This document provides specifications for a federal solicitation seeking jetty stone and related repair services. The solicitation is for the Port Fourchon Navigation Channel East and West Jetty Repair project in Lafourche Parish, Louisiana, issued by the Department of the Army Corps of Engineers Engineering District New Orleans. Services required include furnishing jetty stone, bullnose stone, excavating and maintaining a flotation channel for barge access, and performing compliance surveys. Stone must meet specifications for size, gradation, weight and quality. The deadline for bids is September 1, 2023 by 10:00 AM with bid opening at 11:00 AM on the same date. Payment will be made per ton of stone delivered and placed, with measurement based on barge displacement. Surveys will ensure stone placement meets grade and tolerance requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The subject solicitation for Port Fourchon Navigation Channel, East and West Jetty Repair, Lafourche Parish, Louisiana (ED-22-056), is hereby amended as follows:

1) Provides revisions to the subject requirement as stated on the following continuation pages.

2) The bid submission deadline is Friday, September 1, 2023, 10:00AM, local time. The virtual bid opening date and time is September 1, 2023, 11:00AM, local time.

PLEASE ACKNOWLEDGE AND SUBMIT THIS AMENDMENT WITH YOUR BID PACKAGE.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

U.S. Army Engineer District, New Orleans Attn: CEMVN-CT-W 7400 Leake Avenue, Room 172 New Orleans, LA 70118-3651

W912P823B0023

ED 22-056

1 13

08/25/2023

9B. DATED (SEE ITEM 11)

07/26/2023

See Item 6

W912P8

J

SECTION 35 31 19.03 12

Delete this section in its entirety and substitute the attached revised Section 35 31 19.03 12, therefore.

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 31 19.03 12

JETTY STONE

PART 1 GENERAL

1.1 SCOPE

1.2 MEASUREMENT AND PAYMENT

1.2.1 General

1.2.2 Stone

1.2.2.1 Measurement

1.2.2.2 Payment

1.2.3 Flotation Access

1.3 REFERENCES

1.4 SUBMITTALS

1.5 QUALITY CONTROL

1.5.1 General

1.5.2 Reporting

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Jetty Stone

2.1.1.1 General

2.1.1.2 Sources and Evaluation Testing

2.1.1.3 Gradation of Stone

2.2 MVN STANDARD TEST METHOD FOR GRADATION OF STONE

2.2.1 General

2.2.1.1 Sample Selection

2.2.1.2 Selection of Size for Separation

2.2.2 Procedure

PART 3 EXECUTION

3.1 SITE PREPARATION

3.2 FLOTATION ACCESS

3.3 JETTY STONE PLACEMENT

3.3.1 General Stone Placement

3.3.2 Jetty Repair Stone Placement

3.3.3 Bullnose Stone Placement

3.3.4 Tolerances

-- End of Section Table of Contents --

SECTION 35 31 19.03 12 Page 1 ED 22-056

SECTION 35 31 19.03 12

JETTY STONE

PART 1 GENERAL

1.1 SCOPE

The work provided for herein consists of furnishing all plant, labor, equipment, and materials, and performing all operations in connection with flotation channel excavation and the jetty repairs of the existing East and West Jetty at the Port Fourchon Jetties, located at the mouth of the Port Fourchon Navigation Channel in the Gulf of Mexico in Lafourche Parish, as shown on the contract drawings.

1.2 MEASUREMENT AND PAYMENT

1.2.1 General

No separate measurement or payment will be made for furnishing inspection service, surveying, making reports and performing other services in connection with the Contractor Quality Control Inspection System, and site preparation including preparing and clearing the base. All costs in connection therewith shall be included in items to which the work is incidental.

1.2.2 Stone

1.2.2.1 Measurement

The unit of measurement for stone satisfactorily placed in the work will be the ton (2,000 pounds). Quantities will be computed to the nearest whole ton. If delivered by barge, the Contracting Officer's Representative will measure stone for payment by weight determined by barge displacement. Not less than 10 days prior to unloading stone from any barge for which a displacement table has not previously been furnished and approved, the Contractor shall furnish the Contracting Officer a barge displacement table. The Contractor shall furnish with the barge displacement tables a drawing or sketch of each barge, dimensioned in sufficient detail to permit checking of the tables. The drawing shall show, as a minimum, the length, width, and depth of the barge, and dimensions of the rake or rakes. Each such table shall have its accuracy certified by a person or firm, other than the Contractor, customarily performing this service and who has been approved by the Contracting Officer. Each table submitted shall show the name and/or number of the barge, the barge dimensions, the barge owner, the name of the fabricator, certification, and date of certification of the person or firm preparing the table. All new or modified barges shall be field checked for current dimensions by the Contractor, in the presence of the Contracting Officer's Representative. Each table submitted shall contain in parallel columns, the freeboard of the barge in feet and tenths from zero to the full depth of the barge, and the corresponding gross displacement to the nearest ton. Each barge shall be suitably marked with two displacement gaging lines along each side of the barge. Each gaging line shall be painted perpendicular to the edge of the barge and be no less than 4 inches wide and 1 foot long, on both the deck and side of the barge. Barges with

