Amendment 0004.pdf

PDF 4 MB Posted

Attached to
Algiers Lock 2023 Riverside Dolphin Replacement Federal contract opportunity
Solicitation number
W912P824B0002
Issued by
Department of the Army Corps of Engineers Engineering District New Orleans

About this file

This solicitation is seeking bids for the Algiers Lock 2023 Riverside Dolphin Replacement project. The base work consists of demolishing remnants of an existing northwest dolphin and temporary barrier, demolishing a damaged portion of guidewall, extending the guidewall, and constructing a new dolphin. The optional work includes demolishing an existing northeast quarter-round dolphin, constructing a new timber guidewall, and building a new round cell dolphin. Work will involve furnishing and installing steel H-piles, steel sheet piles, and treated timber piles as well as placing fill, concrete, reinforcement, anchors and pipes for guidewall construction and incidental work. The estimated value is between $10-25 million. Questions are due by January 8, 2024 and the solicitation documents are available on SAM.gov. The contracting specialists are Bianca Gaddison and Jason Crockett and the agency is the Department of the Army Corps of Engineers New Orleans District.

View the file

Other files for this federal contract opportunity

Other files attached to Algiers Lock 2023 Riverside Dolphin Replacement, newest first.
File Type Posted
W912P824B0002 Abstract 2.29.24 SIGNED.pdf PDF
Amendment 0005.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Algiers Lock-2023 Replacement Dolphin Plans_2023-09-01.pdf PDF
W912P824B0002 Solicitation Package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. Set new bid opening date for Thursday, 29 February 2024 at 11:00 AM CST via audio teleconference. All bids are due on Thursday, 29 February 2024 at 10:00 AM CST.

2. Update Specif ications and Plans (Please see attached pages).

3. Provide responses to contractor questions. All questions should be submitted via email by COB Friday, 23 February 2024.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0002

X 9B. DATED (SEE ITEM 11)

15-Dec-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Feb-2024

CODE

CONTRACTING DIV- CHIEF

7400 LEAKE AVENUE, ROOM 172

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P824B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following have been modified:

BIDDER INSTRUCTIONS

SOLICITATION NUMBER: W912P824B0002

NOTE: BIDDERS MAY SUBMIT BIDS BY ONLY ONE METHOD: A) ELECTRONIC COMMERCE

(EMAIL) OR BY 2) PHYSICAL SUBMISSION. BIDDERS SHALL LIMIT THE BID SUBMITTAL TO ONE

OPTION OR THE OTHER, NOT BOTH.

Electronic Submission of Bids/Proposals (Email):

The New Orleans District utilizes electronic commerce (Email) for receipt of electronic bids under this IFB solicitation. To submit an electronic commerce (Email) bid please follow these steps:

1. Send an email containing your name, email address and bid/proposal to the following emails associated with the IFB (MUST include all emails):

Bianca.M.JamesGaddison@USACE.ARMY.MIL Jason.D.Crockett@USACE.ARMY.MIL

2. ALL BIDS SUBMITTED BY EMAIL MUST CONTAIN THE SOLICITATION NUMBER IN THE

SUBJECT LINE.

3. Once the agency receives your bid/proposal at the above email addresses, you will then receive a confirmation email stating your bid/proposal was received. If a bidder does not receive a reply acknowledging receipt electronically from the New Orleans District, it is incumbent upon the bidder to seek confirmation from the issuing Contracting office by phone.

Note: The size limit for incoming emails is 35MB. Any bid/proposal over this size may not be accepted by the server and will constitute the bid not being received timely. Please note that embedded links, URLs, and other html language included may interfere with the USACE server security, which may cause emails to be removed prior to being received by the contracting office. Bidders are advised to refrain from including external links, embedded links, URLs, and other html language not germane to the proposal/bid. Please note it is a bidder’s responsibility, when transmitting its bid electronically, to ensure the receipt of its bid to the proper designee at the proper time. See FAR 14.304(b)(1)(i) regarding untimely electronic bids. Please note, MVN’s computer system firewall may cause a delay in receipt of emails, so be sure to allow ample time for possible delay. If your email would exceed 35MB you can use one of the following methods as a work-around:

Use .zip files as attachments. Combine multiple files into a .zip file to compress file size prior to adding as an email attachment.

Send multiple emails. Label each email with same subject line and indicate number of emails. For example:

Smith Construction W912P823BXXXX (1 of 2) Smith Construction W912P823BXXXX (2 of 2).

W912P824B0002

Physical Submission of Bids:

Bidders may submit their bids by hand carrying or express mail to the New Orleans District Contracting Office in Room 172. Bidders are advised to allow adequate time to ensure timely submission of its bid. Traffic onto the New Orleans District campus may be delayed by trains blocking the entrance or security either at the gate and/or inside of the building. Express delivery may be utilized but it is incumbent upon the bidder to ensure bid delivery time and date is before the receipt of bid cutoff time. See FAR 14.304(b)(1)(ii) and (c).

