T A

IL

-2

-2

EXISTING GROUND

1V:1H

EXISTING GROUND

SEPARATOR GEOTEXTILE

SEPARATOR GEOTEXTILE

1V:2.75H

EL. 58.5

KEY-IN TRANSITION

START RIPRAP

32'-9"

15'-0"

R-200…