This solicitation requests bids for the dry-docking and repair of the dredge Wheeler. The vessel is an all-steel, sea-going hopper dredge measuring 408 feet in length, 384 feet between perpendiculars, with a breadth of 78 feet molded and 82 feet at the wheelhouse catwalks. The solicitation is a total small business set-aside issued by the Department of the Army Corps of Engineers Engineering District New Orleans. Bids are due by August 13, 2020.

The scope of work includes dry-docking the vessel, cleaning and inspecting components including the hull, anchors and chains, sea valves, hopper doors, and machinery systems. Repairs and replacement are specified for items such as plating, inserts, valves, pipes, pumps, electrical systems, insulation, and coatings. The contractor must have a drydock capable of handling the vessel's draft of 22 feet aft and 18 feet forward without removing fuel or water. The work must be completed within 80 days of vessel delivery, which is scheduled for October 10, 2020.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P820B0061

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0008 is the follow ing:

1) Please see the continuation page for further details. Thank you.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 203

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0061

X 9B. DATED (SEE ITEM 11)

13-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2020

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

C-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0008 CONTINUATION PG

GOVERNMENT RESPONSES TO INDUSTRY QUESTIONS

AMENDMENT 0008

SOLICITATION #: W912P820B0061

DATE: 11 SEPTEMBER 2020

1) INDUSTRY QUESTION: Is a bid bond required? Page C-13 last paragraph, Bid Bonds (Offer Guarantee) – What amount is the bond supposed to be? The full amount of the bid or a percentage?

GOVERNMENT RESPONSE: There is No Requirement for a Bid bond.

2) INDUSTRY QUESTION: If so, at what value?

GOVERNMENT RESPONSE: There is No Requirement for a Bid bond.

BID CONFERENCE CALL IN NUMBER.

Participant Access Information Toll-Free: 844-767-5651 Access Code: 684772

Participants may start dialing in 15 minutes before the Conference Start Time.

SCOPE REVISIONS

The Revisions made to the following sections of the scope: 0001 DD-1 BERTHAGE, DRYDOCKING AND SERVICES / F-l DELIVERY OF VESSEL.

C-3

For situational awareness, the revised version of:

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JUL 2020)

Can be found after the Scope Revisions.

DREDGE WHEELER DRY-DOCK REPAIRS FOR 2020

TABLE OF CONTENTS

PART 1 – GENERAL INFORMATION AND REQUIREMENT

GN-1 WORK TO BE DONE (Information)------------------------ C-6 GN-2 VESSEL DATA (Information) --------------------------- C-6 GN-3 AS-BUILT DRAWINGS (Information) --------------------- C-6 GN-4 INTERFERENCE AND LOAD SUPPORT (Information)---------- C-6 GN-5 TECHNICAL SERVICE REPRESENTATIVES (Information) ----- C-7 GN-6 GAS-FREEING AND GAS-FREE CERTIFICATE (Information)--- C-8 GN-7 CONTRACT DRAWINGS (Information) --------------------- C-8

PART 2 – DRYDOCKING & REPAIR

DD-1 BERTHAGE, DRYDOCKING AND SERVICES ------------------- C-14

DD-2 SEA CHESTS AND GRATINGS ----------------------------- C-25

DD-3 SEA CHEST STRAINERS --------------------------------- C-25

DD-4 SEA VALVES ------------------------------------------ C-26

DD-5 ANCHORS AND ANCHOR CHAINS --------------------------- C-31

DD-6 (OPTIONAL) HOPPER DOORS ----------------------------- C-31

DD-6.1 (OPTIONAL) HOPPER DOOR TOP INSERT PLATES RENEW ----- C-34

DD-6.2 (OPTIONAL) HOPPER DOOR SIDE PLATES RENEW ----------- C-34

DD-6.3 (OPTIONAL) HOPPER DOOR FWD & AFT PLATES RENEW ------ C-35

DD-6.4 (OPTIONAL) HOPPER DOOR (3/4 inch) HINGE PLATE BUSHINGS ----------------------------------------------------------- C-35 DD-6.5 (OPTIONAL) HOPPER DOOR (1-3/4 inch) HINGE PLATE BUSHINGS ----------------------------------------------------------- C-36 DD-6.6 (OPTIONAL) HOPPER DOOR 3/4 inch HINGE PLATE REPLACEMENT ----------------------------------------------------------- C-36

DD-6.7 (OPTIONAL) BEARING POT REPLACEMENT ----------------- C-37

DD-6.8 (OPTIONAL) BEARING POT BUSHINGS -------------------- C-38

DD-6.9 (OPTIONAL) HOPPER DOOR PAD EYE BUSHING ------------- C-38

DD-6.10 (OPTIONAL) TOP BUSHINGS ON LOWER PUSH-PULL RODS WITH EYE

----------------------------------------------------------- C-38

C-4

DD-6.11 (OPTIONAL) TOP BUSHINGS ON LOWER PUSH-PULL ROD WITH FORK

----------------------------------------------------------- C-39

DD-6.12 (OPTIONAL) BOTTOM PIPE BUSHINGS ON THE LOWER

PUSH PULL RODS -------------------------------------------- C-39

DD-6.13 (OPTIONAL) REPLACEMENT OF 7 HOPPER DOOR SEALS ----- C-40

DD-6.14 (OPTIONAL) HOPPER DOOR UPPER ROD LOWER GUIDE

PIPE SUPPORT REPLACEMENT ---------------------------------- C-44

DD-6.15 (OPTIONAL) HOPPER DOOR UPPER ROD LOWER GUIDE BLOCK

REPAIR ---------------------------------------------------- C-45

DD-6.16 (OPTIONAL) HOPPER DOOR UPPER ROD UPPER GUIDE

BLOCK REPAIR ---------------------------------------------- C-45

DD-6.17 (OPTIONAL) HOPPER DOOR UPPER ROD NEW SLEEVE

INSTALLATION (AT LOWER GUIDE) ----------------------------- C-46

DD-7 ZINC ANODES ----------------------------------------- C-46

PART 3 – HULL AND HOUSE

HH-1 HOPPER BAY INSPECTION -------------------------------- C-48

HH-2 HOPPER BAY PLATING REPAIRS (INFORMATION) ------------- C-49

HH-2.1 ATHWARTSHIP INSERTS -------------------------------- C-50

HH-2.1.1 (OPTIONAL) --------------------------------------- C-50

HH-2.1.2 (OPTIONAL) --------------------------------------- C-50

HH-2.1.3 (OPTIONAL) --------------------------------------- C-50

HH-2.1.4 (OPTIONAL) --------------------------------------- C-50

HH-2.2 LONGITUDINAL INSERTS ------------------------------- C-50

HH-2.2.1 (OPTIONAL) --------------------------------------- C-50

HH-2.2.2 (OPTIONAL) --------------------------------------- C-51

HH-2.3 (OPTIONAL) LONGITUDINAL REINFORCED PLATE IN VOIDS -- C-51

HH-3 (OPTIONAL) HOPPER BAY SLOPED PLATES WELD SEAM REPAIR – C-51

HH-4 (OPTIONAL) WING VOIDS INTERIOR WELD SEAM REPAIR ------ C-52

HH-5 (OPTIONAL) CENTERWELL BULKHEAD WELD SEAMS REPAIR ----- C-52

HH-6 (OPTIONAL) HOPPER WELD SEAM REPAIR (VARIOUS LOCATIONS) C-53

HH-7 CENTERWELL VERTICAL BEAMS & STRINGER REPLACEMENT

(INFORMATION)