Bid Opening:

The Bid Opening is currently scheduled for Thursday, 29 February, 2024, at 11:00 am CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:00 AM CST, which is the bid submission receipt cutoff time. All bids received after 10:00 AM CST on Thursday, 29 February, 2024, will be considered late.

Audio Teleconference Bid Opening Information:

Instructions as well as any subsequent audio teleconference Bid Opening Information will be provided on SAM.GOV prior to the final closing date of this solicitation. In the event of changes to the solicitation that require a change to the closing date/time, the bid opening Audio Teleconference information will be provided via amendment.

Teleconference Information:

1-844-800-2712 Attendee Code: 43382870 https://usace1.webex.com/meet/jeffrey.j.waguespack

Following the conclusion of the bid opening, in accordance with FAR 14.403(b), abstracts of offers for unclassified acquisitions shall be available for public inspection via SAM.GOV.

SECTION SF 30 - SF 30 CONTINUATION

The required response date/time has changed from 06-Feb-2024 11:00 AM to 29-Feb-2024 11:00 AM.

(End of Summary of Changes)

Algiers Lock Dolphin Replacement

Solicitation W912P824B0002

Questions and Responses

Received on 31 January 2024

1. In response to Addendum 02, questions received on January 3, Question #6, the addendum refers the respondent to Specification Section 00 73 75.00 12, the only mention of welding is in Para. 2.1.1 General, “…shall include, underwater cutting and welding equipment.” AWS D1.1 has been defined as the applicable welding specification per Section

05 50 13 Miscellaneous Metal Fabrications. Underwater welding is deemed as non-structural welds per AWS D1.1. The underwater welding will not pass welding inspection due to the brackish water and the suspended solids in the river. If the welding is to be classified as a structural weld, the work will need to be facilitated in the dry. Is there a different applicable specification that should be applied to underwater welding? If AWS D3.6 is the applicable specification, please indicate the classification (A, B, O)?

RESPONSE: Underwater welding of the strips to the filler plates , if required, shall be approved by the Contracting Officer and all submittals approved before it is performed. If allowed, welding would be in accordance with AWS D3.6, Classification

A. No welding of the sheet pile will be allowed underwater.

2. Section 01 57 20.00 12 Environmental Protection, Para 3.6.1 Hazardous Wastes directs, “

The Contractor shall obtain an EPA ID# and Hazardous Waste Disposal Manifests and shall sign the manifests as the generator.” For the Optional Work, the red lead-based paint will need to be abated prior to the disposal of the demolition salvage. Can the section be revised to identify the Owner as the generator of the project originated hazardous materials?

RESPONSE: The contractor will sign as the Government’s representative. Section 01

57 20.00 12, Paragraph 3.6.1 will be revised via amendment.

3. Drawing Sheet C-002 and SD101 indicates the removal of approximately 48’ of the existing retaining wall. Reference Drawing No 28 (page 26 of 33 of Drawing Set), shows the limits of the existing “floor slab” ( Approx. 7’-6” thick). The floor slab and walls will need to be removed to drive the new timber guide wall due to pile conflicts with the existing structure. Please confirm the demolition requirements for the optional work on Reference

Drawing No 28.

RESPONSE: The existing concrete retaining walls and approach walls are not to be removed. On the north side of the channel (base work), the new timber guidewall is over 500 ft. from the existing concrete retaining wall and concrete approach wall. No pile interference is present. On the south side of the channel (optional work), the new timber guidewall will be installed adjacent to the existing concrete approach wall and retaining wall. The first 5 bents will have all vertical piles as shown in Section A4 on Sht

S-106 to eliminate pile interference between the new timber guidewall and the existing concrete retaining wall.

Received on 31 January 2024

15) Refer to Section 00010- Bidding Schedule. Please clarify if BI 0019 Plastic Wales- Unit of Measure should be in Linear Feet, similar to BI 0010.

RESPONSE: See revised bid schedule issued in AM 0002.

16) Amendment 2 indicates the required cell painting will extend to below the lower strap plate to approx.(+) Elev. 0.5. River elevations rarely fall below (+) 2.0 elevation. Will river elevations that prevent completion of cell painting as scheduled entitle the Contractor to contract time extensions?

RESPONSE: If river water levels prevent painting of the sheet pile striping per the awarded contract, a request for time extension should be submitted in accordance with

Specification Section 01 32 01.00 12, Paragraph 3.8 REQUESTS FOR TIME

EXTENSIONS. The elevation of the bottom of the painted stripes will be revised via amendment.

17) We request the base work bid contract completion time be increased 365 calendar days.

This is due to the schedule relationships between NTP, available standing scheduled steel mill runs for sheetpile, and other factors. Other factors include river levels, lock traffic frequency, lock closure scheduling, and winter weather affecting painting work.

