Schedule of Prices 20-B-0061.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- WHEELER DRY DOCK Federal contract opportunity
- Solicitation number
- W912P820B0061
About this file
This solicitation requests proposals for dry-docking services for the dredge Wheeler. Key details include that the vessel is a 408-foot steel-hulled hopper dredge with a registered gross tonnage of 10,614 long tons. Vendors must contact the contract specialist to receive 194 technical drawings and schematics of the vessel via eight DOD SAFE file transfer links. The purpose is for inspection, maintenance, and repair services while dry-docked. This is a total small business set-aside being conducted by the US Army Corps of Engineers New Orleans District. Proposals are due by the response date specified in the solicitation.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SECTION B | |
| SUPPLIES OR SERVICES AND PRICE/COSTS | |
| SECTION B | |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
| Item | Spec. | Description | Qty. | U/I | Unit Price | Amount | ||
| 0001 | DD-1 | Berthage, Drydocking, and Services | 1 | jb | ||||
| 0002 | DD-2 | Sea Chests and Gratings | 1 | jb | ||||
| 0003 | DD-3 | Sea Chests Strainers | 1 | jb | ||||
| 0004 | DD-4 | Sea Valves | 1 | jb | ||||
| 0005 | DD-5 | Anchors and Anchor Chains | 1 | jb | ||||
| 0006 | DD-6 | Hopper Doors | 7 | ea | ||||
| 0007 | DD-6.1 | (Optional) Hopper Door Top Insert Plates Renew | 10 | ea | ||||
| 0008 | DD-6.2 | (Optional) Hopper Door Side Plates Renew | 10 | ea | ||||
| 0009 | DD-6.3 | (Optional) Hopper Door Fwd & Aft Plates Renew | 6 | ea | ||||
| 0010 | DD-6.4 | (Optional) Hopper Door (3/4") Hinge Plate Bushing | 30 | ea | ||||
| 0011 | DD-6.5 | (Optional) Hopper Door (1-3/4") Hinge Plate Bushing | 30 | ea | ||||
| 0012 | DD-6.6 | (Optional) Hopper Door (3/4") Hinge Plate Replacement | 20 | ea | ||||
| 0013 | DD-6.7 | (Optional) Bearing Pot Replacement | 40 | ea | ||||
| 0014 | DD-6.8 | (Optional) Bearing Pot Bushings | 40 | ea | ||||
| 0015 | DD-6.9 | (Optional) Hopper Door Pad Eye Bushings | 28 | ea | ||||
| 0016 | DD-6.10 | (Optional) Top Bushing on Lower Push-Pull Rods w/Eye | 14 | ea | ||||
| 0017 | DD-6.11 | (Optional) Top Bushing on lower Push-Pull Rods w/Fork | 14 | ea | ||||
| 0018 | DD-6.12 | (Optional) Bottom Bushing on Push-Pull Rods | 28 | ea | ||||
| 0019 | DD-6.13 | (Optional) Replacement of 7 Hopper Door Seals | 7 | ea | ||||
| 0020 | DD-6.14 | (Optional) Upper Rod Lower Guide Support Repl. | 20 | ea | ||||
| 0021 | DD-6.15 | (Optional) Upper Rod Lower Guide Block Repair | 56 | ea | ||||
| 0022 | DD-6.16 | (Optional) Upper Rod Upper Guide Block Repair | 56 | ea | ||||