----------------------------------------------------------- C-53

HH-7.1 (OPTIONAL) LARGE VERTICAL T-BEAM SECTION ----------- C-54

HH-7.2 MEDIUM VERTICAL T-BEAM SECTION --------------------- C-54

HH-7.3 SMALL VERTICAL T-BEAM SECTION (ABOVE STRINGER) ----- C-55

HH-7.4 SMALL VERTICAL T-BEAM SECTION (BELOW STRINGER) ----- C-55

HH-7.5 STRINGER PLATE SECTION ----------------------------- C-55

HH-7.6 CENTERWELL AFT BULKHEAD REPAIRS -------------------- C-56

HH-8 (OPTIONAL) ULTRASONIC THICKNESS MEASUREMENTS --------- C-56

HH-9 COVER FOR STACKS ------------------------------------- C-57

HH-10 (OPTIONAL) SERVICES OF MACHINIST (OUTSIDE) ---------- C-57

HH-11 (OPTIONAL) MACHINING -------------------------------- C-57

C-5

HH-12 WELDING (Information) ------------------------------- C-57

HH-12.1 (OPTIONAL) MILD STEEL WELDING --------------------- C-57

HH-12.2 (OPTIONAL) LOW HYDROGEN WELDING ------------------- C-57

HH-12.3 (OPTIONAL) STAINLESS WELDING ---------------------- C-58

HH-12.4 (OPTIONAL) INSPECTION OF WELDS -------------------- C-58

HH-12.5 REPAIR CRACK ON CRANE SUPPORT RAIL ---------------- C-58

HH-13 BALLAST TANKS, VOIDS, AND COFFERDAMS ---------------- C-58

HH-14 DIRTY LUBE OIL TANK, OILY BILGE TANK, & SLUDGE TANK - C-61

HH-15 FUEL OIL TANKS -------------------------------------- C-62

HH-16 FUEL OIL VENT CONTAINMENTS -------------------------- C-63

HH-17 PROTECTION, CLEANING, AND SURFACE PREPARATION ------- C-63

HH-17.1 PROTECTION ---------------------------------------- C-63

HH-17.2 CLEANING AND SURFACE PREPARATION ------------------ C-65

HH-17.3 EXTERIOR SURFACES PREPARATION --------------------- C-65

HH-17.3.1 SEACHEST & BOW THRUSTER TUNNEL & GRATINGS, ROPE

GUARD/INSPECTION COVERS/COMPRESSION RINGS, HOPPER DOOR

PLATINGS, HOPPER DOORS ------------------------------------ C-65

HH-17.3.2 HULL, KEEL TO LIGHT LOAD LINE

(INCLUDING CENTERWELL PLATING) ---------------------------- C-66

HH-18 (OPTIONAL) BLAST AND PAINT HOPPER DECK & ASSOCIATED

COMPONENTS ------------------------------------------------ C-66

HH-19 POOP DECK WINCHES DECK PLATES REPLACEMENT ----------- C-66

HH-20 BLAST AND PAINT NO. 7 PORT, STARBOARD, CENTER BALLAST

TANKS AND OILY BILGE TANK --------------------------------- C-70

HH-21 INSERT PLATING ON TRANSOM AND AFT SHELL PLATING POOP DECK

LEVEL ----------------------------------------------------- C-71

HH-22 INSERT PLATING ON PORT SIDE CURTAIN HELO DECK ------- C-72

HH-23 INSERT PLATING ON HOPPER COAMING FRAME 61 ----------- C-73

HH-24 DECK PLATING UPPER DECK #2 STARBOARD VOID ----------- C-73

HH-25 SHELL PLATE INSERT FRAME 60 STARBOARD UPPER DECK ---- C-75

HH-26 PUMP MOTOR ROOM HATCH STEEL REPAIRS ----------------- C-76

HH-27 HOPPER BAY PLATING REPAIRS (INFORMATION) ------------ C-77

HH-27.1 BULKHEADS FRAME 61 -------------------------------- C-79

HH-27.2 BULKHEADS & SLOPED PLATES FRAME 114 (PORT & STARBOARD)

----------------------------------------------------------- C-81 HH-27.3 CENTERWELL BULKHEADS at SLOPED PLATES(PORT & STARBOARD) ----------------------------------------------------------- C-84

HH-28 HOPPER BAY TRANSVERSE BEAMS, UPPER DECK LEVEL

(INFORMATION)

----------------------------------------------------------- C-85

HH-28.1 HOPPER BAY TRANSVERSE BEAMS REPLACEMENT (FIRST HOPPER

AREA – FRAME 61 TO 83) -----------------------------------------

-- C-86

C-6

HH-28.2 HOPPER BAY TRANSVERSE BEAMS REPLACEMENT – BOX SHAPE

BEAMS (FRAME 83-84) – PORT & STARBOARD -------------------------

- C-88

HH-28.3 (OPTIONAL) HOPPER BAY TRANSVERSE BEAMS REPLACEMENT – I

BEAMS (FRAME 87-114) – PORT & STARBOARD ------------------------

- C-90

HH-29 ANGLE BRACKETS FOR CENTERWELL DRAGHEAD -------------- C-92

PART 4 – MACHINERY: PROPULSION SYSTEMS

MP-1.1 PROPELLER HYDRAULIC SYSTEM INSPECTION -------------- C-93

MP-2 RUDDER STOP PORT & STARBOARD ------------------------- C-94

MP-3 BOW THRUSTER SYSTEM. (INFORMATION) ------------------- C-94

MP-3.1 BOW THRUSTER SYSTEM INSPECTION AND MAINTENANCE ----- C-94

MP-4.1 RUDDER STOCK & PINTLE PIN CLEARANCES (PORT & STARBOARD)