RESPONSE: The duration for the base contact will be increased by 60 days (365 calendar days) and the duration for the option work will be increased by 45 days (250 calendar days) via amendment. To address the factors specifically identified in the question:

• Delays due to river levels and lock traffic will be handled in accordance with the applicable provisions of Specification Section 01100.

• The majority of the painting can be performed prior to installation, so it should not be overly affected by weather or river conditions.

• The extended duration allows for adequate time to order and produce the sheet pile based on the expected sequence of work and manufacturer provided rolling schedules.

18) Drwg S-102 Section B1. There are drafting lines at the centerlines of all sheetpile in a random pattern. Please indicate the significance of the lines. See attached.

RESPONSE: The drafting lines at the center of the sheetpiles on Dwg. S-102, Section B1 have no specific meaning and can be ignored.

SECTION 00010

Pages 3, 4, and 5. Delete these pages in their entirety and substitute the attached revised pages 3, 4, and 5, therefore

STANDARD FORM 1442

Standard Form 1442, block 11. Change “305 calendar days” to “365 calendar days”.

SECTION 00700

Page 45/408, Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Delete this clause in its entirety, and substitute the following revised clause, therefore:

“52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required (a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than 365 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)”

SUBMITTAL REGISTER

Delete the Submittal Register in its entirety and substitute the attached revised Submittal Register therefore:

SECTION 01 57 20.00 12

Page 12, paragraph 3.6.1. Delete this paragraph in its entirety and substitute the revised following paragraph, therefore:

“3.6.1 Hazardous Wastes

For the handling, removal, transportation and disposal of any generated hazardous wastes, the plan shall conform to the requirements of 40 CFR 260, 49 CFR 171 - 178 as well as other applicable Federal, State and Local regulations. All employees of the Contractor of his/her Subcontractors that will be directly involved in the handling and/or removal of hazardous wastes shall be trained in accordance with 29 CFR 1910.120. In addition, the employees shall have undergone a medical evaluation in accordance with 29 CFR 1910.120. The Contractor shall include copies of employees' certifications and medical examinations as part of the plan specified herein. The plan shall also address the proper Personnel Protective Equipment (PPE) that the employees will be required to wear during the handling and removal of hazardous wastes. The Contractor shall use the Generator EPA ID# given below when the Contractor fills out the Hazardous Waste Disposal Manifests for any hazardous dolphin or guidewall debris removed from the jobsite and shall sign the manifests as the Government’s Representative. Wastes shall be transported via state and Federal approved hazardous waste transporter and disposed of at a state and Federal approved temporary, storage and disposal (TSD) facility. Copies of licenses and certifications of the transporter and TSD shall be included in the plan. The plan shall list the name and address of each transporter and TSD to be utilized. The Contractor shall be responsible for any sampling and analysis required by the TSD for characterization purposes. The Contractor shall submit to the Contracting Officer completed copies of all Hazardous Waste Disposal Manifests within five (5) days after ultimate disposal at the TSD. Other regulations applicable to the handling, removal, transportation and disposal of hazardous wastes are: 40 CFR 261; 40 CFR 262; 40 CFR 268; and LAC 33:V.

Generator Name: Army Corps of Engineers

Site address: USA COE Algiers Lock, 3500 Blythe St.

New Orleans, LA 70131

Generator EPA ID: LAR000077818”

SECTION 05 50 03.00 12

Add the attached new Section 05 50 03.00 12 in its entirety.

SECTION 05 50 13

Delete this Section in its entirety and substitute with the attached revised Section 05 50 13, therefore:

SECTION 09 97 02

Page 13 paragraph 3.1.1. Delete this paragraph in its entirety and substitute the following revised paragraph, therefore:

“3.1.1 General Requirements

Clean surfaces to be painted before applying paint or surface treatments. Remove deposits of grease or oil in accordance with SSPC SP 1, prior to mechanical cleaning.

Perform solvent cleaning with mineral spirits or other low toxicity solvents having a flash point above 38 degrees C, 100 degrees F. Use clean cloths and clean fluids to avoid leaving a thin film of greasy residue on the surfaces being cleaned. Protect items not to be prepared or coated from damage by the surface preparation methods. Protect machinery and electrical components against entry of blast abrasive and dust into working parts. Program cleaning and painting such that dust or other contaminants from the cleaning process do not fall on wet, newly painted surfaces. Protect surfaces not intended to be painted from the effects of cleaning and painting operations. Conduct welding of, or in the vicinity of, previously painted surfaces in a manner to prevent weld spatter from striking the paint and to otherwise reduce coating damage to a minimum.

Restore any paint damaged by welding operations to original condition. Painted areas ground clean for welding shall be repainted to the required mil thickness. Surfaces to be painted that will be inaccessible after construction, erection, or installation operations are completed must be painted before they become inaccessible.”

DRAWINGS

SHEET ID Nos SD-101, S-101, S-102, and S-103. Delete these drawings in their entirety and substitute with the attached revised drawings SHEET ID Nos. SD-101, S-101, S-102, and S-103.