SECTION 35 31 19.03 12 Page 2 ED 22-056 rakes shall have the displacement gaging lines placed at each corner of the box section between the rakes. If a barge has a box end or ends, the gaging lines shall be placed approximately four feet from the box end.

The freeboard will be measured at the four gaging locations and the displacement determined by the use of the "CEMVD Standard Barge Tables" from the average of these measurements. The displacement shall be determined before and after the barge is unloaded and the difference between these values shall be the quantity delivered. All barge measurements will be taken without adjustment for the degree of salinity in the water. The Contractor shall, during bid preparation, estimate the degree of salinity present in the water and include any adjustments in the bid price for "Jetty Stone", "Bullnose Stone", "Jetty Stone - OW" or "Bullnose Stone - OW", if Optional Work is exercised. All barge displacement measurements will be taken assuming fresh water. The determination of satisfactorily placed stone shall be based on survey cross sections. The quantity of stone placed in the work will be reasonably estimated at each individual work site and quantities adjusted upon completed use of a barge of material, or completion of the contract.

No payment will be made for any unauthorized use of the stone.

1.2.2.2 Payment

Payment for stone will be made at the contract unit price per ton for "Jetty Stone" or "Bullnose Stone", "Jetty Stone - OW" or "Bullnose Stone - OW", if Optional Work is exercised. Price and payment shall constitute full compensation for furnishing, hauling, handling, testing, site preparation, placing of stone, maintaining the stone until accepted by the Government; performing "Compliance Jetty Repair Cross Sections Surveys", "Compliance Jetty Repairs Profile Surveys", and "Construction Channel Multibeam Surveys"; all as specified herein and as shown on the drawings.

The Contractor will not be paid for stone placed outside the allowable tolerance.

1.2.3 Flotation Access

No measurement will be made for excavating and maintaining the flotation channel and any removal of materials. Payment for excavating and maintaining the flotation channel will be made at the contract job price for "Flotation Access." Price and payment shall constitute full compensation for excavating and maintaining the flotation channel, disposing earthen material; removing obstacles to construction; and segregating and disposing of debris.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When

SECTION 35 31 19.03 12 Page 3 ED 22-056 used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Stone Sources; G, ED

The Contractor shall submit to the Contracting Officer's Representative (COR) the source of stone that it intends to use along with gradation tests from the quarry.

SD-07 Certificates

Stone Gradation Tests; G, ED

Barge Displacement Tables; G, CD

The Contractor shall submit the Barge Displacement tables to the Contracting Officer's Representative (COR) for approval. Each table submitted shall contain in parallel columns, the freeboard of the barge in feet and tenths from zero to the full depth of the barge, and the corresponding gross displacement to the nearest ton.

1.5 QUALITY CONTROL

1.5.1 General

The Contractor shall establish and maintain quality control for all stone placement operations to ensure compliance with contract requirements, and shall maintain records of the quality control for all construction operations. All information pertaining to inspection and quality control shall be included in the quality control reports to be furnished to the Contracting Officer including, but not limited to, the following:

(1) Submission of stone samples for quality testing, if from other than an approved source.

(2) Inspection of materials before they are incorporated into the work to insure compliance with contract requirements.

(3) Cleanliness of stone.

(4) Gradation of stone.

(5) Quantity of stone delivered and placed each day.

(6) Surveys. Prior to any construction, the Contractor shall conduct preliminary surveys in accordance with Section 02 21 10.00 12 SURVEYS. The Contractor shall layout the work and take surveys of placed stone for compliance with the grades, limits and tolerances set in accordance with the contract drawings, Section 02 21 10.00 12 SURVEYS and as specified herein.

1.5.2 Reporting

The original and two copies of the records of inspection and tests, as well as the records of corrective action taken, shall be furnished to the Government daily. Format of the report shall be as prescribed in

SECTION 35 31 19.03 12 Page 4 ED 22-056

Section 01 45 04.00 10 CONTRACTOR QUALITY CONTROL.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Jetty Stone

2.1.1.1 General

All stone shall be a hard, durable material as approved by the Contracting Officer. The sources from which the Contractor proposes to obtain the material shall be selected well in advance of the time when the material will be required. Stone shall be of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used.