| 0023 | DD-6.17 | (Optional) Upper Rod New Sleeve Installation | 7 | ea | ||||
| 0024 | DD-7 | Zinc Anodes | 1 | jb | ||||
| 0025 | HH-1 | Hopper Bay Inspection | 1 | jb | ||||
| 0026 | HH-2.1.1 | (Optional) Hopper Bay Plating, Athwartship, Plate A | 7 | ea | ||||
| 0027 | HH-2.1.2 | (Optional) Hopper Bay Plating, Athwartship, Plate B | 7 | ea | ||||
| 0028 | HH-2.1.3 | (Optional) Hopper Bay Plating, Athwartship, Plate C | 7 | ea | ||||
| 0029 | HH-2.1.4 | (Optional) Hopper Bay Plating, Athwartship, Plate D | 7 | ea | ||||
| 0030 | HH-2.2.1 | (Optional) Hopper Bay Plating, Longitudinal, Plate A | 7 | ea | ||||
| 0031 | HH-2.2.2 | (Optional) Hopper Bay Plating, Longitudinal, Plate B | 7 | ea | ||||
| 0032 | HH-2.3 | (Optional) Longitudinal Reinforced Plate in Voids | 7 | ea | ||||
| 0033 | HH-3 | (Optional) Hopper Bay Sloped Plate Weld Seam Repair | 20 | ea | ||||
| 0034 | HH-4 | (Optional) Wing Voids Interior Weld Seam Repair | 20 | ea | ||||
| 0035 | HH-5 | (Optional) Centerwell Bulkhead Weld Seams Repair | 20 | ea | ||||
| 0036 | HH-6 | (Optional) Hopper Weld Seam Repair (Various Locations) | 20 | ea | ||||
| 0037 | HH-7.1 | (Optional) Large Vertical T-Beam Section | 3 | ea | ||||
| 0038 | HH-7.2 | Medium Vertical T-Beam Section | 1 | jb | ||||
| 0039 | HH-7.3 | Small Vert. T-Beam Section (Above Stringer) | 1 | jb | ||||
| 0040 | HH-7.4 | Small Vert. T-Beam Section (Below Stringer) | 1 | jb | ||||
| 0041 | HH-7.5 | STRINGER PLATE SECTION. | 1 | jb | ||||
| 0042 | HH-7.6 | CENTERWELL AFT BULKHEAD REPAIRS | 1 | jb | ||||
| 0043 | HH-8 | (Optional) Ultrasonic Thickness Measurements | 10000 | ea | ||||
| 0044 | HH-9 | Cover For Stacks | 1 | jb | ||||
| 0045 | HH-10 | (Optional) Services of Machinist (outside) | 500 | hr | ||||
| 0046 | HH-11 | (Optional) Machining | 50 | hr | ||||
| 0047 | HH-12.1 | (Optional) Mild Steel Welding | 100 | hr | ||||
| 0048 | HH-12.2 | (Optional) Low Hydrogen Welding | 200 | hr | ||||
| 0049 | HH-12.3 | (Optional) Stainless Steel Welding | 200 | hr | ||||
| 0050 | HH-12.4 | (Optional) Inspection of Welds | 50 | hr | ||||
| 0051 | HH-12.5 | REPAIR CRACK ON CRANE SUPPORT RAIL | 1 | jb | ||||
| 0052 | HH-13 | Ballast Tanks, Voids, and CofferDams | 1 | jb | ||||
| 0053 | HH-14 | Dirty Lube Oil, Oily Bilge & Sludge Tanks | 1 | jb | ||||
| 0054 | HH-15 | Fuel Oil Tanks | 1 | jb | ||||
| 0055 | HH-16 | Fuel Oil Vent Containments | 1 | jb | ||||
| 0056 | HH-17 | Protection, Cleaning, and Surface Preparation | 1 | jb | ||||
| 0057 | HH-18 | (OPTIONAL) BLAST AND PAINT HOPPER DECK & ASSOCIATED COMPONENTS. | 1 | jb | ||||
| 0058 | HH-19 | POOP DECK WINCHES DECK PLATES REPLACEMENT | 1 | jb | ||||
| 0059 | HH-20 | BLAST AND PAINT NO. 7 PORT, STARBOARD, CENTER BALLAST | ||||||