00010-3 Ed 22-062

SECTION 00010 – BIDDING SCHEDULE

Gulf Intracoastal Waterway, Algiers Lock, 2023 Riverside Dolphin Replacement, Orleans Parish, Louisiana Item DESCRIPTION Estimated

Quantity Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization and Demobilization 1 JOB 0002 Demolition and Removal 1 JOB 0003 Marina Navigation Light 1 JOB 0004 Steel Sheet Piling, Type PS 31 12,541 SF 0005 Steel H-Piling, HP 14 X 73 3,232 LF 0006 Dolphin Structure 1 JOB 0007 Treated Timber Piling 2,942 LF 0008 Guidewall Construction 1 JOB 0009 Replacement Girts 5 EA 0010 Plastic Wales 979 LF 0011 Replacement Plastic Wales 5 EA 0012 Exterior Lighting 1 JOB

TOTAL BASE WORK: $

OPTIONAL WORK (OW)

0013 Demolition and Removal - OW 1 JOB 0014 Marina Navigation Light - OW 1 JOB 0015 Steel Sheet Piling, Type PS 31 - OW 12,541 SF 0016 Steel H-Piling, HP 14 X 73 - OW 3,232 LF 0017 Dolphin Structure - OW" 1 JOB 0018 Treated Timber Piling - OW 1,678 LF 0019 Guidewall Construction - OW 1 JOB 0020 Plastic Wales – OW 561 LF

TOTAL OPTIONAL WORK $

TOTAL BASE WORK+OPTIONAL WORK

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

00010-4 Ed 22-062

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE

DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR

AWARD.

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. The Government will decide whether or not to exercise the Optional Work within 150 days after Notice to Proceed. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.

NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.

Evaluation of options will not obligate the Government to exercise the option(s).

** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5.

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

00010-5 Ed 22-062

*NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF

OPTIONAL WORK. In the event that OPTIONAL WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 250 calendar days in addition to the original contract duration of 365 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (FAR 52-211-10 – APR 1984)”.

*Denotes change from previous bid schedule.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 10 PAGES

Algiers Lock 2023 Riverside Dolphin Replacement

00 73 75.00 12 SD-01 Preconstruction Submittals

1.7.1 GAccident Prevention Plan

01 32 01.00 12 SD-01 Preconstruction Submittals

1.4 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

01 45 02.00 10 SD-01 Preconstruction Submittals 1.8.5Construction Schedule

01 45 04.00 10 SD-01 Preconstruction Submittals

3.2 G CDContractor Quality Control Plan

01 57 20.00 12 SD-01 Preconstruction Submittals

1.6.1 GEnvironmental Pollution Control

Plan 01 78 02.00 10 SD-02 Shop Drawings

1.3.1 G DO'As-Built' Drawings

02 41 00 SD-01 Preconstruction Submittals

1.9 G RODemolition Plan

1.9.1 G RODemolition Plan

1.6.1 GNotifications

1.6.2Receipts 1.7Existing Conditions

SD-11 Closeout Submittals

1.7 GExisting Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 10 PAGES

03 11 14.00 12 SD-02 Shop Drawings 1.7Shop Drawings

SD-03 Product Data 2.1Materials

SD-05 Design Data

3.2.1 G DOFormwork Not Supporting Weight

of Concrete SD-06 Test Reports

1.8Quality Control

3.2 GForm Removal

03 21 00.00 12 SD-02 Shop Drawings

3.1 DFabrication and Placement

SD-03 Product Data

3.1.3 DMechanical Butt-Splices

2.1Materials

SD-06 Test Reports 1.5.1Material 1.5.2Tests, Inspections, and

Verifications 03 31 00.00 12 SD-03 Product Data

2.2 G DOConcrete Mixture Proportions

3.6.2.5Concrete Batch Tickets

2.1.2 G DOAggregates

3.1.2Batch Plant 3.1.3Concrete Mixers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 10 PAGES

03 31 00.00 12 3.1.4Conveying Equipment and Methods

3.3Placing Equipment and Methods 2.1.7Packaged Repair Material 3.2.2.2Surface Retarder 2.1.3.5Anti-Washout Admixture

SD-05 Design Data

3.2.2 GConstruction Joint Treatment

3.5 G DOCuring and Protection

3.3.4 G DOCold-Weather Placing

3.3.5 G DOHot-Weather Placing

3.2.3Underwater Concrete Plan

3.3.6 GThermal Analysis And Thermal

Control Plan SD-06 Test Reports

1.6.1 GAggregate

3.6.2 GTesting and Inspection for

Contractor Quality Control 3.6.2.13Uniformity of Concrete Mixing 3.6Tests and Inspections 3.3.6.1Temperature Monitoring

SD-07 Certificates 3.6.1Qualifications

2.1.1 GCementitious Materials

2.1.7Packaged Repair Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 10 PAGES