It shall be free from cracks, seams and other defects that would tend unduly to increase its deterioration from natural causes. The inclusion of objectionable quantities of dirt, sand, clay and rock fines will not be permitted. Neither the width nor thickness of any piece shall be less than one third of its length. The faces of individual pieces of stone shall be roughly angular, not rounded in shape. Field stone, rectangular block stone, slabs, and rounded boulders will not be accepted. Gradation shall conform to Table 1 below.

TABLE I - JETTY STONE

Range i n Si ze Per cent Of Si ze Requi r ed

2 to 4 tons 50 percent - 3 tons or more

Some breakage of stone will occur due to handling, however, use of stones smaller than two (2) tons will be limited to 15 percent and shall be used at locations specified by the Contracting Officer.

Specific weight = 155 pounds per cubic foot (pcf)

2.1.1.2 Sources and Evaluation Testing

Stone shall be obtained in accordance with the General Provision entitled " STONE SOURCES" (see Section 01100 GENERAL PROVISIONS). If the Contractor proposes to furnish stone from a source not listed in "STONE SOURCES", the Government will make such investigations as necessary to determine whether acceptable stone can be produced from the proposed source. Satisfactory service records on work outside the Corps of Engineers will be acceptable. If no such records are available, the Government will make tests to assure the acceptability of the stone. The tests to which the stone may be subjected will include petrographic analysis, specific gravity, abrasion, unit weight, absorption, wetting and drying, freezing and thawing and such other tests as may be considered necessary by the Contracting Officer. The following guidance is provided for use by the Contractor in analyzing a source of stone not listed in "STONE SOURCES".

Stone that weighs less than 155 pounds per cubic foot or has more than 2 percent absorption will not be accepted unless other tests and service records show that the stone is satisfactory. The method of test for unit weight and absorption will be ASTM C 127 except that unit weight will be calculated in accordance with note 5 using bulk specific gravity, S.S.D.

Samples of stone from a source not listed in "STONE SOURCES" shall be submitted to the Contracting Officer for testing and acceptance prior to

SECTION 35 31 19.03 12 Page 5 ED 22-056 delivery of any stone to the site of the work. Samples shall consist of at least seven pieces of stone, roughly cubical in shape and weighing not less than 100 pounds each. All such samples shall be taken by the Contractor under the supervision of the Contracting Officer. The samples shall be shipped at the Contractor's expense to the US Army Engineer Research and Development Center (ERDC), 3909 Halls Ferry Road, Vicksburg, Mississippi 39180-6199, at least 90 days in advance of the time of the placing of the stone is expected to begin. The tests will be conducted in accordance with applicable Corps of Engineers methods of tests and will be performed at the US Army Engineer Research and Development Center (ERDC), Vicksburg, Mississippi. The cost of testing will be borne by the Government.

2.1.1.3 Gradation of Stone

Stone gradation tests shall be accomplished at the quarry. Tests by weight shall be made by the Contractor in the presence of the Contracting Officer's Representative. The Contractor shall notify the Contracting Officer not less than 3 working days in advance of each test. In the event of nonavailability of the Government representative, the Contractor shall perform the tests and certify to the Contracting Officer that the stone shipped complies with the specifications. A minimum of one test shall be performed for each 50,000 tons, or fraction thereof, of jetty stone and/or bullnose stone, supplied to the Government from each source.

Each test sample shall be representative of the jetty stone being shipped and consist of not less than 50 tons. Percentage determinations shall be made for each stone weight specified in paragraph General . Gradation test data shall be recorded on MVN form 602-R "Gradation Test Data Sheet," a copy of which is shown at the end of this section. Failure of the test on the initial sample and on an additional sample will be considered cause for rejection of the quarry and/or quarrying process, and all stone represented by the failed tests shall be set aside and not incorporated into the work. Any additional test required because of the failure of an initial test sample will not be considered as one of the other required tests. Certification and test results will represent stone shipped from the quarry and must be received by the Government representative before the stone is used in the work. The Contractor shall designate on the test form that portion (in tons) of the lot tested which is applicable to this contract. Any deviation from the reported tonnage shall be corrected on a revised gradation test form. The Contracting Officer may direct, under the Clause in Section 00700 CONTRACT CLAUSES, entitled "INSPECTION OF CONSTRUCTION" (FAR 52.246-12), additional testing of stone furnished to the worksite if the stone appears, by visual inspection, to be of questionable gradation or quality. Refer to paragraph MVN STANDARD TEST METHOD FOR GRADATION OF STONE for the gradation test method.

