COMITE RIVER DIVERSION PROJECT BID Abstract.pdf
PDF 1 MB Posted
- Attached to
- Flood Control, Amite River and Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project
- Solicitation number
- W912P825B0037
About this file
This document is an Abstract of Offers for a Construction contract for the Flood Control, Amite River and Tributaries project in the Comite River Basin, located in East Baton Rouge Parish, Louisiana. The solicitation (Number W912P825B0037) received six competitive bids from construction companies: Precision Construction LLC, Five-S Group LLC, TKTMJ Inc, Omega Foundation Services, Vixen LLC, and BOH Bros Construction LLC.
The total estimated government cost for base work is $50,275,571, with an additional $23,554,195 for optional work, bringing the total potential contract value to $73,829,766. The bids varied significantly, with base work proposals ranging from $34,926,036 (Precision Construction) to $75,938,661 (BOH Bros Construction), and optional work proposals ranging from $18,828,231 to $32,643,655. The project involves multiple construction elements including mobilization, excavation, concrete work, erosion control, drainage structures, riprap installation, and various site preparation and maintenance tasks. The solicitation was issued by the US Army Engineer District, NOD, with contract specialists Quinton B. Hamm and Christopher Nuccio overseeing the bid process.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE: TOTAL BASE WORK: $ 50,275,571.00
TOTAL OPTIONAL WORK: $ 23,554,195.00
TOTAL BASE + OPTIONAL WORK: $ 73,829,766.00
1. PRECISION CONSTRUCTION, LLC TOTAL BASE WORK: 34,926,036.43
TOTAL OPTIONAL WORK: $ 18,828,231.44
TOTAL BASE+OPTIONAL WORK: $ 53,754,267.87
2. FIVE-S GROUP, LLC TOTAL BASE WORK: $ 50,965,466.94
TOTAL OPTIONAL WORK: $ 21,249,996.61
TOTAL BASE+OPTIONAL WORK: $ 72,215,463.55
3. TKTMJ INC TOTAL BASE WORK: $ 61,141,283.81
TOTAL OPTIONAL WORK: $ 23,358,154.72
TOTAL BASE+OPTIONAL WORK: $ 84,499,438.53
4. OMEGA FOUNDATION SERVICES TOTAL BASE WORK: $ 66,269,305.00
TOTAL OPTIONAL WORK: $ 25,143,690.00
TOTAL BASE+OPTIONAL WORK: $ 91,412,995.00
5. VIXEN LLC TOTAL BASE WORK: $ 69,708,744.00
TOTAL OPTIONAL WORK: $ 32,643,655.00
TOTAL BASE+OPTIONAL WORK: $ 102,352,399.00
6. BOH BROS CONSTRUCTION LLC TOTAL BASE WORK: $ 75,938,661
TOTAL OPTIONAL WORK: $ 30,019,475.00
TOTAL BASE+OPTIONAL WORK: $ 105,958,136.00
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Comite River Diversion Structure, East Baton Rouge Parish, Louisiana
Solicitation Number W912P825B0037
2. DATE ISSUED 3. DATE OPENED
9-Sep-25
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 MOBILIZATION & DEMOBILIZATION 1 JOB $1,838,000.00 $1,838,000.00 $1,421,104.00 $1,421,104.00 $5,500,000.00 $5,500,000.00 $6,825,000.00 $6,825,000.00
Video and Photographic Documentation
1 JOB $36,000.00 $36,000.00 $49,815.00 $49,815.00 $240,226.57 $240,226.57 $38,062.00 $38,062.00
Temporary Drainage Crossings