03 31 00.00 12 2.1.4.1Impervious-Sheet Curing Materials

2.1.3.1Air-Entraining Admixture 2.1.3.4Other Chemical Admixtures 2.1.4.2Membrane-Forming Curing

Compound 2.1.6Latex Bonding Compound

05 50 03.00 12 SD-02 Shop Drawings

3.1.1 GShop Drawings

3.2.4 GWelding Procedure Specifications

(WPS)

3.2.5 GWelder, Welding Operator and

Tacker Qualification Certification

3.2.4 GProcedure Qualification Report

(PQR)

3.4.1 GInspector Qualification

Certification

3.4 GNondestructive Testing

Procedure SD-03 Product Data

1.5.1Materials SD-06 Test Reports

3.2.9Weld Inspection Reports Bolt Testing Reports

SD-07 Certificates

3.2.5 GCertificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 10 PAGES

05 50 13 SD-02 Shop Drawings

2.1.22 GStructural Steel Plates, Shapes

and Bars

2.1.21 GSteel Straps and Filler Plates

3.1.6 GSteel Straps and Filler Plates

2.1.9 GGuardrail

3.2 GGuardrail

SD-03 Product Data

2.1 GEquipment Descriptions

2.1 GMaterials

SD-07 Certificates

2.1.23 GStud Manufacturer's Certification

2.1.23 GStud Manufacturer's Test Reports

SD-08 Manufacturer’s Instructions

3.1.8 GManufacturer's Instructions

09 97 02 SD-01 Preconstruction Submittals

1.3 GSafety, Health, and

Environmental Requirements

1.3.1 GAccident Prevention Plan

1.3.1.5 GConfined Spaces Plan

1.3.1.6 GRespiratory Protection Plan

1.3.2.1 GAirborne Sampling Plan

1.3.1 GVentilation Assessment Plan

1.3.2 GMedical Surveillance Plan

1.3.3.1Waste Manifest

1.3.3.1 GWaste Disposal Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 10 PAGES

09 97 02 1.3.3.2 GPM-10 Monitoring Plan SD-03 Product Data

2.1 GManufacturer's Safety Data Sheet

SD-04 Samples

2.1 GProduct Samples

2.2 GSpecial Paint Formulas

2.4 GSolvent and Thinners

SD-06 Test Reports 1.3.3.2PM-10 Test Report 3.4Inspection Reports 1.3.2.2Medical Status Records 1.3.2.3Change in Medical Status Report

1.3.2.1 GAir Monitoring Test Plan

1.3.2.1Air Monitoring Test Report

SD-07 Certificates 1.5.1Certified EHS Professional 1.5.2Coating Thickness Gage

Qualification 26 27 29 SD-03 Product Data

2.2Mounting Straps

2.3 GMarine Signal Lantern

2.3.2 GSolar Power Station

SD-06 Test Reports

3.2.2 GSolar Power Station Test

SD-07 Certificates

2.3.2 GSolar Power Station

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 10 PAGES

26 27 29 Warranty 26 56 00 SD-02 Shop Drawings

1.6.1.1 GLuminaire Drawings

1.6.1.2 GPole Drawings

SD-03 Product Data

2.1 GLuminaires

2.2 GLight Sources

2.3 GLED Drivers

1.8.1 GLuminaire Warranty

1.8.2 GPole Warranty

2.4 GPoles

2.4.2Brackets

GConduit And Fittings GWire And Cable

SD-05 Design Data

1.6.2 GLuminaire Design Data

SD-06 Test Reports

1.6.3 GANSI/IES LM-79 Test Report

1.6.4 GANSI/IES LM-80 Test Report

1.6.5 GANSI/IES TM-21 Test Report

SD-08 Manufacturer’s Instructions 2.4Poles

SD-10 Operation and Maintenance Data

GLighting System GMaintenance Staff Training Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 10 PAGES