| TANKS AND OILY BILGE TANK | 1 | jb | ||||||
| 0060 | HH-21 | INSERT PLATING ON TRANSOM AND AFT SHELL PLATING POOP DECK LEVEL | 1 | jb | ||||
| 0061 | HH-22 | INSERT PLATING ON PORT SIDE CURTAIN HELO DECK | 1 | jb | ||||
| 0062 | HH-23 | INSERT PLATING ON HOPPER COAMING FRAME 61 | 1 | jb | ||||
| 0063 | HH-24 | DECK PLATING UPPER DECK #2 STARBOARD VOID | 1 | jb | ||||
| 0064 | HH-25 | SHELL PLATE INSERT FRAME 60 | 1 | jb | ||||
| 0065 | HH-26 | PUMP MOTOR ROOM HATCH STEEL REPAIRS | 1 | jb | ||||
| 0066 | HH-27.1 | BULKHEADS FRAME 61 | 1 | jb | ||||
| 0067 | HH-27.2 | BULKHEADS & SLOPED PLATES FRAME 114 (PORT & STARBOARD) | 1 | jb | ||||
| 0068 | HH-27.3 | CENTERWELL BULKHEADS at SLOPED PLATES(PORT, STARBOARD) | 1 | jb | ||||
| 0069 | HH-28.1 | HOPPER BAY TRANSVERSE BEAMS REPLACEMENT (FIRST HOPPER AREA – FRAME 61 TO 83) | 1 | jb | ||||
| 0070 | HH-28.2 | HOPPER BAY TRANSVERSE BEAMS REPLACEMENT – BOX SHAPE BEAMS (FRAME 83-84) – PORT & STARBOARD | 1 | jb | ||||
| 0071 | HH-28.3 | (Optional) HOPPER BAY TRANSVERSE BEAMS REPLACEMENT – I BEAMS (FRAME 87-114) – PORT & STARBOARD | 12 | ea | ||||
| 0072 | HH-29 | Angle Brackets for Centerwell Draghead | 1 | jb | ||||
| 0073 | MP-1.1 | Propeller Hydraulic System Inspection | 1 | jb | ||||
| 0074 | MP-2 | RUDDER STOP PORT & STARBOARD | 1 | jb | ||||
| 0075 | MP-3.1 | Bow Thruster Inspection & Maintenance | 1 | jb | ||||
| 0076 | MP-4.1 | Rudder Stock & Pintle Pin Clearances (Port & Starboard) | 1 | jb | ||||
| 0077 | MD-1.1 | Sluice Valve Inspection | 1 | jb | ||||
| 0078 | MD-1.2.1 | (Optional) Sluice Valve, 18-Inch Diameter | 5 | ea | ||||
| 0079 | MD-1.2.2 | (Optional) Sluice Valve, 24-Inch Diameter | 2 | ea | ||||
| 0080 | MD-1.2.3 | (Optional) Sluice Valve, 26-Inch Diameter | 2 | ea | ||||
| 0081 | MD-1.2.4 | (Optional) Sluice Valve, 30-inch Diameter | 3 | ea | ||||
| 0082 | MD-1.2.5 | (Optional) Sluice Valve, 32-inch Diameter | 2 | ea | ||||
| 0083 | MD-1.2.6 | (Optional) Sluice Valve, 43-inch Diameter | 1 | ea | ||||
| 0084 | MD-1.3 | (Optional) Collection Valve Gate Repair | 3 | jb | ||||
| 0085 | MD-1.4 | Collection Valve Flushing Lines and Body Cleaning | 1 | jb | ||||
| 0086 | MD-2 | REPAIRS TO PORT #12 30 INCH SLUIVE VALVE | 1 | jb | ||||
| 0087 | MD-3 | DREDGE PIPES & VALVES IN VOIDS REPLACEMENT | 1 | jb | ||||
| 0088 | MD-4 | REPAIR CENTER DRAGARM COMPONENTS | 1 | jb | ||||
| 0089 | MD-5 | REPAIR CENTER DRAGARM HOISTING BLOCKS | 1 | jb | ||||
| 0090 | MD-6 | REPAIR HOLE IN SLUICE VALVE 2F PORT | 1 | jb | ||||
| 0091 | MA-1 | MAIN PLATE COOLERS, CLEANING AND INSPECTION & PIPES REPLACEMENT (PORT & STARBOARD) | 1 | jb | ||||
| 0092 | MA-2 | Drain, flush, refill and treat freshwater system | 1 | jb | ||||