----------------------------------------------------------- C-96

PART 5 – MACHINERY: DREDGING SYSTEMS

MD-1 SLUICE VALVES. (INFORMATION) ------------------------- C-97

MD-1.1 SLUICE VALVE INSPECTION ---------------------------- C-97

MD-1.2 SLUICE VALVE RING REPLACEMENT. (INFORMATION) ------- C-97

MD 1.2.1 (OPTIONAL) SLUICE VALVES 18-INCH DIA. ------------ C-98

MD 1.2.2 (OPTIONAL) SLUICE VALVES 24-INCH DIA. ------------ C-98

MD 1.2.3 (OPTIONAL) SLUICE VALVES 26-INCH DIA. ------------ C-98

MD-1.2.4 (OPTIONAL) SLUICE VALVES 30-INCH DIA. ------------ C-98

MD-1.2.5 (OPTIONAL) SLUICE VALVES 32-INCH DIAMETER--------- C-98

MD-1.2.6 (OPTIONAL) SLUICE VALVES 43-INCH DIAMETER--------- C-98

MD-1.3 (OPTIONAL) COLLECTION VALVE GATE REPAIR ------------ C-98

MD-1.4 COLLECTION VALVE FLUSHING LINES AND BODY CLEANING -- C-99

MD-2 REPAIRS TO PORT #12 30 INCH SLUIVE VALVE ------------- C-99

MD-3 DREDGE PIPES & VALVES IN VOIDS REPLACEMENT ----------- C-

MD-4 REPAIR CENTER DRAGARM COMPONENTS --------------------- C-

MD-5 REPAIR CENTER DRAGARM HOISTING BLOCKS ---------------- C-

MD-6 REPAIR HOLE IN SLUICE VALVE 2F PORT ------------------ C-

PART 6 – MACHINERY: AUXILIARY SYSTEMS

MA-1 MAIN PLATE COOLERS, CLEANING AND INSPECTION & PIPES

REPLACEMENT (PORT & STARBOARD) ---------------------------- C-

MA-2 DRAIN, FLUSH, REFILL, and TREAT FRESHWATER SYSTEM ---- C-

C-7

MA-3 CLEAN TWO FRESH WATER EXPANSION TANKS ---------------- C-

MA-4 PORT & STARBOARD AC CHILLED WATER UNITS REPLACEMENT AND AMR

DECK PLATES REPLACEMENT ----------------------------------- C-

MA-5 SEA VALVE #21 PIPING AND FLANGE RENEWAL -------------- C-

MA-6 (OPTIONAL) INSULATION REPLACEMENT THROUGHOUT AMR ----- C-

MA-7 REPLACE 9 WINCHES WIRE ROPES ------------------------- C-

MA-8 CENTERWELL SWELL COMP CYLINDER ----------------------- C-

MA-9 REPLACE DRAIN PIPING FROM GALLEY --------------------- C-

MA-10 NEW OVERHEAD INSULATION ON POOP & UPPER DECK PASSAGEWAYS

----------------------------------------------------------- C-

MA-11 NEW INSULATION INSTALLATION (ROPE STOWAGE & BOATSWAIN

STORES ---------------------------------------------------- C-

MA-12 POTABLE WATER SYSTEM -------------------------------- C-

MA-13 (OPTIONAL) LAUNCH DAVIT SHEAVES --------------------- C-

MA-14 BALLAST TANKS, VOIDS SUCTION PIPES REPLACEMENT ------ C-

MA-15 INSTALL NEW CENTERWELL GIMBAL WINCH GEARBOX --------- C-

MA-16 MARINE SANITATION DEVICE REPLACEMENT ---------------- C-

MA-17 VALVE REACH RODS ------------------------------------ C-

MA-18 TATE TEMCO VALVE MANIFOLDS -------------------------- C-

MA-19 RENEW ADJUSTABLE WEIR SEALS ------------------------- C-

PART 7 – ELECTRICAL

EE-1 DREDGE WHEELER SHIP SERVICE AND EMERGENCY SWITCHBOARD

MAINTENANCE ----------------------------------------------- C-

EE-2 PRIME MOVER CONTROLS SETUP AND SEA TRIALS ------------ C-

C-8

EE-3 HEAT LAMPS FOR MOTORS -------------------------------- C-

EE-4 POWER PANEL INSPECTIONS ------------------------------ C-

EE-5 SHIP SERVICE GENERATOR MAINTENANCE ------------------- C-

EE-6 MAX SPEED CONTROLLER MAINTENANCE --------------------- C-

EE-7 DREDGE PUMP MOTORS AND GENERATORS -------------------- C-

EE-8 MOTOR/GENERATOR SETS --------------------------------- C-

EE-9 DRAGARM WINCH MOTORS --------------------------------- C-

PART 8 – DOCK TRIAL

TR-1 GENERAL. (Information) ------------------------------- C-

TR-2 DOCK TRIALS ------------------------------------------ C-

PART 9 – QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) ------- C-

SECTION D

D-1 PACKING – UNUSED GOVERNMENT FURNISHED PROPERTY ------- D-1

D-2 MARKING ---------------------------------------------- D-1

SECTION E

E-l GENERAL INSPECTION AND TESTS - QUALITY CONTROL

AND QUALITY ASSURANCE ------------------------------------- E-1

E-2 DETAILED INSPECTIONS AND CONDITION REPORTS ----------- E-3

E-3 QUALITY OF ARTICLES, MATERIALS AND EQUIPMENT --------- E-3

SECTION F

F-l DELIVERY OF VESSEL ----------------------------------- F-1

F-2 RETURN OF THE VESSEL --------------------------------- F-1

F-3 DELIVERY SCHEDULE ------------------------------------ F-1

F-4 COMMENCEMENT, EXECUTION AND COMPLETION --------------- F-1

F-5 SCHEDULE AND PROGRESS OF WORK ------------------------ F-2

F-6 PROTECTION OF MATERIAL & WORK ------------------------ F-2

F-7 WORKMANSHIP ------------------------------------------ F-4

F-8 GOVERNMENT-APPROVED HYDRAULIC SHOP ------------------- F-6

C-9

F-9 APPROVAL CRITERIA ------------------------------------ F-6

SECTION G

CONTRACT ADMINISTRATIVE DATA ------------------------------ G-1

SECTION H

H-1 MANDATORY ITEMS -------------------------------------- H-1

H-2 OPTIONAL ITEMS --------------------------------------- H-1

H-2A COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES ------- H-1

H-3 ACCIDENT PROTECTION ---------------------------------- H-2

H-4 NOT USED --------------------------------------------- H-7

H-5 CONTRACTOR'S ESTIMATOR ------------------------------- H-10

H-6 WORK PERFORMED BY THE GOVERNMENT --------------------- H-10

H-7 GOVERNMENT-FURNISHED PROPERTY ------------------------ H-10

H-8 NOT USED --------------------------------------------- H-10

H-9 CHANGES TO CONTRACT ---------------------------------- H-11

H-10 ACCESS TO VESSEL ------------------------------------- H-11

H-11 INSURANCE -------------------------------------------- H-11

H-12 SHIP'S CREW ------------------------------------------ H-11

H-13 INDEMNIFICATION FOR ACCESS TO VESSELS ---------------- H-11

H-14 NON-SMOKING AREAS ------------------------------------ H-12

H-15 SECURITY CLAUSES ------------------------------------- H-12

C-10

PERFORMANCE WORK STATEMENT

PART 1 - GENERAL INFORMATION AND REQUIREMENT

GN-1. WORK TO BE DONE. (Information). The Contractor shall furnish all management, supervision, labor, subcontracting services of manufacturer's representatives and all facilities, utilities, equipment, tools, lubricants, fuels, materials and articles (excluding Government furnished property) necessary to fully execute the work items specified herein.