26 56 00 GEnd-User Training Plan 31 41 16.00 12 SD-02 Shop Drawings

3.1.6 GShop Drawings

SD-03 Product Data

1.7.1 GEquipment Descriptions

SD-06 Test Reports

1.7.1Driving Records SD-07 Certificates

1.8Materials Test Certificates 31 62 16.00 12 SD-01 Preconstruction Submittals

3.1 G ROEWelding Procedure Specifications

3.1 G ROEWelding Procedure Specifications

3.1 G ROWeld Inspector Qualifications

3.1 G ROWeld Inspector Qualifications

1.6.1 G ROPile Placement Plans

1.6.1 G ROPile Placement Plans

1.6.1 G ROEquipment Descriptions

1.6.1 G ROEquipment Descriptions

3.3 G ROEquipment Descriptions

3.3 G ROEquipment Descriptions

SD-02 Shop Drawings

2.1 G ROShop Drawings

2.1 G ROShop Drawings

SD-06 Test Reports

1.6.1 G EDSDriving Records

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 10 PAGES

31 62 16.00 12 3.1 G RONon-Destructive Testing Of Welds

3.1 G RONon-Destructive Testing Of

Welds

1.7 G EDSMaterial Tests

31 62 16.16 12 SD-01 Preconstruction Submittals

1.8 GWork Plan

1.6.1 GQuality Control Plan

SD-02 Shop Drawings

3.1 GShop Drawings

31 62 19.00 12 SD-01 Preconstruction Submittals

3.2.1.1 GEquipment Descriptions

SD-02 Shop Drawings

3.4.1 GTimberwork

SD-06 Test Reports

1.6.2 GPreservative Treatment

1.6.4 GDelivery Inspection List

1.6.1 GDriving Records

SD-07 Certificates

1.6.3 GSDS and CIS

35 59 13.16 SD-02 Shop Drawings

2.1.1 GPlastic Wales

SD-03 Product Data

2.1.1 GPlastic Wales

1.7 GManufacturer's Warranty

2.1.1.5 GOwners Field Guide

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 10 PAGES

35 59 13.16 SD-06 Test Reports

1.7.1.1 GMaterial Test Reports

1.7.1.4 GPerformance Test Data

3.2Delivery inspection list

SD-07 Certificates

2.1.1 GPlastic Wales

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

Algiers Lock-2023 Replacement Dolphin Ed 22-062

SECTION TABLE OF CONTENTS

DIVISION 05 - METALS

SECTION 05 50 03.00 12

METALWORK FABRICATION AND MISCELLANEOUS PROVISIONS

PART 1 GENERAL

1.1 SCOPE

1.2 MEASUREMENT AND PAYMENT

1.3 REFERENCES

1.4 SUBMITTALS

1.5 QUALITY CONTROL

1.5.1 Tests of Materials

1.5.2 Special Test Requirements

1.5.2.1 Government Nondestructive Testing

1.5.2.2 Contractor Nondestructive Testing

1.5.3 Workmanship

1.5.4 Quality Control

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 STRUCTURAL FABRICATION

3.1.1 Material

3.1.2 Dimensional Tolerances for Structural Work

3.1.3 Fabrication

3.2 STRUCTURAL STEEL WELDING

3.2.1 General

3.2.2 Welding Equipment

3.2.3 Structural Steel Fabrication

3.2.4 Welding Procedure Specifications (WPS)

3.2.5 Welder, Welding Operator and Tacker Qualification Certification

3.2.6 Technique

3.2.7 Workmanship

3.2.8 Identification

3.2.9 Inspection

3.3 STUD WELDING

3.3.1 Stud Materials

3.3.2 Stud Base Application Qualification

3.3.3 Workmanship

3.3.4 Inspection

3.3.5 Testing

3.4 NONDESTRUCTIVE EXAMINATION

3.4.1 Testing Personnel

3.4.2 Examination Procedures

3.4.2.1 Ultrasonic Testing

3.4.2.2 Magnetic Particle Inspection

3.4.2.3 Dye Penetrant Inspection

3.5 UNDERWATER FABRICATION

SECTION 05 50 03.00 12 Page 1

3.5.1 General

3.5.2 Underwater Welding

3.5.3 Underwater Cutting

3.6 BOLTED CONNECTIONS

3.6.1 Structural Steel Connections

3.6.1.1 Bolt Holes

3.6.2 Connections

3.6.2.1 Common Grade Bolts

3.6.2.2 High-Strength Bolts

-- End of Section Table of Contents --

SECTION 05 50 03.00 12 Page 2

SECTION 05 50 03.00 12

METALWORK FABRICATION AND MISCELLANEOUS PROVISIONS

PART 1 GENERAL

1.1 SCOPE

This section specifies general workmanship requirements, applicable to the fabrication, assembly and testing of various items of metalwork to insure conformance with the specifications. These requirements are in addition to those contained in the specification sections covering the specific items of work or indicated on the drawings.

1.2 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the material and work covered under this section and all costs in connection therewith shall be included in the applicable contract unit or job price for the items to which the work pertains.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2023) Manual of Steel Construction

AISC 360 (2022) Specification for Structural Steel Buildings (ASD)

ASTM INTERNATIONAL (ASTM)

ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM E165/E165M (2023) Standard Practice for Liquid Penetrant Examination for General Industry

ASTM E709 (2021) Standard Guide for Magnetic Particle Examination

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

ANSI/ASNT CP-189 (2020) Standard for Qualification and Certification of Nondestructive Testing Personnel

ASNT SNT-TC-1A (2020) Personnel Qualification and Certification in Nondestructive Testing

SECTION 05 50 03.00 12 Page 3

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020) Structural Welding Code - Steel

AWS D3.6M (2017) Underwater Welding Code

AWS QC1 (2016-AMD1) Standard for AWS Certification of Welding Inspectors

U.S. NAVAL SEA SYSTEMS COMMAND (NAVSEA)

S0300-BB-MAN-010 (Change B Dated 1 June 2002) U.S. NAVY Underwater Cutting & Welding Manual

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Shop Drawings; G

Shop drawings shall be submitted for approval in accordance with the Section 00700, CONTRACT CLAUSES. Drawings shall include catalog cuts, templates, fabrication and assembly details and type, grade and class of materials as appropriate.