2.2 MVN STANDARD TEST METHOD FOR GRADATION OF STONE

2.2.1 General

2.2.1.1 Sample Selection

The most important part of the test and the least precise is the selection of a representative sample. No "standard" can be devised; larger quarry run stone is best sampled at the shot or muck pile by given direction to the loader; small graded stone is best sampled by random selection from the transporting vehicles. If possible, all parties should take part in the sample selection, and agree before the sample is run, that the sample is representative.

SECTION 35 31 19.03 12 Page 6 ED 22-056

2.2.1.2 Selection of Size for Separation

It is quite possible and accurate to run a gradation using any convenient sizes for separation, without reference to specifications. After the test is plotted on a curve, then the gradation limits may be plotted.

Overlapping gradations with this method are no problem. It is usually more convenient, however, to select points from the gradation limit, such as the minimum 50 percent size, the minimum 15 percent size, and one or two others, as separate points.

2.2.2 Procedure

(1) Select a representative sample (See paragraph Sample Selection), weigh and dump on hard stand.

(2) Select specific sizes (see example) on which to run "individual weight larger than" test. Procedure is similar to the standard aggregate gradation test for "individual weight retained".

(3) Determine the largest size stone in the sample. (100 percent size).

(4) Separate by "size larger than" the selected weights, starting with the larger sizes. Use reference stones, with identified weights, for visual comparison in separating the obviously "larger than" stones. Stones that appear close to the specific weight must be individually weighed to determine size grouping. Weigh each size group, either individually or cumulatively.

(5) Subparagraph (4) will result in "individual weight retained" figures. Calculate individual percent retained (heavier than) and cumulative percent retained and cumulative percent passing (lighter than). Plot percent passing, along with the specification limits on ENG Form 4055 and fill-in and document test on MVN Form 602-R.

EXAMPLE GRADATION

SPECIFICATIONS

STONE WEIGHT IN LBS. INDIVIDUAL PERCENT RETAINED

75 - 125 10 max.

25 - 74 40 - 60 6 - 24 20 - 40 <6 15 max.

EXAMPLE WORKSHEET

STONE WEIGHT INDIVIDUAL WEIGHT INDIVIDUAL %

IN LBS. IN POUNDS RETAINED SPECIFICATIONS

+125 0 0 0 0 75 - 125 2,600 30 30 0 25 - 74 16,200 35 65 5 6 - 24 10,000 25 90 0 < 6 3,200 10 100 0 TOTAL 32,000 lbs.

NOTE: Largest stone 125 lbs.

SECTION 35 31 19.03 12 Page 7 ED 22-056

PART 3 EXECUTION

3.1 SITE PREPARATION

All deteriorated structures, debris, vegetation and abandoned piling which lie within the template of the jetties or interfere with construction shall be removed and disposed of in accordance with Section 01 57 20.00 12 ENVIRONMENTAL PROTECTION of these specifications. Immediately prior to placing stone, the area to receive the stone will be inspected by the Contracting Officer and no material shall be placed thereon until that area has been approved.

3.2 FLOTATION ACCESS

The Contractor is allowed to excavate a flotation channel, for access at the locations shown on the drawings. The flotation channel shall be dredged/excavated to the limits, slopes, and grades shown on the contract drawings as needed. The top edge of cut (T.E.C.) closest to the jetty shall be the control line for the flotation channel excavation. The top edge of cut for the flotation channel excavation shall be a minimum 60 feet offset from the jetty centerline within the navigation channel. The allowable bottom width for the flotation channel shall have a maximum width of 80 feet. The allowable depth of the flotation channel shall be no lower than elevation -8.0' (NAVD88). All excavated material from the flotation channel shall be placed in the temporary stockpile adjacent to the flotation channel in accordance with the contract drawings. Any obstructions encountered during flotation channel excavation, such as submerged stone, stumps, timber piles and debris shall be separated from the earthen materials, removed from the site of work and disposed of in accordance with Section 01 57 20.00 12 ENVIRONMENTAL PROTECTION. No separate payment will be made for excavating and removal of these obstructions. Prior to project completion, all material in the temporary stockpile shall be removed and placed in the excavated flotation channel.

The temporary stockpile area shall be brought back to the surrounded matching grade of the water bottom. The excavated flotation channel shall not be backfill above the existing water bottom.