GN-2. VESSEL DATA. (Information). The dredge WHEELER is an all-steel, sea-going hopper dredge. The dimensions of the hull are:

Length Overall 408 feet -3 inches Length Between Perpendiculars 384 feet -0 inches Breadth Molded 78 feet -0 inches Breadth at Wheelhouse Catwalks 82 feet -0 inches Registered Gross Tonnage 10,614.47 long tons Lightship Displacement 9,846.25 long tons Ballast, Fuel and Water 600 long tons (approx.)

GN-3. AS-BUILT DRAWINGS (Information). Within 10 days after completion of the Contract, furnish reproducibles reflecting "as-built" conditions for all new structures, piping, machinery or equipment installed under the contract. For those items where the specifications call for alterations or modifications to the existing equipment, machinery, piping or structures, the Government will furnish the as-built reproducibles and the Contractor will revise the drawings to indicate the "as-built" alteration or modification. The latter group of drawings will also be due within 10 days. All costs incurred for this work will be included in the bid price for the respective item of work.

GN-4. INTERFERENCE AND LOAD SUPPORT (Information). Remove and reinstall any interference required to accomplish the work specified without additional contract time or cost to the Government. Interference is defined as any part of the vessel, whether installed or portable, that must be removed or disturbed to accomplish the work specified. Approval shall be obtained from Contracting Officer Representative prior to disconnecting piping or other vessel services. Drain lines shall be by-passed or diverted to prevent damage by flooding. All damaged or missing fasteners shall be replaced with fasteners of the same

C-11 type as original. New gaskets, packing and seals shall be installed on all disturbed connections and proven leak free.

Damaged lagging and insulation shall be repaired or replaced.

All new work or disturbed existing interferences shall be cleaned and painted in accordance with this specification or applicable line item of ASI drawing 19-01-01. Upon reinstallation, all interferences shall be returned to their original operational condition and position. During disassembly and removal process, the Contractor shall provide support for or secure as necessary the remaining items or sections, i. e.

dragarms, dredge piping, davits, walkways, trunnions, service frames, adjustable weirs, steel structures, etc. All costs incurred on these interferences and load support shall be included in the bid price for the respective item of work.

GN-5. TECHNICAL SERVICE REPRESENTATIVES (Information). There are several items which require the work to be accomplished under the supervision of a specific technical service representative, which will be provided by the Contractor.

However, utilization of the specified representative is not mandatory. The Contractor may elect to procure the services of another individual or firm that has the necessary technical qualifications, experience or expertise. The name of the individual or firm and the qualifications, expertise or experience relative to the work to be accomplished shall be submitted to the Contracting Officer Representative for approval prior to starting the work. The Contractor remains solely responsible for the satisfactory completion of all work and the reliable operation of all systems specified herein. The cost of these representatives will be included in the bid price for the respective item(s) of work.

A daily report will be prepared by each technical service representative and submitted directly to the Contracting Officer Representative within 24 hours. The report will be the responsibility of the technical service representative, and will describe conditions noted with recommendations for corrective action, all work performed that day, parts used and any additions or modifications made to the existing equipment. If the Contractor requires any reports in addition to these, the Contracting Officer Representative will be furnished a copy of the reports.

C-12

The representatives listed below have the necessary technical qualifications, experience and expertise and are recommended for any applicable items in which they are specified:

a. PROPULSION SYSTEMS INC.

Propulsion Systems, Inc.

609 NW 45TH Street Seattle, WA. 98107

(206) 789-0944

b. HYDRAULIC TECHNICIAN Local Hydraulic Contractor See Section F, paragraph F-8.

c. HERBERT HILLER (Fire Fighting System) Local or regional office

d. ROLLS – ROYCE (Previouly Bird-Johnson - Bow Thruster System)

Rolls-Royce Naval Marine Inc. (or any regional offices) 110 Norfolk Street Walpole, MA 02081

(508) 668-9610

e. ALFA LAVAL INC.

Northwoods Industrial Park

12249A FM 529

Houston, TX 77041

(832) 594-9338

GN-6. GAS-FREEING AND GAS-FREE CERTIFICATE. (Information).

Before beginning any hot work or any other work involving the use of an open flame, or any other means of igniting flammables, clean and gas-free the affected spaces as required by Clause 5(e), OSHA Safety and Health Standards (29 CFR 1915), and these specifications. Spaces requiring the gas-freeing shall be "Safe For Workers - Safe for Fire (Safe for Hot Work)".

Until all hot work or all other work involving the use of an open flame or any other means of igniting flammables is completed, maintain the affected spaces in a "Safe For Workers - Safe For Fire" condition.

C-13

Test affected spaces. Testing and certification shall be accomplished by a certified chemist who is approved for this type of work by the National Fire Protection Association.

Furnish and display at the entrance to the affected spaces and at the primary gangway "Gas-free " or "Safe for Workers - Safe for Fire (Safe for Hot Work)" certificate(s). Furnish to the Contracting Officer Representative one additional copy.

The cost of testing, providing gas-free certificate(s), and physically gas freeing affected spaces shall be included in and proportioned among the bid prices for each item of work requiring cleaning and gas-freeing of a compartment.