Welding Procedure Specifications (WPS); G

A Welding Procedure Specification for each AWS Joint Designation, welding process and, as appropriate, each material, including prequalified welds, shall be submitted to the Contracting Officer and approved before fabrication is commenced.

The WPS shall be submitted with the shop drawings. A CWI or NDT inspector meeting the qualifications stated in herein shall approve all WPS's. The CWI's or NDT inspector's signature, certification number(s) and, if applicable, stamp shall be on all WPS's.

Welder, Welding Operator and Tacker Qualification Certification; G

Welder, welding operator and tacker qualification certification for each welder, welding operator or tack welder shall be submitted to the Contracting Officer and approved before fabrication is commenced. A CWI or NDT inspector meeting the qualifications stated herein shall approve all welder qualifications. The CWI's or NDT inspector's signature, certification number(s) and, if applicable, stamp shall be on all welder qualifications.

Procedure Qualification Report (PQR); G

Procedure Qualification Reports (PQR's) if needed shall be submitted to the Contracting Officer for approval before fabrication is commenced. A CWI or NDT inspector meeting the

SECTION 05 50 03.00 12 Page 4 qualifications stated herein shall approve all PQR's. The CWI's or NDT inspector's signature, certification number(s) and, if applicable, stamp shall be on all PQR's.

Inspector Qualification Certification; G

Copies of the certifications, including the Level III NDT Technician that certified the Level I and Level II Technicians shall be included in the submittal. Included with the Level III NDT certification shall be letter signed by the Level III Technicians stating that they are either full time employees or under retention for the NDT process they are certified for.

Nondestructive Testing Procedure; G

A copy of the weld testing firm's nondestructive testing procedures for each procedure used for weld testing shall be submitted to the Government Representative for approval prior to commencement of fabrication. Each procedure shall be modified to reflect the requirements of the project.

SD-03 Product Data

Materials

The Contractor shall furnish the Contracting Officer copies of all purchase and mill orders, shop orders for materials and work orders, including all new orders placed by Contractors and old orders extended by each supplier. The Contractor, at the time of submittal of shop drawings, shall furnish a list designating the material to be used for each item. Where mill tests are required, purchase orders shall contain the test site address and the name of the testing agency. The Contractor shall also furnish a shipping bill or memorandum of each shipment of finished pieces or members to the project site, giving the designation mark and weight of each piece, the number of pieces, the total weight, and if shipped by rail in carload lots, the car initial and number.

Copies of certified shipping bills, in duplicate, shall be mailed promptly to District Engineer, U.S. Army Corps of Engineers, New Orleans, Louisiana 70160-0267.

SD-06 Test Reports

Weld Inspection Reports

Bolt Testing Reports

SD-07 Certificates

Certificates ; G

Certificates for material tests, examinations, and welding procedure and operator qualifications shall be submitted for approval as specified.

SECTION 05 50 03.00 12 Page 5

1.5 QUALITY CONTROL

1.5.1 Tests of Materials

The Contractor shall, at his expense, perform analyses and tests to demonstrate that all materials are in conformity with the specifications.

Should the Contractor desire to use stock materials not manufactured specifically for the work covered by these specifications, he shall submit evidence, satisfactory to the Contracting Officer, that such material conforms to the requirements of the specifications. Detailed tests of these materials will then not be required, if so approved by the Contracting Officer. Tests, except where modified, shall be made as indicated in the respective detailed specifications or on the drawings and, unless otherwise authorized, in the presence of the Contracting Officer.

The Contractor shall furnish specimens and samples for additional independent tests and analyses upon request by the Contracting Officer.

Specimens and samples shall be properly labeled and prepared for shipment.

1.5.2 Special Test Requirements

1.5.2.1 Government Nondestructive Testing

When doubt exists as to the soundness of any material part such part may be subjected to any form of nondestructive testing determined by the Contracting Officer. This may include ultrasonic, magnaflux, dye penetrant, x-ray, gamma ray or any other test that will thoroughly investigate the part in question. The cost of such investigation will be borne by the Government. Any defects will be cause for rejection and rejected parts shall be replaced and retested at the Contractor's expense.

1.5.2.2 Contractor Nondestructive Testing

The Contractor shall perform the nondestructive testing as specified herein and shown on the drawings. The cost of such investigation will be borne by the Contractor. Any defects will be cause for rejection and rejected welds shall be repaired and retested at the Contractor's expense.

1.5.3 Workmanship

Workmanship shall be of the highest grade and in accordance with the best modern practices to conform with the specifications for the item of work being furnished.