1 JOB $95,600.00 $95,600.00 $124,529.00 $124,529.00 $118,268.78 $118,268.78 $178,500.00 $178,500.00
Traffic Control
1 JOB $135,000.00 $135,000.00 $398,520.00 $398,520.00 $72,055.93 $72,055.93 $892,500.00 $892,500.00
Erosion Control
1 JOB $48,650.00 $48,650.00 $115,220.00 $115,220.00 $90,569.24 $90,569.24 $393,750.00 $393,750.00
Truck Wash-Down Rack
1 JOB $338,000.00 $338,000.00 $263,218.00 $263,218.00 $305,092.16 $305,092.16 $115,500.00 $115,500.00
Demolition
1 JOB $318,000.00 $318,000.00 $103,952.00 $103,952.00 $30,861.95 $30,861.95 $105,000.00 $105,000.00
Reinforced Concrete
1 JOB $16,038,000.00 $16,038,000.00 $14,025,000.00 $14,025,000.00 $17,160,738.54 $17,160,738.54 $30,268,217.00 $30,268,217.00
Excavation
336,316 CY $14.00 $4,708,424.00 $10.71 $3,601,944.36 $7.15 $2,404,659.40 $9.56 $3,215,180.96
Excavation (Drainage Ditch)
4,000 CY $16.60 $66,400.00 $10.58 $42,320.00 $250.00 $1,000,000.00 $20.08 $80,320.00
A. HIRED LABOR Precision Construction, LLC Five-S Group. L.L.C
Quinton B, Hamm
Contract Specialist
8. GOVERNMENT ESTIMATE
SIGNATURE
9. OFFERS
NO. 1 NO. 2
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
UNRESTRICTED
5. PROJECT TITLE
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Christopher Nuccio
Contracting Officer
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
9-Sep-25
NO. 3
B. OFFEROR TKTMJ, INC
(Check A, B or C and complete D, E, and F)
7B. DESCRIPTION OF OFFERED ITEM
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
B. BID SECURITY (Type and amount)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
A. HIRED LABOR Precision Construction, LLC Five-S Group. L.L.C
Quinton B, Hamm
Contract Specialist
8. GOVERNMENT ESTIMATE
SIGNATURE
9. OFFERS
NO. 1 NO. 2
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
UNRESTRICTED
5. PROJECT TITLE
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Christopher Nuccio
Contracting Officer
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
9-Sep-25
NO. 3
B. OFFEROR TKTMJ, INC
(Check A, B or C and complete D, E, and F)
7B. DESCRIPTION OF OFFERED ITEM
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
B. BID SECURITY (Type and amount)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
Embankment, Compacted Fill
8,300 CY $44.00 $365,200.00 $5.75 $47,725.00 $4.00 $33,200.00 $15.03 $124,749.00
0012 Semi-Compacted Fill (Drainage Ditch)
1,500 CY $4.00 $6,000.00 $3.74 $5,610.00 $3.16 $4,740.00 $17.41 $26,115.00
Separator Geotextile
26,704 SY $6.00 $160,224.00 $4.46 $119,099.84 $5.02 $134,054.08 $8.26 $220,575.04
Clearing and Grubbing
71.2 AC $7,430.00 $529,016.00 $4,723.09 $336,284.01 $8,950.25 $637,257.80 $7,483.44 $532,820.93
Construction Dewatering
1 JOB $757,303.00 $757,303.00 $2,273,505.00 $2,273,505.00 $4,589,984.85 $4,589,984.85 $3,071,250.00 $3,071,250.00
Grouted Riprap, R-1500
380 CY $239.00 $90,820.00 $220.94 $83,957.20 $205.68 $78,158.40 $373.03 $141,751.40
Grouted Riprap, R-90
440 CY $221.00 $97,240.00 $168.02 $73,928.80 $200.95 $88,418.00 $357.95 $157,498.00
Furnish Vinyl SG-825 Sheet Piles