GN-7 CONTRACT DRAWINGS (INFORMATION)

The work shall conform to the following contract drawings, all of which form a part of these specifications and are available on the web through www.fbo.gov. All drawings are available in electronic form (PDF files or other Word scannings files). There will be no hard copies of drawings (bluelines, xerox, etc.) to be sent out.

AVONDALE SHIPYARD (ASI) DRAWINGS

Dwg. No. Title

01-03-01 General Arrangement, Outboard Profile 01-03-02 General Arrangement, Inboard Profile 01-03-03 General Arrangement, Hold 01-03-04 General Arrangement, Second Deck 01-03-05 General Arrangement, Main Deck 01-03-06 General Arrangement, Upper Deck 01-03-07 General Arrangement, Poop, Fo'c'sle and Top of

Hopper 01-03-08 General Arrangement, Boat Dk, Bridge Dk and Upper

Bridge Dk 01-03-09 General Arrangement, Navigating Dk, Pilothouse and Top of pilothouse 07-00-01 Docking Plan 11-01-01 Shell Expansion – FR 61 – 114 11-01-02 Shell Expansion – AFT FR. 61 11-01-03 Shell Expansion – FWD. FR. 114 11-01-08 Hull Inserts for Dragarm Trunnion

C-14

11-02-01 Tank Top Plating & Framing Frs. 114-149(Sht 1 of 2) 11-02-012 Tank Top Plating & Framing Frs. 114-149(Sht 2 of 2) 11-02-02 Tank Top Plating & Framing Frs. 61-114 11-02-03 Tank Top Plating & Framing Frs. 16-61 11-03-01 Forepeak Framing 11-03-02 Aftpeak Framing 11-03-05 Transverse Floor Fr 16-61 (sheet 1) 11-03-052 Transverse Floor Fr 16-61 (sheet 2) 11-03-06 Transverse Webs Frs 61-114 11-04-03 CVK & Girders Fr 16-61 11-04-04 Shell Long Fr 34-149, sht. 1 11-04-042 Shell Long Fr 34-149, sht. 2 11-04-08 Hopper Well Center Keelson 11-04-09 Hopper Well Side Keelson 11-04-10 Hopper Well Cross Keelson 11-05-01 Transverse Blkds Frs 28, 40, 61 11-05-02 Transverse Blkds Frs 84,114 & 132-136 11-05-03 Transverse Blkds Frs 67, 77, 98 11-05-04 Center Well Bulkheads (Sheet 1) 11-05-042 Center Well Bulkheads (Sheet 2) 11-05-06 Bhds Below Poop & Foscle Deck 11-05-07 Long’l Bhds Frs. 114-149 11-05-08 Long’l Bhds Frs. 61-114 11-06-01 Hopper Coaming 11-06-02 Forecastle Deck Plating & Framing 11-06-03 Upper Deck Plating & Framing – Frs. 114-149 11-06-04 Upper Deck Plating & Framing – Frs. 16-61 11-06-05 Poop Deck Plating & Framing 11-06-06 30’-6” Flat Plating & Framing Frs. 16-61 11-06-07 19’-2” Flat Plating & Framing Frs. 16-61 11-06-08 19’-2” Flat Frs. 114-149 11-06-09 30’-6” Flat Frs 114-149 11-06-10 Boat Deck Pltg & Blhd below 11-06-11 Bridge Deck Pltg & Frms Below 11-06-16 Upper Deck Plating & Framing – Frs. 61-114 11-06-17 30’-6” Flat Plating & Framing Frs. 61-114 11-06-18 19’-2” Flat Plating & Framing 11-07-02 Stack 11-11-01 Midship Section 11-13-01 Foundations Booklet 11-18-012 Profile Long’s Bhds 11-18-015 Shell Expansion – Scantlings

C-15

16-02-01 Hatch, Manhole & Scuttle List 16-02-14 Interior Joiner Doors 19-01-01 Painting Schedule 19-06-01 Zinc Anodes Arrgt. and Details 22-01-01 Rudder 22-01-02 Rudder Support System 22-01-03 Steering Gear Foundations 26-05-01 Anchor Handling System Arrgt. & Dets.

28-03-01 Ship's Name, Hailing Port, Hull Marking &

Insignia 29-01-01 Capacity Plan 29-01-03 Sounding and Ullage Tables 29-01-08 Stability Booklet (year 2013) 29-06-01 Joint Welding Details 33-01-01 Joiner Arrangements 33-01-06 Floating Decks, Upper Deck, Arrgt. & Dets.

33-01-07 Typical Joiner Details 33-01-20 Fixed Light Casings 33-01-26 Misc. Joiner Items 33-01-31 Access Panels 33-01-32 Ceiling Arrgt.

38-02-20 Diagram Air Cond Chilled Water System 38-02-21 Chilled Water Arrangements 38-02-211 Chilled Water Arrgt LM 38-02-212 Chilled Water Arrgt PD 38-10-09 HVAC General Notes – Construction Details 38-10-13 HVAC Arrangements – Fan Rooms 38-10-18 HVAC Arrgt – Details Poop Deck 38-10-19 HVAC Arrgt – Details Upper Deck 39-01-01 Insulation Schedule Piping & Machinery 39-01-02 Sheet Metal Sheating, Arrgt. & Dets.

39-01-08 Joiner Insulation, Arrgt. & Dets.

43-02-01 Stern Tube & Rope Guard Details 48-00-01 Standard Pipe Hanger Details 48-00-10 Piping Material Schedule 48-01-10 Diagram Bilge, Ballast, Bilge Management & Vacuum Priming 48-01-11 Bilge & Ballast System Aft Fr. 61 48-01-111 Bilge & Ballast System Aft Fr. 61 L/M 48-01-112 Bilge & Ballast System Aft Fr. 61 P/D 48-01-12 Bilge & Ballast Piping – Fwd Fr 114 48-01-121 Bilge & Ballast Piping – Fwd Fr 114 L/M 48-01-122 Bilge & Ballast Piping – Fwd Fr 114 P/D 48-01-13 Bilge & Ballast Piping – Fr 114-61

C-16

48-03-10 Diagram Fireman System 48-03-12 Fireman – Fwd Fr. 61 48-03-121 Fireman – Fwd Fr. 61 L/M 48-03-122 Fireman – Fwd Fr. 61 P/D 48-04-10 Diagram Potable Water System 48-04-11 Hot & Cold Potable Water Arrangement 48-04-111 Potable Water LM 48-04-112 Potable Water PD 48-04-20 Diagram Fresh Water Cooling System 48-04-23 Fresh Water Cooling – Aft Fr. 61 48-04-24 Fresh Water Cooling – Fwd Fr. 61 48-05-10 Diagram Seawater Service System 48-05-11 S.W. Cooling – Aft Fr. 61 48-05-111 S.W. Cooling – Aft Fr. 61 L/M 48-05-112 S.W. Cooling – Aft Fr. 61 P/D 48-05-12 S.W. Cooling – Fwd. Fr. 61 48-05-121 S.W. Cooling – Fwd Fr. 61 L/M 48-05-122 S.W. Cooling – Fwd Fr. 61 P/D 48-08-11 Internal Gravity Deck Drains 48-08-15 Diagram Vacuum Sewage System 48-08-16 Vacuum San. Drains Arrgt.