| 0093 | MA-3 | Clean Two Fresh Water Expansion Tanks | 1 | jb | ||||
| 0094 | MA-4 | PORT & STARBOARD AC CHILLED WATER UNITS REPLACEMENT AND AMR DECK PLATES REPLACEMENT | 1 | jb | ||||
| 0095 | MA-5 | SEA VALVE #21 PIPING AND FLANGE RENEWAL | 1 | jb | ||||
| 0096 | MA-6 | (Optional) Insulation Replacement Throughout AMR | 200 | ea | ||||
| 0097 | MA-7 | REPLACE 9 WINCHES WIRE ROPES | 1 | jb | ||||
| 0098 | MA-8 | CENTERWELL SWELL COMP CYLINDER | 1 | jb | ||||
| 0099 | MA-9 | REPLACE DRAIN PIPING FROM GALLEY | 1 | jb | ||||
| 0100 | MA-10 | NEW OVERHEAD INSULATION ON POOP & UPPER DECK PASSAGEWAYS | 1 | jb | ||||
| 0101 | MA-11 | NEW INSULATION INSTALLATION (ROPE STOWAGE & BOATSWAIN STORES) | 1 | jb | ||||
| 0102 | MA-12 | POTABLE WATER SYSTEM | 1 | jb | ||||
| 0103 | MA-13 | (OPTIONAL) LAUNCH DAVIT SHEAVES | 2 | ea | ||||
| 0104 | MA-14 | BALLAST TANKS, VOIDS SUCTION PIPES REPLACEMENT | 1 | jb | ||||
| 0105 | MA-15 | INSTALL NEW CENTERWELL GIMBAL WINCH GEARBOX | 1 | jb | ||||
| 0106 | MA-16 | MARINE SANITATION DEVICE REPLACEMENT | 1 | jb | ||||
| 0107 | MA-17 | VALVE REACH RODS | 1 | jb | ||||
| 0108 | MA-18 | TATE TEMCO VALVE MANIFOLDS | 1 | jb | ||||
| 0109 | MA-19 | (OPTIONAL) RENEW ADJUSTABLE WEIR SEALS | 2 | EA | ||||
| 0110 | EE-1 | Ship Service And Emergency Switchboard Maintenance | 1 | jb | ||||
| 0111 | EE-2 | Prime Mover Controls Setup and Sea Trials | 1 | jb | ||||
| 0112 | EE-3 | HEAT LAMPS FOR MOTORS | 1 | jb | ||||
| 0113 | EE-4 | POWER PANEL INSPECTIONS | 1 | jb | ||||
| 0114 | EE-5 | SHIP SERVICE GENERATORS MAINTENANCE | 1 | jb | ||||
| 0115 | EE-6 | MAX SPEED CONTROLLER MAINTENANCE | 1 | jb | ||||
| 0116 | EE-7 | DREDGE PUMP MOTORS AND GENERATORS | 1 | jb | ||||
| 0117 | EE-8 | MOTOR/GENERATOR SETS | 1 | jb | ||||
| 0118 | EE-9 | DRAGARM WINCH MOTORS | 1 | jb | ||||
| 0119 | TR-2 | Dock Trials | 1 | jb | ||||
| 0120 | Growth Rate (Optional) | 2000 | hr | |||||
| This labor hourly rate shall be used in pricing all | ||||||||
| contract changes in accordance with the clause of | ||||||||
| Section H-2A entitled "COMPOSITE LABOR HOUR RATE FOR | ||||||||
| CONTRACT CHANGES." | ||||||||
| NOTE: This bid schedule includes an estimated quantity for | ||||||||
| evaluation purpose only.Actual hours may be lower or higher. | ||||||||
| 0121 | Percent Mark-Up (%) | % | ||||||
| The percent mark-up applies only to materials, parts, | ||||||||
| and sub-contract service in growth work only. | ||||||||
| NOTE: This percentage will be evaluated for reasonableness | ||||||||
| Total | $ - 0 |
Mandatory $ - 0
Optional $ - 0
&"Courier New,Regular"&12B-&P
Sheet2
File details come from the government source that posted it. Updated .