10,805 SF $31.00 $334,955.00 $27.77 $300,054.85 $45.57 $492,383.85 $22.81 $246,462.05
Drive Vinyl SG-825 Sheet Piles
10,805 SF $9.00 $97,245.00 $27.77 $300,054.85 $21.74 $234,900.70 $14.17 $153,106.85
Furnish Steel HP12x53 H-Piles
142,430 LF $106.00 $15,097,580.00 $42.85 $6,103,125.50 $59.99 $8,544,375.70 $43.46 $6,190,007.80
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
Contract Specialist
8. GOVERNMENT ESTIMATE
SIGNATURE
9. OFFERS
NO. 1 NO. 2
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
UNRESTRICTED
5. PROJECT TITLE
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Christopher Nuccio
Contracting Officer
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
9-Sep-25
NO. 3
B. OFFEROR TKTMJ, INC
(Check A, B or C and complete D, E, and F)
7B. DESCRIPTION OF OFFERED ITEM
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
B. BID SECURITY (Type and amount)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
Drive Steel HP12x53 H-Piles
142,430 LF $44.00 $6,266,920.00 $17.06 $2,429,855.80 $42.02 $5,984,908.60 $27.53 $3,921,097.90
Farm Gates
2 EA $3,969.00 $7,938.00 $7,200.00 $14,400.00 $722.90 $1,445.80 $16,012.50 $32,025.00
Barbed Wire Fencing
1,600 LF $50.00 $80,000.00 $28.93 $46,288.00 $16.68 $26,688.00 $62.84 $100,544.00
0024 Turf Establishment and Maintenance
12 AC $7,330.00 $87,960.00 $444.81 $5,337.72 $8,674.78 $104,097.36 $9,603.13 $115,237.56
24” DIA. Reinforced Concrete Pipe
80 LF $191.00 $15,280.00 $56.47 $4,517.60 $113.26 $9,060.80 $1,085.90 $86,872.00
48” DIA. Reinforced Concrete Pipe
330 LF $539.00 $177,870.00 $186.01 $61,383.30 $237.52 $78,381.60 $835.23 $275,625.90
Concrete Headwall
75 CY $1,954.00 $146,550.00 $2,090.31 $156,773.25 $1,912.90 $143,467.50 $3,013.50 $226,012.50
Sand (Drainage Ditch)
320 CY $27.00 $8,640.00 $44.37 $14,198.40 $39.91 $12,771.20 $71.37 $22,838.40
Bedding Stone (Drainage Ditch)
260 TON $68.00 $17,680.00 $43.29 $11,255.40 $71.77 $18,660.20 $150.43 $39,111.80
54” DIA. Aluminum Flap Gates
3 EA $42,000.00 $126,000.00 $31,994.81 $95,984.43 $44,207.99 $132,623.97 $90,125.00 $270,375.00
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
Contract Specialist
8. GOVERNMENT ESTIMATE
SIGNATURE
9. OFFERS
NO. 1 NO. 2
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
UNRESTRICTED
5. PROJECT TITLE
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Christopher Nuccio
Contracting Officer
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
9-Sep-25
NO. 3
B. OFFEROR TKTMJ, INC
(Check A, B or C and complete D, E, and F)
7B. DESCRIPTION OF OFFERED ITEM
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
B. BID SECURITY (Type and amount)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
Bedding Stone
9,300 TON $62.00 $576,600.00 $67.78 $630,354.00 $66.75 $620,775.00 $80.34 $747,162.00
Channel Riprap, R-1500
13,400 TON $81.00 $1,085,400.00 $67.71 $907,314.00 $84.24 $1,128,816.00 $96.45 $1,292,430.00
Channel Riprap, R-90
11,204 TON $69.00 $773,076.00 $67.78 $759,407.12 $84.24 $943,824.96 $92.43 $1,035,585.72
TOTAL BASE WORK:
$50,527,571.00 $34,926,036.43 $50,965,466.94 $61,141,283.81
OPTIONAL WORK (OW)
Erosion Control – (OW)
1 JOB $ 47,800.00 $47,800.00 $24,286.00 $24,286.00 $88,249.03 $88,249.03 $110,670.00 $110,670.00
Excavation – (OW)
330,000 CY $ 14.00 $4,620,000.00 $12.15 $4,009,500.00 $7.04 $2,323,200.00 $9.56 $3,154,800.00
Semi-Compacted Fill – (OW)
15,000 CY $ 44.00 $660,000.00 $6.46 $96,900.00 $3.47 $52,050.00 $15.03 $225,450.00
Semi-Compacted Fill – (OW)
8,800 CY $ 4.00 $35,200.00 $5.69 $50,072.00 $4.28 $37,664.00 $17.41 $153,208.00
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
Contract Specialist
8. GOVERNMENT ESTIMATE
SIGNATURE
9. OFFERS
NO. 1 NO. 2
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
UNRESTRICTED
5. PROJECT TITLE
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Christopher Nuccio
Contracting Officer
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
9-Sep-25
NO. 3
B. OFFEROR TKTMJ, INC
(Check A, B or C and complete D, E, and F)
7B. DESCRIPTION OF OFFERED ITEM
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
B. BID SECURITY (Type and amount)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
Separator Geotextile – (OW)
84,695 SY $ 6.00 $508,170.00 $4.46 $377,739.70 $3.75 $317,606.25 $5.01 $424,321.95
Clearing and Grubbing – (OW)
43 AC $ 8,040.00 $345,720.00 $4,385.65 $188,582.95 $8,950.32 $384,863.76 $7,483.44 $321,787.92
Asphaltic Paving – (OW)
513 SY $ 270.00 $138,510.00 $399.70 $205,046.10 $238.00 $122,094.00 $180.63 $92,663.19
Turf Establishment and Maintenance – (OW)
141 AC $ 7,333.00 $1,033,953.00 $2,680.59 $377,963.19 $8,674.78 $1,223,143.98 $4,598.40 $648,374.40
Bedding Stone – (OW)
22,849 TON $ 62.00 $1,416,638.00 $67.18 $1,534,995.82 $66.75 $1,525,170.75 $80.34 $1,835,688.66
Channel Riprap, R-3500 – (OW)
94,160 TON $ 90.00 $8,474,400.00 $67.18 $6,325,668.80 $85.55 $8,055,388.00 $89.32 $8,410,371.20
Channel Riprap, R-1500 – (OW)
39,300 TON $ 81.00 $3,183,300.00 $67.18 $2,640,174.00 $85.55 $3,362,115.00 $96.45 $3,790,485.00
Channel Riprap, R-200 – (OW)
2,000 TON $ 75.00 $150,000.00 $67.18 $134,360.00 $84.24 $168,480.00 $105.00 $210,000.00
Channel Riprap, R-90 – (OW)
42,616 TON $ 69.00 $2,940,504.00 $67.18 $2,862,942.88 $84.24 $3,589,971.84 $93.40 $3,980,334.40
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
A. HIRED LABOR Precision Construction, LLC Five-S Group. L.L.C
Quinton B, Hamm
Contract Specialist
8. GOVERNMENT ESTIMATE
SIGNATURE
9. OFFERS
NO. 1 NO. 2
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
UNRESTRICTED
5. PROJECT TITLE
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Christopher Nuccio
Contracting Officer
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
9-Sep-25
NO. 3
B. OFFEROR TKTMJ, INC
(Check A, B or C and complete D, E, and F)
7B. DESCRIPTION OF OFFERED ITEM
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
B. BID SECURITY (Type and amount)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
TOTAL OPTIONAL WORK:
$23,554,195.00 $18,828,231.44 $21,249,996.61 $23,358,154.72
*****Please note total discrepancies are marked in red font. Unit prices were used to re-calculate.
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
DATE SIGNED
10-Sep-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 MOBILIZATION & DEMOBILIZATION 1 JOB $5,500,000.00 $5,500,000.00 $5,300,000.00 $5,300,000.00 $9,000,000.00 $9,000,000.00
Video and Photographic Documentation
1 JOB $130,000.00 $130,000.00 $100,000.00 $100,000.00 $10,000.00 $10,000.00
Temporary Drainage Crossings
1 JOB $850,000.00 $850,000.00 $5,200,000.00 $5,200,000.00 $600,000.00 $600,000.00
Traffic Control
1 JOB $1,250,000.00 $1,250,000.00 $300,000.00 $300,000.00 $800,000.00 $800,000.00
Erosion Control
1 JOB $450,000.00 $450,000.00 $550,000.00 $550,000.00 $35,000.00 $35,000.00
Truck Wash-Down Rack
1 JOB $500,000.00 $500,000.00 $250,000.00 $250,000.00 $450,000.00 $450,000.00
Demolition
1 JOB $350,000.00 $350,000.00 $323,000.00 $323,000.00 $100,000.00 $100,000.00
Reinforced Concrete
1 JOB $28,478,440.00 $28,478,440.00 $25,000,000.00 $25,000,000.00 $40,000,000.00 $40,000,000.00
6. NUMBER OF AMENDMENTS ISSUED C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED - Yes, 0007 C. AMENDMENTS ACKNOWLEDGED- Yes, 0007
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
7B. DESCRIPTION OF OFFERED ITEM
5. PROJECT TITLE 9. OFFERS
Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project
(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6
Omega Foundation Services Vixen.LLC B. Boh Bros Construction co LLC
SIGNATURE
UNRESTRICTED Contracting Officer
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W912P825B0037
9-Sep-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY ENGINEER DISTRICT, NOD Quinton B, Hamm 7400 Leake Avenue Contract Specialist New Orleans, LA 70118
Christopher Nuccio
Excavation
336,316 CY $20.00 $6,726,320.00 $12.00 $4,035,792.00 $20.00 $6,726,320.00
Excavation (Drainage Ditch)
4,000 CY $20.00 $80,000.00 $10.00 $40,000.00 $22.00 $88,000.00
Embankment, Compacted Fill
8,300 CY $10.00 $83,000.00 $3.00 $24,900.00 $62.00 $514,600.00
0012 Semi-Compacted Fill (Drainage Ditch)
1,500 CY $10.00 $15,000.00 $8.00 $12,000.00 $7.00 $10,500.00
Separator Geotextile
26,704 SY $10.00 $267,040.00 $23.00 $614,192.00 $4.00 $106,816.00
Clearing and Grubbing
71.2 AC $15,000.00 $1,068,000.00 $12,500.00 $890,000.00 $10,000.00 $712,000.00
Construction Dewatering
1 JOB $2,750,000.00 $2,750,000.00 $6,200,000.00 $6,200,000.00 $4,000,000.00 $4,000,000.00
Grouted Riprap, R-1500
380 CY $395.00 $150,100.00 $635.00 $241,300.00 $225.00 $85,500.00
Grouted Riprap, R-90
440 CY $375.00 $165,000.00 $600.00 $264,000.00 $215.00 $94,600.00
Furnish Vinyl SG-825 Sheet Piles
10,805 SF $30.00 $324,150.00 $45.00 $486,225.00 $16.00 $172,880.00
Drive Vinyl SG-825 Sheet Piles
10,805 SF $15.00 $162,075.00 $27.00 $291,735.00 $15.00 $162,075.00