48-09-10 Diagram Vents, Sounding Tubes and Overflows 48-09-11 Vents, Sounds, Overflows, Fwd Fr. 114 48-09-111 Vents, Sounds, Overflows, Fwd Fr. 114 LM 48-09-112 Pipes PD-36-37-49 48-09-12 Vents, Sounds & Overflows Fr. 114 – Fr. 61 48-09-121 Vents, Sounds & Overflows Fr. 114 – Fr. 61 L/M 48-09-122 Vents, Sounds & Overflows Fr. 114 – Fr. 61 P/D 48-09-13 Vents, Sounds, Overflows, Aft Fr. 61 48-09-131 Vents, Sounds, Overflows, Aft Fr. 61 LM 48-17-25 Jetting & Washdown System 48-17-251 Jetting & Washdown System LM 48-17-252 Jetting & Washdown System PD 48-23-01 Sea Chests 48-23-07 Shell Penetrations & Sea Valve List 48-24-06 Schedule of Power Operated Valves Mech. Std. 35 Pipe Joint Preparation and Welding Details

DREDGE TECHNOLOGY CORP. DRAWINGS

Dwg. No. Title

70006-0358-001 Specification Rubber Gasket Flanges 70006-2700-001 List of Bolts for Suction and Delivery

C-17

70006-2725-003 Straight Pipe for Collection Line Pump Room 70006-2725-005 General Arrangement of Collection Lines in

Hopper 70006-2725-006 Branch Pipes for Collection Lines in Hopper 70006-2725-008 Straight Pipes for Collection Lines in

Hopper 70006-2725-009 Hopper Suction Inlet 70006-2730-002 Bends in Delivery Lines in Pump Room 70006-2730-003 Bulkhead Passings in Pump Room 70006-2730-006 Adjusting Pipes for Delivery Lines in Pump

Room 70006-4013-901 Gen. Arr. Of Hopper Doors and Actuating

Mechanism 70006-4013-902 Hopper Doors 70006-4013-903 Hopper Doors-Hull Connections 70006-4013-904 Assembly and Details, Hopper Door Actuating

Mechanism 70006-4013-907 Pins and Bushings For Hopper Doors 70006-4013-910 Seals of Hopper Doors 70006-4418-901 General Arrangement of Center Dragarm 70006-4418-902 Arrangement of Upper Part Center Dragarm 70006-4418-906 Gimbal Ring for Center Dragarm 70006-4418-907 Sliding Carrier for Center Dragarm 70006-4418-908 Short Pipe with Pivot Arm for Center Dragarm 70006-4418-909 Turning Gland for Center Dragarm 70006-4418-912 Pins and Busings for Gimbal Joint Center Dragarm 70006-4418-920 Sliding Carrier for Center Dragarm Details 70006-5059-929 Grease Bolt for Center Dragarm Draghead Block 70006-6650-908 Grease Bolt for Center Dragarm Gimbal Block 70006-6650-910 Hoisting Block for Center Draghead Frame 70006-6650-919 Hoisting Block for Center Gimbal Frame 70006-6650-921 Parts for Center Gimbal Hoisting Block 70006-6650-934 Parts for Center Draghead Hoisting Block 70006-6651-903 Hoisting Block for Center Trunnion Frame 70006-6651-906 Parts for Center Trunnion Hoisting Block

MISCELLANEOUS DRAWINGS

Dwg. No. Title Manufacturer 914-433-011 Davit Arm Installation, Winch Edgewater and Misc Details

C-18

11333 HPU Technical Publication Propulsion Sys.

Inc.

22076 Shafting Arrangement Propulsion Sys.

Inc.

22385 & B/M Hydraulic Power Unit Assy. Propulsion Sys.

Inc.

22437 & B/M Servo Box Assy. Propulsion Sys.

Inc.

E080SA42097 Thruster Assembly, Model 080 Bird-Johnson With Bill of Materials E080SA49135 Hydraulic Power Unit Bird-Johnson

Goulds Pump Manual For Goulds Pump, Goulds Model 3996MT

Tate Temco Manual For Tate Temco Valve Tate Temco Manifolds

Zurn Co Gate Type Duplex Strainer Zurn 570 Series

Sketch 2 ALMO Fr 126 Sketch 3 Pump Room – Tank Top Level Sketch 4 Centerwell Beams, Port side Sketch 5 Centerwell Beams, Starboard side Sketch 8 Locations of Reach Rods WHE-MA4-1 MA-4 Deck Replacement WHE-HH30-1 Angle Brackets for Centerwell Draghead Sketch A Outline of Hopper Plates to Be Replaced, Frame 61

And Frame 114 Sketch B Outline of Hopper Plates to Be Replaced, Longitudinal Bulkheads, Frames 61-114, Port Side Sketch C Outline of Hopper Plates to Be Replaced, Longitudinal Bulkheads, Frames 61-114, Starboard Side

Sketch D Outline of Centerwell Sloped Plates to be replaced, Port Side

Sketch E Outline of Centerwell Sloped Plates to be replaced, starboard side

C-19

PERFORMANCE WORK STATEMENT

PART 2 – DRYDOCKING & REPAIR

0001 DD-1 BERTHAGE, DRYDOCKING AND SERVICES.

The contractor’s drydock must be along the East Coast or Gulf Coast of the United States.

The Dredge Wheeler is expected to be available for drydocking on or about 10 October 2020. Bidders shall submit confirmation of drydock availability within the month of October 2020. Exact drydock entry date shall be mutually agreed upon by the contractor and the government.

The Contractor shall furnish pilot service to safely move the ship from entrance channel sea buoy closest to Contractor's facility to the front of the Contractor's drydock or wetberth.

Thereafter, the Contractor shall provide the pilot and tugs services to move/escort the ship into the drydock or wet berth.

While the vessel is in his possession during the contract period, the contractor shall provide the pilot and tugs services, including multiple (if applicable) moving/escorting the ship from contractor’s drydock to contractor’s wetberth or vice versa. The contractor shall also provide pilot service when the ship departs from the contractor’s drydock or wetberth to sea buoy. Refer to Section F for details of delivery and return of the vessel. Delivery and return will be coordinated with the Contracting Officer Representative.