3.3 JETTY STONE PLACEMENT

3.3.1 General Stone Placement

All stone shall be placed by clamshell bucket, stone grab, or by some other method approved by the Contracting Officer that will not drop or cast the stone, but will release the stone in such a manner that they will be properly interlocked with the underlying or adjacent stones to resist displacement by wave action and provide a uniform and compact section.

Each stone shall be firmly set and well supported by underlying and adjacent stone. The Contractor shall relocate the unsatisfactorily placed stone within the specified limits for payment or the weight of the stone so misplaced will be estimated by the Contracting Officer's Representative and the payment deductions shall be determined from this estimate and the bid unit price of the stone. The larger stones shall be well distributed and the entire mass of stones in their final position shall be graded to conform to the gradation specified in paragraph "General". The finished stone shall be free from objectionable pockets of small stones and clusters of larger stones. Placing stone by dumping it at the top of the slope and pushing it down the slope will not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be

SECTION 35 31 19.03 12 Page 8 ED 22-056 obtained by selective loading of the material at the quarry or other source; by controlled dumping of successive loads during final placing; or by other methods of placement, which will produce the specified results.

Rearranging of individual stones by mechanical equipment will be required to the extent necessary to obtain a reasonably well-graded distribution of stone sizes as specified above. The Contractor shall maintain the stone until accepted and any material displaced prior to acceptance, and due to the Contractor's negligence, shall be replaced at the Contractor's expense to the slopes, lines and grades shown on the contract drawings.

3.3.2 Jetty Repair Stone Placement

Stone shall be placed within the lines, grades, dimensions, and crown elevation in accordance with the "East and West Jetty Repair and Bullnose Theoretical Section" plans, and profiles shown in the contract drawing and within the specified tolerances in accordance with paragraph "Tolerances".

3.3.3 Bullnose Stone Placement

Stone shall be placed within the lines, grades, dimensions, and crown elevation in accordance with the "East and West Jetty Repair and Bullnose Theoretical Section" plans, and profiles shown in the contract drawing and within the specified tolerances in accordance with paragraph "Tolerances".

3.3.4 Tolerances

A tolerance of plus 18 inches from the slopes, lines and grades shown on the contract drawings will be allowed in the finished surface of the stone, except that the extreme of this tolerance shall not be continuous over a distance greater than 200 linear feet. The average tolerance for each layer of the entire job shall be no more than 50 percent of the tolerances specified above.

-- End of Section --

SECTION 35 31 19.03 12 Page 9 ED 22-056

GRADATION TEST DATA SHEET

Quarry Type of Stone Tested

Date of Test Testing Rate Tons

TEST REPRESENTS

Contract No. District Tons

Total

GRADATION

Cumulative Stone Weight

(lbs)

Weight Retained

(lbs)

Individual Percent Retained

Percent Retained

Percent Passing

Specification Requirement

Total Weight

Remarks:

I certify that the above sample is representative of the total tonnage covered by this test report.

Contractor Representative

Government Representative

MVN FORM 602-R

Jun 02

Am_0003r_W912P823B0023_Port Fourchon Navigation Channel, East and West Jetty Repair_Ed-22-056.pdf
Am_0002_W912P823B0023_Port Fourchon Navigation Channel, East and West Jetty Repair, Lafourche Parish, Louisiana ED-22-056
Am_0003__Port Fourchon_ East and West Jetty Repair_Ed-22-056
35 31 19.03 12
35 31 19.03 12 - JETTY STONE
35 31 19.03 12 - JETTY STONE
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.2.1 General
1.2.2 Stone
1.2.2.1 Measurement
1.2.2.2 Payment

1.2.3 Flotation Access

1.3 REFERENCES
1.4 SUBMITTALS
1.5 QUALITY CONTROL
1.5.1 General
1.5.2 Reporting
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Jetty Stone
2.1.1.1 General
2.1.1.2 Sources and Evaluation Testing
2.1.1.3 Gradation of Stone
2.2 MVN STANDARD TEST METHOD FOR GRADATION OF STONE
2.2.1 General
2.2.1.1 Sample Selection
2.2.1.2 Selection of Size for Separation

2.2.2 Procedure

PART 3 EXECUTION
3.1 SITE PREPARATION
3.2 FLOTATION ACCESS
3.3 JETTY STONE PLACEMENT
3.3.1 General Stone Placement
3.3.2 Jetty Repair Stone Placement
3.3.3 Bullnose Stone Placement
3.3.4 Tolerances
35 31 19.01 12_Form602-R
35 31 19.03 12_Form4055copy