Furnish Steel HP12x53 H-Piles
142,430 LF $65.00 $9,257,950.00 $60.00 $8,545,800.00 $44.00 $6,266,920.00
Drive Steel HP12x53 H-Piles
142,430 LF $25.00 $3,560,750.00 $49.00 $6,979,070.00 $15.00 $2,136,450.00
Farm Gates
2 EA $4,500.00 $9,000.00 $1,800.00 $3,600.00 $5,000.00 $10,000.00
Barbed Wire Fencing
1,600 LF $20.00 $32,000.00 $24.00 $38,400.00 $22.00 $35,200.00
0024 Turf Establishment and Maintenance
12 AC $10,000.00 $120,000.00 $8,600.00 $103,200.00 $3,200.00 $38,400.00
24” DIA. Reinforced Concrete Pipe
80 LF $400.00 $32,000.00 $375.00 $30,000.00 $150.00 $12,000.00
48” DIA. Reinforced Concrete Pipe
330 LF $450.00 $148,500.00 $525.00 $173,250.00 $300.00 $99,000.00
Concrete Headwall
75 CY $2,000.00 $150,000.00 $2,000.00 $150,000.00 $1,500.00 $112,500.00
Sand (Drainage Ditch)
320 CY $80.00 $25,600.00 $20.00 $6,400.00 $100.00 $32,000.00
Bedding Stone (Drainage Ditch)
260 TON $100.00 $26,000.00 $75.00 $19,500.00 $125.00 $32,500.00
54” DIA. Aluminum Flap Gates
3 EA $100,000.00 $300,000.00 $45,000.00 $135,000.00 $35,000.00 $105,000.00
Bedding Stone
9,300 TON $90.00 $837,000.00 $85.00 $790,500.00 $100.00 $930,000.00
Channel Riprap, R-1500
13,400 TON $105.00 $1,407,000.00 $110.00 $1,474,000.00 $100.00 $1,340,000.00
Channel Riprap, R-90
11,204 TON $95.00 $1,064,380.00 $95.00 $1,064,380.00 $100.00 $1,120,400.00
TOTAL BASE WORK:
$66,269,305.00 $69,636,244.00 $75,938,661.00
OPTIONAL WORK (OW)
Erosion Control – (OW)
1 JOB $100,000.00 $100,000.00 $100,000.00 $100,000.00 $10,000.00 $10,000.00
Excavation – (OW)
330,000 CY $15.00 $4,950,000.00 $16.00 $5,280,000.00 $22.00 $7,260,000.00
Semi-Compacted Fill – (OW)
15,000 CY $15.00 $225,000.00 $4.00 $60,000.00 $65.00 $975,000.00
Semi-Compacted Fill – (OW)
8,800 CY $8.00 $70,400.00 $3.00 $26,400.00 $7.00 $61,600.00
Separator Geotextile – (OW)
84,695 SY $8.00 $677,560.00 $25.00 $2,117,375.00 $5.00 $423,475.00
Clearing and Grubbing – (OW)
43 AC $12,500.00 $537,500.00 $15,000.00 $645,000.00 $5,200.00 $223,600.00
Asphaltic Paving – (OW)
513 SY $250.00 $128,250.00 $55.00 $28,215.00 $100.00 $51,300.00
Turf Establishment and Maintenance – (OW)
141 AC $2,500.00 $352,500.00 $8,600.00 $1,212,600.00 $3,200.00 $451,200.00
Bedding Stone – (OW)
22,849 TON $80.00 $1,827,920.00 $85.00 $1,942,165.00 $100.00 $2,284,900.00
Channel Riprap, R-3500 – (OW)
94,160 TON $95.00 $8,945,200.00 $130.00 $12,240,800.00 $105.00 $9,886,800.00
Channel Riprap, R-1500 – (OW)
39,300 TON $90.00 $3,537,000.00 $115.00 $4,519,500.00 $100.00 $3,930,000.00
Channel Riprap, R-200 – (OW)
2,000 TON $85.00 $170,000.00 $105.00 $210,000.00 $100.00 $200,000.00
Channel Riprap, R-90 – (OW)
42,616 TON $85.00 $3,622,360.00 $100.00 $4,261,600.00 $100.00 $4,261,600.00
TOTAL OPTIONAL WORK:
$25,143,690.00 $32,643,655.00 $30,019,475.00
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
*****Please note total discrepancies are marked in red font. Unit prices were used to re-calculate.