Delivery of vessel. The Government shall deliver the vessel to the entrance channel sea buoy closest to the Contractor's shipyard. For the purpose of computing the Contract time, the closest hour that the vessel is placed in control of the Contractor's tug boat or Pilot, or delivered by the Government to the Contractor's shipyard, shall be considered as time of commencement. Tugs and pilot service to be provided under item DD-1. (Note: The tentative scheduled date for delivery of the vessel to the contractor shall be 10 October 2020).

The time of returning the vessel to the Government shall be the closest hour after acceptance of the vessel by the Government.

Delivery schedule. The work will be completed within eighty

(80) calendar days after delivery of the dredge (F-1 and F-2) to the Contractor.

C-20

Upon receipt of the vessel, the Contractor shall drydock the vessel for such time that will be necessary to complete all underwater work included in these specifications. The time at wet-dock berthing or other prior to starting any work, shall not exceed five (5) calendar days prior to entering the drydock.

Prior to drydocking, the Contractor shall prepare a proposed blocking plan, utilizing the data on ASI Dwg. No. 07-00-01 Docking Plan, and submit the blocking plan to the Contracting Officer Representative for approval. The drydock shall be capable of handling the vessel, meeting the draft requirements listed below without the removal of fuel or water:

The following are the estimated ship’s draft at time of arrival and the drydock requirement:

The ship will arrive at the contractor drydock at the estimated draft of 22 feet Aft and 18 feet Forward.

The blocks in the drydock (graving or floating docks) must be minimum of six (6) feet high (Note: Blocks are less than 6 feet high shall not be accepted). With the Wheeler landed, the drydock (floating dock only) must have a minimum freeboard of 1 ft - 0 inch.

During drydocking and undocking process, there must be a minimum of one (1) foot clearance between the bottom of keel plate and the top of the blocks. Upon drydocking, all blocks shall be checked and wedged up for firm contact with the hull.

For safety reason, the drydock (graving or floating) must have a minimum of 10 ft clearance on each side of the ship from the side of the hull to the drydock innermost intrusion. In another words, drydock with an internal width clearance of less than 99 ft shall not be acceptable.

Floating drydocks less than 380 feet in length will not be accepted. The bow and/or stern of the ship will be allowed to overhang over the water if the floating dry dock is less than the overall length. Graving drydocks must be longer than the length of the Wheeler. The ship shall be fully supported by blocks along the length of the flat keel plate and centerline skeg plate.

If the drydock is less than the overall length of the ship, all additional costs for scaffolding, platforms or any

C-21 other means to access parts of the ship that overhang over the water shall be included in the respective line item.

Return of the vessel. Contractor shall coordinate and complete the various items of work in sufficient time to allow for aligning and starting up the support systems needed for dock trials. The contract time shall include sufficient time for the vessel to take on approximately 200,000 gallons of fuel oil and 3,000 gallons of lube oil prior to dock trials or up to 14 hours. No hot work will be allowed while fuel/oil is being transferred. After all repairs and trials are completed, the Government shall accept return of the vessel at the sea buoy where the vessel was delivered to the contractor.

Important Note: Due to the scope of work in many line items in the hopper that require foreseeable extensive usage of crane services, it is a requirement that the contractor’s drydock must have two (2) working cranes with two (2) certified crane operators during the entire contract. The contractor shall plan, resource, and execute work expeditiously through the use of 2 independent crane operations at all times. The shipyard can meet this requirement with a rented crane, all costs are to be included in this line item.

Furnish crane service complete with riggers to load and unload machinery, equipment, launch, rescue boat, stores, and supplies from/to the vessel (for government use only). Crane service shall be provided at a time mutually agreeable to the Contractor and the Government Inspector, within eight (8) hours from the time of the request. For estimate purpose, a total of 100 hours of crane service shall be used.

During the drydocking and undocking procedures while the ship is in the contractor possession, the contractor shall provide the services of a pilot, tugboats and all line handlers (aboard and ashore) and all required lines. Note: During dock trials, the contractor shall provide the service of one (1) tugboat with a minimum of 4000 HP and extra mooring lines (see sections TR-1 and TR-2 for additional information).

DRYDOCK SUBMITTALS -- Unless specified otherwise, at least forty eight (48) hours prior to docking/undocking the vessel, submit to the Contracting Officer Representative the following:

C-22

Drydock certification submittal. Prior to award of the Contract, submit to the Contracting Officer certification for the drydock or tentative drydocks to be used to lift the vessel.

Ensure that the drydock is certified for docking the vessel of the dimensions and weight given by one of the following only:

(1) US Navy, Naval Sea Systems Command

(2) American Bureau of Shipping (ABS)

(3) An independent registered Professional Engineer, who shall cover the inspection requirements of item (1) or (2) above.

The Inspection Certificate shall be within three (3) years if the age of the dock is less than ten (10) years old and within two (2) years if the age of the dock is over ten (10) years old.

Note: Floating drydocks must be one integral unit. The Government will not allow the coupling of two rated docks to meet the load requirements of the vessel. Also, the contractor shall not use the drydock to perform other work(s) on other contracts except for the work specified (or related) in this contract while the ship is in the drydock.

Certification inclusions. Regardless of the type of certification provided, submit to the Contracting Officer Representative the information regarding the docking facility, as applicable:

(1) Drainage and dewatering systems

(2) Mooring systems for floating docks

(3) Fire protection services

(4) Fire alarm locations

(5) Emergency power

(6) Emergency ballast/dewatering pumps

(7) Structural Examination with Load per Foot Rating

Stability and block loading calculations. Submit to the Contracting Officer Representative docking/undocking calculations as follows, including the effect of all dockmaster authorized weight additions/removals or shifts as the result of ship's actions or the contract scope of work.

(1) Blocking

(2) Stability of the vessel afloat

C-23

(3) Vessel Stability for keel touch

(4) Draft at Instability

(5) Vessel's GM when water is at top of blocks

(6) ** System Stability when water is at top of blocks

(7) ** System Stability when pontoon deck is awash

(8) ** System Stability when pontoon deck breaks surface

(9) ** Pumping Plan

** Submit for Floating Drydocks Only

Documentation of drydocking significant events. The Contractor shall submit the following information in a separate written report to the Contracting Officer Representative within 48 hours after docking and undocking the vessel.

The precise time that the vessel's first extremity crossed the drydock boundary upon docking. The precise time that the vessel's last extremity crossed the drydock boundary upon undocking. The forward and aft draft readings just before docking and immediately after undocking.

Manning document. Provide a list of drydocking operations which describes all stations to be manned, functions to be performed, and the experience and training qualifications of personnel carrying out each function, including casualty and damage control qualifications.

Dockmaster. The dockmaster assigned by the Contractor shall provide a resume of training and experience and meet one of the following criteria:

(1) Has served as a dockmaster at the type of facility for which the individual is qualified during at least 10 dockings or undockings, of which one has been accomplished within the previous 6 months.

(2) Has served under a dockmaster in an apprentice/assistant role during at least 20 dockings or undockings, of which 10 have been performed at the type of facility for which the individual is qualified. One docking or undocking shall have been conducted within the previous 6 months.

(3) Has served under a dockmaster in an apprentice or assistant role during at least 10 dockings or

C-24 undockings and has served as a dockmaster at the type of facility for which the individual is qualified during at least 5 dockings or undockings, of which one has been accomplished within the previous 6 months.

Immediately after drydocking, provide and install temporary scupper drains and sewage pumpout lines of suitable sizes from the drains and overboard discharge lines, as required to prevent water draining down the ship's sides. Leave temporary drain lines connected throughout drydock. Proceed to dispose of all mud and debris being removed from the following hopper areas:

longitudinal beams, transverse beams, bulkheads, discharge gratings, door seal areas, and hopper sloping hips in all hopper bins. All of the above areas shall be thoroughly cleaned and washed after removal of mud and debris. This shall be accomplished within five days of entering dry-dock. Also cut and remove all ropes, debris, rocks, and other trash, wherever located throughout hopper areas, including at all trash deflectors (aft, at frame 61), trash screens (fwd), and turtle catch cages (aft and fwd). Remove all drain lines after completion of drydock work. Also leave hoppers and hopper areas clean and leave dredge ready for undocking. The contractor shall be responsible to dispose of all sand and debris from the drydock floor. The Contractor shall be responsible for pumping all bilges, disposing of sewage treatment plant effluent and containing and/or removing and disposing any oil which may accumulate anywhere on the vessel, including the hoppers, during the course of the repair period.

INSPECTION POINT. Prior to undocking the vessel, a pre-undocking conference shall be held with representatives of the contractor, Government Inspectors, and ship’s crew in attendance. The plan for undocking shall be reviewed and agreed upon. The hazardous energy/lock out status of the ship’s equipment will be reviewed and updated at this time. A determination shall be made of what systems or equipment require tag out prior to undocking. The Contractor and a representative of the Contracting Officer will perform a joint pre-undocking inspection in accordance with the checklist provided in Section J, Attachment No. J-1, to ensure that the vessel is in all respects ready to be re-floated. The checklist shall be completed by the Contractor, verified by the Government Inspectors and submitted to the Contracting Officer Representative prior to the undocking. Undock the vessel, after

C-25 all underwater work and the pre-undocking inspection have been completed.

When necessary, while the vessel is in the Contractor’s possession, provide berthing for the vessel. The Contractor shall provide all mooring lines and fenders sufficient in strength, quantity, location and quality to prevent damage to the vessel and the dock. Provide all necessary labor, material, services and equipment as required to safely move the vessel while it is in the Contractor's facility. In addition, provide adequate protection in the case of adverse weather conditions (i.e., hurricane). This shall include, but not be limited to, providing tugs on standby (to be sufficient in quantity and size), pilot service, extra mooring lines with chafing gear and anchors aboard and ready. Provide all line handlers aboard and ashore as needed. Bollards used for the WHEELER shall not be shared with other ships.

Provide services to the dredge in accordance with the requirements below at all times while the vessel is moored or drydocked within the Contractor's facility. The Master or Senior Officer aboard the vessel must be notified whenever firefighting or damage control capabilities are reduced significantly, such as when the CO2 system is taken off line.

The Contractor shall also inform the Master or Senior Officer when these services are returned.

Services to be furnished by contractor. Costs for services are to be included in the bid price for item DD-1 (Berthing, Drydocking and Services). While the vessel is in the custody of the Contractor, the contractor shall furnish the following:

a. Power and Lighting: A continuous 480 volts A.C., 3-phase, 60 Hz source using a 3-wire system shall be supplied by the Contractor to the shore power connection boxes on the poop deck of the vessel. Shore power will be operational within 8 hours of reaching the Contractor's wet or dry dock. This system shall provide at the minimum 480 volts at 1,200 amperes at the switchboard. Shore power cables shall be of a sufficient size to carry a minimum of 1,200 amps. Placement of a skid-mounted generator onboard the ship will not be acceptable. If the Contractor fails to provide adequate electrical shore power to the dredge, the Contracting Officer or his authorized representative may stop all work until this problem is

C-26 corrected. At no time shall this be a cause for extension of contract time or additional cost to the Government.

b. Air and Water: Supply the vessel on a 24-hour, 7 day week basis with the following:

* Potable water certified for human consumption at a minimum of 100 gallons per minute at 50 psi with a relief valve set at 70 psi.

* Firemain water at a minimum of 400 gallons per minute at 110 psi with a relief valve set at 140 psi.

* Two (2) 2 inch minimum diameter fresh cooling waterlines (supply) for air conditioning and refrigeration at a minimum of 250 gallons per minute at 35 psi with a relief valve set at 60 psi. The contractor shall also provide two (2) 2 inch discharge lines to the drydock.

Notes: One (1) supply line and one (1) discharge line shall be used at all times during the entire drydock duration. The other two lines shall be reserved and shall be used by the government if extra cooling capacity is needed. All supply and discharge lines shall be provided complete with connections to the ship’s chilled water units. The contractor shall coordinate with the ship crew to route all lines.

* Dry, filtered compressed air at a minimum of 100 cubic feet per minute at 100 psi.

c. Sanitation: Furnish daily, garbage and trash collection service throughout the ship during the entire shipyard period.

Use of leak proof dumpsters shall be provided on the dredge and emptied daily. All flammable items and cuttings from job must be removed from decks and voids, and disposed of daily, including trash generated by the ship's crew. The Government Inspector shall designate the exact location of the dumpsters.

Also, furnish, install and maintain bypass lines and divert the discharges from the drains and plumbing systems overboard through hoses or pipes and fittings installed on the hull. This discharge must be diverted to an approved facility ashore and must be provided on a 24-hour a day basis.

d. Crane Service: Furnish crane service complete with riggers to load and unload machinery, equipment, launch, rescue boat, stores, and supplies from/to the vessel (for government use only).