1.5.4 Quality Control

The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements and shall maintain records of all quality control operations covered by these specifications.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 STRUCTURAL FABRICATION

3.1.1 Material

Material must be straight before being laid off or worked. If straightening is necessary it shall be done by methods that will not impair

SECTION 05 50 03.00 12 Page 6 the metal. Sharp kinks or bends shall be cause for rejection of the material. Material with welds will not be accepted, except where welding is definitely specified, indicated on the drawings, or otherwise approved.

Bends, except for minor details, shall be made by approved dies, press brakes or bending rolls. Where heating is required precautions shall be taken to avoid overheating the metal and it shall be allowed to cool in a manner as not to destroy the original properties of the metal. Flame cutting of material other than structural steel shall be subject to approval and, where proposed, shall be indicated on shop drawings submitted to the Contracting Officer. Shearing shall be accurately done and all portions of the work shall be neatly finished. Corners shall be square and true unless otherwise shown on the drawings. Re-entrant cuts shall be filleted to a minimum radius of 3/4-inch unless otherwise approved.

Finished members shall be free from twists, bends and open joints.

3.1.2 Dimensional Tolerances for Structural Work

Dimensions shall be measured by means of an approved calibrated steel tape of approximately the same temperature as the material being measured at the time of measurement. The overall dimensions of an assembled structural unit shall be within the tolerances as follows: an allowable variation of 1/32-inch is permissible in the overall length of component members with both ends milled; individual component members without milled ends shall not deviate from the dimensions shown on the drawings by more than 1/16-inch for members 30 feet or less in length and by more than 1/8-inch for members over 30 feet in length.

3.1.3 Fabrication

Fabrication must be in accordance with the applicable provisions of AISC 325.

Fabrication and assembly must be done in the shop to the greatest extent possible. Punch, subpunch and ream, or drill bolt holes perpendicular to the surface of the member.

3.2 STRUCTURAL STEEL WELDING

3.2.1 General

Unless otherwise authorized or specified, welding of structural steel shall be by an electric arc welding process using a method which excludes the atmosphere from the molten metal. Welding, unless otherwise specified or authorized shall conform to the applicable provisions of AWS D1.1/D1.1M.

3.2.2 Welding Equipment

All items of welding equipment shall conform to the requirements of

AWS D1.1/D1.1M.

3.2.3 Structural Steel Fabrication

Structural steel may be cut by mechanically guided or hand guided torches provided an accurate profile with a smooth surface which is free from cracks and notches is obtained. Surfaces and edges to be welded shall be prepared in accordance with AWS D1.1/D1.1M and approved WPS. Where structural steel is not to be welded chipping or grinding will not be required except as necessary to remove slag and sharp edges of mechanically guided or hand guided cuts not exposed to view. Hand guided cuts that are to be exposed or visible shall be chipped, ground or machined to sound

SECTION 05 50 03.00 12 Page 7 metal. In all cutting, flame shall be so adjusted and manipulated as to avoid cutting beyond the prescribed lines. Cut surfaces and edges shall be left free of slag. Splices, not designated on the drawings, shall be submitted to the Government Representative for approval.

3.2.4 Welding Procedure Specifications (WPS)

The Contractor shall prepare for submission to the Contracting Officer a complete schedule of welding procedures which shall consist of detailed procedure specifications for each structure to be welded and tables or diagrams showing the procedure to be used for each required joint. The schedule shall conform to the provisions of AWS D1.1/D1.1M as applicable to Cyclically Loaded Structures, include filler metal requirements, preheat and interpass temperature requirements and any stress relief heat treatment, and show types and locations of welds designated on the drawings and/or in the specifications to receive nondestructive examination. The procedures shall be such as to minimize residual stresses and distortion of the completed weldment. Procedures shall be qualified by tests as prescribed in AWS D1.1/D1.1M, Clause 6, Part B or Clause 10, Part C except for prequalified procedures described in AWS D1.1/D1.1M, Clause 5, or Clause 10, Part B. Copies of the Procedure Qualification Report (PQR)shall be submitted to the Contracting Officer along with appropriate WPS's.

Properly documented evidence of compliance with all requirements of these specifications for previous qualification tests shall establish the joint welding procedure as prequalified. Each procedure shall be clearly identified as being either prequalified or qualified by tests. The test welding and specimen testing must be witnessed and the test report document signed by a representative of the Contracting Officer. The Contractor will be directed or authorized to make any changes in previously approved welding procedures that are deemed necessary or desirable by the Contracting Officer. Approval of any procedure, however, will not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications. A CWI or NDT Inspector meeting the qualification stated herein shall approve all WPS's and PQR's.

The CWI's or NDT Inspector's signature and if applicable stamp shall be on every WPS and PQR submitted.

3.2.5 Welder, Welding Operator and Tacker Qualification Certification

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .